ds-1400-1900tur

1
TUR Centraliser Data Sheet Type : Temporary Under Ream S2 Size : 14For use in : 19Cased and Open Hole or & through 17.5" Casing Details Number of bows : 6 Overall length : 21.4 External diameter ref. : 19.000 Internal diameter : 14.20 Centraliser weight : 20.5 lb. Hole size in. * Initial insertion force lbf. ** Restart force lbf. *** Run force lbf. Restoring force at 67% standoff lbf. Standoff at API Restoring force (%) 19.000 0 0 0 1575 74 17.500 983 550 550 2450 80 * Initial insertion into restricted bore based on 20° x 0.5lead in chamfer occurs once ** Restart force inside restricted bore accumulative *** Run force inside restricted bore accumulative Non-API 10D type Centraliser/hole configuration for passage through previously installed casing into oversize/under reamed OH. Note: Centek performance curve figures are corrected by deducting half the internal diameter clearance from the vertical 'Y' axis to indicate true Standoff conditions Note: It is strongly recommended that the Centek ‘LatLoad’ program is utilised for each individual under -ream situation to check acceptability of accumulative ‘Start’ loads through previously installed tubulars. "This data sheet contains proprietary information which may not be disclosed to a third party by whatsoever means without specific agreement in writing from Centek Limited" Document Number : DS-1400-1900TUR Part Number : 1400-1900TUR Issue : 12-1 Date : 05/01/12 Test Number : 528_A Image for illustration only

Upload: mang-oha

Post on 22-Nov-2015

20 views

Category:

Documents


0 download

TRANSCRIPT

  • TUR Centraliser Data Sheet

    Type : Temporary Under Ream S2

    Size : 14

    For use in : 19 Cased and Open Hole or &

    through 17.5" Casing

    Details

    Number of bows : 6

    Overall length : 21.4

    External diameter ref. : 19.000

    Internal diameter : 14.20

    Centraliser weight : 20.5 lb.

    Hole size in.

    * Initial insertion force lbf.

    ** Restart force lbf.

    *** Run force lbf.

    Restoring force at 67% standoff lbf.

    Standoff at API Restoring force (%)

    19.000 0 0 0 1575 74

    17.500 983 550 550 2450 80

    * Initial insertion into restricted bore based on 20 x 0.5 lead in chamfer occurs once

    ** Restart force inside restricted bore accumulative

    *** Run force inside restricted bore accumulative

    Non-API 10D type Centraliser/hole configuration for passage through previously installed casing into oversize/under

    reamed OH.

    Note: Centek performance curve figures are corrected by deducting half the internal diameter clearance from the

    vertical 'Y' axis to indicate true Standoff conditions

    Note: It is strongly recommended that the Centek LatLoad program is utilised for each individual under-ream

    situation to check acceptability of accumulative Start loads through previously installed tubulars.

    "This data sheet contains proprietary information which may not be disclosed to a third party by whatsoever means

    without specific agreement in writing from Centek Limited"

    Document Number : DS-1400-1900TUR Part Number : 1400-1900TUR

    Issue : 12-1 Date : 05/01/12 Test Number : 528_A

    Image for illustration only