dwirs public meeting 2015 march 24
TRANSCRIPT
Tonight’s presentation
• About the project
• Looking ahead and what you’ll see
• Benefits and partnerships in your community
By the numbers
• 11,000 feet3’ to 6’ sewers in tunnel
• 2,700 feet15” to 7’ sewers in open-cut
• Plus structures, regulators, modifications
Schedule
• Construction Start Jan 2014
• Substantial Completion Nov. 2016
• Final Completion Sept. 2017
Planned Work ActivitiesOver the Next Three Months
Structural Concrete
Shaft Construction
Microtunneled Sewer
Construction Look Ahead0 to 30 Days
Road closure summary:
• E. 110th St./Hazeldell Rd.
between Glenview Ave and
Dundee Dr.
• E. 109th St. at St. Clair Ave.
• E. 109th St. at Elk Ave.
• E. 109th St. at Helena Ave.
• Elk Ave. at E. 107th St.
• Helena at E. 107th St.
• Linn Dr. at Linn Circle (New)
Construction Look Ahead0 to 30 Days
New road closure:
– Linn Drive at Linn Circle (south of Lima Ave.)
– Open to southerly one-way traffic north of FDR driveway.
Construction Look Ahead30 to 60 Days
Road closure summary:
• E. 110th St./Hazeldell Rd. between Glenview Ave and Dundee Dr.
• E. 109th St. at St. Clair Ave.
• E. 109th St. at Elk Ave.
• E. 109th St. at Helena Ave.
• Elk Ave. at E. 107th St.
• Helena at E. 107th St.
• Linn Dr. at Linn Circle
(NO NEW CLOSURES)
Construction Look Ahead60 to 90 Days
Road closure summary:
• E. 110th St./Hazeldell Rd. between Glenview Ave and Dundee Dr.
• E. 109th St. at St. Clair Ave.
• E. 109th St. at Elk Ave.
• E. 109th St. at Helena Ave.
• Elk Ave. at E. 107th St.
• Helena at E. 107th St.
• Linn Dr. at Linn Circle
(NO NEW CLOSURES)
Dugway Storage Tunnel(DST)
Contractor Selected:
SIH JV
• Const. Start Spring 2015
• Const. Completion Summer 2019
• 24 FT diameter Storage Tunnel
• 200 FT deep with 6 Shafts
• 15,000 LF
• Storage Volume of 51 MG
• CSO reduction of 376 MG/year
• Estimated Cost $153M
Future projects
Dugway South Relief Sewer
(DS)
Est. Start March 2016
Lakeview and Ada
East 140th Relief Sewer
Est. Start May 2016
Doan Valley Tunnel (DVT)
Est. Start June 2017
Lakeview and Ada
Superior Ave
Shoreline Storage Tunnel
(SST)
Est. Start March 2023
Forest Hills Park Mining
Site
SST
E140
DugwaySouth
DST
DVT
Community benefits
• Pollution reduction– System will prevent 110 million
gallons of combined sewer overflow every year
Community benefits
• Final roadway restoration will include new pavement
• Enhanced restoration will be considered
Good Neighbor Ambassadors
• Ambassador team will support neighborhood projects, receive training, and serve as Sewer District representatives to residents