duct numbering for ee-
DESCRIPTION
Duct numbering for EE-. 06.B. 07.B. 06.A. 07.A. 08.B. 08.A. 09.B. 09.A. 10.B. 10.A. 11.B. 11.A. 12.B. 12.A. 13.A. 13.B. 14.A. 14.B. 30/07/2004. Wolfgang Funk - CERN CMS. 1. View towards I.P. for EE+. LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 3*4.3X2 (27) - PowerPoint PPT PresentationTRANSCRIPT
Duct numbering for EE-
Wolfgang Funk - CERN CMS30/07/2004
06.B
06.A07.B
07.A
08.B
08.A09.B
09.A
10.B
10.A
11.B
11.A
12.B 12.A
13.B13.A
14.B14.A
1
Wolfgang Funk - CERN CMS30/07/2004
Duct 05.A
Duct 05.B
LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 3*4.3X2 (27)signal 1*9 (64)
LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 1*9 (64)
Bret
OF 15*4.3X2 (129)HV 4*14 (616)Sniff 1*6 (29)
P F
Pret
LV 10*12.2 (1169)CO 1*14 con (154)
Signal 1*10 (79)
CO 1*14 is (314mm**2)CO 1*14 con (154)
N2 1*8 (51)
sn N2
Sum: (1960)
Sum: (1860)
Similar to Duct 03.B
Similar to Duct 03.A
View towards I.P. for EE+
View from I.P. for EE-
Duct 06.B
Duct 06.A
2
Note that the EE HV cables are only the indicated size where there is no space problem. The mantle is cut off elsewhere (curves) and saves almost 60% of cross section.
Wolfgang Funk - CERN CMS30/07/2004
Duct 04.A
Duct 04.B
LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 5*4.3X2 (45) signal 1*9 (64)
LV1 8*7.4 (344)LV2 8*6.1 (240)HV 2*15.3 (368) signal 2*9 (128)
P FP ret
HV 4*14 (616)CO 1*14 is (314)
OF 15*4.3X2 (129)
LV 10*12.2 (1169mm**2)CO 1*14 con (154)
Signal 1*10 (79)
P F Sum: (2149)
Sum: (1987)
Similar to Duct 02.A
Similar to Duct 02.B
Duct 07.B
Duct 07.A
3
Wolfgang Funk - CERN CMS30/07/2004
Duct 03.A
Duct 03.B
LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 5*4.3X2 (45)signal 1*9 (64)
LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 3*4.3X2 (27)Signal 1*9 (64)
OF 15*4.3X2 (129)HV 2*14 (308)
LV 10*12.2 (1169)CO 1*14 con (154)
Signal 1*10 (79)
CO 4*10 is (804mm**2)CO 1*14 is (314)CO 1*12 is (255)CO 1*14 con (154)
OESR
P FP ret
BF BF BF BF OESF
FES F
Sum: (1969)
Sum: (2549)
Similar to Duct 05.B
Similar to Duct 05.A
Duct 08.B
Duct 08.A
4
Wolfgang Funk - CERN CMS30/07/2004
Duct 02.A
Duct 02.B
LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 1*9 (64)
PE 1*3.6 (10)LV1 8*7.4 (344)LV2 8*6.1 (240)HV 2*15.3 (368)OF 4*4.3X2 (36)signal 2*9 (128)
P FP ret
LV 10*12.2 (1169mm**2)CO 1*14 con (154)
Signal 1*10 (79)
CO 2*14 is (628)Laser 1*10 (79)
OF 15*4.3X2 (129)Co 1*14 (154)
P F
MEM 24*2.2 (92)MEM 4*1.5X2 (12)MEM 6*2X10 (120)
Note: additional cables between MEM and balconies: Hybrid (5V,2.5V Ving, sensing for all) 2*12.3 (238), OF 2*4.3X2 (18) MEM cables (MEM 24*2.2 (92), MEM 4*1.5X2 (12) and MEM 6*2X10 (120) )are only between MEM and Dees
Sum: (2340)
Sum: (2403)
Sum: (2122)
Similar to Duct 04.B
Similar to Duct 04.A
DCS 1*11 (95)DCS 1*7.2 (41)DCS 1*5.8 (26)
Duct 09.B
Duct 09.A
5
P F retB ret
Note: PE is only in in 9A-/2B+ for ES and not in 18A-/11B+
Wolfgang Funk - CERN CMS30/07/2004
Duct 01.A
CO 1*71 (3960)
Duct 10.B
6
Wolfgang Funk - CERN CMS30/07/2004
Duct 01.B
CO 1*71 (3960)
Duct 10.A
7
Wolfgang Funk - CERN CMS30/07/2004
Duct 18.B
LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 1*9 (64)
P FP ret
LV 10*12.2 (1169mm**2)CO 1*14 con (154)
Signal 1*10 (79)
Sum: (2122)
Similar to Duct 16.B
Duct 11.A
Duct 18.A
CO 2*14 is (628)Co 1*14 (154)
P F
HV 4*14 (616)OF 15*4.3X2 (129)
Sum: (2652)
Similar to Duct 16.A
Duct 11.B
8
P F
LV1 8*7.4 (344)LV2 8*6.1 (240)HV 2*15.3 (368)OF 5*4.3X2 (45)signal 2*9 (128)
DCS 1*11 (95)DCS 1*7.2 (41)DCS 1*5.8 (26)
retB ret
Wolfgang Funk - CERN CMS30/07/2004
Duct 17.A
LV1 4*7.4 (172) LV2 4*6.1 (120)HV 1*15.3 (184)OF 3*4.3X2 (27)Signal 1*9 (64)
LV 10*12.2 (1169)CO 1*14 con (154)
Signal 1*10 (79)
P FP ret Sum: (1969)
Similar to Duct 15.A
Duct 12.B
Duct 17.B
LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 5*4.3X2 (45)signal 1*9 (64)
CO 4*10 is (804mm**2)CO 1*14 is (314)CO 1*12 con (113)CO 1*14 con (154)
OESRBF BF BF BF OES
FSum: (2407)
Similar to Duct 15.B
Duct 12.A
FES R
9
OF 15*4.3X2 (129)HV 2*14 (308)
Wolfgang Funk - CERN CMS30/07/2004
Duct 16.A
LV1 8*7.4 (344)LV2 8*6.1 ( 240)HV 2*15.3 (368) signal 2*9 (128)
P F Sum: (2139)
Similar to Duct 18.A
Duct 13.B
Duct 16.B
LV1 4*7.4 (172)LV2 4*6.1 (120)HV 1*15.3 (184)OF 5*4.3X2 (45) signal 1*9 (64)
P FP ret
LV 10*12.2 (1169mm**2)CO 1*14 con (154)
Signal 1*10 (79)
Sum: (1987)
Similar to Duct 18.B
Duct 13.A
10
HV 4*14 (616)CO 1*14 is (314)
OF 15*4.3X2 (129)
Wolfgang Funk - CERN CMS30/07/2004
Duct 15.A
LV1 4*7.4 (172)LV2 4*6.1 (120)OF 2*4.3X2 (18)signal 2*9 (128)
14/23
Pret
LV 10*12.2 (1169)CO 1*14 con (154)
Signal 1*10 (79)
Sum: (1840)
Similar to Duct 17.A
Duct 14.B
Duct 15.B
LV1 2*7.4 (86)LV2 2*6.1 (60)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 1*9 (64)
Bret
HV 6*14 (924)OF 15*4.3X2 (129)
Sniff 1*6 (29)
P F
CO 1*14 is (314mm**2)CO 1*14 con (154)
N2 1*8 (51)
sn
N2Sum: (2126)
Similar to Duct 17.B
Duct 14.A
N2/sniff 1*12 (113)
N2
Note: ES N2 pipe is input on one Dee and output on other Dee (same diameter)
11
Note: in 14B-/15A+ for ES only LV2 2*6.1 and not 4! whereas in 5B-/6A+ LV2 4*6.1 existent
Note: in the ducts 14B-/15A+/5B-/6A+ ES LV1 and ES LV2 all cables run to counting room since used for heating
History
Wolfgang Funk - CERN CMS30/07/2004 12
1. Move ES services out of 10B-/10A- into 9A-/11B- (no space in ducts with ES pipes).2. Move PF from 7A- to 9A- and from 13B- to 11B- to avoid crossing of cooling pipe over
ring flange bean.3. Move half of OF from 6B-/8B-/13B-/11B- to 7A-/9A-/14A-/12A- to have less crossings.4. Move half of HV from 7A-/9A-/14A-/12A- to 6B-/8B-/13B-/11B- to have less crossings.5. Change of DCS scheme: no DCS cable anymore in 7B-/13A-, but 3 DCS cables in
9B-/11A-, no overall cross section increase.
New version 14/7/03 to avoid crossing of services at EE patch panel area according to Justin’s proposal of patch panel design of spring ’03:
New version 6/8/03 to increase LV cable sets to 20/Quadrant (before 18/Quadrant) because of new “EE-mechatronics’’ design of Tony:
1. 2 more LV EE cables each in ducts 7B-,9B-,11A-,13A- .
New version 11/8/03 to increase space in ducts for ES cooling pipes.
1. Move EE backplate return pipes from 10B-/10A- into 9A-/11B- .
History(2)
Wolfgang Funk - CERN CMS30/07/2004 13
1. Remove one OF from of 9A-.2. Remove separate LV cables for controls 14A- (are part of standard LV system)
New version 23/9/03 to adapt latest version of ES services:
New version 03/12/03 to adapt latest version of EE/ES services:
1. One ES unit contains now only one signal- (control) cable instead of 2 with exception of duct 14B-.2. One ES LV unit contains now of 4*7.4 and 4*6.1 instead of 6*7.43. MEM services adopted to new information4. EE HV 2*13 mantles/Dee (each has 13/12 coax) replaces single coaxes, changed some positions to equalize filling factors.
New version 2/03/04 to adapt latest version of EE/ES services:
1. In 14B- ES now only 2 LV 6.1mm instead of 4 (but not other Dee (5B-), where are still 4)2. In 14A- ES only 2 LV 6.1mm and 2 LV 7.4mm instead of 4 each before3. Only 4 signal cables/Quadrant for EE instead of 6 before4. One more optical fiber in all ducts where there was a fiber for ES (spare)
History(3)
Wolfgang Funk - CERN CMS30/07/2004 14
1. 4 less OF spares/ Dee than before.2. Implement 1 OF spare per double MEM3. Implement 1 protection conductor per ES disk
New version 30/7/04 to adapt latest version of ES/EE services: