dupont corridor development open house 840 dupont, … · 2017-08-29 · 10 2016-02-25issued for...

6
840 DUPONT, TORONTO, ON DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE 840 DUPONT, TORONTO, ON May 4, 2017 275 Albany, 420 Dupont 500 Dupont 740 Dupont 840 Dupont Dupont-By-The-Castle BIA Boundary Dupont Street Regeneration Study Bound- Context Map Rendering SUMMARY OF BUILDING STATISTICS SITE AREA: 11,308 m 2 TOTAL GFA: 35,125 m 2 FSI: 3.11 BUILDING HEIGHT: 36.27 m (to finished roof ) STOREYS: 9 Storeys GROUND FLOOR HEIGHT: 5.94 m # OF RESIDENTIAL UNITS: 304 BACHELOR: 0 / 0.00 % 1 BED: 18 / 5.92 % 1 BED + DEN: 128 / 42.11 % 2 BED: 42 / 13.82 % 2 BED + DEN: 82 / 26.97 % 3 BED OR MORE: 34 / 11.18 % RESIDENTIAL GFA: 26,420.60 m 2 RETAIL GFA: 8,625.30 m 2 INDOOR AMENITY SPACE: 687.40 m 2 OUTDOOR AMENITY SPACE: 957 m 2 # OF RESIDENTIAL PARKING: 264 # OF VISITORS PARKING: 45 # OF RETAIL PARKING: 209 # OF BICYCLE PARKING: 353

Upload: others

Post on 02-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE 840 DUPONT, … · 2017-08-29 · 10 2016-02-25issued for review kl 11 2016-03-23issued for review kl 12 2016-04-29issued for settlement kl

This drawing, as an instrument of service, is provided by and is the property of TurnerFleischer Architects Inc. The contractor must verify and accept responsibility for alldimensions and conditions on site and must notify Turner Fleischer Architects Inc. ofany variations from the supplied information. This drawing is not to be scaled. Thearchitect is not responsible for the accuracy of survey, structural, mechanical,electrical, etc., information shown on this drawing. Refer to the appropriate consultant'sdrawings before proceeding with the work. Construction must conform to all applicablecodes and requirements of authorities having jurisdiction. The contractor working fromdrawings not specifically marked 'For Construction' must assume full responsibilityand bear costs for any corrections or damages resulting from his work.

BASED ON JD BARNES PLAN OF SURVEY WITHTOPOGRAPHY OF LOT 48 AND PART OF LOTS 47,49, 50 AND 51 REGISTERED PLAN 197 (YORK)AND PART OF LOTS 7, 8, 9, 10, 11 AND 12REGISTERED PLAN 814 (CITY OF TORONTO)PUBLISHED ELEVATION = METRES

THE PLANS ARE TO BE READ IN CONJUNCTIONWITH THE LANDSCAPE AND GRADING AND SITESERVICING PLAN.

REFER TO LANDSCAPE DRAWINGS PREPAREDBY TERRPLAN LANDSCAPE ARCHITECTS.

REFER TO SITE SERVICING DRAWINGSPREPARED BY COUNTERPOINT.

LOT 48ANDPART OF LOTS 47, 49, 50 AND 51REGISTERED PLAN 197 (YORK)ANDPART OF LOTS 7, 8, 9, 10, 11 AND 12REGISTERED PLAN 814 (CITY OF TORONTO)

SPA-0.01

DUPONT STREET &SHAW STREET

STATISTICS

Sobeys DevelopmentsLimited Partnership

840 DUPONT, TORONTO, ON

DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE840 DUPONT, TORONTO, ON May 4, 2017

275 Albany, 420 Dupont

500 Dupont740 Dupont840 Dupont

Dupont-By-The-Castle BIA Boundary

Dupont Street Regeneration Study Bound-

Context Map

Rendering

SUMMARY OF BUILDING STATISTICSSITE AREA: 11,308 m2

TOTAL GFA: 35,125 m2

FSI: 3.11

BUILDING HEIGHT: 36.27 m (to �nished roof )

STOREYS: 9 Storeys

GROUND FLOOR HEIGHT: 5.94 m

# OF RESIDENTIAL UNITS: 304

BACHELOR: 0 / 0.00 % 1 BED: 18 / 5.92 % 1 BED + DEN: 128 / 42.11 % 2 BED: 42 / 13.82 % 2 BED + DEN: 82 / 26.97 % 3 BED OR MORE: 34 / 11.18 %

RESIDENTIAL GFA: 26,420.60 m2

RETAIL GFA: 8,625.30 m2

INDOOR AMENITY SPACE: 687.40 m2

OUTDOOR AMENITY SPACE: 957 m2

# OF RESIDENTIAL PARKING: 264

# OF VISITORS PARKING: 45

# OF RETAIL PARKING: 209

# OF BICYCLE PARKING: 353

Page 2: DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE 840 DUPONT, … · 2017-08-29 · 10 2016-02-25issued for review kl 11 2016-03-23issued for review kl 12 2016-04-29issued for settlement kl

5615 ft²521.7 m²

RETAIL C

2468 ft²229.2 m²

RETAIL ALOADING

13' -

2"

4013

60' -

7"

1846

636

' - 0

"10

979

31' -

6"

9605

33' -

10

1/2"

1032

913

' - 3

"40

3513

' - 4

"40

6028

' - 3

"86

092'

- 7"

791

RESIDENTIAL LOADINGTYPE 'G'

4.0m x 13m (MIN. VERTICALCLEARANCE OF 6.1m)

DUPONT STREET

SHAW

STR

EET

CANADIAN PACIFIC RAILWAY

6517 ft²605.5 m²

RETAIL B2

CAR

S O

NLY

ALLACCESS

3987 ft²370.4 m²

RETAIL LOBBY

4816 ft²447.5 m²

RETAIL D

54' - 5"16587

11' - 1 1/2"3395

3' - 2"966

MOVING

57 PARKING SPACES(RETAIL)

2 PARKING SPACES(CAR SHARE)

RAMP UP @ 8%

STAGINGAREA

(35 m2)

EXHAUSTSHAFT

232'

- 2

1/2"

7077

3

160' - 11 1/2"49061

OUTLINE OF EXITCORRIDOR ABOVE

FRESH AIR INTAKE

EXHAUSTSHAFT

1SPA-2.16

RETAIL LOADINGTYPE 'B'

3.5m x 11m (MIN. VERTICALCLEARANCE OF 4.0m)

F.F.E. = 121.85

F.F.E. = 121.85 F.F.E. = 121.85

F.F.E. = 121.85

F.F.E. = 121.42

11' -

11

1/2"

3645

11' -

2"

3399

RETAIL LOADINGTYPE 'A'

3.5m x 17m (MIN. VERTICALCLEARANCE OF 4.4m)

RETAIL LOADINGTYPE 'A'

3.5m x 17m (MIN. VERTICALCLEARANCE OF 4.4m)

3' - 5"1044

84' - 10 1/2"25864

138' - 9 1/2"42298

53' - 11"16437

54' - 1 1/2"16500

161' - 11 1/2"49360

2' - 1"629

57' -

4 1

/2"

1748

8

1' - 7 1/2"500

160' - 8"48971

334' - 2"101855 3' - 8 1/2"

1133

5000 5000

1400

0

CAR SHARE

CAR SHARE

CRASH WALL

EXISTING 4STOREYBUILDING

EXISTING 1STOREYBUILDING

2837 ft²263.6 m²

RESIDENTIAL

RETAIL LOADINGTYPE 'B'

3.5m x 11m (MIN. VERTICALCLEARANCE OF 4.0m)

CACF

OUTLINEOF

FLOOR 2

6000

COMPACTOR

113'

- 5

1/2"

3457

82285 ft²212.3 m²

RETAIL B1

1986 ft²184.5 m²

RESIDENTIAL

493' - 7 1/2"150459

56' -

7 1

/2"

1726

3

MALECHANGEROOM

FEMALECHANGEROOM

RAILWAY 20M HORIZONTALSETBACK

494' - 10"150826

SANITARYMH

STORM WATERTANK LID

600036' - 9"11200

F.F.E. = 121.75

FIREHYDRANT

2837 ft²263.6 m²

RESIDENTIAL

486 ft²45.1 m²

RETAIL ELOADING

PROVIDE HEAVY DUTYPAVING FOR TYPE G

TRUCK LOADING

11' -

7"

3524

12' -

9 1

/2"

3898

87' -

4 1

/2"

2663

014

4' -

10"

4414

38'

- 11

"27

20

12000

909 ft²84.5 m²

RETAILGARBAGE

ROOM

DOG WASH

PROPOSED SIAMESECONNECTION

8.30

m

RETAIL LOADINGTYPE 'B'

3.5m x 11m (MIN. VERTICALCLEARANCE OF 4.0m)

77' -

8"

2367

9

8' -

7"26

16

POTENTIALRESIDENTIAL

LOBBY12.9 m²139 ft² 3' - 10"

1168

11' -

5"

3480 13' - 1"

3988

65' -

7 1

/2"

2000

0

334' - 6 1/2"101968

FIRE ROUTE

PARK728.1 m²7838 ft²

POTENTIALPATIO AREA

99.4 m²1070 ft²

2' - 1"629

12' - 0 1/2"3667

11' -

6 1

/2"

3523

13' -

2"

4013

11' -

6 1

/2"

3516

12' -

9 1

/2"

3898

216'

- 9

1/2"

6608

3

14' - 1"4296

24' -

9"

7539

23' -

1 1

/2"

7044

24' -

4"

7414

14' - 3 1/2"4356

1' - 8"506

2' -

9 1 /

2"85

0

PRIMARY ENTRANCE

SECONDARY ENTRANCE

RETAIL ENTRANCE

ENTRANCE SYMBOLS

This drawing, as an instrument of service, is provided by and is the property of TurnerFleischer Architects Inc. The contractor must verify and accept responsibility for alldimensions and conditions on site and must notify Turner Fleischer Architects Inc. ofany variations from the supplied information. This drawing is not to be scaled. Thearchitect is not responsible for the accuracy of survey, structural, mechanical,electrical, etc., information shown on this drawing. Refer to the appropriate consultant'sdrawings before proceeding with the work. Construction must conform to all applicablecodes and requirements of authorities having jurisdiction. The contractor working fromdrawings not specifically marked 'For Construction' must assume full responsibilityand bear costs for any corrections or damages resulting from his work.

Checked by :

Drawn by :

Date :Proj no. :

Scale :

Drawing No :

Project :

Drawing Name :

2015-07-15

Client :

A.Y.

R.F.

TRUE

NO

RTH

CO

NST

RU

CT I

ON

NO

RTH

TORONTO, ONTARIO

BASED ON JD BARNES PLAN OF SURVEY WITHTOPOGRAPHY OF LOT 48 AND PART OF LOTS 47,49, 50 AND 51 REGISTERED PLAN 197 (YORK)AND PART OF LOTS 7, 8, 9, 10, 11 AND 12REGISTERED PLAN 814 (CITY OF TORONTO)PUBLISHED ELEVATION = METRES

THE PLANS ARE TO BE READ IN CONJUNCTIONWITH THE LANDSCAPE AND GRADING AND SITESERVICING PLAN.

REFER TO LANDSCAPE DRAWINGS PREPAREDBY TERRPLAN LANDSCAPE ARCHITECTS.

REFER TO SITE SERVICING DRAWINGSPREPARED BY COUNTERPOINT.

LOT 48ANDPART OF LOTS 47, 49, 50 AND 51REGISTERED PLAN 197 (YORK)ANDPART OF LOTS 7, 8, 9, 10, 11 AND 12REGISTERED PLAN 814 (CITY OF TORONTO)

1237

7-D

upon

t and

Sha

w_W

IP (2

016)

_CA

CF

Opt

ion

1_lu

kel_

det

ache

d.rv

t

As indicated

12.377

SPA-2.03

DUPONT STREET &SHAW STREET

FLOOR 1

Sobeys DevelopmentsLimited Partnership

NOTES:

BE ADVISED THAT SHOULD ANY PARTY, INCLUDINGTHE APPLICANT OR ANY SUBSEQUENT OWNER,APPLY FOR MORE THAN ONE CONDOMINIUMCORPORATION ENCOMPASSING ANY OR ALL OF THISDEVELOPMENT OR MAKE AN APPLICATION THATRESULTS IN A LAND DIVISION, STAFF MAY REQUIRELEGAL ASSURANCES, INCLUDING BUT NOT LIMITED TOEASEMENTS, WITH RESPECT TO THE APPROVEDSERVICES. SUCH ASSURANCES WILL BE DETERMINEDAT THE TIME OF APPLICATION FOR CONDOMINIUMAPPROVAL.

SOLID WASTE MANAGEMENT FACILITIES AND THEHORIZONTAL AND VERTICAL CLEARANCES REQUIREDFOR CITY COLLECTION VEHICLES HAVE BEENCONSTRUCTED IN ACCORDANCE WITH THEAPPROVED SITE PLAN DRAWINGS

PLEASE REFER TO BA GROUP`S DRAWINGS FORCONVEX MIRROR AND SIGNAGE LOCATIONS.

No. Date: Issued/Revision: By1 2015-08-17 ISSUED FOR REZONING AY9 2015-11-18 ISSUED FOR SPA AY10 2016-02-25 ISSUED FOR REVIEW KL11 2016-03-23 ISSUED FOR REVIEW KL12 2016-04-29 ISSUED FOR SETTLEMENT KL

13 2017-03-24 RESUBMISSION FOR DERAILMENTPROTECTION PEER REVIEW

KL14 2016-09-23 RESUBMISSION FOR SPA KL

DUPONT STREET

SHAW

STR

EET

CANADIAN PACIFIC RAILWAY

4111 ft²382.0 m²

RETAIL LOBBY

ELEV.

OUTLINE OF MEZZANINEABOVE

13' -

3 1

/2"

4053

92' -

11

1/2"

2833

576

' - 1

0"23

416

61' -

11"

1886

78'

- 11

"27

20

310 '

- 5 "

9461

7

289'

- 9

1/2"

8833

4

STAIR ACCESS TOMEZZANINE ABOVE

24' - 2"7372

130' - 11"39906

341' - 1"103965

4' - 0"1216

147'

- 3"

4487

817

' - 4

"52

857'

- 2"

2189

13' -

3"

4035

13' -

4"

4060

28' -

3"

8604

2' -

7 1/

2"79

6

57' -

4 1

/2"

1748

8

20063 ft²1863.9 m²RETAIL E

39801 ft²3697.7 m²RETAIL A

PARK BELOW

FLUID COOLER WELL

GREEN ROOF ATFLOOR 2

56' -

7 1

/2"

1726

3

3' -

5"10

39

11' -

11

1/2"

3645

CART CORRAL

4582 ft²425.7 m²AMENITY

GYM

LOUNGE

622 ft²57.8 m²

2BUNIT 12

839 ft²78.0 m²

2BUNIT 11

811 ft²75.4 m²

2BUNIT 10

757 ft²70.3 m²

2BUNIT 9

2425 ft²225.3 m²AMENITY

596 ft²55.3 m²

2BUNIT 8

797 ft²74.0 m²

2BUNIT 7

534 ft²49.6 m²

1B+DUNIT 6

747 ft²69.4 m²

2BUNIT 5

728 ft²67.6 m²

2BUNIT 4

559 ft²52.0 m²

1B+DUNIT 3

691 ft²64.2 m²

2BUNIT 2

758 ft²70.4 m²

2BUNIT 1

720 ft²66.9 m²

2BUNIT 13

YOGA

MALECHANGEROOM

FEMALECHANGEROOM

W/R

THEATRE

RAILWAY 20M HORIZONTALSETBACK

STAIR C

STAIR G

STAIR I

STAIR K

STAIR M

STAIR N

STAIR B

STAIR ESTAIR D

226'

- 6

1/2"

6905

2

720 ft²66.9 m²

2BUNIT 14

733 ft²68.1 m²

2BUNIT 15

TER

RAC

E

OUTLINE OF FLOOR 3ABOVE

65' -

7 1

/2"

2000

0

24' - 6 1/2"7478

76' - 3 1/2"23254

115' - 5 1/2"35195

64' - 5 1/2"19650

58' - 0"17676

157' - 9 1/2"48097

2' - 4"717

472' - 0"143871

231'

- 8"

7061

8

472' - 0"143871

3' -

5"10

39

10' -

4 1

/2"

3160

2' -

11"

893

1' - 8"506

2' -

9 1 /

2"85

0

2' - 4"717

This drawing, as an instrument of service, is provided by and is the property of TurnerFleischer Architects Inc. The contractor must verify and accept responsibility for alldimensions and conditions on site and must notify Turner Fleischer Architects Inc. ofany variations from the supplied information. This drawing is not to be scaled. Thearchitect is not responsible for the accuracy of survey, structural, mechanical,electrical, etc., information shown on this drawing. Refer to the appropriate consultant'sdrawings before proceeding with the work. Construction must conform to all applicablecodes and requirements of authorities having jurisdiction. The contractor working fromdrawings not specifically marked 'For Construction' must assume full responsibilityand bear costs for any corrections or damages resulting from his work.

Checked by :

Drawn by :

Date :Proj no. :

Scale :

Drawing No :

Project :

Drawing Name :

2015-07-15

Client :

A.Y.

R.F.

TRUE

NO

RTH

CO

NST

RU

CT I

ON

NO

RTH

TORONTO, ONTARIO

BASED ON JD BARNES PLAN OF SURVEY WITHTOPOGRAPHY OF LOT 48 AND PART OF LOTS 47,49, 50 AND 51 REGISTERED PLAN 197 (YORK)AND PART OF LOTS 7, 8, 9, 10, 11 AND 12REGISTERED PLAN 814 (CITY OF TORONTO)PUBLISHED ELEVATION = METRES

THE PLANS ARE TO BE READ IN CONJUNCTIONWITH THE LANDSCAPE AND GRADING AND SITESERVICING PLAN.

REFER TO LANDSCAPE DRAWINGS PREPAREDBY TERRPLAN LANDSCAPE ARCHITECTS.

REFER TO SITE SERVICING DRAWINGSPREPARED BY COUNTERPOINT.

LOT 48ANDPART OF LOTS 47, 49, 50 AND 51REGISTERED PLAN 197 (YORK)ANDPART OF LOTS 7, 8, 9, 10, 11 AND 12REGISTERED PLAN 814 (CITY OF TORONTO)

1237

7-D

upon

t and

Sha

w_W

IP (2

016)

_CA

CF

Opt

ion

1_lu

kel_

det

ache

d.rv

t

1 : 250

12.377

SPA-2.05

DUPONT STREET &SHAW STREET

FLOOR 2

Sobeys DevelopmentsLimited Partnership

No. Date: Issued/Revision: By1 2015-08-17 ISSUED FOR REZONING AY9 2015-11-18 ISSUED FOR SPA AY12 2016-04-29 ISSUED FOR SETTLEMENT KL

13 2017-03-24 RESUBMISSION FOR DERAILMENTPROTECTION PEER REVIEW

KL14 2016-09-23 RESUBMISSION FOR SPA KL

DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE840 DUPONT, TORONTO, ON May 4, 2017

Ground Floor Plan 1:300

Floor 2 Plan 1:300

Page 3: DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE 840 DUPONT, … · 2017-08-29 · 10 2016-02-25issued for review kl 11 2016-03-23issued for review kl 12 2016-04-29issued for settlement kl

FLOOR 1

121850

FLOOR 2

127787

U/G PARKING 1

117850

FLOOR 4

139120

FLOOR 5

142120

FLOOR 6

145120

FLOOR 3

135620

FLOOR 7

148120

U/G PARKING 2

114850

FLOOR 8

151120

FLOOR 9

154120

MECH.

158120

T/O MECH.

161620

U9U8 U10 U11U7U6U5 U12

U122 3 4 5 6 7 8 9 10 11 13 142

SPA-5.02

U4

UGPARKINGLEVEL 2

UGPARKINGLEVEL 1

LOCKERS

BIKE STORAGE

CANADIAN PACIFICRAILWAY

DUPONTSTREET

3.5

0 m

4.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.5

0 m

7.8

3 m

5.9

4 m

4.0

0 m

3.0

0 m

26.0

0 m

13.7

7 m

RETAIL CRESIDENTIALLOBBY

GROUND LEVEL PARKING

RETAIL E

GREENROOF

GREENROOF RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

5.55 m6.80 m8.40 m8.30 m8.30 m8.30 m8.30 m8.30 m1.25 m

PR

OP

ER

TY

LIN

E

PR

OP

ER

TY

LIN

E

9.21 m3.00 m6.00 m3.56 m2.74 m4.50 m2.32 m

0.84 m

6.50 m6.50 m4.48 m3.58 m

FLOOR 1 MEZZ

124937

FLOOR 2 MEZZ

132170

U3

UGPARKINGLEVEL 2

BOTTOM OF PARKING 2

113950

1512

45 DEG

REES AN

GULAR

PLANE

RESIDENTIAL RESIDENTIAL

UGPARKINGLEVEL 1

AVG. EST. GRADE ALONGTHE NORTH PROPERTY

LINE = 122.75

AVG. EST. GRADE ALONGRAIL CORRIDOR = 124.54

22

' - 1

1 1

/ 2"

7000

124.57

36

' - 4

"

11080

5' -

10 1

/2"

1790

42

' - 2

1/2

"

12870

130' -

6"

39770

0.82 m1.83 m2.10 m

CONTINUOUSTREE TRENCH

2' - 10"

859

CURB APRON

PEDESTRIANCLEARWAY

3.66 m

66' - 0 1/2"MIN. 20m SETBACK

20128

2' - 8 1/2"826

FLOOR 1

121850

FLOOR 2

127787

U/G PARKING 1

117850

FLOOR 4

139120

FLOOR 5

142120

FLOOR 6

145120

FLOOR 3

135620

FLOOR 7

148120

U/G PARKING 2

114850

FLOOR 8

151120

FLOOR 9

154120

MECH.

158120

T/O MECH.

161620

U9U8 U10 U11U7U6U5 U12

3.5

0 m

4.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.5

0 m

7.8

3 m

5.9

4 m

4.0

0 m

3.0

0 m

0.9

0 m

26.0

0 m

13.7

7 m

39.7

7 m

CANADIAN PACIFICRAILWAY

DUPONTSTREET

GREEN ROOF/TERRACE

PR

OP

ER

TY

LIN

E

PR

OP

ER

TY

LIN

E

RETAIL DPROPOSED FFE = 121.85

RETAIL A

RESIDENTIAL

BUILDING BEYOND

42' -

2 1

/2"

12870

STAGINGAREA

RETAIL LOADING &WASTE STORAGE

ROOM

MEZZANINE BEYOND

RETAIL A

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

PARKINGAND DRIVEWAY

2 3 4 5 6 7 8 9 10 11 13 14

2

SPA-5.02

U4

1.25 m 8.30 m 8.30 m 8.30 m 8.30 m 8.30 m 8.40 m 6.80 m 5.55 m

3.58 m 4.48 m 6.50 m 6.50 m

0.84 m

2.32 m 4.50 m 2.74 m 3.56 m 6.00 m 3.00 m

FLOOR 1 MEZZ

124937

FLOOR 2 MEZZ

132170

U3

UG PARKINGLEVEL 2

UG PARKINGLEVEL 1

BOTTOM OF PARKING 2

113950

1512

22

' - 1

1 1

/ 2"

7000

AVG. EST. GRADE ALONGTHE NORTH PROPERTY

LINE = 122.75

AVG. EST. GRADE ALONGRAIL CORRIDOR = 124.54

124.54

36

' - 4

"

11080

5' -

10 1

/2"

1790 2.10 m

1.83 m 0.82 m

CONTINUOUSTREE TRENCH

PEDESTRIANSIDEWALK

CURB APRON

1.04 m

0.27 m

70' - 6"MIN. 20m SETBACK

21489

2' - 9 1/2"851

This drawing, as an instrument of service, is provided by and is the property of TurnerFleischer Architects Inc. The contractor must verify and accept responsibility for alldimensions and conditions on site and must notify Turner Fleischer Architects Inc. ofany variations from the supplied information. This drawing is not to be scaled. Thearchitect is not responsible for the accuracy of survey, structural, mechanical,electrical, etc., information shown on this drawing. Refer to the appropriate consultant'sdrawings before proceeding with the work. Construction must conform to all applicablecodes and requirements of authorities having jurisdiction. The contractor working fromdrawings not specifically marked 'For Construction' must assume full responsibilityand bear costs for any corrections or damages resulting from his work.

BASED ON JD BARNES PLAN OF SURVEY WITHTOPOGRAPHY OF LOT 48 AND PART OF LOTS 47,49, 50 AND 51 REGISTERED PLAN 197 (YORK)AND PART OF LOTS 7, 8, 9, 10, 11 AND 12REGISTERED PLAN 814 (CITY OF TORONTO)PUBLISHED ELEVATION = METRES

THE PLANS ARE TO BE READ IN CONJUNCTIONWITH THE LANDSCAPE AND GRADING AND SITESERVICING PLAN.

REFER TO LANDSCAPE DRAWINGS PREPAREDBY TERRPLAN LANDSCAPE ARCHITECTS.

REFER TO SITE SERVICING DRAWINGSPREPARED BY COUNTERPOINT.

LOT 48ANDPART OF LOTS 47, 49, 50 AND 51REGISTERED PLAN 197 (YORK)ANDPART OF LOTS 7, 8, 9, 10, 11 AND 12REGISTERED PLAN 814 (CITY OF TORONTO)

SPA-5.01

DUPONT STREET &SHAW STREET

SECTIONS

Sobeys DevelopmentsLimited Partnership

1 : 250

N-S SECTION 21

1 : 250

N-S SECTION LOOKINGEAST2

FLOOR 1

121850

FLOOR 2

127787

U/G PARKING 1

117850

FLOOR 4

139120

FLOOR 5

142120

FLOOR 6

145120

FLOOR 3

135620

FLOOR 7

148120

U/G PARKING 2

114850

FLOOR 8

151120

FLOOR 9

154120

MECH.

158120

T/O MECH.

161620

U9U8 U10 U11U7U6U5 U12

U122 3 4 5 6 7 8 9 10 11 13 142

SPA-5.02

U4

UGPARKINGLEVEL 2

UGPARKINGLEVEL 1

LOCKERS

BIKE STORAGE

CANADIAN PACIFICRAILWAY

DUPONTSTREET

3.5

0 m

4.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.5

0 m

7.8

3 m

5.9

4 m

4.0

0 m

3.0

0 m

26.0

0 m

13.7

7 m

RETAIL CRESIDENTIALLOBBY

GROUND LEVEL PARKING

RETAIL E

GREENROOF

GREENROOF RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

5.55 m6.80 m8.40 m8.30 m8.30 m8.30 m8.30 m8.30 m1.25 m

PR

OP

ER

TY

LIN

E

PR

OP

ER

TY

LIN

E

9.21 m3.00 m6.00 m3.56 m2.74 m4.50 m2.32 m

0.84 m

6.50 m6.50 m4.48 m3.58 m

FLOOR 1 MEZZ

124937

FLOOR 2 MEZZ

132170

U3

UGPARKINGLEVEL 2

BOTTOM OF PARKING 2

113950

1512

45 DEG

REES AN

GULAR

PLANE

RESIDENTIAL RESIDENTIAL

UGPARKINGLEVEL 1

AVG. EST. GRADE ALONGTHE NORTH PROPERTY

LINE = 122.75

AVG. EST. GRADE ALONGRAIL CORRIDOR = 124.54

22

' - 1

1 1

/ 2"

7000

124.57

36

' - 4

"

11080

5' -

10 1

/2"

1790

42

' - 2

1/2

"

12870

130' -

6"

39770

0.82 m1.83 m2.10 m

CONTINUOUSTREE TRENCH

2' - 10"

859

CURB APRON

PEDESTRIANCLEARWAY

3.66 m

66' - 0 1/2"MIN. 20m SETBACK

20128

2' - 8 1/2"826

FLOOR 1

121850

FLOOR 2

127787

U/G PARKING 1

117850

FLOOR 4

139120

FLOOR 5

142120

FLOOR 6

145120

FLOOR 3

135620

FLOOR 7

148120

U/G PARKING 2

114850

FLOOR 8

151120

FLOOR 9

154120

MECH.

158120

T/O MECH.

161620

U9U8 U10 U11U7U6U5 U12

3.5

0 m

4.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.0

0 m

3.5

0 m

7.8

3 m

5.9

4 m

4.0

0 m

3.0

0 m

0.9

0 m

26.0

0 m

13.7

7 m

39.7

7 m

CANADIAN PACIFICRAILWAY

DUPONTSTREET

GREEN ROOF/TERRACE

PR

OP

ER

TY

LIN

E

PR

OP

ER

TY

LIN

E

RETAIL DPROPOSED FFE = 121.85

RETAIL A

RESIDENTIAL

BUILDING BEYOND

42' -

2 1

/2"

12870

STAGINGAREA

RETAIL LOADING &WASTE STORAGE

ROOM

MEZZANINE BEYOND

RETAIL A

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

PARKINGAND DRIVEWAY

2 3 4 5 6 7 8 9 10 11 13 14

2

SPA-5.02

U4

1.25 m 8.30 m 8.30 m 8.30 m 8.30 m 8.30 m 8.40 m 6.80 m 5.55 m

3.58 m 4.48 m 6.50 m 6.50 m

0.84 m

2.32 m 4.50 m 2.74 m 3.56 m 6.00 m 3.00 m

FLOOR 1 MEZZ

124937

FLOOR 2 MEZZ

132170

U3

UG PARKINGLEVEL 2

UG PARKINGLEVEL 1

BOTTOM OF PARKING 2

113950

1512

22

' - 1

1 1

/ 2"

7000

AVG. EST. GRADE ALONGTHE NORTH PROPERTY

LINE = 122.75

AVG. EST. GRADE ALONGRAIL CORRIDOR = 124.54

124.54

36

' - 4

"

11080

5' -

10 1

/2"

1790 2.10 m

1.83 m 0.82 m

CONTINUOUSTREE TRENCH

PEDESTRIANSIDEWALK

CURB APRON

1.04 m

0.27 m

70' - 6"MIN. 20m SETBACK

21489

2' - 9 1/2"851

This drawing, as an instrument of service, is provided by and is the property of TurnerFleischer Architects Inc. The contractor must verify and accept responsibility for alldimensions and conditions on site and must notify Turner Fleischer Architects Inc. ofany variations from the supplied information. This drawing is not to be scaled. Thearchitect is not responsible for the accuracy of survey, structural, mechanical,electrical, etc., information shown on this drawing. Refer to the appropriate consultant'sdrawings before proceeding with the work. Construction must conform to all applicablecodes and requirements of authorities having jurisdiction. The contractor working fromdrawings not specifically marked 'For Construction' must assume full responsibilityand bear costs for any corrections or damages resulting from his work.

BASED ON JD BARNES PLAN OF SURVEY WITHTOPOGRAPHY OF LOT 48 AND PART OF LOTS 47,49, 50 AND 51 REGISTERED PLAN 197 (YORK)AND PART OF LOTS 7, 8, 9, 10, 11 AND 12REGISTERED PLAN 814 (CITY OF TORONTO)PUBLISHED ELEVATION = METRES

THE PLANS ARE TO BE READ IN CONJUNCTIONWITH THE LANDSCAPE AND GRADING AND SITESERVICING PLAN.

REFER TO LANDSCAPE DRAWINGS PREPAREDBY TERRPLAN LANDSCAPE ARCHITECTS.

REFER TO SITE SERVICING DRAWINGSPREPARED BY COUNTERPOINT.

LOT 48ANDPART OF LOTS 47, 49, 50 AND 51REGISTERED PLAN 197 (YORK)ANDPART OF LOTS 7, 8, 9, 10, 11 AND 12REGISTERED PLAN 814 (CITY OF TORONTO)

SPA-5.01

DUPONT STREET &SHAW STREET

SECTIONS

Sobeys DevelopmentsLimited Partnership

1 : 250

N-S SECTION 21

1 : 250

N-S SECTION LOOKINGEAST2

DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE840 DUPONT, TORONTO, ON May 4, 2017

N-S Section Looking East 1:400

South Elevation 1:400

N-S Section 2 1:400

Page 4: DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE 840 DUPONT, … · 2017-08-29 · 10 2016-02-25issued for review kl 11 2016-03-23issued for review kl 12 2016-04-29issued for settlement kl

PROP

ERTY

LINE

PROP

ERTY

LINE

PROPERTY LINE PROPERTY LINE

PROPERTY LINE

LIGHT BOLLARD

LEGEND

POLE LIGHT

2017

-04-

273:1

6 PM

SHEET NO.:

PROJECT NO.:

DATE:

SCALE:

CHECKED:

DRAWN:

DRAWING

PROJECT

revision

signed

no.

date

date by

CONTRACTOR MUST VERIFY ALL DIMENSIONS ON THE JOB AND REPORT ANYDISCREPANCY TO THE LANDSCAPE ARCHITECT BEFORE PROCEEDING WITH THEWORK.ALL DRAWINGS AND SPECIFICATIONS ARE INSTRUMENTS OF SERVICE AND THEPROPERTY OF THE LANDSCAPE ARCHITECT WHICH MUST BE RETURNED AT THECOMPLETION OF THE WORK.ALL DRAWINGS TO BE USED FOR CONSTRUCTION ONLY WHEN SIGNED BY THELANDSCAPE ARCHITECT.

NOT FOR CONSTRUCTION

I:\01-

PROJ

ECTS

\2013

\13-1

22 S

OBEY

DUP

ONT

AND

SHAW

\02-C

AD\01

-CUR

RENT

\PLO

T\01

-DES

IGN

REVI

EW\13

-122

-LS-

100S

-SIT

EPLA

N.DW

G

CLIENT

SHEET NO.:

01 ISSUED FOR SPA 2015-11-18 DC

[email protected] www.terraplan.ca20 Champlain Blvd. Suite 102 - Toronto ON - M3H 2Z1

SOBEY'S DEVELOPMENTS DUPONT ST. AND SHAW ST.

TORONTO, ONTARIO

DC

MB

2015-01-01

13-122

02 ISSUED FOR SPA 2016-09-23 JC

03 ISSUED FOR PERMIT APPLICATION 2017-02-27 JC

0 1 2 3 4 5 10m

1:250

AS SHOWN

LS-101

LANDSCAPE LIGHTING PLAN - GRND FLOOR

SOBEYS DEVELOPMENTS DUPONT ST. AND SHAW ST. - LANDSCAPE PLAN RENDERING

PARK

PROPERTY LINE

LARGE SHADE STREET TREES

LINE OF BUILDING ABOVE LINE OF BUILDING ABOVE TACTILE SURFACING

CITY OF TORONTO

CONTINUOUS SOIL TRENCH

HEAVY DUTY UNIT PAVING

LIGHT BOLLARD

CITY OF TORONTO

CONC. SIDEWALK

CITY OF TORONTO

UNIT PAVER BAND AT CURB LIGHT DUTY CONCRETE

UNIT PAVING

PROP

ERTY

LIN

E

1

DUPONT STREET

CANADIAN PACIFIC RAILWAY

SHAW STREET

DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE840 DUPONT, TORONTO, ON May 4, 2017

Landscape/Planting Plan 1:350

Rendering

Page 5: DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE 840 DUPONT, … · 2017-08-29 · 10 2016-02-25issued for review kl 11 2016-03-23issued for review kl 12 2016-04-29issued for settlement kl

PROP

ERTY

LINE

PROP

ERTY

LINE

PROPERTY LINE PROPERTY LINE

PROPERTY LINE

LIGHT BOLLARD

LEGEND

POLE LIGHT

2017

-04-

273:1

6 PM

SHEET NO.:

PROJECT NO.:

DATE:

SCALE:

CHECKED:

DRAWN:

DRAWING

PROJECT

revision

signed

no.

date

date by

CONTRACTOR MUST VERIFY ALL DIMENSIONS ON THE JOB AND REPORT ANYDISCREPANCY TO THE LANDSCAPE ARCHITECT BEFORE PROCEEDING WITH THEWORK.ALL DRAWINGS AND SPECIFICATIONS ARE INSTRUMENTS OF SERVICE AND THEPROPERTY OF THE LANDSCAPE ARCHITECT WHICH MUST BE RETURNED AT THECOMPLETION OF THE WORK.ALL DRAWINGS TO BE USED FOR CONSTRUCTION ONLY WHEN SIGNED BY THELANDSCAPE ARCHITECT.

NOT FOR CONSTRUCTION

I:\01-

PROJ

ECTS

\2013

\13-1

22 S

OBEY

DUP

ONT

AND

SHAW

\02-C

AD\01

-CUR

RENT

\PLO

T\01

-DES

IGN

REVI

EW\13

-122

-LS-

100S

-SIT

EPLA

N.DW

G

CLIENT

SHEET NO.:

01 ISSUED FOR SPA 2015-11-18 DC

[email protected] www.terraplan.ca20 Champlain Blvd. Suite 102 - Toronto ON - M3H 2Z1

SOBEY'S DEVELOPMENTS DUPONT ST. AND SHAW ST.

TORONTO, ONTARIO

DC

MB

2015-01-01

13-122

02 ISSUED FOR SPA 2016-09-23 JC

03 ISSUED FOR PERMIT APPLICATION 2017-02-27 JC

0 1 2 3 4 5 10m

1:250

AS SHOWN

LS-101

LANDSCAPE LIGHTING PLAN - GRND FLOOR

SOBEYS DEVELOPMENTS DUPONT ST. AND SHAW ST. - LANDSCAPE PLAN RENDERING

PARK

PROPERTY LINE

LARGE SHADE STREET TREES

LINE OF BUILDING ABOVE LINE OF BUILDING ABOVE TACTILE SURFACING

CITY OF TORONTO

CONTINUOUS SOIL TRENCH

HEAVY DUTY UNIT PAVING

LIGHT BOLLARD

CITY OF TORONTO

CONC. SIDEWALK

CITY OF TORONTO

UNIT PAVER BAND AT CURB LIGHT DUTY CONCRETE

UNIT PAVING

PROP

ERTY

LIN

E

1

DUPONT STREET

CANADIAN PACIFIC RAILWAY

SHAW STREET

SOBEYS DEVELOPMENTS DUPONT ST. AND SHAW ST. - DUPONT STREET SECTION 1

DUPONT STREET 3980 845 1830 800

PROPERTY LINE

DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE840 DUPONT, TORONTO, ON May 4, 2017

Streetscape Design

Streetscape / Pedestrian Level Rendering

Page 6: DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE 840 DUPONT, … · 2017-08-29 · 10 2016-02-25issued for review kl 11 2016-03-23issued for review kl 12 2016-04-29issued for settlement kl

1

118 6 552

1152

5 897 610 7

5 10 978 43

1

118 6 552

1152

5 897 610 7

5 10 978 43

3 44

8112

8576 9 10

5 8 9 5610 8 7

WINDOW FRAME

WINDOW FRAME

DUPONT CORRIDOR DEVELOPMENT OPEN HOUSE840 DUPONT, TORONTO, ON May 4, 2017

Material Samples