DESCRIPTION
Wind 2 Power Investment in Bulgaria. e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564 f. +359-2-981-8870 e-mail: [email protected]. Prof. George Angelow President. eec Ltd, Bulgaria is a branch of eec LLC, DC, USA. Company Profile. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/1.jpg)
east electric company, Ltd.20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564 f. +359-2-981-8870 e-mail: [email protected]
eec Ltd, Bulgaria is a branch of eec LLC, DC, USA
Prof. George AngelowPresident
WindWind22Power Power Investment in BulgariaInvestment in Bulgaria
![Page 2: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/2.jpg)
east electric company (eec) is the portfolio company of a line of projects for development of power production on renewables, • run-of-river hydro-power,• bio-gas from land-fills,• wind,• solar and hybrid renewable energy facilities and systems.
It is an eec's ordinary, but not mandatory, practice to be stockholder in these companies. As the experts usually assert it is more than 50 percent of the prerequisite of every such project for the acquisition of the certificates, other permits and licenses, including an eligible wind velocity measuring as it is required under the local country and EU regulations.
eec is the operator providing to its partners all these instruments.
eec is member of Lions Club, Paris.
Company ProfileCompany Profile
www.eec.us.com
![Page 3: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/3.jpg)
Wind Power in BulgariaWind Power in Bulgaria
There are good conditions in Bulgaria for construction of wind farms, more specifically along the sea coast and at places with altitude of 1,000 meters or higher.
There is a 20-percent bonus for development of renewables in Bulgaria as associated to the EU when the financing is provided by the EBRD. The Green Certificate issue is the next step of the Government policy for encouraging the investors. The purchase price of the wind energy is one of the highest in the EU.
Following the EU Regulations , 11 percent of the power consumption from 2010 should be from renewables. A part of it could be the wind energy.On the map you can see the windy areas in three groups according to the wind density.Several zones of them are in the focus of our exploration—Cape Emine, Resovo and the ridge of the west mountain chain—Golo Bardo Mountain is one of the most appropriate areas.
Cape Emine
Resovo
Stara Planina
>1000 W/m2 300-999 W/m2 200-299 W/m2
Pernik
![Page 4: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/4.jpg)
SOFIA
PERNIKPERNIK
RESOVORESOVO
KAZANLUKKAZANLUK
east electric company, Ltd. intends to prepare four construction sites for wind farms:• West wind zone – Pernik (two areas) and Trun (wind measuring in progress), • Kazanluk 1 and 2 (two areas in the foothills of Stara Planina Mountain),• Cape Emine (wind measuring in progress),• Cape Resovo.
Wind zone with measurementsMeasurements in progress
TRUNTRUN
![Page 5: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/5.jpg)
West Wind Zone “Pernik”West Wind Zone “Pernik”
Golo Burdo Mountain Golo Burdo Mountain Peak VetrushkaPeak Vetrushka Area: Area: 300,000 m300,000 m22
Number of wind Number of wind turbines:*turbines:*at least at least 100 x 3.6 MW 100 x 3.6 MW
Lubash Mountain, Peak LubashLubash Mountain, Peak Lubash Area Area 20,000 m20,000 m22 Number of wind turbines:*Number of wind turbines:*at least at least 10 x 3.6 MW10 x 3.6 MW
Both areas are about 24 miles from Sofia
* The exact number and the generators‘ output power depend on both the construction design and supplier of the equipment for each site.
![Page 6: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/6.jpg)
Month
Win
d ve
loci
ty, m
/sWest Wind Zone “Pernik-1”West Wind Zone “Pernik-1”
Golo Burdo Mountain Peak VetrushkaGolo Burdo Mountain Peak Vetrushka
Pow
er, k
w
Annual Energy Yield: 10,500 MW/h per turbineAnnual Revenue: € 819,000 /turbineNumber of Turbines:* 100; 3.6 MW each
Month
80 m10 m
Wind Rose (directional distributionof wind) of Golo Burdo Mountain, Peak Vetrushka.
* The exact number and the generators‘ output power depend on both the construction design and supplier of the equipment for each site.
![Page 7: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/7.jpg)
Wind Zones “Kazanluk”Wind Zones “Kazanluk”
These photos picture the nature of the twoKazanluk wind zones in the four directions.
Kazanluk-1Kazanluk-1 Area Area 250,000 m250,000 m22
Number of wind turbines:Number of wind turbines:at least at least 80 x 3.6 MW 80 x 3.6 MW
Kazanluk-2Kazanluk-2 Area Area 140,000 m140,000 m22
Number of wind turbines:Number of wind turbines:at least at least 35 x 3.6 MW 35 x 3.6 MW
* The exact number and the generators‘ output power depend on both the construction design and supplier of the equipment for each site.
![Page 8: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/8.jpg)
Annual Energy Yield: 8,500 MW/h per turbineAnnual Revenue: € 66,300 /turbineNumber of Turbines: 80; 3.6 MW each
Month
Win
d ve
loci
ty, m
/sPo
wer
, kw
Month
80 m10 mWind Rose (directional distributionof wind) of Kazanluk-1 area.
Wind Zone “Kazanluk-1”Wind Zone “Kazanluk-1”
* The exact number and the generators‘ output power depend on both the construction design and supplier of the equipment for each site.
![Page 9: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/9.jpg)
Wind Zone “Shabla”Wind Zone “Shabla”
Annual Energy Yield: 9,000 MW/h per turbineAnnual Revenue: € 702,000 /turbineNumber of Turbines: 35; 3.6 MW each
Month
Win
d ve
loci
ty, m
/sPo
wer
, kw
Month
80 m10 m
Wind Rose (directional distributionof wind) of Shabla area.
* The exact number and the generators‘ output power depend on both the construction design and supplier of the equipment for each site.
![Page 10: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/10.jpg)
Wind Zone “Resovo”Wind Zone “Resovo”
Area: Area: 11,000 m11,000 m22
Number of Wind Turbines:* Number of Wind Turbines:* 3 x 3.6 MW 3 x 3.6 MW
This is the most attractive windy site in the country—the most southerly area on the coast bordering Turkey .
* The exact number and the generators‘ output power depend on both the construction design and supplier of the equipment for each site.
![Page 11: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/11.jpg)
Wind Zone “Resovo”Wind Zone “Resovo”
Annual Energy Yield: 9,600 MW/h per turbineAnnual Revenue: € 748,800 /turbineNumber of Turbines:* 3; 3.6 MW each
Month
Win
d ve
loci
ty, m
/sPo
wer
, kw
Month
80 m10 mWind Rose (directional distributionof wind) of Resovo area.
* The exact number and the generators‘ output power depend on both the construction design and supplier of the equipment for each site.
![Page 12: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/12.jpg)
Wind Zone “Emine”Wind Zone “Emine”
![Page 13: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/13.jpg)
In ProgressIn Progress
• Wind Zone “Trun”, area: 210,000 m2; altitude: 1,700 m the wind velocity measurement is still in progress.
• Wind Zone “Pernik” - Lubash Mountain, Peak Lubash, area: 210,000 m2; the wind velocity measurement is still in progress.
• Wind Zone “Kazanluk-2”, area: 140,000 m2 in the foothills of Stara Planina Mountain; obtaining certificates of ownership of the part
of the above-specified land is in progress yet.
• Wind Zone “Emine”, area: 140,000 m2 on the sea coast; windy zone certified with about 1,000 W/m2 density of the wind; the wind velocity measurement is still in progress.
![Page 14: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/14.jpg)
Wind Velocity Measurement , Extrapolations and ComputingWind Velocity Measurement , Extrapolations and Computing
Meteorological Data: Meteorological Data:
• Cross reference of wind velocity/density—direct measurement by anemometer and through ultrasound facility on 10 m, 20 m and 30 m height on discrete of each 10 min and averaged covering a of the last 10 years.
• The temperature and humidity of the air for monthly one year average measured all above mentioned data obtained by, compared with the information delivered by the Metrological Centers of both the Bulgarian and Texas (U.S.A.) Air Forces.
• Software extrapolation of the data for 80 m height.
• Software extrapolation of the physical data for the period of 10 years.
Power Estimations: Power Estimations:
• Power (kW) and Annual Energy Yield (MW/h) were calculated for General Electric 3.6 MW wind turbines using the Standard Rayleigh distribution and unobstructed air flow.
![Page 15: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/15.jpg)
eeast eelectric ccompany, Ltd.
What the Investor May Expect from Cooperation with What the Investor May Expect from Cooperation with eeceec Land procurement (the land in Bulgaria is still the cheapest in EU). Exchange the purpose of the land (from agricultural to industrial for construction of wind turbines). Meteorological data—wind velocity measurement and treatment (see the previous slide).Environmental Study with Excel-based Time-table Pro-forma Budgeting of cash flows with profitability evaluation and sensitivity analyses concerning the wind velocity fluctuation risk factor on annual bases.Proof the wind turbine ecological impact – certificate issued by the Ministry of Ecology. Adaptation of the engineering design to the local regulation requirements (very important). Permission for starting industrial design, construction and other certificates (optional).* Design for optimal location of the wind turbines with horizontal axes (HAWT).SWOT analyses of two alternatives for funding—through Grand Scheme of the EBRD and Ex-In Bank of the United States.**
* These certificates follow the general construction design.
** eec eec Ltd., Bulgaria, is subsidiary of eeceec Inc., Washington, DC, therefore we could inquire for offering equipment and other capital goods on US pricing level (lower than the quoted to EU), term of delivery and other commercial provisions.
www.eec.us.com
![Page 16: e ast e lectric c ompany , Ltd. 20 Felix Kaniz St., Sofia 1606, Bulgaria t. +359-2-852-4564](https://reader031.vdocument.in/reader031/viewer/2022013101/5681420b550346895dadff8d/html5/thumbnails/16.jpg)
eeast eelectric ccompany, Ltd.
www.eec.us.com
Message to the InvestorsMessage to the InvestorsOur whole experience is at your service. We hope you will make use of it. We should appreciate the opportunity of showing how efficiently we can serve you.
If we can answer any questions, we shall be glad to do so.
Managing Staff,
Signature:
Thank you for your timeThank you for your time