dt schedule a - epcor · 2017. 4. 4. · note: the local access fee (laf) is a surcharge imposed by...
TRANSCRIPT
Schedule 2017 SAS
DT – Schedule A
Transmission Access Service Tariff Effective January 1, 2017
Schedule 2017 SAS
Table of Contents
RESIDENTIAL SERVICE ......................................................................................................................................... 1
COMMERCIAL/INDUSTRIAL <50 KVA ............................................................................................................... 2
COMMERCIAL/INDUSTRIAL 50 KVA TO <150 KVA........................................................................................ 3
COMMERCIAL/INDUSTRIAL 150 KVA TO <5,000 KVA ................................................................................... 5
PRIMARY COMMERCIAL/INDUSTRIAL 150 KVA TO <5,000 KVA .............................................................. 7
COMMERCIAL/INDUSTRIAL GREATER THAN 5,000 KVA ........................................................................... 9
COMMERCIAL/INDUSTRIAL GREATER THAN 5,000 KVA TOTALIZED ................................................. 11
DIRECT TRANSMISSION-CONNECTED ........................................................................................................... 13
GENERATOR INTERCONNECTION .................................................................................................................. 14
STREET LIGHTING SERVICE ............................................................................................................................. 15
TRAFFIC CONTROL .............................................................................................................................................. 16
SECURITY LIGHTING SERVICE ........................................................................................................................ 17
LANE LIGHTING SERVICE .................................................................................................................................. 18
TEMPORARY ADJUSTMENT ............................................................................................................................... 19
INTERIM ADJUSTMENT ....................................................................................................................................... 20
SHORT-TERM ADJUSTMENT.............................................................................................................................. 21
TABLE 3: EDTI’S 2017 SYSTEM ACCESS SERVICE RATE SCHEDULES .................................................. 22
TABLE 4: EDTI’S 2017 CUSTOMER SPECIFIC LOSS FACTOR AND OPERATING RESERVE
PERCENTAGE ......................................................................................................................................................... 23
EPCOR Distribution & Transmission Inc.
Page 1 of 23 Effective: January 1, 2017
Schedule 2017 SAS
RESIDENTIAL SERVICE (2017 RATE)
Price Schedule SAS-R Effective: January 1, 2017
For System Access Service for all Points of Service throughout the territory served by the Company.
For single-phase service at secondary voltage through a single meter.
For normal use by a single and separate household.
Not applicable to any commercial or industrial use.
Price
The charge for service in any one billing day is the Energy Charge, determined for each individual
Point of Service.
Energy Charge
(per kWh)
Transmission SAS-R1* $0.03080
The minimum daily charge is the Energy Charge.
Application
1) Price Adjustments - the following price adjustments (riders) may apply:
Local Access Fees (Rider LAF) – See Note Temporary Adjustment (Rider G) Interim Adjustment (Rider J) Short Term Adjustment (Rider K) Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 2 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Commercial/Industrial <50 kVA (2017 RATE)
Price Schedule SAS- SC Effective: January 1, 2017
For System Access Service for all Points of Service that have a normal maximum demand of less than 50 kVA with single or three-phase electric service at secondary voltage, throughout the territory served by the Company. These services will have energy meters or will have energy consumption on an estimated basis. This rate is also applicable to all sites for which no other rate is applicable
Price
Charges for service in any one billing day shall be the Energy Charge, determined for each individual Point of Service:
Energy Charge
(per kWh)
Transmission SAS-SC1* $0.03276
The minimum daily charge is the Energy Charge.
Application
1) Power Factor Correction - where a Customer’s power factor is found to be less than 90%, the Company may require the Customer to install corrective equipment
2) Price Adjustments - the following price adjustments (riders) may apply: Local Access Fees (Rider LAF) – See Note
Temporary Adjustment (Rider G) Interim Adjustment (Rider J)
Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton.
* Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 3 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Commercial/Industrial 50 kVA to <150 kVA (2017 RATE)
Price Schedule SAS-MC Effective: January 1, 2017
For System Access Service for all Points of Service that have a normal maximum demand of greater than or equal to 50 kVA and less than 150 kVA, with single or three-phase electric service at secondary voltage, throughout the territory served by the Company. These services will have demand meters
Price
Charges for service in any one billing day shall be the sum of the Demand Charge and Energy Charge, determined for each individual Point of Service:
Demand Charge
(per kVA per Day)
Energy Charge
(per kWh)
Transmission SAS-MC1* $0.23444
SAS-MC2* $0.00435
The billing demand may be estimated or measured and will be the greater of the following:
(a) the highest metered demand during the billing period; (b) 90% of the highest metered demand in the twelve month period including and ending with the
billing period; (c) the estimated demand; (d) the contract demand; (e) 5 kVA.
The minimum daily charge is the sum of the Service Charge and the total Demand Charge.
EPCOR Distribution & Transmission Inc.
Page 4 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Commercial/Industrial 50 kVA to <150 kVA (2017 RATE)
Price Schedule SAS-MC (Continued) Effective: January 1, 2017
Application
1) Power Factor Correction - where a Customer’s power factor is found to be less than 90%, the
Company may require the Customer to install corrective equipment 2) Price Adjustments - the following price adjustments (riders) may apply:
Local Access Fees (Rider LAF) – See Note Temporary Adjustment (Rider G)
Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 5 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Commercial/Industrial 150 kVA to <5,000 kVA Distribution-Connected
(2017 RATE)
Price Schedule SAS-TOU Effective: January 1, 2017
For System Access Services, single or three-phase, that have a normal maximum demand of greater
than or equal to 150 kVA and less than 5,000 kVA, for all Points of Service throughout the territory served by the Company from the Alberta Interconnected System. This rate is applicable to all sites that are served at the secondary voltage of the transformer, normally with a delivery voltage of below 1,000 volts.
The Point of Service must be equipped with interval data metering.
Price
Charges for service in any one billing day shall be the sum of the Energy Charge, Demand Charge,
OSS Charge and Operating Reserve Charges, determined for each individual Point of Service:
Energy Charge (per
kWh)
Demand Charge
(per kW per Day)
OSS Charge
(per kW per Day)
Operating Reserve
(% x kWh delivered during each hour x
Applicable Pool Price during each hour)
Transmission SAS-TOU1* $0.00215
SAS-TOU2* $0.35762
SAS-TOU3* $0.00120
SAS-TOU4* 6.46%
Billing demand for the Transmission charges shall be the higher of:
(a) The highest metered demand during the billing period;
(b) 85% of the highest metered demand in the 12-month period including and ending with the billing
period;
(c) the estimated demand;
(d) the Transmission Contract Demand (TCD);
(e) 50 kilowatts.
EPCOR Distribution & Transmission Inc.
Page 6 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Commercial/Industrial 150 kVA to <5,000 kVA Distribution Connected
(2017 RATE)
Price Schedule SAS-TOU (Continued) Effective: January 1, 2017
Application
1) Power Factor Correction - where a Customer’s power factor is found to be less than 90%, the Company may require the Customer to install corrective equipment.
2) Price Adjustments - the following price adjustments (riders) may apply: Local Access Fees (Rider LAF) – See Note
Temporary Adjustment (Rider G) Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 7 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Primary Commercial/Industrial 150 kVA to <5,000 kVA Distribution Connected
(2017 RATE)
Price Schedule SAS-TOUP Effective: January 1, 2017
For System Access Service, single or three-phase, that have a normal maximum demand of greater
than or equal to 150 kVA and less than 5,000 kVA, for all Points of Service throughout the territory served by the Company from the Alberta Interconnected System. This rate is applicable to all sites that are served at the primary voltage of the transformer, normally with a delivery voltage of over 1,000 volts.
The Point of Service must be equipped with interval data metering.
Price
Charges for service in any one billing day shall be the sum of the Energy Charge, Demand Charge, OSS
Charge and Operating Reserve Charges, determined for each individual Point of Service:
Energy Charge (per
kWh)
Demand Charge
(per kW per Day)
OSS Charge
(per kW per Day)
Operating Reserve
(% x kWh delivered during each hour x
Applicable Pool Price during each hour)
Transmission SAS-TOUP1* $0.00213
SAS-TOUP2* $0.35814
SAS-TOUP3* $0.00120
SAS-TOUP4* 6.38%
Billing demand for the System charges shall be the higher of:
a) The highest metered demand during the billing period;
b) 85% of the highest metered demand in the 12-month period including and ending with the billing
period;
c) the estimated demand;
d) the Transmission Contract Demand (TCD);
e) 50 kilowatts.
EPCOR Distribution & Transmission Inc.
Page 8 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Primary Commercial/Industrial 150 kVA to <5,000 kVA Distribution Connected
(2017 RATE)
Price Schedule SAS-TOUP (Continued) Effective: January 1, 2017
Application
1) Power Factor Correction - where a Customer’s power factor is found to be less than 90%, the Company may require the Customer to install corrective equipment
2) Price Adjustments - the following price adjustments (riders) may apply:
Local Access Fees (Rider LAF) - Note Temporary Adjustment (Rider G)
Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 9 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Commercial/Industrial Greater than 5,000 kVA Distribution-Connected
(2017 RATE)
Price Schedule SAS-CS Effective: January 1, 2017
For System Access Service, single or three-phase, that have a maximum demand of greater than or
equal to 5,000 kVA in the previous year, for all Points of Service throughout the territory served by the Company from the Alberta Interconnected System. This rate is also applicable to new sites that forecast to have a normal maximum demand of greater than or equal to 5,000 kVA. The Point of Service must be equipped with interval data metering.
Each new site under this rate is required to enter into an Electric Service Agreement with EPCOR SYSTEM.
Price
Charges for service in any one billing day shall be the sum of the Energy Charge, Demand Charge,
OSS Charge and Operating Reserve Charges, determined for each individual Point of Service:
Energy Charge (per
kWh)
Demand Charge
(per kW per Day)
OSS Charge
(per kW per Day)
Operating Reserve
(% x kWh delivered during each hour x
Applicable Pool Price during each hour)
Transmission SAS-CS1* $0.00211
SAS-CS2* $0.34657
SAS-CS3* $0.00116
SAS-CS4* Refer to Table 4 below
Billing demand for the System charges shall be the higher of:
a) The highest metered demand during the billing period;
b) 90% of the highest metered demand in the 24-month period including and ending with the billing
period;
c) the estimated demand;
d) the Transmission Contract Demand (TCD);
e) 50 kilowatts.
EPCOR Distribution & Transmission Inc.
Page 10 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Commercial/Industrial Greater than 5,000 kVA Distribution-Connected
(2017 RATE)
Price (Continued)
Application
1) Power Factor Correction - where a Customer’s power factor is found to be less than 90%, the Company may require the Customer to install corrective equipment
2) Price Adjustments - the following price adjustments (riders) may apply: Local Access Fees (Rider LAF) – See Note
Temporary Adjustment (Rider G) Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 11 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Commercial/Industrial Greater than 5,000 kVA Totalized Distribution-Connected
(2017 RATE)
Price Schedule SAS-CST Effective: January 1, 2017
For System Access Service, single or three-phase, that have a totalized maximum demand of greater
than or equal to 5,000 kVA in the previous year, for all Points of Service throughout the territory served by the Company from the Alberta Interconnected System. This rate is also applicable to new sites that forecast to have a normal totalized maximum demand of greater than or equal to 5,000 kVA. The Point of Service must be equipped with interval data metering.
Each new site under this rate is required to enter into an Electric Service Agreement with EPCOR SYSTEM.
Price
Charges for service in any one billing day shall be the sum of the Energy Charge, Demand Charge,
OSS Charge and Operating Reserve Charges, determined for each individual Point of Service:
Energy Charge (per
kWh)
Demand Charge
(per kW per Day)
OSS Charge
(per kW per Day)
Operating Reserve
(% x kWh delivered during each hour x
Applicable Pool Price during each hour)
Fixed Point of Delivery Daily
Charge
Transmission SAS-CST4* $0.00210
SAS-CST3* $0.39821
SAS-CST6* $0.00138
SAS-CST5* 6.31%
SAS-CST7* $233.01
Billing demand for the System charges shall be the higher of:
a) The highest metered demand during the billing period;
b) 90% of the highest metered demand in the 24-month period including and ending with the billing
period;
c) the estimated demand;
d) the Transmission Contract Demand (TCD);
e) 50 kilowatts.
EPCOR Distribution & Transmission Inc.
Page 12 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Commercial/Industrial Greater than 5,000 kVA Totalized Distribution-Connected
(2017 RATE)
Price (Continued)
Application
1) Power Factor Correction - where a Customer’s power factor is found to be less than 90%, the Company may require the Customer to install corrective equipment
2) Price Adjustments - the following price adjustments (riders) may apply: Local Access Fees (Rider LAF) – See Note
Temporary Adjustment (Rider G) Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 13 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Direct Transmission-Connected (2017 RATE)
Price Schedule SAS-DC Effective: January 1, 2017
For System Access Service, single or three-phase, for all Points of Service throughout the territory served by the Company from the Alberta Interconnected System, that are directly connected to a transmission substation, and do not make any use of System facilities owned by EPCOR System.
The Point of Service must be equipped with interval data metering.
Price
Charges for service in any one billing day shall be the sum of the Energy Charge, Demand Charge,
OSS Charge and Operating Reserve Charges, determined for each individual Point of Service:
Transmission The applicable rate(s) of the Alberta Electric System Operator Tariff
Total charges from the AESO for each Point of Delivery applicable to sites on this rate will be flowed through to such sites.
Application
1) Price Adjustments - the following price adjustments (riders) may apply:
Local Access Fees (Rider LAF) – See Note
Temporary Adjustment (Rider G) Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 14 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
GENERATOR INTERCONNECTION Distribution-Connected
(2017 RATE)
Price Schedule SAS-DGEN Effective: January 1, 2017
For Points of Service served by the Company from the Alberta Interconnected System, with on-site
generating equipment connected to the System, which may be used to supply load at the same site.
For interconnection of the generator to the Distribution System
To charge Generators if the Point of Delivery attracts STS charges from the AESO
The Point of Service must be equipped with bi-directional interval data metering, for both supply and demand, the cost of which will be in addition to the charges under this rate.
Price
Charges for service in any one billing day shall be the sum of the STS charges from the AESO: Capital Recovery Charges:
The cost of the Incremental Interconnection Facilities will be determined as set out in Section 9.4 of the Terms and Conditions for System Service Connections. The total amount will be collected from the customer in accordance with Section 9.5 of the Terms and Conditions for System Service Connections. A contract will be arranged between the customer and the Company, specifying the contract term and the monthly amount, which will be calculated using the Company’s Rate of Return and Depreciation in effect at the commencement of the contract term.
The Generating customer will be required to pay all replacement costs for incremental facilities as per Section 9.4 of the Terms and Conditions for System Service Connections.
Application
1) Price Adjustments - the following price adjustments (riders) may apply: Local Access Fees (Rider LAF) – See Note
Temporary Adjustment (Rider G) Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton.
EPCOR Distribution & Transmission Inc.
Page 15 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
STREET LIGHTING SERVICE (2017 RATE)
Price Schedule SAS-SL Effective: January 1, 2017
To the Retailer for services owned by the City of Edmonton for Street Lighting Service
Price
Charges for service in any one billing month are the sum of the Demand Charges.
Demand Charge
(per kW per Day)
Transmission SAS-SL1* $0.18117
Billing demand for the Transmission charges shall be 90% of the highest metered demand in the 12-
month period including and ending with the billing period.
Application
1) Price Adjustments – the following price adjustments (riders) may apply: Local Access Fees (Rider LAF) – See note
Temporary Adjustment (Rider G) Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 16 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Traffic Control (2017 RATE)
Price Schedule SAS-TL Effective: January 1, 2017
For services owned by the City of Edmonton for Traffic Lights and other Traffic Control Service
Price
Charges for service in any one billing month are the sum of the Demand Charges.
Demand Charge
(per kW per Day)
Transmission SAS-TL1* $0.73937
Billing demand for the Transmission charges shall be 90% of the highest metered demand in the 12-
month period including and ending with the billing period.
Application
1) Price Adjustments – the following price adjustments (riders) may apply: Local Access Fees (Rider LAF) – See Note
Temporary Adjustment (Rider G) Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 17 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Security Lighting Service (2017 RATE)
Price Schedule SAS-SEL Effective: January 1, 2017
For existing unmetered Security Light Service. This rate is not available to new services.
Price
Charges for service in any one billing month are the sum of the Demand Charges, determined for
each individual Point of Service.
Demand Charge
(per kW per Day)
Transmission SAS-SEL1* $0.18907
Billing demand for the Transmission charges shall be 90% of the highest metered demand in the 12-
month period including and ending with the billing period.
Application
1) Price Adjustments – the following price adjustments (riders) may apply: Local Access Fees (Rider LAF) – See Note
Temporary Adjustment (Rider G) Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 18 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Lane Lighting Service (2017 RATE)
Price Schedule SAS-LL Effective: January 1, 2017
For the services owned by the City of Edmonton for Lane Lights
Price
Charges for service in any one billing month are the sum of the Demand Charges.
Demand Charge
(per kW per Day)
Transmission SAS-LL1* $0.18986
Billing demand for the Transmission charges shall be 90% of the highest metered demand in the 12-
month period including and ending with the billing period.
Application
1) Price Adjustments – the following price adjustments (riders) may apply: Local Access Fees (Rider LAF)- See Note
Temporary Adjustment (Rider G) Interim Adjustment (Rider J) Short Term Adjustment (Rider K)
Note: The Local Access Fee (LAF) is a surcharge imposed by the City of Edmonton and is not approved by the Alberta Utilities Commission. The LAF applies to all sites within the City of Edmonton. * Refer to the values associated with the Cell References in the Attached Table 3.
EPCOR Distribution & Transmission Inc.
Page 19 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
TEMPORARY ADJUSTMENT Rider G - Balancing Pool Rider Effective: January 1, 2017
Applicable to all customers, at points of service, throughout the territory served by the Company for
energy consumption.
Current Rider G rates are available on EPCOR’s website:
https://www.epcor.com/products-services/power/rates-tariffs-fees/Pages/power-tariffs-terms-and-
conditions-edmonton.aspx
Rate Schedule Energy Charge Demand
Charge per KW or KVA per Day
OSS Charge Operating Reserve
SAS-R - N/A N/A N/A
SAS-SC - N/A N/A N/A
SAS-MC - N/A N/A N/A
SAS-TOU - N/A N/A N/A
SAS-TOUP - N/A N/A N/A
SAS-CS - N/A N/A N/A
SAS CST - N/A N/A N/A
SAS-DC - N/A N/A N/A
SAS-DGEN - N/A N/A N/A
SAS-SL - N/A N/A N/A
SAS-TL - N/A N/A N/A
SAS-LL - N/A N/A N/A
SAS-SEL - N/A N/A N/A
Note: Rider G does not apply to Rider LAF and Rider J.
EPCOR Distribution & Transmission Inc.
Page 20 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
INTERIM ADJUSTMENT Rider J - SAS True-Up Rider Effective: January 1, 2017
Applies to all electric service throughout the territory served by the Company when a charge or refund
is approved by the AUC.
Current Rider J rates are available on EPCOR’s website:
https://www.epcor.com/products-services/power/rates-tariffs-fees/Pages/power-tariffs-terms-and-
conditions-edmonton.aspx
Rate Schedule
Energy Charge Demand Charge per KW or KVA per Day
OSS Charge Operating Reserve
SAS-R N/A N/A N/A N/A
SAS-SC N/A N/A N/A N/A
SAS-MC N/A N/A N/A N/A
SAS-TOU N/A N/A N/A N/A
SAS-TOUP N/A N/A N/A N/A
SAS-CS N/A N/A N/A N/A
SAS-CST N/A N/A N/A N/A
SAS-DC N/A N/A N/A N/A
SAS-DGEN N/A N/A N/A N/A
SAS-SL N/A N/A N/A N/A
SAS-TL N/A N/A N/A N/A
SAS-LL N/A N/A N/A N/A
SAS-SEL N/A N/A N/A N/A
EPCOR Distribution & Transmission Inc.
Page 21 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
SHORT-TERM ADJUSTMENT Rider K - Transmission Charge Deferral Account True-Up Rider Effective: January 1, 2017
Applies to all electric service throughout the territory served by the Company when a charge or refund
is approved by the AUC.
Current Rider K rates are available on EPCOR’s website:
https://www.epcor.com/products-services/power/rates-tariffs-fees/Pages/power-tariffs-terms-and-
conditions-edmonton.aspx
Rate Schedule
Energy Charge Demand Charge per KW or KVA per Day
OSS Charge Operating Reserve
SAS-R - N/A N/A N/A
SAS-SC - N/A N/A N/A
SAS-MC - N/A N/A N/A
SAS-TOU - N/A N/A N/A
SAS-TOUP - N/A N/A N/A
SAS-CS - N/A N/A N/A
SAS-CST - N/A N/A N/A
SAS-DC - N/A N/A N/A
SAS-DGEN - N/A N/A N/A
SAS-SL - N/A N/A N/A
SAS-TL - N/A N/A N/A
SAS-SEL - N/A N/A N/A
SAS-LL - N/A N/A N/A
EPCOR Distribution & Transmission Inc.
Page 22 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Table 3: EDTI’s 2017 System Access Service Rate Schedules (2017 RATE)
Rate Class Cell
Reference Value Description
Residential SAS-R1 $0.03080 / kWh of Energy Charge
Commercial/ Industrial Service <50 kVA
SAS-SC1 $0.03276
/ kWh of Energy Charge
Commercial/ Industrial Service 50 kVA to Less Than 150 kVA
SAS-MC1 $0.23444
/kVA/day of Demand Charge
Commercial/ Industrial Service 50 kVA to Less Than 150 kVA
SAS-MC2 $0.00435
/ kWh of Energy Charge
150 to 5000 kVA (Secondary) SAS- TOU1 $0.00215 / kWh of Energy Charge
150 to 5000 kVA (Secondary) SAS-TOU2 $0.35762 /kW/day of Demand Charge
150 to 5000 kVA (Secondary) SAS-TOU3 $0.00120 /kW/day of Other System Support Charge
150 to 5000 kVA (Secondary) SAS-TOU4 6.46% Operating Reserve Charge (Total Energy x
OR% x Pool Price)
150 to 5000 kVA (Primary) SAS-TOUP1 $0.00213 / kWh of Energy Charge
150 to 5000 kVA (Primary) SAS-TOUP2 $0.35814 /kW/day of Demand Charge
150 to 5000 kVA (Primary) SAS-TOUP3 $0.00120 /kW/day of Other System Support Charge
150 to 5000 kVA (Primary) SAS-TOUP4 6.38% Operating Reserve Charge (Total Energy x
OR% x Pool Price)
> 5000 kVA SAS-CS1 $0.00211 / kWh of Energy Charge
> 5000 kVA SAS-CS2 $0.34657 /kW/day of Demand Charge
> 5000 kVA SAS-CS3 $0.00116 /kW/day of Other System Support Charge
> 5000 kVA SAS-CS4 See Table 4 for individual OR%
Operating Reserve Charge (Total Energy x OR% x Pool Price)
CST SAS-CST4 $0.00210 / kWh of Energy Charge
CST SAS-CST3 $0.39821 /kW/day of Demand Charge
CST SAS-CST6 $0.00138 /kW/day of Other System Support Charge
CST SAS-CST5 6.31% Operating Reserve Charge (Total Energy x
OR% x Pool Price)
CST SAS-CST7 $233.01 Fixed Point of Delivery Daily Charge
Direct Connects to AESO SAS-DC1 Flowthrough / kWh of Energy Charge
Direct Connects to AESO SAS-DC2 Flowthrough /kW/day of Demand Charge
Direct Connects to AESO SAS-DC3 Flowthrough /kW/day of Other System Support Charge
Direct Connects to AESO SAS-DC4 Flowthrough Pool Price Charge (Total Energy)
Direct Connects to AESO SAS-DC5 Flowthrough Fixed Point of Delivery Daily Charge Multiplied
by applicable Substation Fraction
Photo Eye (Street Lights) SAS-SL1 $0.18117 /kW/day of Demand Charge
Continuous Operating Load SAS-TL1 $0.73937 /kW/day of Demand Charge
Photo Eye (Security Lights) SAS-SEL1 $0.18907 /kW/day of Demand Charge
Photo Eye (Lane Lights) SAS-LL1 $0.18986 /kW/day of Demand Charge
EPCOR Distribution & Transmission Inc.
Page 23 of 23 Effective: January 1, 2017
EPCOR Distribution & Transmission Inc.'s Terms and Conditions for Distribution Access Service and Terms and Conditions for Distribution Service Connections apply to all retailers and customers provided with Distribution Access Services and/or System Access Service by EPCOR Distribution & Transmission Inc. Both sets of Terms and Conditions are available at EPCOR System offices during normal working hours or on the website www.epcor.ca.
Schedule 2017 SAS
Table 4: EDTI’s 2017 Customer Specific Loss Factor and Operating Reserve Percentage
Rate Class Cell
Reference CS Loss Factor
SAS-CS4 Description
> 5000 kW - Primary CS20 0.16% 6.31% Specific Distribution Loss Factor - CS20
> 5000 kW - Primary CS21 0.35% 6.32% Specific Distribution Loss Factor - CS21
> 5000 kW - Primary CS22 1.35% 6.39% Specific Distribution Loss Factor - CS20
> 5000 kW - Primary CS23 0.18% 6.31% Specific Distribution Loss Factor - CS23
> 5000 kW - Primary CS24 0.09% 6.31% Specific Distribution Loss Factor - CS24
> 5000 kW - Primary CS25 0.20% 6.31% Specific Distribution Loss Factor - CS25
> 5000 kW - Primary CS26 1.44% 6.39% Specific Distribution Loss Factor - CS26
> 5000 kW - Primary CS27 0.20% 6.31% Specific Distribution Loss Factor - CS27
> 5000 kW - Primary CS28 0.43% 6.33% Specific Distribution Loss Factor - CS28
> 5000 kW - Primary CS29 0.38% 6.32% Specific Distribution Loss Factor - CS29
> 5000 kW - Primary CS30 0.01% 6.30% Specific Distribution Loss Factor - CS30
> 5000 kW - Primary CS31 0.18% 6.31% Specific Distribution Loss Factor - CS31
> 5000 kW - Primary CS32 0.19% 6.31% Specific Distribution Loss Factor - CS32
> 5000 kW - Primary CS33 1.37% 6.39% Specific Distribution Loss Factor - CS33
> 5000 kW - Primary CS34 0.10% 6.31% Specific Distribution Loss Factor - CS34
> 5000 kW - Primary CS35 0.30% 6.32% Specific Distribution Loss Factor - CS35
> 5000 kW - Primary CS37 0.12% 6.31% Specific Distribution Loss Factor - CS37
> 5000 kW - Primary CS38 0.00% 6.30% Specific Distribution Loss Factor - CS38
> 5000 kW - Primary CS39 0.724% 6.35% Specific Distribution Loss Factor - CS39
> 5000 kW - Primary CS40 1.273% 6.38% Specific Distribution Loss Factor - CS40
> 5000 kW - Primary CS41 0.668% 6.34% Specific Distribution Loss Factor - CS41
> 5000 kW - Primary CS42 0.574% 6.34% Specific Distribution Loss Factor - CS42
> 5000 kW - Primary CS43 0.513% 6.33% Specific Distribution Loss Factor - CS43
> 5000 kW - Primary CS44 0.470% 6.33% Specific Distribution Loss Factor - CS44