DSM Measures in Haryana

23rd July 2014

Page 2: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Contents

Importance of DSM in case of Haryana

Load Curve of Haryana

Analysis of Load Curve

Status of Smart Grid Project

Revision iof PLEC Charges and Impact study of DHBVN

Status of MOU with BEE & EESL

DSM implementation: Objective Oriented and Sustainable Approach

DSM measures implemented in Haryana: Projects and Coverage

Case Studies

HAREDA Green Building at Panchkula

Propsoed NET-ZERO Buliding of UHBVN at Panchkula

2

Page 3: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Importance of DSM in case of Haryana: Substantial

Scope for Energy Conservation

Domestic constitutes 22% share of the total sales in the State

• The Bachat Lamp Yojna resulted in reduction of 10.23 MW connected load and annual saving of 15.73

MUs in Sonepat and Y’ Nagar which have 13% of the total state’s DS consumers

Agricultural constitutes 29% of the total sales in the State

• W.e.f. December 2009 , it has been mandated to use star rated Agriculture Pump. After that all the new

AP connections i.e. 112945 nos. are released with Star rated Pump sets, which constitute 19% of total

installed base of 579338 Nos. AP connections in the state. which clearly indicates huge scope for

Agriculture DSM

3

Domestic77%

Non Domestic10%

LT (Industry)2%

HT Industry 0%

AP(Metered)6%

AP(Un-metered)

4%OTHERS

1%

No of connection as of March'14

Domestic22%

Non Domestic10%

LT (Industry)6%

HT Industry 25%

AP(Metered)15%

AP(Un-metered)

14%

OTHERS8%

Actual Sales for FY13-14

Page 4: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

4

Quarterly Load Curve

6864 (20:00)

5434 (08:00)

0500

100015002000250030003500400045005000550060006500700075008000

(in

MW

)

Time

Average Load Curve for Haryana (July to Sep 2013)MAX (MW) 6864

MIN (MW) 5434

AVG (MW) 6055

5307 (18:45)

3745 (02:45)

0500

100015002000250030003500400045005000550060006500700075008000

(in

MW

)

Time

Average Load Curve for Haryana (Oct to Dec 2013)MAX (MW) 5307

MIN (MW) 3745

AVG (MW) 4229

Page 5: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Quarterly Load Curve

5

5883 (20:00)

4438 (08:00)

0500

100015002000250030003500400045005000550060006500700075008000

(in

MW

)

Time

Average Load Curve for Haryana (April to June 2014)MAX (MW) 5883

MIN (MW) 4438

AVG (MW) 5072

Page 6: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Load Curve Facts

6

Quarter/DemandMax Min Average

% Difference between Max &

Min

July-September 2013 6864 5434 6055 26%

October-December 2013

5307 3745 4229 42%

January-March 20145241 3219 4018 63%

April-June 20145883 4438 5072 33%

Page 7: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Analysis of Load Curve

• The load curve graph is almost flat for the period July-September

• There is small leverage in other three quarters where wecan use DSM measures to flatten the load curve.

• Presently the load curve flattening is being done throughPeak load exemption charges [PLEC] for Industrialconsumers.

• It is observed that peak demand of system is primarily dueto Domestic lighting load and Non-domestic load in evening.For addressing the peak due to domestic and commercialload utilities are planning to implement ToD meteringinitially in Panipat city area under smart grid project.

7

Page 8: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Technical Support for undertaking Load Research through BEE & EESL

• A MoU has been signed with Bureau of Energy Efficiency (BEE) inJuly , 2014, wherein EESL will hire 2 DSM consultants for UHBVN,the cost of which will be funded by BEE.

• The UHBVN has already conveyed its willingness to allow EESL tohire consultants in July, 2014 .

• As per MoU, EESL will provide support to DISCOMs in followingbroad areas.

– Develop Approach and Methodology for Load Survey, LoadResearch, Load Strategies and development of DSM ActionPlan.

– Provide technical support to the consultants during Load Survey,Load Research, Load Strategies and development of DSMAction Plan.

8

Page 9: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Load Management Initiatives -Smart Grid

Location:

• Panipat City Subdivision, UHBVN

• Implementation Agency :- NEDO, Japan

Project Summary:

• Project covers 31,623 consumers in Panipat

• Input energy of about 144.14 MU

• Functionality covered:

–Advanced Metering Infrastructure (AMI)

–Peak Load Management (PLM)

–Outage Management System (OMS)

–Renewable integration through net metering

• Estimated cost of the project Rs. 46.76 crore

• Annual benefit of Rs. 9.3 crore

• Payback period- 60 months

Page 10: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Benefits of the Smart Grid Project

• Advanced Metering Infrastructure (AMI)

– Reduction in AT&C losses

– Reduction in cost of Billing

• Peak Load Management (PLM)

– Better load management

– Partial shifting of Peak Load to non-peak hours & saving on

expensive Unscheduled Interchange

• Outage Management System (OMS)

– Reduction in transformer & line outages and downtime

– Improvement in reliability & customer satisfaction

Page 11: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Smart Grid -Analytics & Visualization

Analytics for Load Forecasting and Load Research

Analytics for Peak Load Estimation and Customer Segmentation

Analytics for Demand Response & Time of Use

Analytics for Outage & Asset Management

Analytics for Energy Accounting and Leakage

Analytics for Capacitor Bank Planning and Volt Var Optimization

Page 12: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Load Management Initiatives –Peak Load Exemption Charges [PLEC]

Levy of PLEC on Power intensive Industrial consumers to flatten the

load curve is applicable since 1990’s

• Primary objective is to flatten the curve during peak by shifting

the load to off peak. The PLEC Charges were reduced from Rs 3.80 per

unit in FY 2013-14 to Rs 1.90 per unit by utilities and as per present tariff

order for 2014-15 the applicable rate is as under :-

• Existing PLEC For Normal Consumer charges are :-

– Up to 50% of the Contract Demand :- Rs 1.00 per KVAH

– Above 50% of Contract Demand :- Rs 1.50 per KVAH

• For Open access Consumer PLEC charges are :-

• Up to 20% of the contract demand:-Nil

• From 20% to 50% of the contract demand:- Rs 0.95/Kwh

• Above 50%:- Rs 1.5/Kwh

Page 13: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Load Management Initiatives –Peak Load Exemption Charges [PLEC]-Impact Analysis- Case Study of DHBVN

Average Industrial Load of DHBVN during Day Time:- 960 MW

Average Industrial Load during Night :- 400 MW.

Average Industrial Load during Peak Time[06:30 P.M. To 10:00

P.M.] :- 250 to 300 MW

Impact of Reduced PLEC Charges :- 15% Increase in

Consumption during Peak Load.

Page 14: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

DSM implementation: Objective Oriented and Sustainable

Approach

Objective Approach

• Energy conservation by price (through Incentive and Penalty mechanism)

– Through Tariff setting

– Peak Load exemption charges

– Reliability surcharge

– Incentive provisions for Shifting of load to off-peak hours

Peak Load

Management

• Energy Conservation by usage of efficient Equipment (through awareness and

mandatory provision)

– Promotion of CFLs for lighting in High Value consumers

– Mandatory Purchase of star rated equipment

– Mandatory provisions for Purchase of star rated equipment for consumers

Promotion of

energy efficient

equipment

• Energy Conservation by coordinated efforts

– Promotion and distribution of CFLs in low demand consumers

– Rebate on switching over to Other energy sources

– Improved Supply hours & Reliability for participating consumers

Customer

involvement and

Satisfaction

• Integration with other scheme

– Loss Reduction

• Sustainability through Long Term Planning

• Through Innovation;

Cost optimization

14

Page 15: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

DSM measures implemented in Haryana: Projects and

Coverage

DSM Measures

Agriculture

Urban

(DS)

Industrial

CommercialTariff

Energy

Efficient

Building

Street light

Rural

(DS & NDS)

• Village Supply

Improvement (VSI scheme)

• Bachat Lamp Yojana

• Incentivized Promotion of

Solar Water Heater System

in Domestic use

• Bachat Lamp Yojana

• Incentivized

Promotion of Solar

Water Heater System

in Domestic use

• Peak Load

exemption charges

similar to ToD Tariff

• Reliability Charges

• Promotion of

essential usage of

CFLs for Lightening

• Promotion of

essential usage of

CFLs for Lightening

• AG DSM pilot project under

BEE (replacement pumps)

• Incentive scheme for shifting of

AG demand to off peak

• Compulsion of star rated

pumps from December 2009

• ESCO implementation through

EESL

• Replacement of

Street lamps/ bulbs

with Energy Efficient

Street Light.

• Green Building of

HAREDA

• Compulsion of CFLs

in Government

Building since 2005

• Peak Load

exemption charges

similar to ToD Tariff

• Reliability Charges 15

Page 16: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Pilot Project : Village Supply Improvement (VSI) Scheme

Integrated Scheme for DSM + Loss Reduction

Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Connection through LT service cable emanating from meter box to nearby consumer

premises

Incentives for the Villages; getting supply at par with urban

Utility

• Reduction in demand

• Improved Billing Efficiency

• Improved Revenue

• Cost effective with payback of 1-2 years

• Reduction in consumer complaints

• Reduction in transformer failure

Consumer

• Improved Supply hours upto 20-22 hrs

per day

• Improved supply conditions; load

balancing , under loading of transformer

• No Billing complaint like house lock,

inaccessible meter

• Switch over to efficient lightening system

(CFL) resulting savings

Scheme Modalities:

Benefit of the schemes: Win-Win case for Utility and Consumer

16

Page 17: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

20-in-1 Meter Pillar Boxes with New Cables Installed in

Singhran & Chirod Village, Hisar

17

Page 18: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Quantitative Benefits from Pilot VSI Project: Singhran & Chirod

Village

Reduction in energy input of 43%.

Increased billed units by 98%.

Collection efficiency increases by 26%

Total AT&C loss reduction of 61%. [ pre-implementation AT&C loss is 77% and after implementation of

scheme AT&C losses comes down to 26%]

Avoidance of CAPEX as no augmentation of DT, Conductor and cable required.

Reduction in nos. Distribution Transformer and reduced DT damage rate.

Total 105 nos. of new consumers has been added; Total 135 defective meters were replaced

Average cost per consumer of the project is around Rs. 5560/-

Estimated payback period of 23 months

Consumer Indexing was also carried out; Transformer wise energy audit possible

Improved Supply hours from 11 hours to 22 hours

• The scheme was implemented in 100 villages of the state.

• Work order for 57 feeders covering 144 villages has been issued till date.

18

Page 19: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Other DSM initiatives …….

AG DSM pilot

project (BEE)

• Proposed scheme of Replacement of existing pump sets by

energy efficient pumps with BEE support under ESCO

• Estimated savings as per BEE of 16.7 MUs is at total cost of Rs.

7.85 Crores for replacement of 2124 pumps on single 11 KV

Mohanpur Feeder in Kurukshetra

• However , in spite of repeated follow up, no response from

ESCOs due to absence of credible Baseline date.

• Feeder segregation and HVDS scheme for Separated AG feeders and metered DTs provides platform for

implementing further DSM measures achieving reduction of demand

• To change the old and inefficient pumps, Implementation of AG DSM through ESCO routes is initiated by

DISCOMs; Concerns about the post supply liability of services observed between suppliers

19

Page 20: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Other DSM initiatives……..

Bachat Lamp

Yojana (BLY)

• Under BLY CDM Project of BEE, total 454483 CFLs distributed in Sonepat

& Yamunaganar circles of Haryana to the domestic consumers

• Total 10.23 MW of savings is observed , resulting in annual savings of

15.73 MUs

Solar Water

Heater System in

Domestic use

• Incentivized scheme started in 2007

• Rebate of Rs 100/-, Rs 200/- and Rs. 300/- for Solar water heater capacity

of Rs 100 LPD, Rs 200 LPD and Rs 300 LPD respectively.

• Rebate applicable up to three years after installation of solar heater

system

• DISCOMs are providing rebate of Rs. 3.75 lakhs to 262 nos of consumers

Promotion of

essential usage

of CFLs for

Lightening

• Usage of CFLs was made essential since July 2007 for industrial and

commercial consumers having load more than 5 KW

• Total 34532 nos. of commercial & Industrial consumers has already been

shifted to energy efficient lights/ CFLs

• After Bulk procurement 899039 ( 9 lacs) nos of CFLs has been sold to

domestic consumers at Nigam Counters at subsidized rate.

20

Page 21: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Other DSM initiatives ……..

Reliability Charges

Replacement of Street

lamps• Total 14595 nos. of Street lamps replaced with Energy Efficient Street Light.

Promotion of 4 star

rated Equipment

• Mandated usage of 4 star rated agricultural pump sets since December 2009

• Total 65818 nos. of 4 star rated transformers of different capacity has been purchased

Sr. No Reliability of Supply Reliability of charge

1Total Period During which supply remained available during the

billing period works out to 95% and above

Rs 1.50 per unit

2Total Period During which supply remained available during the

billing period works out equal to 90% or above but less than 95%

Rs 0.50 per unit

3Total Period During which supply remained available during the

billing period works out to be less than 90%

Nil (Penalty* clause shall

apply)

*Penalty liability on DISCOM: Rs. 0.50 per unit for the entire consumption during the billing period

21

Page 22: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Green Building HAREDA Compliance with the Energy Conservation

Building Codes (ECBC)

Comply with the 5 star GRIHA rating,

highest for Green buildings of Govt. of India

Constructed based on solar passive design

techniques having Building Integrated

Photovoltaic (BIPV) system of 42.50 KW

capacity, Solar Chimney, evaporative cooling,

cavity walls, Use of Fly ash based bricks water

recycling and Energy Efficient Lighting

Benefits of the Building

• Achievement of an internal temperature of about 28 deg. Centigrade without Air Conditioning

• Estimated energy consumption about 30 kWhr/m2/year compared to 200 kWhr/m2/year for existing air

conditioned buildings

• 25% reduced lighting energy need and Annual Energy Consumption at 3.48 units per sq, ft. against 18.5 units

per sq. ft. of a conventional building

http://hareda.gov.in/?model=pages&nid=31

22

Page 23: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

NET ZERO Building of UHBVN at Panchkula-

UHBVN is also constructing building based on Net Zero Energy

consumption having total construction area 14470 sqmtr having 2

floor basement, Ground floor and 5 floors with following features.

• Designed Net Zero Energy (NZE) building with solar photovoltaic’s

• Building envelop is optimally designed and oriented towards north-

south direction for cutting out the harsh eastern / western radiation.

• Zero Water Discharge to Municipal drains

• Self Shaded Building with terrace spaces and greenery at each floor.

• Rain water Harvesting pit for recharging aquifer.

• Passive cooling on central circulation space through natural ventilation

• Efficient Day lighting of all office spaces.

• Solar water heating system for kitchen & Guest Houses.

• Double Basement Parking to Reduce urban heat island created from

surface parking.

23

Page 24: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Salient features of proposed NET ZERO Building of UHBVN at

Panchkula- Contd……

Energy Efficient Systems to be deployed

• More than 60% reduction in the lighting loads with the help of LED system.

• More than 65% reduction in HVAC load by proposing low energy equipment like

DeVAP system which is a passively cooling system.

• More than 90% on floor area is day lit by providing dedicated light shaft at the

center of wing.

Energy Efficient Measures Undertaken

• Use of occupancy sensors, Daylight and sensors.

• Use of high efficiency chillers.

• Variable frequency drives.

• Demand control ventilation system.

• High side equipment size reduction through efficient building envelope.

• Window wall ratio is 25% only.

24

Page 25: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Salient features of proposed NET ZERO Building of

UHBVN at Panchkula- Contd……

• Operational total estimated Energy savings/year in lighting is 286443

units

.

• The estimated load of 750 KW will effectively be reduced to 250 KW

with the help of energy efficiency measures.

• By minimizing all the energy load , the whole load can be generated

onsite by proposing PV’s system as per following plan.

Rooftop Solar PV 2066sqm

Outside rooftop 1396 sqm

Total 3462sqm

• The estimated payback period of solar PV installations is 8 years

25

Page 26: DSM Measures in Haryana - INDIAdsm-india.org/wp-content/uploads/2016/06/DSM-Haryana-PPT-after... · Installation of Meters outside the consumers’ premises in Meter Pillar Boxes

Thank You