![Page 1: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/1.jpg)
Dynamic Scheduling ofNetwork Updates
Based on the slides by Xin JinHongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan,
Ming Zhang, Jennifer Rexford, Roger Wattenhofer
Presented by Sergio Rivera
![Page 2: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/2.jpg)
2
SDN: Paradigm Shift in Networking
• Many benefits– Traffic engineering [B4, SWAN]
– Flow scheduling [Hedera, DevoFlow]
– Access control [Ethane, vCRIB]
– Device power management [ElasticTree]
• Systems operate by updating the data plane state of the network (periodically or by triggers)
Controller• Direct and centralized updates of forwarding rules in switches
![Page 3: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/3.jpg)
3
Motivation• Time to update switch rules varies and leads to slow
network updates: – Switch hardware capabilities– Control load on the switch– Nature of updates– RPC delays (not that much…)
• Controlled experiments explore the impact of four factors:– # rules to be updated– Priorities of the rules– Type of rules (insertion vs modification)– Control load
![Page 4: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/4.jpg)
4
Observations
Single-Priority rules
3.3 ms per-rule update time
Random-priority rules
Reaches 18 ms per-rule update time when inserting 600 rules
![Page 5: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/5.jpg)
5
Observations (cont’d).
Modifying rules (TCAM starts with 600 single-priority rules)
11 ms per-rule modification time (insert & delete).
Control activities were performed while updating 100 rules
Time to update highly varies. (e.g. 99th percentile vs. 50th percentile)
>10x
Even in controlled conditions, switch update time varies significantly!
![Page 6: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/6.jpg)
6
Network Update is Challenging• Requirement 1: fast– Slow updates imply longer periods where congestion or
packet loss occur
• Requirement 2: consistent– No congestion, no blackhole, no loop, etc.
Network
Controller
![Page 7: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/7.jpg)
7
What is Consistent Network Update
Current State
A
D
CB
EF1: 5 F4: 5
F2: 5 F3: 10
Target State
A
D
CB
E
F1: 5
F4: 5
F2: 5 F3: 10
![Page 8: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/8.jpg)
8
What is Consistent Network Update
• Asynchronous updates can cause congestion• Need to carefully order update operations
Current State
A
D
CB
EF1: 5 F4: 5
F2: 5 F3: 10
Target State
A
D
CB
E
F1: 5
F4: 5
F2: 5 F3: 10
A
D
CB
EF4: 5F1: 5
F3: 10F2: 5
Transient State
![Page 9: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/9.jpg)
9
Existing Solutions are Slow
• Existing solutions are static [ConsistentUpdate’12, SWAN’13, zUpdate’13]
– Pre-compute an order for update operations
F3
F4
F2
F1
StaticPlan A
Target StateCurrent State
A
D
CB
EF4: 5
F2: 5
F1: 5
F3: 10A
D
CB
E
F1: 5
F4: 5
F2: 5 F3: 10
![Page 10: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/10.jpg)
10
Existing Solutions are Slow
• Existing solutions are static [ConsistentUpdate’12, SWAN’13, zUpdate’13]
– Pre-compute an order for update operations
• Downside: Do not adapt to runtime conditions– Slow in face of highly variable operation completion time
F3
F4
F2
F1
StaticPlan A
![Page 11: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/11.jpg)
11
Static Schedules can be Slow
F3
F4
F2 F1StaticPlan B
F3
F4
F2
F1
StaticPlan A
F1F2F3F4
Time1 2 3 4 5
F1F2F3F4
Time1 2 3 4 5
F1F2F3F4
Time1 2 3 4 5
F1F2F3F4
Time1 2 3 4 5
Target StateCurrent State
A
D
CB
EF4: 5
F2: 5
F1: 5
F3: 10A
D
CB
E
F1: 5
F4: 5
F2: 5 F3: 10
No static schedule is a clear winner under all conditions!
![Page 12: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/12.jpg)
12
Dynamic Schedules are Adaptive and Fast
F3
F4
F2 F1StaticPlan B
F3
F4
F2
F1
StaticPlan A
Target StateCurrent State
A
D
CB
EF4: 5
F2: 5
F1: 5
F3: 10A
D
CB
E
F1: 5
F4: 5
F2: 5 F3: 10
No static schedule is a clear winner under all conditions!
F3
F4
F2F1
DynamicPlan
Adapts to actual conditions!
![Page 13: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/13.jpg)
13
Challenges of Dynamic Update Scheduling
• Exponential number of orderings• Cannot completely avoid planning
Current State
A
D
CB
EF3: 5
F2: 5
F1: 5F4: 5
F5: 10
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
![Page 14: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/14.jpg)
14
Challenges of Dynamic Update Scheduling
• Exponential number of orderings• Cannot completely avoid planning
Current State
A
D
CB
EF3: 5F1: 5
F4: 5
F5: 10
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5F2: 5
F2
Deadlock
![Page 15: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/15.jpg)
15
Challenges of Dynamic Update Scheduling
• Exponential number of orderings• Cannot completely avoid planning
Current State
A
D
CB
EF3: 5
F2: 5
F4: 5
F5: 10
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
F1
F1: 5
![Page 16: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/16.jpg)
16
Challenges of Dynamic Update Scheduling
• Exponential number of orderings• Cannot completely avoid planning
Current State
A
D
CB
E
F2: 5
F4: 5
F5: 10
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
F1 F3
F1: 5
F3: 5
![Page 17: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/17.jpg)
17
Challenges of Dynamic Update Scheduling
• Exponential number of orderings• Cannot completely avoid planning
Current State
A
D
CB
E F4: 5
F5: 10
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
F1 F3 F2
Consistent update plan
F2: 5
F1: 5
F3: 5
![Page 18: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/18.jpg)
18
Dionysus Pipeline
Dependency Graph Generator
Update Scheduler
Network
CurrentState
TargetState
ConsistencyProperty
Encode valid orderings
Determine a fast order based on constraints of CP
• Balance planning and opportunism using a two-stage approach
Scheduler is independent of CP
![Page 19: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/19.jpg)
19
Dependency Graph Generation
Dependency Graph Elements
Operation node
Resource node (link capacity, switch table size)Node
Edge Dependencies between nodes
Path node
Current State
A
D
CB
EF3: 5
F2: 5
F1: 5F4: 5
F5: 10
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
Group operations and link capacity resources
![Page 20: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/20.jpg)
20
Dependency Graph Generation
Current State
A
D
CB
EF3: 5
F2: 5
F1: 5F4: 5
F5: 10
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
MoveF3
MoveF1
MoveF2
![Page 21: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/21.jpg)
21
Dependency Graph Generation
Current State
A
D
CB
EF3: 5
F2: 5
F1: 5F4: 5
F5: 10
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
A-E: 5
MoveF3
MoveF1
MoveF2
![Page 22: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/22.jpg)
22
Dependency Graph Generation
Current State
A
D
CB
EF1: 5
F4: 5
F5: 10
A-E: 5
5
MoveF3
MoveF1
MoveF2
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
F3: 5
F2: 5
![Page 23: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/23.jpg)
23
Dependency Graph Generation
A-E: 55
5
MoveF3
MoveF1
MoveF2
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
Current State
A
D
CB
EF3: 5
F2: 5
F1: 5F4: 5
F5: 10
![Page 24: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/24.jpg)
24
Dependency Graph Generation
A-E: 55
55
MoveF3
MoveF1
MoveF2
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
Current State
A
D
CB
EF3: 5
F2: 5
F1: 5F4: 5
F5: 10
![Page 25: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/25.jpg)
25
Dependency Graph Generation
A-E: 55
D-E: 0
5
5 5
5
MoveF3
MoveF1
MoveF2
Target State
A
D
CB
E
F1: 5
F3: 5F4: 5
F5: 10
F2: 5
Current State
A
D
CB
EF3: 5
F2: 5
F1: 5F4: 5
F5: 10
![Page 26: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/26.jpg)
26
Dependency Graph Generation
• DG captures dependencies but still leaves scheduling flexibility.
• Two challenges in dynamically scheduling updates:– Cycle resolution in the DG– At any given time, decide which subset of rules will be
issued first
![Page 27: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/27.jpg)
27
Dependency Graph Generation
• Supported scenarios– Tunnel-based forwarding: WANs– WCMP forwarding: data center networks
• Supported consistency properties– Loop freedom– Blackhole freedom– Packet coherence– Congestion freedom
![Page 28: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/28.jpg)
28
Tunnel-Based Forwarding• A flow is forwarded along one or more tunnels• Ingress switch tags packet with the tunnel identifier• Ingress switch splits incoming traffic accross the
tunnels based on configured weights.
• Offers loop freedom and packet coherence by design
• Blackhole freedom is guaranteed if:– A tunnel is fully established before the ingress switch puts
any traffic on it– All traffic is removed from the tunnel before the tunnel is
deleted
![Page 29: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/29.jpg)
29
Tunnel-Based Dependency Graph
S4-S5: 10
5D
A
p3 p2
5C
S1-S4: 10
S5: 50
S1: 50
S4: 50
1
1
1
55
EFG
S2: 50
S1-S2: 0
S2-S5: 5
5
5
1
1
B1
![Page 30: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/30.jpg)
30
WCMP Forwarding
• Switches at every hop match on packet headers and split flows over multiple next hops with configured weights
• Packet coherence is based on version numbers:– Ingress switch tags each packet with a version number– Downstream switches handle packets based on the embedded
version number– Tagging ensures packets never mix configurations
• Blackhole- and Loop-Freedom is possible: – Do not require versioning – Can be encoded in the dependency graph – (authors omit description of graph construction for such
conditions)
![Page 31: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/31.jpg)
31
WCMP Dependency Graph
S4-S5: 10Yp3 p2
5
S1-S4: 10
S2: 50
5
5
S1-S2: 0
S2-S5: 5
5
5
1
1
@S1: [(S2, 1) , (S4,0)] -> [(S2, 0.5) , (S4, 0.5)]
@S2: [(S3, 0.5) , (S5, 0.5)] -> [(S3, 1) , (S5, 0)]
X
Z
@S4: Has only one next-hop. No change needed
![Page 32: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/32.jpg)
32
Dionysus Pipeline
Dependency Graph Generator
Update Scheduler
Network
CurrentState
TargetState
ConsistencyProperty
Encode valid orderings
Determine a fast order
![Page 33: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/33.jpg)
33
Dionysus Scheduling
• Scheduling as a resource allocation problem
A-E: 55
D-E: 0
5
5 5
5
MoveF3
MoveF1
MoveF2
• How to allocate available resources to operations to minimize the update time?
![Page 34: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/34.jpg)
34
Dionysus Scheduling
• Scheduling as a resource allocation problem
A-E: 0
D-E: 0
5
5 5
5
MoveF3
MoveF1
MoveF2
Deadlock!
![Page 35: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/35.jpg)
35
Dionysus Scheduling
• Scheduling as a resource allocation problem
A-E: 05
D-E: 05 5
5
MoveF3
MoveF1
MoveF2
![Page 36: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/36.jpg)
36
Dionysus Scheduling
• Scheduling as a resource allocation problem
A-E: 05
D-E: 55
5
MoveF3
MoveF2
![Page 37: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/37.jpg)
37
Dionysus Scheduling
• Scheduling as a resource allocation problem
A-E: 05
5
MoveF3
MoveF2
![Page 38: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/38.jpg)
38
Dionysus Scheduling
• Scheduling as a resource allocation problem
A-E: 55 Move
F2
![Page 39: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/39.jpg)
39
Dionysus Scheduling
• Scheduling as a resource allocation problem
MoveF2
Done!
![Page 40: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/40.jpg)
40
Dionysus Scheduling
• Scheduling as a resource allocation problem
• NP-complete problems under link capacity and switch table size constraints
• Approach– DAG: always feasible, critical-path scheduling to solve ties– Convert to a virtual DAG (general case include cycles)– Rate limit flows to resolve deadlocks
![Page 41: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/41.jpg)
41
Critical-Path Scheduling
• Calculate critical-path length (CPL) for each node
– Extension: assign larger weight to operation nodes if we know in advance the switch is slow
• Resource allocated to operation nodes with larger CPLs
A-B:5
CPL=3
C-D:0
5
CPL=1
5
5 5
5
CPL=1
CPL=2
CPL=2
CPL=1
MoveF4
MoveF3
MoveF2
MoveF1
![Page 42: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/42.jpg)
42
Critical-Path Scheduling
• Calculate critical-path length (CPL) for each node
– Extension: assign larger weight to operation nodes if we know in advance the switch is slow
• Resource allocated to operation nodes with larger CPLs
A-B:0
CPL=3
C-D:0
5
CPL=1
5
5
5
CPL=1
CPL=2
CPL=2
CPL=1
MoveF4
MoveF3
MoveF2
MoveF1
![Page 43: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/43.jpg)
43
Handling Cycles
• Convert to virtual DAG– Consider each strongly connected
component (SCC) as a virtual node
CPL=1CPL=3
weight = 1weight = 2
• Critical-path scheduling on virtual DAG– Weight wi of SCC: number of operation nodes
A-E: 55
D-E: 0
5
5 5
5
MoveF3
MoveF1
MoveF2
MoveF2
![Page 44: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/44.jpg)
44
Handling Cycles
• Convert to virtual DAG– Consider each strongly connected
component (SCC) as a virtual node
CPL=1CPL=3
weight = 1weight = 2
• Critical-path scheduling on virtual DAG– Weight wi of SCC: number of operation nodes
A-E: 05
D-E: 05 5
5
MoveF3
MoveF1
MoveF2
MoveF2
![Page 45: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/45.jpg)
45
Deadlocks may still happen• The algorithm does not find feasible solution among all
possible orderings (problem hardness)
• No feasible solution exists even if the target state is valid
• Resolve deadlocks reducing flow rates (informing rate limiters)
![Page 46: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/46.jpg)
46
Resolving Deadlocks
• K* = Max number of flows rate limited each time (affects throughput).
• Centrality to decide the order of iteration.• Resource consumption by path-nodes or tunnel-add
operations must happen within the same SCC.
![Page 47: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/47.jpg)
47
Resolving Deadlocks (cont’d)• K* = 1
R3:0 P5
8A P6 R1:0
8
R2:0
P1
C
P4
P2
P7
B P3
8
88 8
4 4
4
44
4
4
4
• By centrality, node A is selected.
• Reduces 4 units of traffic on both P6 and P7.
![Page 48: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/48.jpg)
48
Resolving Deadlocks (cont’d)• K* = 1
R3:0 P5
8A P6 R1:0
R2:0
P1
C
P4
P2
P7
B P3
8
88 8
0 4
4
44
4
0
4
• Which releases 4 units of free capacity in R1 and R2
8
![Page 49: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/49.jpg)
49
Resolving Deadlocks (cont’d)• K* = 1
R3:0 P5
8A R1:4
R2:4
P1
C
P4
P2B P3
8
88 8
4
44
4
• A has no children. It does not belong to the SCC any more
• C is scheduled and partially schedules B
8
![Page 50: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/50.jpg)
50
Resolving Deadlocks (cont’d)• K* = 1
R3:0 P5
0/8A R1:0
0/8
R2:0 C
P4
P2B P3
4/8 4/8 4 4
• Moves 4 units from P3 to P4
• After C finishes, it schedules the remainded operation B
4/8
4/8
![Page 51: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/51.jpg)
51
Resolving Deadlocks (cont’d)• K* = 1
R3:4 P5
0/8A R1:0
0/8
R2:4
P4
B P3
0/4 0/4
• For node A, increase its rate on P5 as long as R3 receives free capacity released by P4
0/4
0/4
![Page 52: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/52.jpg)
52
Resolving Deadlocks (cont’d)• K* = 1
R3:0 P5
4/8A R1:0
4/8
R2:0
P4
B
• For node A, increase its rate on P5 as long as R3 receives free capacity released by P4
4/4
4/4
![Page 53: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/53.jpg)
53
Resolving Deadlocks (cont’d)• K* = 1
R3:4 P5
4/8A R1:0
4/8
R2:0
• For node A, increase its rate on P5 as long as R3 receives free capacity released by P4
![Page 54: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/54.jpg)
54
Resolving Deadlocks (cont’d)• K* = 1
R3:0 R1:0
R2:0
NO DEADLOCK!
![Page 55: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/55.jpg)
Evaluation: Testbed – TE CaseStraggler switches (+500 ms latency)
Install Tunnel
Remove Tunnel
![Page 56: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/56.jpg)
Evaluation: Testbed – Failure Recovery CaseStraggler switches (+500 ms latency)
Install Tunnel
Remove Tunnel
![Page 57: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/57.jpg)
Evaluation: Large-Scale Simulations• Focus on congestion freedom as consistency property
• WAN: Dataset from a large WAN that interconnects O(50) sites.o Collect traffic logs on routers every 5-minute intervalso 288 traffic matrices collected. (each is a different state)o Tunnel-based routing is used
• DC: Dataset from a large data center network with several hundred switches. o Collect traffic traces by logging the socket events on all servers and
aggregate into ToR-to-ToR flows over 5-minutes intervals o 288 traffic matrices collected per day o 1500 largest flows are chosen (40-60% of all traffic)o 1500 as switch rule memory size
• Alternative approaches: OneShot (opportunistic) and SWAN (static)
![Page 58: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/58.jpg)
58
Evaluation: Update Time
99th
90th
50th
Dionysus outperforms SWAN in both configurations. For instance, in WAN TE:• Normal: 57% - 49% - 52% faster • Straggler: 88% - 84% - 81% faster
![Page 59: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/59.jpg)
59
Evaluation: Link Oversubscription (WAN Failure Recovery – Random Link)
• Least oversubscription among the three• Reduces oversubscription by 41% (N) - 42% (S) < SWAN• Update time: 45% (N) - 82% (S) faster in the 99th percentile
![Page 60: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/60.jpg)
Evaluation: Deadlocks
• Planning-based approaches lead to no deadlocks• Opportunistic approach deadlocks 90% (WAN) and 70% (DC)
of the time
WAN Topology is less regular than DC topology (i.e., more complex dependencies)
![Page 61: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/61.jpg)
61
Evaluation: Deadlocks (cont’d)
10% memory slack = Memory size as 1100 when switch is loaded with 1000 rules
K*=5 in RateLimit algorithm
![Page 62: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/62.jpg)
62
Conclusion
• Dionysus provides fast, consistent network updates through dynamic scheduling– Dependency graph: compactly encodes orderings– Scheduling: dynamically schedules operations
Dionysus enables more agile SDN control loops
![Page 63: Dynamic Scheduling of Network Updates Based on the slides by Xin Jin Hongqiang Harry Liu, Rohan Gandhi, Srikanth Kandula, Ratul Mahajan, Ming Zhang, Jennifer](https://reader036.vdocument.in/reader036/viewer/2022062320/56649c765503460f9492abbc/html5/thumbnails/63.jpg)
63
Thanks!