dvcs-2 mechanical design status charles hyde guy reinmuth lpc clermont hall a dvcs collaboration...

19
DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

Upload: kerry-cain

Post on 29-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

DVCS-2Mechanical Design Status

Charles Hyde

Guy Reinmuth

LPC Clermont

Hall A DVCSCollaboration Meeting15-16 December 2008Monastir, Tunisia

Page 2: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

3D overview

Page 3: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

Data Acquisition Position

XY-Table

DVCS Stand

75cm

Page 4: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

Calorimeter: Plan View

Page 5: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

Elastic Calibration: Target to Calo = 5.6 m

No double cantilever

Page 6: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

Full Extension: Target to Calo = 6.24 m

Double cantilever

Page 7: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

Cable Passage, Light Isolation

Removable floor-plates

75 cm

HV, LV, DC: Flat ribbon cables to main patchSignal: RG58

Page 8: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

E00-110 Calorimeter Cabling

Page 9: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

E00-110 Patch Panel

Page 10: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

XY-Table in LED Calibration Position, 3m

• Black Box and XY-Table move separately Requires crane XY-Table cable

Page 11: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

XY-Table, Detail

New XY arms for 39x48 cm2 motion.

Page 12: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

XY-Table in LED Calibration Position

• Black Box and XY-Table move separately Requires crane XY-Table cable

Page 13: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

Blue Light

Page 14: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

Blue Light, with Ballasts

Page 15: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

Calo Blocks

• Add another square annulus to secure PMT base.

Page 16: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

SICCAS

Page 17: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

ATLAS and “MOD” R7877 PMTs

• Same pinout?

• Different shape.

• 100 PMT on order

Page 18: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

E00-110 General View

Page 19: DVCS-2 Mechanical Design Status Charles Hyde Guy Reinmuth LPC Clermont Hall A DVCS Collaboration Meeting 15-16 December 2008 Monastir, Tunisia

E00-110 General View / Patch Panel