HANDLING OF ALL WORK PACKAGES
Creation of a new Heavy Duty dynamic engine test bed from two existing test beds
• Calculations• 3Dmodellingofthetestbed• CivilWorksguidanceschematics• Studies,consultationsandtheirtechnical
adjustment...• CivilWorks• Acoustics• Airflow&Ventilation• Fluids• Electricalengineering• Mechanics• Dynamometer• Standardtestscompliantwithregulations
Services proposed by D2T:
P. 5
STEP 1: CIVIL WORKS
1.Protectionoftheconstructionareafromdust.
2.Preparationofseismicblockfoundations.
3.Cuttingtheloadbearingwallbetweenthetwocells.
4.Extractionofthecutblocksbyslicesofonetoneach
P. 6
STEP 2: ACOUSTICS
1.Layingofcabletrays2. Installationoftheacousticpanels:
wallsandceilings3. Integrationofthecabletraysinthe
walls4.Finishingworkforopenings
P. 7
STEP 3: SETTING OF THE TEST BED PLATE
1.Preparationofagatewaytoreachthetestbed,tocarrytheload.2.Receiptoftheironframeforreceivingconcrete.3.Settingdecouplingspringboxesat3Hz.4.Frameintendedtoreceivetheconcreteonthespringboxes.Fillingthe
concrete,vibratedconcrete.5. Implementationofthetestbedplate,thenpouringtheresinbetween
thetestbedplateandtheconcrete.
P. 9
STEP 5: FLOOR, BLOCK WALLS, FIRE SAFETY
Settingoftheblockpanelsontheexteriorwalls
Firefightingequipment
Raisedpatternplateandduckboards
P. 10
STEP 6: AIR FLOW & VENTILATION
• Doubleflowcellairtreatmentunitwithenergyrecoverybetweenventilationandextraction
• Temperatureconditioningofcombustionair• Humidity
P. 11
STEP 7: ELECTRICAL ENGINEERING
Settingofelectricalcabinets:• Distributioncontrolandsafetycabinet• Ventilationcabinet• Powercabinet,dynamometerdrive.• Connectionandinstallationofthe
dynamometer