BALASORE ALLOYS LTD.
Dust Generation
Mapping
Elimination &
Control Plan
Sustain
Dust Mapping& Control Plan.
Prepared By : Deepak Kumar Sahoo
Under the guidance of
Mr. S V Bhavani Varma & Mr. J S Verma
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Cover Page
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - i
Objective
Achieving
Dust Free Environment
in Plant Premises
through
Dust Mapping &Control Plan
[DMCP] Initiative.
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page – ii
Table of Contents
S/N Contents Pg. No.
1 Introduction -: 01 :-
2 Dust Generation [Source] -: 03 :-
2.1 1. Material Flow -: 04 :-
2.2 2. Transportation -: 06 :-
2.3 3. Environment -: 08 :-
3 Dust Mapping -: 09 :-
4 Elimination & Control Plan -: 12 :-
4.1 1. Material Flow -: 13 :-
4.2 2. Transportation -: 14 :-
4.3 3. Environment -: 15 :-
5 ROI for DMCP Initiative -: 16 :-
6 Sustain -: 17 :-
Authority Measured as: 24 hr mean Relevance
UK Air Quality Standard 50 μg/m3
Air quality in relation to
public healthSPCB, Orissa 100 μg/m3
Industrial 190.6 - 238.2 μg/m3
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 01
Introduction
Dust : It consists of particles in the atmosphere that
come from various sources such as solid particles from raw
materials, soil dust lifted by weather / Wind flow, Flue
Gases, vehicle movement etc.
Dust Level Standard
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 02
Time Line for DMCP Initiatives
Initial
Assessment
Dust
Mapping
Elimination,
Control Plan
& Implementation
Sustain &
Improvement
2 Month
3 Month
9 Months
Kick off
Completion
of Initial
Assessment
Receiving
the Dust
Measuring
Instrument.
Completion
of Dust
Mapping.
Finalization
of
Elimination
& Control
Plan
Will reach
final stage
of
execution –
Control
Plan
Sustain &
Scope for
improvement
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 03
Source of Dust generation
There are various sources of dust generation; but in BAL
Plant, we identified mainly the dust came from 3 major
Sources.
Material flow
Transportation
Environmental
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 04
Material Flow : Flow Diagram
RM
Storage
UG
Bunker
Day bin
Bunker
Weigh
Hoppers
F/C
Chutes
Material
Charging Smelting Tapping Casting Loading
Breaking
yard
Slag Yard
Sales
Cooling
Loading
truck
MRP
plant Loading
truck
Return
Dust Weigh
mint
Storage
area Recycle
UG
Bunker
Screen
House
Detailed Process Map for Material Flow
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 05
Dust Generation : Material Flow
Gate Entry
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 06
Transportation: Flow Diagram
RM Store Area
/ Br.plant
Weigh
bridge
UG
Bunker
Weigh
bridge
Storage
Area
Casting
Metal/Slag
loading
Slag Yard
MRP plant
Weighing
Break yard Weighing Sales yard
Weighing
Material
loading &
Weighment
Raw material feeding
Product handling movement
Raw Material Entry
Weighment
RM yard at
unloading
point
Weighment Exit
Exit
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 07
Dust Generation : Transportation
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 08
Dust Generation : Environment
Open Raw Material Stock Yard
Chimney ( BAL Plant & Br. Plant )
Under Construction
Open Conveyer System
More Fines Generation
Internal Road Conditions
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 09
Dust Mapping : Why ?
If you can MEASURE it,
you can CONTROL it.
We can reduce 30% of the current dust generation, if we
are able to measure the dust level continuously.
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 10
Dust Mapping : Measuring Device
HAZ-DUST Real-time
Area Dust MonitorP311DT-9881 P611
$ 1763 £ 1.764,00£ 847 £ 2425
SKC Inc.PCE Instruments
UK Ltd.
PCE Instruments
UK Ltd.
PCE Instruments
UK Ltd.
The Avg. Cost of Dust Measuring Device is costing around 2 Lacs
INR and the lead time Maximum 15 days. [Date of Payment to
Equipment received @ BAL Plant.]
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 11
Dust Map : Area Wise
After receiving the the Dust Measuring device we will
measure the dust level with each individual area and
monitor the dust level on weekly basis.
1. Initial Access the dust level inside the plant
2. Prepare the Dust MAP in the whole Plant.
3. Weekly Dust Tracking – Area wise.
4. Trend Analysis for Dust level.
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 12
Elimination & Control Plan
Elimination and Control Plan may be outsource or develop
in house.
In House
Develop
Consultant
or Expert
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 13
Control Plan : Material Flow
Dust is generating during material flow due to
1. Leakage.
2. Spillage.
3. Wrong Design.
4. Poor Maintenance.
5. Open conveyor System
Suggestion and possible cause : Material Flow
Doc. No : BAL/DS/DMCP/A11-02 Dec’ 13 | Page - 01
Dust Mapping And Control Plan Control Plan Material Flow.
INDEX
Dust Generation
Mapping
Elimination &
Control Plan
Sustain
Dust Mapping& Control Plan.
Control Plan
Material Flow
Doc. No : BAL/DS/DMCP/A11-02 Dec’ 13 | Page - 02
Suggestion
During material unloading some
of the materials drops to the
platform; that material went to
UG Bunker
S1 : Platform Can be checker
plate.
S2 : Increase the height of side
wall so no material will fall in the
platform
S N Padhi
15.01.14
Discussion with Engineering team.
KAM
Target Date
Support Required
Dust Mapping And Control Plan Control Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 03
Suggestion
KAM
Target Date
Support Required
Dust Mapping And Control Plan Control Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 04
Suggestion
If we can arrange the uniform
water spray near bunker the dust
level can be reduce; also at the
same time we need to take care
the moisture level in the raw
materials.
KAM
Target Date
Support Required
Dust Mapping And Control Plan Control Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 05
Suggestion
Some of the materials are came
through conveyor.
KAM
Target Date
Support Required
Dust Mapping And Control Plan Control Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 06
Suggestion
Raw Materials falling one corner
of the conveyor.
KAM
Target Date
Support Required
Dust Mapping And Control Plan Control Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 07
Suggestion
KAM
Target Date
Support Required
Dust Mapping And Control Plan Control Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 08
Suggestion
GAP between Conveyor and
bunker can be reduce so that
dust particle will go to the
bunker.
KAM
Target Date
Support Required
Dust Mapping And Control Plan Control Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 09
Suggestion
GAP can be reduce so that dust
particle will go to the bunker.
KAM
Target Date
Support Required
Dust Mapping And Control Plan Control Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 10
Suggestion
Conveyor can make close type by
using PVC screen arrangement
just like airport luggage x-ray
machine entrance.
KAM
Target Date
Support Required
Dust Mapping And Control Plan Control Plan Material Flow.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 11
Suggestion
Conveyor brush required during
return so that raw material can’t
transform.
KAM
Target Date
Support Required
Dust Mapping And Control Plan Control Plan Material Flow.
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 14
Control Plan : Transportation
Dust is generating during material flow due to
1. High Vehicles movement (Motion Study
required)
2. Internal Road conditions are not up to the
mark.
3. Leakage in Trucks
4. Speedy Movement.
Suggestion and possible cause : Transportation
Doc. No : BAL/DS/DMCP/A11-02 Dec’ 13 | Page - 1
Dust Mapping and Control Plan Control Plan Transportation.
Dust Generation
Mapping
Elimination &
Control Plan
Sustain
Dust Mapping& Control Plan.
Control Plan
Transportation
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Transportation.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Transportation.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Transportation.
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 15
Control Plan : Environment
Dust is generating during material flow due to
1. Open Raw Material Stock Yard
2. Chimney ( BAL Plant & Br. Plant )
3. Under Construction
4. Open Conveyer System
5. More Fines Generation during process.
6. Open Land Space – both inside and outside
the plant premises.
Suggestion and possible cause : Transportation
Doc. No : BAL/DS/DMCP/A11-02 Dec’ 13 | Page - 1
Dust Mapping and Control Plan Control Plan Environment.
Dust Generation
Mapping
Elimination &
Control Plan
Sustain
Dust Mapping& Control Plan.
Control Plan
Environment
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Environment.
Doc. No : BAL/DS/DMCP/A11-05 Dec’ 13 | Page - 3
Suggestion
KAM
Target Date
Support Required
Dust Mapping and Control Plan Control Plan Environment.
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 16
Control Plan : ROI of DMCP
During the pre-assessment the ROI of DMCP will be
calculated .
1. Direct financial benefits
1. Yield – Raw Materials.
2. Productivity improvement.
2. Furnace process stabilization for less dust
generation.
3. Man-hours involve.
4. Brand impact in socio economy life.
5. Employees health impact.
6. Intangible benefits.
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | Page - 17
Sustain
1. Dust Mapping Audit : Area Wise
2. Dust Mapping Score interlink with PMS.
3. Reward & Recognition Scheme for Dust
Mapping and Control Plan.
4. Raw Material (From Brqt. To Furnace )
Yield to be monitored and analyzed
periodically.
5. External Consultant for periodical
assessment.
6. Periodically visit for good manufacturing
practice Ferro alloys plant.
Du
st
Ge
ne
ra
tio
nM
ap
pin
gC
on
tro
l P
lan
Su
sta
in
Doc. No : BAL/DS/DMCP/A11 Dec’ 13 | END
BALASORE ALLOYS LIMITED.
Contact me QR Code
Download this presentation at : http://goo.gl/Zs9Ej4
DEEPAK KUMAR SAHOOEmail : [email protected]