INTERIOR RESTORATION OF DURBAR HALL INTERIOR RESTORATION OF DURBAR HALL, Town Hall Mumbai Completion Report December 2012 DURBAR HALL COMPLETION REPORT COMPLETION REPORT AUGUST 2013 Abha Narain Lambah Associates Conservation Architects & Historic Building Consultants 5, Garden Homes, First road, First Road, Khar (West), Mumbai-400052 l 022 260 6 022 2604 66 Abha Narain Lambah Associates Conservation Architects & historic Building Consultants Tel No: 022-26055756, Fax No: 022-26045667 Email: [email protected]

Upload: others

Post on 05-Jun-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Durbar Hall Completion - MMR-HCS

INTERIOR RESTORATION OF DURBAR HALL

INTERIOR RESTORATION OF DURBAR HALL, Town Hall MumbaiCompletion Report – December 2012

DURBAR HALL

COMPLETION REPORTCOMPLETION REPORTAUGUST 2013

Abha Narain Lambah Associates Conservation Architects & Historic Building Consultants

5, Garden Homes, First road, First Road, Khar (West),Mumbai-400052

l 022 260 6 022 2604 66

Abha Narain Lambah AssociatesConservation Architects & historic Building Consultants

Tel No: 022-26055756, Fax No: 022-26045667Email: [email protected]

Page 2: Durbar Hall Completion - MMR-HCS

INTERIOR RESTORATION OF DURBAR HALL, Town Hall MumbaiCompletion Report – December 2012

Structural Restoration Works of Roof (Works Done Under PWD)

The roof above the Durbar hall was opened up for inspection by the consultants. It was found that the main truss members showed sagging , a lit of rafters

Abha Narain Lambah AssociatesConservation Architects & historic Building Consultants

The roof above the Durbar hall was opened up for inspection by the consultants. It was found that the main truss members showed sagging , a lit of rafters and other wooden members and boarding were completely deteriorated. Thus the truss bottom chord s were jacked up to their original position, and sandwich the same between two M.S. members. Also, the deteriorated rafters & Boarding were replaced with new members. New layer of G.I. sheets & Mangalore tiles was done above the T.W. Boarding.

Page 3: Durbar Hall Completion - MMR-HCS

INTERIOR RESTORATION OF DURBAR HALL, Town Hall MumbaiCompletion Report – December 2012

Interior Restoration of Durbar Hall (Works Done Under MMR-HCS Funding)

The interior restoration scheme comprised of, acoustic panel fixing over the wall surface, providing wooden dado, covering the acoustical panels with silk

Abha Narain Lambah AssociatesConservation Architects & historic Building Consultants

The interior restoration scheme comprised of, acoustic panel fixing over the wall surface, providing wooden dado, covering the acoustical panels with silk Damask, Providing brass picture rail & chains to hang portraits to avoid puncturing walls, restoring & installing Brass chandeliers with POP ceiling bosses of the same design as original & Polishing of floor.

Page 4: Durbar Hall Completion - MMR-HCS

INTERIOR RESTORATION OF DURBAR HALL, Town Hall MumbaiCompletion Report – December 2012

Interior Restoration of Durbar Hall (Works Done Under MMR-HCS Funding)

Abha Narain Lambah AssociatesConservation Architects & historic Building Consultants

AFTERBEFORE

Page 5: Durbar Hall Completion - MMR-HCS

INTERIOR RESTORATION OF DURBAR HALL, Town Hall MumbaiCompletion Report – December 2012

Abha Narain Lambah AssociatesConservation Architects & historic Building Consultants

Page 6: Durbar Hall Completion - MMR-HCS

INTERIOR RESTORATION OF DURBAR HALL, Town Hall MumbaiCompletion Report – December 2012

The fabric with shade variation waschanged, and Atmosphere gave theother lot of the fabric to the Society toreplace few panels – August 2013

Abha Narain Lambah AssociatesConservation Architects & historic Building Consultants

replace few panels – August 2013

Page 7: Durbar Hall Completion - MMR-HCS

INTERIOR RESTORATION OF DURBAR HALL, Town Hall MumbaiCompletion Report – December 2012

Abha Narain Lambah AssociatesConservation Architects & historic Building Consultants

Page 8: Durbar Hall Completion - MMR-HCS

INTERIOR RESTORATION OF DURBAR HALL, Town Hall MumbaiCompletion Report – December 2012

Abha Narain Lambah AssociatesConservation Architects & historic Building Consultants

Page 9: Durbar Hall Completion - MMR-HCS

INTERIOR RESTORATION OF DURBAR HALL, Town Hall MumbaiCompletion Report – December 2012

Interior Restoration of Durbar Hall (Works Done Under MMR-HCS Funding)

Sr. No. Sub – Head of Works Amount

1 Work Order for Damask Works to M/s Atmosphere Rs 3 22 0001 Work Order for Damask Works to M/s. Atmosphere Rs. 3,22,000

2 Work Order for Civil + Electrical Works to M/s. Furniture Arts Rs. 18,87,910

3 Total Expenditure of Civil + Electrical Works Rs. 15,96,124.92

4 Total Expenditure Done for Interior Upgradation (1 + 3) Rs. 19,18,124.92

5 Total Architect’s Fees (@ 7.5% of Project Cost + Service Tax) Rs.1,59,718.10

GRAND TOTAL of PROJECT COST for INTERIOR  R 20 77 843

Abha Narain Lambah AssociatesConservation Architects & historic Building Consultants

G O o OJ C COS o OUPGRADATION of DURBAR HALL (4 + 5) Rs. 20,77,843