    SINHGAD ACADEMY OF ENGINEERING, KONDHWA (BK) UNIT TEST I 2013-14

    Class: F.E Subject : Basic c iv i l & Environm enta l Engineer ing Term-I

    Date: 19/08/2013 Max. Marks: 25 Time: 30 Min

    INSTRUCTIONS

    1] Questions 1 to 25 carry 1 mark each question

    2] All Questions are compulsory

    Q 1) To carry out geotechnical investigation is a role of civil engineer in

    a) Construction of a dam b) Construction of a road

    c) Construction of a canal d) Everywhere in a),b) & c)

    Q2) Rehabilitation of people affected is a major concern in

    a) Construction of a dam b) Construction of a canal

    c) Construction of a road d) Construction of a bridge

    Q3) Calculation of earthwork that is volume of cutting and filling is required for

    a) Construction of a dam b) Construction of a canal

    c) Construction of a road d) Construction of a bridge

    Q4) Structural Design of various members is a role of civil Engineer in

    a) Construction of a dam b) Construction of a building

    c) Construction of a bridge d) Everywhere in a) ,b) & c)

    Q5) Relative positions of various points on the ground are determined in the horizontal plane by

    a) Surveying b) Estimation

    c) Leveling d) Construction Management

  • 8/14/2019 DWG BCE UT-1.docx

    2/4

    Q6) The part of the structure between ground level and first floor level is known as .

    a) Plinth b)Mega Structure

    c) Superstructure d) Substructure

    Q7) Optimal use of various resources for proper planning of various activities is ensured in.

    a) Surveying b) Estimation

    c) Leveling d) Project Management

    Q8) A G + 20 storied building is to be constructed. Which type of the structure will you allow?

    a) Framed structure b) Composite structure

    c) Load Bearing structure d) Compound structure

    Q9) A suitable site for construction of a dam is selected. Which of the following branches will

    Help you to determine the reservoir capacity?

    a) Surveying b) Estimation

    c) Leveling d) Project Management

    Q10) The road pavement which cannot change their shape to some extent without rupture

    are

    a) Rigid Pavement b) Flexible Pavement

    c) Semi rigid Pavement d) Loose Pavement

    Q11) A Sleeper rest on ..

    a) Ballast b) Sub base

    c) Rigid Pavement d) Rails

    Q12) In .. behavior of fluid is studied at the rest.

    a) Fluid Dynamics b) Fluid Statics

    c) Fluid Kinetics d) Fluid Kinematics

  • 8/14/2019 DWG BCE UT-1.docx

    3/4

    Q13) Stability analysis of the soil is studied in

    a) Surveying b) Construction Engineering

    c) Geotechnical Engineering d) Project Management

    Q14) which of the following is not a part of Environmental Engineering

    a) Sanitary Engineering b) Water Supply b) Geotechnical Engineering d) Environment pollution.

    Q15) A Potable water is

    a) Fit for drinking b) Unfit for drinking b) Not available d) none of these.

    Q 16) Waste water needs treatment

    a) So as to make it potable b) So as to make it safe for discharging in water source. b) Both (a) and (b) d) Neither ( a) nor (b) .

    Q17) An earthquake map of INDIA has been prepared by the Department showing zones

    Liable to severe, moderate and minor earthquakes.

    a) Metrological b) Survey

    b) Construction Engineering d) none of these.Q18) The point on the surface of the earth directly above the Hypocenter is called

    a) Epicenter b) Center b) Hypocenter d) none of these.

    Q19) Remote sensing in Surveying uses a sensor system that transfers and receive the energy in

    The form of.

    a) Electromagnetic waves b) U.V. rays b) Infrared rays d) Magnetic waves

    Q20) Ultimate bearing capacity of soil is given by

    a) S.B.C X F.S. b) S.B.C / F.S.c) F.S. / S.B.C d) None of these.

  • 8/14/2019 DWG BCE UT-1.docx

    4/4

    Q21) which is the example of substructure?

    a) Footing b) wall

    b) Parapet wall d) SlabQ22) When the load on the two close columns is unequal, Footing is used.

    a) Trapezoidal b) strap b) Rectangular d) Isolated Column

    Q23) The foundation is known as shallow when

    a) D B d) D < B

    Q24) Bearing capacity of soil is measured in

    a) KN/m2 b ) KN/m b) KN/m3 d) KN/m4

    Q25) The project management tool(s) is/are

    a) Bar Chart b ) Critical Path Method b) Project Evaluation And Review Technique d) All Of The Above