e d s a · 2020. 2. 13. · shop service elevator information up information ee rm. x- ray result...

20
RECREATION AREA LOT 14, BLK 3 10 8 SEWAGE TREATMENT PLANT (STP) PERIMETER LINE PERIMETER LINE PERIMETER LINE P T U A Z O N B L V D E D S A LOCATION: PROJECT TITLE: SHEET NO. PREPARED BY: CHECKED BY: APPROVED BY: R E C O M M E N D A P P R O V A L: POLICE MAJOR CHIEF, PLANS & DESIGN SECTION JAMES A ESPORAS DIRECTOR, ENGINEERING SERVICE POLICE BRIGADIER GENERAL OIC, INFRASTRUCTURE DIVISION POLICE LIEUTENANT COLONEL ROLLY P ONOFRE POLICE COLONEL ABELARDO C MATILLANO CHIEF OF STAFF, ENGINEERING SERVICE PDS_IDFILES A PROPOSED CAMP PANOPIO MASTER DEVELOPMENT PLAN SUBMITTED BY: EDWIN C ROQUE THE DIRECTOR FOR LOGISTICS POLICE MAJOR GENERAL CAMILO PANCRATIUS P CASCOLAN THE CHIEF OF DIRECTORIAL STAFF POLICE LIEUTENANT GENERAL OSCAR D ALBAYALDE CHIEF, PHILIPPINE NATIONAL POLICE POLICE GENERAL EXISTING (RETAIN) PERIMETER FENCE 218.06 15.00 39.93 55.10 ENTRY ENTRY EXIT ENTRY EXIT BLDG NO. BLDG NAME FLOOR AREA BLDG DIMENSION NO. OF STOREY 7 8 9 11 12 13 14 SEWAGE TREATMENT PLANT(STP) HS DORMITORY MULTI-PURPOSE BUILDING MEDICAL STAFF QUARTERS CHAPEL PARKING BLDG 1 STOREY BLDG 4 STOREY BLDG 4 STOREY BLDG 1 STOREY BLDG 5 STOREY BLDG 24.00M X 36.00M 4,320.00 SQM 2,143.75 SQM 646.00 SQM 1,354.50 SQM 144.00 SQM 144.00 SQM 12.00M X 12.00M 4 STOREY BLDG 17.50M X 24.50M 12.00M X 12.00M 19.00M X 34.00M 10.50M X 25.80M 10 SECURITY & ADMIN BUILDING 1 STOREY BLDG 64.00 SQM 8.00M X 8.00M BLDG NO. BLDG NAME FLOOR AREA BLDG DIMENSION NO. OF STOREY 1 2 1 STOREY BLDG 1 STOREY BLDG 160.00 SQM 150.00 SQM 1 STOREY BLDG 10.00 M X 15.00 M 2.00 M X 3.50 M 5 STOREY WITH ROOFDECK PNP MEDICAL CENTER 18.00 SQM 3.00 M X 6.00 M 3 GUARD HOUSE POWER HOUSE GARBAGE HOUSE/MRF 4 5 POLICE STATION (existing) 2,143.75 SQM 17.50M X 24.50M 22,788.00 SQM 288.00 SQM 12.00 M X 12.00 M 2 STOREY BLDG MEDICAL STAFF QUARTERS MEDICAL FACILITIES ( UPPER LEVEL ) 6 LAUNDRY FACILITY 1 STOREY BLDG 4.00M X 8.00M 32.00 SQM QUARTERING FACILITIES FOR PERSONNEL ( LOWER LEVEL ) PED GATE ENTRY/EXIT ENTRY/EXIT SCALE 1: 20 METERS 38.51 SITE DEVELOPMENT PLAN OMEGA JIREH D FIDEL P. TUAZON BLVD., COR. PLANAS ST., BARANGAY KAUNLARAN, CUBAO, Q.C. 229.68 35.03 264.69 92.58 PHASE 2 PUMP HOUSE SEPTIC TANK CISTERN POLICE COLONEL BENJAMIN C VILLASIS, JR DEPUTY DIRECTOR, ENGINEERING SERVICE .\signatures\esporas.png

Upload: others

Post on 10-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • RECREATIONAREA

    LOT 14, BLK 3

    10

    8

    SEWAGETREATMENTPLANT (STP)

    PERIMETERLINE

    PER

    IMET

    ERLI

    NE

    PERIMETERLINE

    P T

    U

    A

    Z

    O

    N

    B

    L V

    D

    E D S A

    LOCATION:

    PROJECT TITLE: SHEET NO.PREPARED BY:

    CHECKED BY:

    APPROVED BY:R E C O M M E N D A P P R O V A L:

    POLICE MAJOR CHIEF, PLANS & DESIGN SECTION

    JAMES A ESPORAS

    DIRECTOR, ENGINEERING SERVICEPOLICE BRIGADIER GENERAL

    OIC, INFRASTRUCTURE DIVISIONPOLICE LIEUTENANT COLONELROLLY P ONOFRE

    POLICE COLONELABELARDO C MATILLANO

    CHIEF OF STAFF, ENGINEERING SERVICE PDS_IDFILES

    APROPOSED CAMP PANOPIO

    MASTER DEVELOPMENT PLAN

    SUBMITTED BY:

    EDWIN C ROQUE

    THE DIRECTOR FOR LOGISTICSPOLICE MAJOR GENERAL

    CAMILO PANCRATIUS P CASCOLAN

    THE CHIEF OF DIRECTORIAL STAFFPOLICE LIEUTENANT GENERAL

    OSCAR D ALBAYALDE

    CHIEF, PHILIPPINE NATIONAL POLICEPOLICE GENERAL

    EXISTING (RETAIN)PERIMETER FENCE

    218.06 15.00

    39.93

    55.10

    ENTRY

    ENTRYEXIT

    ENTRY

    EXIT

    BLDG NO. BLDG NAME FLOOR AREA BLDG DIMENSION NO. OF STOREY

    789

    11121314 SEWAGE TREATMENT PLANT(STP)

    HS DORMITORY

    MULTI-PURPOSE BUILDINGMEDICAL STAFF QUARTERS

    CHAPELPARKING BLDG

    1 STOREY BLDG4 STOREY BLDG4 STOREY BLDG

    1 STOREY BLDG5 STOREY BLDG24.00M X 36.00M4,320.00 SQM

    2,143.75 SQM646.00 SQM

    1,354.50 SQM

    144.00 SQM

    144.00 SQM 12.00M X 12.00M4 STOREY BLDG

    17.50M X 24.50M

    12.00M X 12.00M

    19.00M X 34.00M

    10.50M X 25.80M10

    SECURITY & ADMIN BUILDING 1 STOREY BLDG64.00 SQM 8.00M X 8.00M

    BLDG NO. BLDG NAME FLOOR AREA BLDG DIMENSION NO. OF STOREY

    12 1 STOREY BLDG

    1 STOREY BLDG160.00 SQM

    150.00 SQM

    1 STOREY BLDG

    10.00 M X 15.00 M

    2.00 M X 3.50 M

    5 STOREY WITH ROOFDECK PNP MEDICAL CENTER

    18.00 SQM 3.00 M X 6.00 M3GUARD HOUSE

    POWER HOUSEGARBAGE HOUSE/MRF

    45 POLICE STATION (existing)

    2,143.75 SQM 17.50M X 24.50M

    22,788.00 SQM

    288.00 SQM 12.00 M X 12.00 M 2 STOREY BLDGMEDICAL STAFF QUARTERS

    MEDICAL FACILITIES ( UPPER LEVEL )

    6 LAUNDRY FACILITY 1 STOREY BLDG4.00M X 8.00M32.00 SQM

    QUARTERING FACILITIES FOR PERSONNEL ( LOWER LEVEL )

    PED GATEENTRY/EXIT

    ENTRY/EXIT

    SCALE 1: 20 METERS

    38.5

    1

    SITE DEVELOPMENT PLAN

    OMEGA JIREH D FIDELP. TUAZON BLVD., COR. PLANAS ST., BARANGAY KAUNLARAN, CUBAO, Q.C.

    229.68

    35.03

    264.6992.58

    PHASE 2PUMP

    HOUSE

    SEPTICTANK

    CISTERN

    POLICE COLONELBENJAMIN C VILLASIS, JR

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    .\signatures\esporas.png

  • SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-2PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    GROUND FLOOR PLAN

    LOADING

    CB EA D GF H J K LI M ON P Q R

    1

    3

    8

    2

    6

    4

    7

    5

    SCALE: 1:100MTS

    SITE DEVELOPMENT PLAN

    A-1

    1

    ARCHITECTURAL FLOOR PLAN

    ALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

    PARKING AREA

    PARKING AREA

    PARKING AREA

    PNP MEDICAL PLAZA

  • SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    POLICE MAJOR GENERAL

    THE ACTING CHIEF OF DIRECTORIAL STAFF

    CESAR HAWTHORNE R BINAG

    JOHN D LUGLUG

    POLICE BRIGADIER GENERAL

    DIRECTOR, HEALTH SERVICE

    RECOMMEND APPROVAL:CONCURRED BY:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    ALLEN R. BUENAVENTURA

    REG. NO.:

    PROJECT ARCHITECT

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    CS 115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

    PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BARANGAY ,

    KAUNLARAN, QUEZON CITY

    EXTERIOR PERSPECTIVES

    POLICE LIEUTENANT GENERAL

    THE DEPUTY CHIEF, PNP FOR ADMINISTRATION

    CAMILO PANCRATIUS P CASCOLAN

    APPROVED BY:

    POLICE GENERAL

    CHIEF, PHILIPPINE NATIONAL POLICE

    ARCHIE FRANCISCO F GAMBOA

    TABLE OF CONTENTS REVISIONS

    ARCHITECTURAL

    STRUCTURAL

    SANITARY

    ELECTRICAL

    MECHANICAL

    ICT

    OTHERS

    CS EXTERIOR PERSPECTIVESVICINITY MAP

    A1 SITE DEVELOPMENT PLAN

    A3 SECOND FLOOR PLANA4 THIRD FLOOR PLANA5 FOURTH FLOOR PLANA6 FIFTH FLOOR PLANA7 ROOF DECK PLANA8

    FRONT ELEVATIONREAR ELEVATION

    A9

    LEFT-SIDE ELEVATIONRIGHT-SIDE ELEVATIONLONGITUDINAL SECTION

    A10

    CROSS SECTIONSCHEDULE OF DOORS & WINDOWSREGULAR PROJECTING ARMINSTALLATION

    P

    .

    T

    U

    A

    Z

    O

    N

    B

    L

    V

    D

    M

    A

    Y

    O

    R

    I

    G

    N

    A

    C

    I

    O

    S

    A

    N

    T

    O

    S

    D

    I

    A

    Z

    B

    A

    T

    A

    Y

    C

    R

    I

    S

    T

    O

    B

    A

    L

    D

    R

    I

    O

    D

    C

    .

    B

    E

    N

    I

    T

    E

    Z

    S

    T

    Z

    A

    M

    B

    A

    L

    E

    S

    I

    R

    I

    D

    M

    A

    T

    A

    B

    A

    P

    .A

    B

    E

    R

    N

    A

    R

    D

    O

    D

    R

    I

    O

    D

    C. B

    EN

    IT

    EZ

    S

    T

    MATULIN

    A

    U

    R

    O

    R

    A

    B

    L

    V

    D

    A

    U

    R

    O

    R

    A

    B

    L

    V

    D

    E

    .

    D

    .

    S

    .

    A

    .

    E

    .

    D

    .

    S

    .

    A

    .

    E

    .

    D

    .

    S

    .

    A

    .

    E

    .

    D

    .

    S

    .

    A

    .

    E

    .

    D

    .

    S

    .

    A

    .

    E

    .

    D

    .

    S

    .

    A

    .

    E

    .

    D

    .

    S

    .

    A

    .

    1

    S

    T

    A

    V

    E

    N

    U

    E

    7

    T

    H

    A

    V

    E

    N

    U

    E

    1

    0

    T

    H

    A

    V

    E

    N

    U

    E

    L

    IB

    E

    R

    T

    Y

    A

    V

    E

    N

    U

    E

    M

    A

    IN

    A

    V

    E

    N

    U

    E

    1

    0

    T

    H

    A

    V

    E

    N

    U

    E

    1

    3

    T

    H

    A

    V

    E

    N

    U

    E

    1

    5

    T

    H

    A

    V

    E

    N

    U

    E

    P

    .

    T

    U

    A

    Z

    O

    N

    B

    L

    V

    D

    P

    .

    T

    U

    A

    Z

    O

    N

    B

    L

    V

    D

    7

    T

    H

    A

    V

    E

    N

    U

    E

    P

    L

    A

    N

    A

    S

    S

    I

    T

    E

    I

    I

    I

    E

    .

    D

    .

    S

    .

    A

    .

    P

    .

    T

    U

    A

    Z

    O

    N

    B

    L

    V

    D

    NOT TO SCALE

    VICINITY MAP

    A2 GROUND FLOOR PLAN

    A11

    SOLAR PANEL LAYOUT

    A12 GROUND FLOOR FINISH PLANA13 SECOND FLOOR FINISH PLANA14 THIRD FLOOR FINISH PLANA15 FOURTH FLOOR FINISH PLANA16 FIFTH FLOOR FINISH PLANA17 ROOF DECK FINISH FLOOR PLANA18 GROUND FLOOR REFLECTED

    CEILING PLANA19 SECOND FLOOR REFLECTED

    CEILING PLANA20 THIRD FLOOR REFLECTED

    CEILING PLANA21 FOURTH FLOOR REFLECTED

    CEILING PLANA22 FIFTH FLOOR REFLECTED

    CEILING PLANA23 ROOF DECK REFLECTED

    CEILING PLANS1 CONSTRUCTION NOTESS2 FOUNDATION PLANS3 GROUND FLOOR FRAMING PLANS4 SECOND FLOOR FRAMING PLANS5 THIRD FLOOR FRAMING PLANS6 FOURTH FLOOR FRAMING PLANS7 FIFTH FLOOR FRAMING PLANS8 TYPICAL DETAIL OF BEAMS & GIRDERS

    SCHEDULE OF BEAMS/GIRDERS @ FOUNDATIONSCHEDULE OF BEAMS/GIRDERS @ GROUND FLOOR

    S8 TYPICAL DETAIL OF BEAMS & GIRDERSSCHEDULE OF BEAMS/GIRDERS @ FOUNDATIONSCHEDULE OF BEAMS/GIRDERS @ GROUND FLOOR

    S9 SCHEDULE OF BEAMS/GIRDERS @ GROUND FLOOR,SECOND FLOOR

    S10 SCHEDULE OF BEAMS/GIRDERS @ SECOND FLOORS11 SCHEDULE OF BEAMS/GIRDERS @ SECOND FLOOR,

    THIRD FLOORS12 SCHEDULE OF BEAMS/GIRDERS @ THIRD FLOOR,

    FOURTH FLOOR, FIFTH FLOOR & ROOF DECKS13 SCHEDULE OF BEAMS/GIRDERS @ ROOF DECK

    RAMP FRAMING DETAILORIENTATION OF BEAMS & GIRDER SCHEDULE

    S14 TYPICAL SUSPENDED SLAB DETAILSCHEDULE OF COLUMN/PEDESTALTYPICAL COLUMN DETAILTYPICAL DETAIL OF EXT. CHBTYPICAL DETAIL OF INT. CHBTYPICAL STAIR DETAIL

    S15 SCHEDULE OF COMBINED FOOTINGBASE ISOLATOR DETAIL

    S16 PERSPECTIVEE0 DRAWING INDEX

    GENERAL NOTESLEGENDS & SYMBOLSABBREVIATIONS

    E1 SINGLE LINE DIAGRAME2 SINGLE LINE DIAGRAME3 SINGLE LINE DIAGRAME4 SINGLE LINE DIAGRAME5 SINGLE LINE DIAGRAME6 GROUND FLOOR POWER LAYOUTE7 SECOND FLOOR POWER LAYOUTE8 THIRD FLOOR POWER LAYOUTE9 FOURTH FLOOR POWER LAYOUTE10 FIFTH FLOOR POWER LAYOUTE11 ROOF DECK POWER LAYOUTE12 GROUND FLOOR MECHANICAL POWER LAYOUTE13 SECOND FLOOR MECHANICAL POWER LAYOUTE14 THIRD FLOOR MECHANICAL POWER LAYOUTE15 FOURTH FLOOR MECHANICAL POWER LAYOUTE16 FIFTH FLOOR MECHANICAL POWER LAYOUTE17

    GROUND FLOOR CABLE TRAY LAYOUTE18E19E20E21

    E22

    SECOND FLOOR CABLE TRAY LAYOUTTHIRD FLOOR CABLE TRAY LAYOUTFOURTH FLOOR CABLE TRAY LAYOUT

    FIFTH FLOOR CABLE TRAY LAYOUTROOF DECK CABLE TRAY LAYOUTE23GROUND FLOOR LIGHTING LAYOUTE24SECOND FLOOR LIGHTING LAYOUTE25THIRD FLOOR LIGHTING LAYOUTE26

    ROOF DECK MECHANICAL POWER LAYOUT

    FOURTH FLOOR LIGHTING LAYOUTE27FIFTH FLOOR LIGHTING LAYOUTE28ROOF DECK LIGHTING LAYOUTE29GROUNDING SYSTEM LAYOUT PLANE30RISER GROUNDING SYSTEM LAYOUTE31ROOF DECK LIGHTING PROTECTION LAYOUTE32LOAD SCHEDULEE33LOAD SCHEDULEE34LOAD SCHEDULEE35LOAD SCHEDULEE36LOAD SCHEDULEE37LOAD SCHEDULEE38LOAD SCHEDULEE39LOAD SCHEDULEE40LOAD SCHEDULEE41LOAD SCHEDULEE42LOAD SCHEDULEE43LOAD SCHEDULEE44LOAD SCHEDULEWIRE SCHEDULE

    E45

    MISCELLANEOUS DETAILSE46MISCELLANEOUS DETAILSE47MISCELLANEOUS DETAILSE48

    GROUND FLOOR WATER DISTRIBUTION SYSTEMP2SECOND FLOOR WATER DISTRIBUTION SYSTEMP3THIRD FLOOR WATER DISTRIBUTION SYSTEMP4FOURTH FLOOR WATER DISTRIBUTION SYSTEMP5FIFTH FLOOR WATER DISTRIBUTION SYSTEMP6ROOF DECK WATER DISTRIBUTION SYSTEMP7GROUND FLOOR SEWER/STORM DRAINAGE SYSTEMP8

    P9 SECOND FLOOR SEWER/STORM DRAINAGE SYSTEMP10 THIRD FLOOR SEWER/STORM DRAINAGE SYSTEMP11 FOURTH FLOOR SEWER/STORM DRAINAGE SYSTEMP12 FIFTH FLOOR SEWER/STORM DRAINAGE SYSTEMP13 ROOF DECK SEWER/STORM DRAINAGE SYSTEM

    GROUND FLOOR HOT WATER DISTRIBUTION SYSTEMP14SECOND FLOOR HOT WATER DISTRIBUTION SYSTEMP15THIRD FLOOR HOT WATER DISTRIBUTION SYSTEMP16FOURTH FLOOR HOT WATER DISTRIBUTION SYSTEMP17FIFTH FLOOR HOT WATER DISTRIBUTION SYSTEMP18ROOF DECK HOT WATER DISTRIBUTION SYSTEMP19STP KEY PLANP20STP KEY PLANP21TOP VIEW STP CHAMBER & PIPING LAYOUTP22STP CHAMBER & PIPING LAYOUTP23

    P24TOP VIEW STP CHAMBER & EQUIPMENT & PIPING LAYOUTP25

    P26P27P28P29

    STP CHAMBER & PIPING LAYOUT

    TOP VIEW STP CHAMBER & PUMP ROOM LAYOUTPERSPECTIVE VIEW STP CHAMBER LAYOUTPERSPECTIVE VIEW STP PUMP ROOM LAYOUTTOP VIEW STP CHAMBER & EQUIPMENT & PIPING LAYOUT

    GROUND FLOOR ACMV PLANM1SECOND FLOOR ACMV PLANM2THIRD FLOOR ACMV PLANM3FOURTH FLOOR ACMV PLANM4FIFTH FLOOR ACMV PLANM5ROOF DECK ACMV PLANM6SECOND FLOOR FDAS PLANM7THIRD FLOOR FDAS PLANM8FIFTH FLOOR FDAS PLANM9GROUND FLOOR MED GAS PLANM10

    M11 SECOND FLOOR MED GAS PLANM12 THIRD FLOOR MED GAS PLANM13 FOURTH FLOOR MED GAS PLANM14 FIFTH FLOOR MED GAS PLANICT1 PERIMETER STRUCTURE CABLING SYSTEMICT2 GROUND FLOOR STRUCTURE CABLING SYSTEMICT3 SECOND FLOOR STRUCTURE CABLING SYSTEMICT4 THIRD FLOOR STRUCTURE CABLING SYSTEMICT5 FOURTH FLOOR STRUCTURE CABLING SYSTEMICT6 FIFTH FLOOR STRUCTURE CABLING SYSTEMICT7 ROOF DECK STRUCTURE CABLING SYSTEM

  • LOADING

    CB EA D GF H J K LI M ON P Q R

    1

    3

    8

    2

    6

    4

    7

    5

    SCALE: 1:100MTS

    SITE DEVELOPMENT PLAN

    A-1

    1

    ARCHITECTURAL FLOOR PLAN

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-1PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    SITE DEVELOPMENT PLANALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

    PNP MEDICAL PLAZA

  • SCALE: 1:100MTS

    GRD FLOOR PLAN

    ARCHITECTURAL FLOOR PLAN

    CB EA D GF H J K LI M ON P Q R

    1

    3

    8

    2

    6

    4

    7

    5

    A

    B

    EE RM.

    ELEVATOR

    TB DOTS

    CONFERENCEROOM CHILD

    PROTECTIONUNIT

    ANIMAL BITECENTER

    TREATMENT

    EMS MALETOILET

    RECEPTION

    VAULT

    OFFICE

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 1720

    L O B B Y

    SINK

    FEMALETOILET

    SS

    TOILET

    TOILET

    FUTUREEXPANSION

    INFORMATION

    MAIN ENTRY

    COFFEESHOP

    SERVICEELEVATOR

    INFORMATION

    UP

    INFORMATION

    EE RM.X- RAY RESULT

    RELEASING

    X-RAYRECORDS

    LOUNGE

    CT- SCAN FILM STO.

    PANTRY

    DARK ROOM

    TOILET

    TOILETX-RAY

    ULTRASOUND

    TOILET

    2D

    SECURITYPOST ANTE

    ELEVATOR

    EE RM.

    BUDGET

    FINANCE

    INFORMATION

    WORKSTATION

    BILLING

    CASHIER

    VAULT

    CASH

    PHILHEALTH

    PHILHEALTHOFFICE

    ADMITTING A

    OFFICE OF THEADMINISTRATION

    PACKAGE DEPOSITCOUNTER

    SATELLITE MEDRECORDS

    VAULT

    STO.

    RACK RACKPARKING

    CAFETERIA

    CASH

    HEATING

    COFFEE

    TEA

    RACK

    DISHWASHING

    DIETICIANOFFICE

    PEDIA ORTHO CLINICW/ CASTING

    RESPIRATORY

    ANESTHESIA

    MALE NURSELOCKER

    EMERGENCYMEDICINE

    DENTALINTERNAL MED. SURGERY DERMA

    OPD ENTRY

    ELEVATOR LOBBY

    EE RM.

    INFO

    RM

    ATIO

    N

    SECURITY

    DIRECTORFAMILY MED.

    CHAIR FAMILYMED.

    NURSESTATION

    OPD PATIENT'SRECORDS

    BLO

    OD

    EXTR

    ACTI

    ON

    TOILET

    EQUIPMENTSTO.

    WAITINGAREA

    CHILD PLAYAREA

    BREASTFEEDING

    FEMALE TOILET

    MALE TOILET

    ADA

    MINOR OR

    CHANGINGROOM

    PANTRY

    MEETINGRM.

    HALL

    H A L L

    STORAGE

    TREATMENTTRIAGE

    GUARD OUTPOST

    ENTRY

    DOCTOR'SCONSULTATION

    TOILET

    WAITINGAREA

    TOILET

    SECRETARY

    CHIEF ER

    TOILETSLEEPING

    ISOLATIONROOM

    DECONTAMINATIONROOM

    TOILET

    SHOWER

    ANTEROOM

    DOCTOR ONDUTY

    NURSE STATIONEQUIPMENT &

    SUPPLYCABINET

    TOILET

    VIPVIP

    TOILET

    STRECHER'SPARKING

    TOILET

    GARDEN

    SOCIAL SERVICEOFFICE

    CASH

    SS

    TOILET

    MEDICINE

    PMRS

    ULTRASOUND

    H A L L W A Y

    CHIEF OPD RM.

    SECRETARY

    WAITING AREA

    DARKROOM CONTROL

    BOOTH DRESS

    CHANGINGAREA

    CHANGINGAREA

    STO.

    SHO. SHO.TOI. TOI.

    DRESSINGRM. CONTROL RM.

    SS

    TOILET

    SHAFT

    1 2 3 4 5 6

    7

    8

    9101112131415

    16

    17

    18

    PPE

    DOCTOR ONDUTY

    FEMALE MALE

    LOCKER

    LOCKER

    DELIVERYSORTING

    RADIOLOGYOFFICE

    TOILET

    UP

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 1720

    SINK

    SINK

    SINK

    SINK

    SINK

    SINK

    SINK

    SINK

    SINK

    MALE TOILET PWD

    FEMALE TOILET

    GARBAGEDISPOSAL AREA

    TOILET

    TOILET

    EE RM.

    VAULT

    SINK

    SINK SINKSINK

    SINK

    SINK

    OPTHA OBGYN

    SINK SINK

    SINK

    SINK SINK

    SINK

    SINK

    SINK SINK

    SINK

    WETDRY

    SINK

    SINK

    VIP DININGAREA

    SINK

    TOILET

    TOILET

    WORK STATION

    RECEIVING

    MAIN LOBBY

    STO.

    SINK

    TOILET

    WAITINGAREA

    TOILET

    UP

    123456789

    10

    14131211 15 191817 20

    UP

    RAMP

    LANDING

    MORGUE

    AUTOPSY AREA

    OFFICE

    PUBLIC DINING

    STAFF DINING

    SINK

    WAITING AREA

    ANTEROOMSECURITY

    POST

    TOILETCASTING

    RELEASING

    PROPERTY SUPPLYSTORAGE

    LOADING

    PROPERTY SUPPLYOFFICE

    L O B B Y

    RELEASE

    LOCKER

    BOTIKA NG BAYAN

    FREEZERROOM

    RECEIVING

    FLAMABLESTORAGE

    EXTEMPORANEOUSPREPARATION AREA

    ENTRY

    SINK

    SINK

    PREPARATIONAREA

    CHIEF PHARMACISTOFFICE

    WORK STATION

    SINK

    ENT

    TOILET

    SHOWER

    STAFF AREA

    RELEASING

    STO

    RAG

    E

    SUPPLY &INSTRUMENT

    STO.

    TOILET

    SINK

    NURSESTATION

    TOILET

    THERAPY BED TREATMENT AREA

    SINK SINK

    OUT PATIENTREHABILITATION ROOM

    TOILET &BATH

    303.00 SQM

    MED PREPARATIONAREA

    EE ROOM

    PEDIA

    H A L L W A Y H A L L W A Y

    ELEVATORRECYCLABLE BIODEGRADABLES

    BIOHAZARD HOLDING

    1 2 3 4 5 6 7 8 9 10

    14 13 12 11

    15

    19 18 1720

    ELEVATOR

    PLATFORM

    123456789

    10

    14131211 15 191817

    20

    SINK SINK SINK SINK SINK

    H A L L W A Y

    H A L L W A YH A L L W A Y

    ELEVATOR ELEVATOR

    ELEVATORELEVATOR

    ELEVATOR

    FEMALE NURSELOCKER

    MINOR OPERATINGROOM

    PROPERTY SUPPLYWORK AREA

    SHAFT

    SINK

    ROLLL-UP

    COOKINGPREPARATION

    AREA

    COOKING

    BAKING

    RACK

    AUXSHAFT

    AUXSHAFT

    AUXILIARYOFFICE SPECIAL DIET

    PREP AREA

    HAND WASHSINK

    SINK

    FEMALETOILET

    MALETOILET

    DRY STO. COLD STO.

    FOODASSEMBLY

    SINK

    SINK

    TOILET

    CART

    CART

    CART

    STO

    OL

    URIN

    E

    BLOODEXTRACTION

    CHAIR

    BLOOD LETTINGBED

    TRANSACTIONWINDOW

    CASHRELEASE

    I.T ROOM/CCTV ROOMSUPPORTING FACILITY

    BLOOD LETTINGBED

    SINK

    HISTOPATH

    HISTOPATH

    ANTEROOM

    ANTEROOMGROSSING

    STATION

    SINKSINK

    SINK

    SINK

    CONDENSING UNITCONDENSING UNIT

    CONDENSING UNIT

    CONDENSING UNIT CONDENSING UNIT

    CONDENSING UNIT CONDENSING UNIT

    PFT ISOLATION

    D

    LE

    DG

    E

    CONDENSING UNIT

    CO

    ND

    ENSIN

    G U

    NIT

    LE

    DG

    E

    INTERIOR PERSPECTIVES (MAIN ENTRANCE LOBBY/MAIN LOBBY)

    A-2

    1

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-2PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    GROUND FLOOR PLANINTERIOR PERSPECTIVES

    ALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

  • SCALE: 1:100MTS

    2ND FLOOR PLAN

    ARCHITECTURAL FLOOR PLAN

    CB EA D GF H J K LI M ON P Q R

    3

    8

    2

    6

    4

    7

    5

    1

    A

    B

    CHAPEL

    DRESSING

    DRESSING

    TOILET

    NURSESTATION

    LOUNGE

    NURSE OFFICE

    HIGH RISKPREGNANCY UNIT

    M-DRF-DRF-NM-NURSE

    JC

    SLOPSINK

    CHANGINGROOM

    CHANGINGROOM

    CHANGINGROOM

    DELIVERY RM.

    STERILE CORRIDOR

    SUBSTERILE

    C-SECTION

    PACKING

    STERILE STORAGE

    SHO.

    WC

    RELEASING

    AUTOCLAVEROOM

    DEPUTY OFFICE

    OFFICE

    BREASTFEEDING

    8-BEDS

    SUPPLY STORAGE

    STRETCHER'SPARKING

    EE RM.

    STERILE STORAGE

    RECOVERY

    VIP

    VIP

    NURSESTATION

    SS

    SS

    MINOR OR

    ENDOSCOPY

    CLEAN

    CORRIDOR

    ENDOSCOPY

    JANITOR'SCLOSET

    SUPPLYRM.

    OR 1

    OR 2

    OR 3AUTOCLAVE

    RM.

    WASHING

    NEPRHOCLINIC

    EE RM.

    CLEAN-UP

    ELEVATOR

    ELEVATOR

    TOILET CHANGING CHANGING

    MALE TOILET

    FEMALE TOILET

    PWD

    NURSE CALLROOM

    NURSE CALLROOM

    FEMALE DOCTORCALL ROOM

    MALE DOCTORCALL ROOM PANTRY CHIEF ER

    SHOWER

    12-BEDS8-BEDS

    NURSES STATION

    JANITORS CLOSET

    TREATMENTRM.

    SINK

    RECORDSAREA

    SUPPLY &EQUIPMENT

    STO.

    WAITING AREA

    FIXED WINDOW

    PPERACK

    SHOERACK

    LABOR RM.

    97876

    SHOWER

    STERILE

    CORRIDOR

    1 2 3 4 1 2 3 4 5 6

    12111085

    1

    2

    3

    4

    5

    6

    7

    8

    TOILETSHOWER TOILETSHOWER TOILETSHOWER TOILET

    UP

    TOILET

    TOILET

    TOILETTOILET

    TOILET TOILET

    TOILETTOILET

    3

    2

    1

    6

    5

    6- BEDS

    TOILET

    STO.

    TOILET

    SUPPLYCAB.

    TOILET TOILET TOILET TOILETDRESSING DRESSING DRESSING DRESSING

    WORKING STATION

    NEW BORN WELLBABIESFIXED GLASS

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    1314 12 111519 18 17

    20

    UP

    DN

    2345689

    10

    14131211 15 191817

    20

    EE RM.

    STAFF

    ELEVATOR LOBBY

    WORKAREA

    DIRECTOR'SOFFICE

    HROFFICE

    EXAM AREA

    TOILET TOILET TOILET TOILET TOILET

    CHIEF OFHOSPITAL

    CHIEF OFCLINIC

    CHIEF OFNURSE

    CHIEF OFOPERATION

    MEETINGRM.

    TOILET

    CHIEF OFADMIN

    INFO

    ANTEROOM

    SINK

    TOILET

    LOUNGE

    SINK

    ANTE RM.

    CHANGING AREA

    LOCKER

    LOCKER

    SINK

    SINK

    SUB STERILE SUB STERILE

    H A L L W A Y

    SUB STERILE

    SUB STERILE

    HALLWAY

    H A L L W A Y

    H A L L W A Y

    RAMP

    LANDING

    20

    ANTEROOM ANTE ROOM

    ANTEROOM

    SINK

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 17

    UP

    DN

    12345678910

    14131211

    15

    191817 20

    DN

    UP

    EE RM.

    STRETCHERPARKING

    ANTE

    DIALYSIS

    VIP

    NURSE STATION

    WATER TREATMENTROOM1

    6 7 8

    CLEANLINEN

    JANITORSCLOSET

    SLOPSINK

    H A L L W A Y

    BICARBROOMREPROCESSING

    RM.

    WEIGHINGSCALE

    SINK

    SINKSINK

    SOILEDLINEN

    GARBAGEBINSINSTRUMENT

    AND SUPPLYSTORAGE

    WAITING AREA

    SCRUB

    RECOVERYRM.

    TOILET

    SINK

    1

    2

    3

    5

    4

    6

    1

    2

    3

    STO.

    WAITING AREA

    32

    SINK

    COMMONTOILET

    PWD TOILET

    LOCKER

    STORAGE

    MEDICATIONPREPARATION

    AREA

    NICU

    ANTE RM.

    8- BEDS

    TREATMENTAREA

    WASHING

    ANTE RM.

    STO.

    WEIGHINGSCALE

    CLEAN-UP

    6 SQM 6 SQM6 SQM

    6 SQM 6 SQM 6 SQM

    WAITING AREA

    EE RM.

    IN PATIENT REHABMEDICATION THERAPY

    TOILET

    TOILET

    OFFICEANTE ROOM

    SUPPLYSTORAGE

    THERAPY BED

    NURSESTATION

    GOWNING

    DRESSINGRM.

    TOILET

    ANTE RM.

    PICU 6- BEDS

    4 5 6 7

    SURGICAL ICU8- BEDS

    MEDICAL ICU8- BEDS

    VIEWINGWINDOW

    VIEWINGWINDOW

    ROOM

    TOILET

    PPE ANTEROOM

    ISO

    SINK

    WORKSTATION

    SUPPLY &EQUIPMENTCABINET

    NURSESTATION

    SINK

    MED PREPARATIONAREA

    RADIANTWARMER

    SINK

    DIRTY LINENCLEANSINK

    ANTE RM.SUPPLY

    STORAGE

    DRESSING RM

    NURSE TOILET

    NURSE STATION

    MEDICATIONPREPARATION

    AREA

    SINK

    ANTE RM.

    SUPPLYSTORAGE

    DRESSING RM

    NURSE TOILET

    EE RM.

    STORAGE

    RADIANTWARMER

    GOWNING

    GOWNING

    TOILET

    SINK

    NURSE STATION

    SCRUB

    SCRUB

    HRPU

    H A L L W A Y H A L L W A Y

    WAITING AREA(MICU)

    WAITING AREA

    WAITING AREA(SICU)

    WAITING AREA

    VIEWINGWINDOW

    VIEWINGWINDOW

    WORKSTATION

    36.13 SQM

    37.59 SQM

    34.52 SQM

    34.21SQM

    34.80 SQM

    SUB STERILE

    SCRUB

    SCRUB

    13 SQM

    109.39 SQM

    113.56 SQM

    34.92 SQM

    DELIVERY RM.35.69 SQM

    91.10 SQM

    43.90 SQM

    90.46 SQM

    75.97 SQM

    96.18 SQM 123.56 SQM

    104.08 SQM

    SUB-STERILE CORRIDOR

    STO.

    4

    6 SQM

    5

    6 SQM

    ABGMACH

    TOILETPFT

    STO.

    RTU

    STORAGE

    1

    2

    5

    6

    7

    8

    WAITINGAREA

    WAITINGAREA

    WAITINGAREA

    MEDICINEPREPARATION

    AREA

    SUPPLY &EQUIPMENTCABINET

    STERILE PACKING

    SINK

    2 3WAITINGAREA

    ANTE RM.

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 1115

    19 18 1720

    JANITORIAL ROOMTOILET

    ELEVATORLOBBY

    LIBRARY

    MULTI-PURPOSEHALL

    CONNECTING BRIDGETO MAIN BLD.

    PANTRY

    ELEVATORLOBBY

    LANDSCAPEBELOW

    ANTEROOM

    AUXSHAFT

    AUXSHAFT

    MINOR OR22.9 SQM

    SUBSTERILE

    PASS THRU HALLWAY

    VIP 4

    ISO

    2

    I.T ROOM/CCTV ROOM

    1

    SINK

    2

    SINK

    3

    SINK

    8

    1

    SINK

    2

    SINK

    3

    SINK

    4 5 6 7

    8

    NURSE STATIONMEDICATION

    PREPARATION AREA

    SINK

    ANTEROOM

    MINOR OR

    1

    SINK

    2

    SINK

    3

    SINK

    CHIEFPATHOLOGIST

    CHIEFMED-TECH

    RECORD'S

    SUPPORTING FACILITY

    ISO

    ISO

    ISO

    ISO

    ISO

    ISO

    SUPPLYRM.

    LABORATORY

    RECORD'SROOM

    ANTEROOM

    MEDIA.

    AUTOMATION

    HISTOPATH

    CLINICAL MICROSCOPYHEMATOLOGY

    ANTEROOM

    RECORD'S

    REC

    ORD

    'SREC

    ORD

    'S

    EE RM.

    SCRUB

    35.13 SQM

    TRANSFORMERROOM

    LE

    DG

    E

    LE

    DG

    E

    01A

    01A

    01A

    01A

    01A

    01A

    01A

    01A

    ELEV

    SERVICEELEVATOR

    SHAFT

    EE ROOM

    ELEV

    ELEVATOR

    ELEVATOR

    SHAFT

    ELEVATOR

    ELEVELEV

    scrub

    A-3

    1

    INTERIOR PERSPECTIVES (ECUMENICAL CHAPEL/MULTI-PURPOSE HALL)

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-3PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    SECOND FLOOR PLANINTERIOR PERSPECTIVES (ECUMENICALCHAPEL/MULTI-PURPOSE HALL)

    ALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

  • SCALE: 1:100MTS

    3RD FLOOR PLAN

    ARCHITECTURAL FLOOR PLAN

    CB EA D GF H J K LI M ON P Q R

    1

    3

    8

    2

    6

    4

    7

    5

    A

    B

    PHARMACIST

    COLD

    ROOM

    PHARMACY

    STORAGE

    ROOM

    LAUNDRY AREA

    FOLD

    SOILED

    WD WD WD WD

    RAMP

    LANDING

    UP

    UP

    DN

    8 BEDS

    WARD

    8 BEDS

    WARD

    ISOLATION

    ROOM

    WAITING AREA

    MALETOILET

    FEMALETOILET

    ADA

    INFO

    LIBRARY

    DEPT. CHAIR

    ANTE

    RM

    UP

    DN

    12345678910

    14131211

    15

    191817 20

    SUITE

    ROOM

    SUITE

    ROOM

    ISOLATION

    ROOM

    OPEN ABOVE

    RAMP

    LANDING

    EE. ROOM

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    DN

    8 BEDS

    WARD

    8 BEDS

    WARD

    EE. ROOM

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 17

    20

    8 BEDS

    WARD

    SUITE

    ROOM

    UP

    DN

    123456789

    10

    14131211 15 191817

    20

    8 BEDS

    WARD

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    TREATMENT

    RM.

    KIOSK

    KIOSK

    TREATMENT

    ROOM

    TOILET

    OFFICE

    INFO

    LIBRARY

    DEPT. CHAIR

    TOILET

    OFFICE

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 17

    20

    DECK

    ENGINEERING

    HEAD

    MAINTENANCE

    HEAD

    STO

    WAITING

    AREA

    ASSISTANCE

    DESK

    ENGINEERING

    WORKSHOP

    AREA

    OPEN

    CO

    ND

    EN

    SIN

    G

    UN

    IT

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 11

    15

    19 18 1720

    ELEVATOR

    SURGERY DEPARTMENT DEPARTMENT OF OBSTETRICS & GYNECOLOGY

    SERVICEELEVATOR

    ELEVATORELEVATOR

    ELEVATOR

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATOR

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATOR ELEVATOR

    ELEVATOR

    ELEVATOR

    EE RM.

    FOLD

    JANITOR'S

    STORAGE

    GARBAGE BIN

    EE. ROOM

    JANITOR'S

    STORAGE

    GARBAGE BIN

    LOADING

    AUXSHAFT

    SUITE

    ROOM

    AUXSHAFT

    I.T ROOM/CCTV ROOMSUPPORTING FACILITY

    GREEN

    ROOF

    GREEN

    ROOF

    GREEN

    ROOF

    GREEN

    ROOF

    SHAFT

    NURSE

    STATION

    NURSE

    STATION

    SHAFT

    NURSE

    STATION

    NURSE

    STATION

    CO

    ND

    EN

    SIN

    G

    UN

    IT

    OPEN

    LE

    DG

    E

    UTILITY

    ROOM

    OPEN

    UTILITY

    ROOM

    LE

    DG

    E

    EE ROOM

    A-4

    1

    INTERIOR PERSPECTIVES (PRIVATE ROOM/SUITE ROOM)

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-4PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    ALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

    THIRD FLOOR PLANINTERIOR PERSPECTIVES (PRIVATEROOM/SUITE ROOM)

  • SCALE: 1:100MTS

    4TH FLOOR PLAN

    ARCHITECTURAL FLOOR PLAN

    1

    3

    8

    2

    6

    4

    7

    5

    A

    B

    C ED GF H J K LI M O P Q R

    UP

    8 BEDS

    WARD

    8 BEDS

    WARD

    ISOLATION

    ROOM

    WAITING AREA

    MALE TOILET

    FEMALE TOILET

    PWD

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 11

    15

    19 18 1720

    UP

    DN

    12345678910

    14131211

    15

    191817 20

    SUITE

    ROOM

    SUITE

    ROOM

    ISOLATION

    ROOM

    ELEVATOR

    ELEVATOR

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    DN

    8 BEDS

    WARD

    8 BEDS

    WARD

    EE. ROOM

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 17

    20

    8 BEDS

    WARD

    UP

    DN

    123456789

    10

    14131211 15 191817

    20

    8 BEDS

    WARD

    TREATMENT

    RM.

    TREATMENT

    RM.

    KIOSK

    KIOSK

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    EE. ROOM

    JANITOR'S

    STORAGE

    INFO

    LIBRARY

    DEPT. CHAIR

    TOILET

    OFFICE

    INFO

    LIBRARY

    DEPT. CHAIR

    TOILET

    OFFICE

    ELEVATOR

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATORELEVATOR

    SERVICEELEVATOR

    ELEVATOR

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATOR ELEVATOR

    DEPARTMENT OF PEDIATRICS DEPARTMENT OF ANESTHESIOLOGY

    GARBAGE BIN

    EE. ROOM

    JANITOR'S

    STORAGE

    GARBAGE BIN

    SUITE

    ROOM

    AUXSHAFT

    SUITE

    ROOM

    AUXSHAFT

    STORAGE

    OFFICE

    STORAGE

    STORAGE

    STAFF

    SERVER ROOM

    OFFICE

    BMS

    CCTV ROOM

    BIOMEDICAL

    ENGINEERING

    EQUIPMENT

    ROOM

    DECON.

    ROOM

    CSSR

    SHAFT

    NURSE

    STATION

    NURSE

    STATION

    SHAFT

    NURSE

    STATION

    NURSE

    STATION

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 17

    20

    ELEVATOR

    ROOF

    DECK

    OPEN

    LE

    DG

    E

    OPEN

    LE

    DG

    E

    UTILITY

    ROOM

    UTILITY

    ROOM

    EE ROOM

    A-5

    1

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-5PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    FOURTH FLOOR PLANINTERIOR PERSPECTIVES ( PRIVATE ROOM/SUITE ROOM)

    ALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

    INTERIOR PERSPECTIVES (PRIVATE ROOM/SUITE ROOM)

  • SCALE: 1:100MTS

    5TH FLOOR PLAN

    ARCHITECTURAL FLOOR PLAN

    C ED GF H J K LI M

    1

    3

    8

    2

    6

    4

    7

    5

    A

    B

    UP

    8 BEDS

    WARD

    8 BEDS

    WARD

    ISOLATION

    ROOM

    WAITING AREA

    MALETOILET

    FEMALETOILET

    PWD

    UP

    DN

    12345678910

    14131211 15 191817 20

    SUITE

    ROOM

    SUITE

    ROOM

    ISOLATION

    ROOM

    ELEVATOR

    ELEVATOR

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    DN

    8 BEDS

    WARD

    8 BEDS

    WARD

    EE. ROOM

    4 BEDSWARD

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 17

    20

    8 BEDS

    WARD

    UP

    DN

    123456789

    10

    14131211 15 191817

    20

    8 BEDS

    WARD

    TREATMENT

    RM.

    TREATMENT

    RM.

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    INFO

    LIBRARY

    DEPT. CHAIR

    TOILET

    OFFICE

    INFO

    LIBRARY

    DEPT. CHAIR

    TOILET

    OFFICE

    KIOSK

    KIOSK

    EE. ROOM

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 11

    15

    19 18 1720

    SERVICEELEVATOR

    ELEVATOR

    NURSE

    STATION

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATOR

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATORELEVATORELEVATOR ELEVATOR

    INTERNAL MEDICINE DEPARTMENT

    JANITOR'S

    STORAGE

    GARBAGE BIN

    EE. ROOM

    JANITOR'S

    STORAGE

    GARBAGE BIN

    4 BEDSWARD

    SUITE

    ROOM

    AUXSHAFT

    SUITE

    ROOM

    AUXSHAFT

    I.T ROOM/CCTV ROOMSUPPORTING FACILITY

    MEDICAL RECORDSROOM

    WORKSPACE

    OFFICE

    SHAFT SHAFT

    NURSE

    STATION

    NURSE

    STATION

    NURSE

    STATION

    UTILITY

    ROOM

    UTILITY

    ROOM

    OPEN

    LE

    DG

    E

    OPEN

    LE

    DG

    E

    UTILITY

    ROOM

    UTILITY

    ROOM

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-6PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    FIFTH FLOOR PLANINTERIOR PERSPECTIVES (FOUR BEDSWARD)

    ALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

    1A-6

    INTERIOR PERSPECTIVES (4 BEDS WARD ROOM)

    SHEET NO.SUBMITTED BY:PROJECT TITLE: RECOMMEND APPROVAL:PREPARED BY: APPROVED BY: SHEET CONTENTS:

  • SCALE: 1:100MTS

    ROOF DECK PLAN

    ARCHITECTURAL FLOOR PLAN

    UP

    DN

    12345678910

    14131211 15

    191817 20

    DN

    C ED GF H J K LI M

    1

    3

    8

    2

    6

    4

    7

    5

    A

    B

    SERVICEELEVATOR

    ELEVATOR

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 1115

    19 18 1720

    ELEVATOR

    SHEET NO.

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-7PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    ROOF DECK PLANALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

    1A-7

    SHEET NO.SUBMITTED BY:PROJECT TITLE: RECOMMEND APPROVAL:PREPARED BY: APPROVED BY: SHEET CONTENTS:

  • SCALE:1:100MTS

    SOLAR PANEL LAYOUT

    ARCHITECTURAL FLOOR PLAN

    SCALE: 1:100MTS

    SOLAR PANEL DIMENSION

    ARCHITECTURAL FLOOR PLAN

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-8PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    SOLAR PANEL LAYOUTSOLAR PANEL DIMENSION

    ALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

    1A-8

    SHEET NO.SUBMITTED BY:PROJECT TITLE: RECOMMEND APPROVAL:PREPARED BY: APPROVED BY: SHEET CONTENTS:

    2A-8

  • PHILIPPINE NATIONAL POLICE

    GENERAL HOSPITAL

    FF F

    SIDEWALK+FGL

    FFL

    CEILING VOID

    2ND FLOOR

    SLAB

    CEILING VOID

    3RD FLOOR

    SLAB

    CEILING VOID

    4TH FLOOR

    SLAB

    CEILING VOID

    5TH FLOOR

    SLAB

    ELEVATOR APEX

    PARAPET RAILING

    2.0

    0 M

    TS

    3.5

    0 M

    TS

    3.5

    0 M

    TS

    4.5

    0 M

    TS

    4.5

    0 M

    TS

    2.7

    0 M

    TS

    A B C D E F G H I J K L M N O P Q R

    ABCDEFGHIJKLMNOPQR

    SCALE: 1:100MTS

    FRONT ELEVATION

    SCALE: 1:100MTS

    REAR ELEVATION

    FRONT ELEVATIONREAR ELEVATION

    SHEET NO.

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-9PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    ALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

    SHEET NO.SUBMITTED BY:PROJECT TITLE: RECOMMEND APPROVAL:PREPARED BY: APPROVED BY: SHEET CONTENTS:

    1A-9

    2A-9

  • CONDENSING

    UNIT

    H A L L

    H A L L

    WAITING AREA

    CHIEF OF ADMIN

    TOILET

    OFFICES

    H A L L

    L O B B Y

    DARK ROOM X RAY

    ULTRA SOUND 2D

    SATELLITE MED RECORDS

    STORAGE

    CHIEF OF

    ADMINISTRATION

    CHAIR FAMILY MED.

    BOTIKA NG BAYAN

    8 BEDS WARD

    H A L L W A Y

    TO CONNECTING

    BRIDGE

    FUTURE EXPANSION

    ENGINEERING DEPT.

    HALL WAY

    CEILING VOID

    CEILING VOID

    CEILING VOID

    CEILING VOID CEILING VOID

    TOILET

    CEILING VOID CEILING VOID

    CEILING VOID

    CEILING VOID

    CEILING VOID CEILING VOID

    H A L L

    CEILING VOIDCEILING VOID

    CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID

    TOILET H A L L

    TOILET H A L L

    STRECHER &

    WHEELCHAIR

    PARKING

    STRECHER &

    WHEELCHAIR

    PARKING

    STRECHER &

    WHEELCHAIR

    PARKING

    CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID

    TOILET

    TOILET

    TOILET

    CEILING VOID CEILING VOID CEILING VOID

    H A L L

    H A L L

    CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID CEILING VOID

    TOILET

    CONDENSING

    UNIT

    CEILING VOID CEILING VOID CEILING VOID

    TOILET

    CEILING VOID CEILING VOID

    H A L LTOILET

    H A L LTOILET

    CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID

    H A L L W A Y

    CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID

    H A L L W A Y

    CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID

    STRECHER &

    WHEELCHAIR

    PARKING

    STRECHER &

    WHEELCHAIR

    PARKING

    STRECHER &

    WHEELCHAIR

    PARKING

    CEILING VOID

    CEILING VOID

    CEILING VOID

    CEILING VOID

    CEILING VOID

    CEILING VOID

    CEILING VOID CEILING VOID

    CEILING VOID

    CEILING VOID

    CEILING VOID

    TOILETH A L L

    TOILETH A L L

    TOILET

    H A L L

    CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID

    CEILING VOID

    A B C D E F G H I J K L M N O P Q R

    1 2 3 4 5 6 871234568 7

    SCALE: 1:100MTS

    LEFT-SIDE ELEVATION

    SCALE: 1:100MTS

    RIGHT-SIDE ELEVATION

    SCALE: 1:100MTS

    LONGITUDINAL SECTION

    LEFT-SIDE ELEVATIONRIGHT-SIDE ELEVATIONLONGITUDINAL SECTION

    A-10

    3

    A-10

    1

    A-10

    2

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-10PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    ALLEN R. BUENAVENTURA

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    MCM

    ARB

    ARARB

  • H A L L

    EMERGENCY ROOM

    H A L L

    RECOVER ROOM

    CLEAN CORRIDOR

    H A L L H A L L

    WASH ROOM

    WATER

    TREATMENT

    CHIEF OF OPERATION

    H A L L

    CHIEF OF ADMIN

    H A L L

    WAITING AREA

    ANIMAL BITE

    CENTER

    TREATMENT

    SECURITY

    POST

    NURSE STATION

    CEILING VOID CEILING VOID CEILING VOID CEILING VOID

    CHIEF OF ER

    S.S.S.S.

    CEILING VOID CEILING VOID CEILING VOID CEILING VOIDCEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOIDCEILING VOID CEILING VOID CEILING VOIDCEILING VOID CEILING VOID

    CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID

    CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID

    PRIVATE ROOM

    CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID CEILING VOID

    1 2 3 4 5 6 87

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    1W

    2W

    3W

    4W

    5W

    F

    F

    F F F

    D1

    38 SETS

    D10

    4 SETS

    D12

    8 SETS2 SETS

    D9

    5 SETS9 SETS

    D8

    3 SETS

    D11

    11 SETS6 SETS

    D2

    51 SETS

    D7

    5 SETS

    D3 D5 D6

    AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN

    D4

    2 SETS

    AS SHOWNAS SHOWN AS SHOWN AS SHOWN

    D1

    38 SETS

    D10

    4 SETS

    D12

    8 SETS

    D9

    5 SETS9 SETS

    D8

    3 SETS

    D11

    11 SETS6 SETS

    D2

    51 SETS

    D7

    5 SETS

    D3 D5 D6

    AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN

    D4

    2 SETS

    AS SHOWNAS SHOWN AS SHOWN AS SHOWN

    D1

    PRIVATEROOM

    38 SETS

    D10

    OFFICES

    9 SETS

    D12

    JANITORSGARBAGE

    7 SETS

    D13

    ENGINEERING WORK SHOP AREAGENSET

    13 SETS2 SETS

    D9

    5 SETS6 SETS

    D8

    3 SETS

    D11

    10 SETS6 SETS

    D2

    51 SETS

    D7

    TOILET -CUBICLE

    5 SETS

    D3 D5 D6

    AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN

    D4

    2 SETS

    AS SHOWNAS SHOWN AS SHOWN AS SHOWN AS SHOWN

    D14

    5 SETS

    D9

    6 SETS34 SETS

    29 SETS

    D17

    13 SETS

    D20

    12 SETS

    D15

    43 SETS

    D8

    10 SETS

    D11

    22 SETS

    D19

    26 SETS

    D24

    4 SETS

    D2

    9 SETS

    6 SETS

    D16

    4 SETS

    D7

    TOILET -CUBICLE

    5 SETS

    D3D5 D6

    AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN AS SHOWN

    AS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWNAS SHOWN

    D4

    1 SET

    AS SHOWN

    16 SETS

    AS SHOWN

    D25

    2 SETS

    AS SHOWN

    D26

    2 SETS

    SCALE: 1:100MTS

    CROSS SECTION

    SCALE: 1:50MTS

    SCHEDULE OF DOORS & WINDOWS

    NO TO SCALE

    REGULAR PROJECTING

    ARM INSTALLATION

    CROSS SECTIONSCHEDULE OF DOORS & WINDOWSREGULAR PROJECTING ARMINSTALLATION

    A-11

    1

    A-11

    2

    A-11

    3

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-11PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    ARB

    ARARB

    ALLEN R. BUENAVENTURA MCM

  • LEGEND: SPECIFICATION:

    FLOOR FINISH PLAN:

    SCALE: 1:100MTS

    GRD FLOOR PLAN

    FLOOR FINISH PLAN

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-12PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    ARB

    ARARB

    A-12

    1

    GROUND FLOOR FINISH PLAN

    CB EA D GF H J K LI M ON P Q R

    1

    3

    8

    2

    6

    4

    7

    5

    A

    B

    EE RM.

    ELEVATOR

    TB DOTS

    CONFERENCEROOM CHILD

    PROTECTIONUNIT

    ANIMAL BITECENTER

    TREATMENT

    EMS MALETOILET

    RECEPTION

    VAULT

    OFFICE

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 17

    20

    L O B B Y

    FEMALETOILET

    SS

    TOILET

    TOILET

    FUTUREEXPANSION

    INFORMATION

    MAIN ENTRY

    COFFEESHOP

    SERVICEELEVATOR

    INFORMATION

    UP

    INFORMATION

    EE RM.X- RAY RESULT

    RELEASING

    X-RAYRECORDS

    LOUNGE

    CT- SCAN FILM STO.

    PANTRY

    DARK ROOM

    TOILET

    TOILETX-RAY

    ULTRASOUND

    TOILET

    2D

    SECURITYPOST ANTE

    ELEVATOR

    EE RM.

    BUDGET

    FINANCE

    INFORMATION

    WORKSTATION

    BILLING

    CASHIER

    VAULT

    CASH

    PHILHEALTH

    PHILHEALTHOFFICE

    ADMITTING A

    OFFICE OF THEADMINISTRATION

    PACKAGE DEPOSITCOUNTER

    SATELLITE MEDRECORDS

    VAULT

    STO.

    CAFETERIA

    RACK

    DISHWASHING

    DIETICIANOFFICE

    PEDIA ORTHO CLINICW/ CASTING

    RESPIRATORY

    ANESTHESIA

    MALE NURSELOCKER

    EMERGENCYMEDICINE

    DENTALINTERNAL MED. SURGERY DERMA

    OPD ENTRY

    ELEVATOR LOBBY

    EE RM.

    INFO

    RM

    ATIO

    N

    DIRECTORFAMILY MED.

    CHAIR FAMILYMED.

    NURSESTATION

    OPD PATIENT'SRECORDS

    BLO

    OD

    EXTR

    ACTI

    ON

    TOILET

    EQUIPMENTSTO.

    WAITINGAREA

    CHILD PLAYAREA

    BREASTFEEDING

    FEMALE TOILET

    MALE TOILET

    ADA

    MINOR OR

    CHANGINGROOM

    PANTRY

    MEETINGRM.

    HALL

    H A L L

    TREATMENTTRIAGE

    ENTRY

    DOCTOR'SCONSULTATION

    WAITINGAREA

    TOILET

    SECRETARY

    CHIEF ER

    TOILETSLEEPING

    ISOLATIONROOM

    DECONTAMINATIONROOM

    TOILET

    SHOWER

    ANTEROOM

    TOILET

    STRECHER'SPARKING

    TOILET

    GARDEN

    SOCIAL SERVICEOFFICE

    TOILET

    MEDICINE

    PMRS

    ULTRASOUND

    H A L L W A Y

    CHIEF OPD RM.

    SECRETARY

    WAITING AREA

    DARKROOM CONTROL

    BOOTH DRESS

    CHANGINGAREA

    CHANGINGAREA

    DRESSINGRM. CONTROL RM.

    SS

    SHAFT

    FEMALE MALE

    DELIVERYSORTING

    RADIOLOGYOFFICE

    TOILET

    UP

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 1720

    SINK

    MALE TOILET PWD

    FEMALE TOILET

    GARBAGEDISPOSAL AREA

    TOILET

    TOILET

    EE RM.

    VAULT

    OPTHA OBGYN

    VIP DININGAREA

    TOILET

    TOILET

    WORK STATION

    MAIN LOBBY

    WAITINGAREA

    TOILET

    UP

    123456789

    10

    14131211 15 191817 20

    UP

    RAMP

    LANDING

    MORGUE

    AUTOPSY AREA

    OFFICE

    PUBLIC DINING

    STAFF DINING

    WAITING AREA

    ANTEROOMSECURITY

    POST

    TOILETCASTING

    RELEASING

    PROPERTY SUPPLYSTORAGE

    LOADING

    PROPERTY SUPPLYOFFICE

    L O B B Y

    LOCKER

    BOTIKA NG BAYAN

    FREEZERROOM

    RECEIVING

    FLAMABLESTORAGE

    EXTEMPORANEOUSPREPARATION AREA

    ENTRY

    PREPARATIONAREA

    CHIEF PHARMACISTOFFICE

    WORK STATION

    ENT

    STAFF AREA

    SUPPLY &INSTRUMENT

    STO.

    TOILET

    NURSESTATION

    TOILET

    THERAPY BED TREATMENT AREA

    OUT PATIENTREHABILITATION ROOM

    TOILET &BATH

    EE ROOM

    PEDIA

    H A L L W A Y H A L L W A Y

    ELEVATORRECYCLABLE BIODEGRADABLES

    BIOHAZARD HOLDING

    1 2 3 4 5 6 7 8 9 10

    14 13 12 111519 18 1720

    ELEVATOR

    PLATFORM

    123456789

    10

    14131211 15 191817

    20

    H A L L W A Y

    H A L L W A YH A L L W A Y

    ELEVATOR ELEVATOR

    ELEVATORELEVATOR

    ELEVATOR

    FEMALE NURSELOCKER

    MINOR OPERATINGROOM

    PROPERTY SUPPLYWORK AREA

    SHAFT

    COOKINGPREPARATION

    AREA

    COOKING

    BAKING

    RACK

    AUXSHAFT

    AUXSHAFT

    AUXILIARYOFFICE

    SPECIAL DIETPREP AREA

    HAND WASHSINK

    FEMALETOILET

    MALETOILET

    DRY STO. COLD STO.

    FOODASSEMBLY

    TOILET

    STO

    OL

    URIN

    E

    BLOODEXTRACTION

    CHAIR

    CASHRELEASE

    I.T ROOM/CCTV ROOMSUPPORTING FACILITY

    BLOOD LETTINGBED

    HISTOPATH

    HISTOPATH

    ANTEROOM

    ANTEROOMGROSSING

    STATION

    CONDENSING UNITCONDENSING UNIT

    CONDENSING UNIT

    CONDENSING UNIT CONDENSING UNIT

    CONDENSING UNIT CONDENSING UNIT

    PFT ISOLATION

    LE

    DG

    E

    CONDENSING UNIT

    CO

    ND

    ENSIN

    G U

    NIT

    LE

    DG

    E

    ALLEN R. BUENAVENTURA MCM

  • SCALE: 1:100MTS

    2ND FLOOR PLAN

    FLOOR FINISH PLAN

    SECOND FLOOR FINISH PLAN

    LEGEND: SPECIFICATION:

    FLOOR FINISH PLAN:

    A-13

    1

    CB EA D GF H J K LI M ON P Q R

    3

    8

    2

    6

    4

    7

    5

    1

    A

    B

    CHAPEL

    DRESSING

    DRESSING

    TOILET

    NURSESTATION

    LOUNGE

    NURSE OFFICE

    HIGH RISKPREGNANCY UNIT

    M-DRF-DRF-NM-NURSE

    JC

    SLOPSINK

    CHANGINGROOM

    CHANGINGROOM

    CHANGINGROOM

    DELIVERY RM.

    STERILE CORRIDOR

    SUBSTERILE

    C-SECTION

    PACKING

    STERILE STORAGE

    SHO.

    WC

    RELEASING

    AUTOCLAVEROOM

    DEPUTY OFFICE

    OFFICE

    BREASTFEEDING

    8-BEDS

    SUPPLY STORAGE

    EE RM.

    STERILE STORAGE

    ELEVATOR ELEVATOR

    RECOVERY

    NURSESTATION

    MINOR OR

    ENDOSCOPY

    ENDOSCOPY

    JANITOR'SCLOSET

    OR 1

    OR 2

    OR 3AUTOCLAVE

    RM.

    WASHING

    NEPRHOCLINIC

    EE RM.

    ELEVATOR

    ELEVATOR

    ELEVATOR

    ELEVATOR

    ELEVATORELEVATOR

    TOILET CHANGING CHANGING

    MALE TOILET

    FEMALE TOILET

    PWD

    NURSE CALLROOM

    NURSE CALLROOM

    FEMALE DOCTORCALL ROOM

    MALE DOCTORCALL ROOM PANTRY CHIEF ER

    SHOWER

    ELEVATOR LOBBY

    12-BEDS8-BEDS

    NURSES STATION

    JANITORS CLOSET

    TREATMENTRM.

    SUPPLY &EQUIPMENT

    STO.

    WAITING AREA

    PPERACK

    SHOERACK

    LABOR RM.

    SHOWER TOILET

    ELEVATOR

    SHAFT

    UP

    TOILET

    TOILET

    TOILETTOILET

    TOILET TOILET

    TOILETTOILET

    TOILET

    STO.

    TOILET

    SUPPLYCAB.

    TOILET TOILET TOILET TOILETDRESSING DRESSING DRESSING DRESSING

    WORKING STATION

    NEW BORN WELLBABIESFIXED GLASS

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    1314 12 1115

    19 18 1720

    UP

    DN

    234568910

    14131211 15

    191817 20

    EE RM.

    STAFF

    ELEVATOR ELEVATOR

    ELEVATOR LOBBY

    DIRECTOR'SOFFICE

    TOILET TOILET TOILET TOILET TOILET

    CHIEF OFHOSPITAL

    CHIEF OFCLINIC

    CHIEF OFNURSE

    CHIEF OFOPERATION

    MEETINGRM.

    TOILET

    CHIEF OFADMIN

    INFO

    ANTEROOM

    SINK

    TOILET

    ANTE RM.

    CHANGING AREA

    SUB STERILE SUB STERILE

    H A L L W A Y

    SUB STERILE

    SUB STERILE

    HALLWAY

    H A L L W A Y

    H A L L W A Y

    RAMP

    LANDING

    20

    ANTEROOM ANTE ROOM

    ANTEROOM

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 1115

    19 18 17

    UP

    DN

    12345678910

    14131211 15 191817 20

    DN

    UP

    EE RM.

    ANTE

    DIALYSIS

    WATER TREATMENTROOM

    SLOPSINK

    H A L L W A Y

    BICARBROOMREPROCESSING

    RM. GARBAGEBINSINSTRUMENT

    AND SUPPLYSTORAGE

    WAITING AREA

    RECOVERYRM.

    TOILET

    COMMONTOILET

    PWD TOILET

    LOCKER

    STORAGE

    NICU

    ANTE RM.

    8- BEDS

    TREATMENTAREA

    WASHING

    ANTE RM.

    TOILET

    CLEAN-UP

    WAITING AREA

    EE RM.

    IN PATIENT REHABMEDICATION THERAPY

    TOILET

    TOILET

    OFFICEANTE ROOM

    SUPPLYSTORAGE

    THERAPY BED

    NURSESTATION

    DRESSINGRM.

    TOILET

    PICU 6- BEDS

    SURGICAL ICU

    VIEWINGWINDOW

    VIEWINGWINDOW

    ROOM

    ANTEROOM

    NURSESTATION

    SINK

    DIRTY LINENCLEAN

    ANTE RM.SUPPLY

    STORAGE

    DRESSING RM

    NURSE TOILET

    ANTE RM.

    SUPPLYSTORAGE

    DRESSING RM

    NURSE TOILET

    EE RM.

    STORAGE

    RADIANTWARMER

    GOWNING

    TOILET

    NURSE STATION

    HRPU

    H A L L W A Y H A L L W A Y

    WAITING AREA(MICU)

    WAITING AREA

    WAITING AREA(SICU)

    WAITING AREA

    VIEWINGWINDOW

    VIEWINGWINDOW

    WORKSTATION

    36.13 SQM

    SUB STERILE

    13 SQM

    34.92 SQM

    DELIVERY RM.

    91.10 SQM

    90.46 SQM

    75.97 SQM

    104.08 SQM

    SUB-STERILE CORRIDOR

    STO.

    TOILETPFT

    STO.

    RTU

    STORAGE

    WAITINGAREA

    WAITINGAREA

    WAITINGAREA

    MEDICINEPREPARATION

    AREA

    SUPPLY &EQUIPMENTCABINET

    STERILE PACKING

    WAITINGAREA

    ANTE RM.

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 111519 18 1720

    ELEVATOR

    EE ROOM

    JANITORIAL ROOMTOILET

    ELEVATORLOBBY

    LIBRARY

    MULTI-PURPOSEHALL

    CONNECTING BRIDGETO MAIN BLD.

    PANTRY

    ELEVATORLOBBY

    LANDSCAPEBELOW

    ANTEROOM

    AUXSHAFT

    AUXSHAFT

    MINOR OR

    SUBSTERILE

    I.T ROOM/CCTV ROOM

    NURSE STATION

    ANTEROOM

    MINOR OR

    CHIEFPATHOLOGIST

    CHIEFMED-TECH

    SUPPORTING FACILITY

    ISO

    ISO

    SUPPLYRM.

    LABORATORY

    RECORD'SROOM

    ANTEROOM

    MEDIA.

    AUTOMATION

    HISTOPATH

    CLINICAL MICROSCOPYHEMATOLOGY

    ANTEROOM

    EE RM.

    SCRUB

    35.13 SQM

    TRANSFORMERROOM

    LE

    DG

    E

    LE

    DG

    E

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-13PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    ARB

    ARARB

    ALLEN R. BUENAVENTURA MCM

  • THIRD FLOOR FINISH PLAN

    SCALE: 1:100MTS

    3RD FLOOR PLAN

    FLOOR FINISH PLAN

    LEGEND: SPECIFICATION:

    FLOOR FINISH PLAN:

    A-14

    1

    CB EA D GF H J K LI M ON P Q R

    1

    3

    8

    2

    6

    4

    7

    5

    A

    B

    PHARMACIST

    COLD

    ROOM

    PHARMACY

    STORAGE

    ROOM

    LAUNDRY AREA SOILED

    RAMP

    LANDING

    UP

    UP

    DN

    8 BEDS

    WARD

    8 BEDS

    WARD

    ISOLATION

    ROOM

    WAITING AREA

    MALETOILET

    FEMALETOILET

    DEPT. CHAIR

    ANTE

    RM

    UP

    DN

    123456789

    10

    14131211 15 191817 20

    SUITE

    ROOM

    SUITE

    ROOM

    ISOLATION

    ROOM

    LANDSCAPING

    RAMP

    LANDING

    EE. ROOM

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    DN

    8 BEDS

    WARD

    8 BEDS

    WARD

    EE. ROOM

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 1115

    19 18 1720

    8 BEDS

    WARD

    SUITE

    ROOM

    UP

    DN

    12345678910

    14131211 15

    191817 20

    8 BEDS

    WARD

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    TREATMENT

    RM.

    KIOSK

    KIOSK

    TREATMENT

    ROOM

    TOILET

    OFFICE

    INFO

    LIBRARY

    DEPT. CHAIR

    TOILET

    OFFICE

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 111519 18 1720

    DECK

    ENGINEERING

    HEAD

    MAINTENANCE

    HEAD

    STO

    WAITING

    AREA

    ASSISTANCE

    DESK

    ENGINEERING

    WORKSHOP

    AREA

    OPEN

    CO

    ND

    EN

    SIN

    G

    UN

    IT

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 1720

    ELEVATOR

    SURGERY DEPARTMENT DEPARTMENT OF OBSTETRICS & GYNECOLOGY

    SERVICEELEVATOR

    ELEVATORELEVATOR

    ELEVATOR

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATOR

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATOR ELEVATOR

    ELEVATOR

    ELEVATOR

    EE RM.

    JANITOR'S

    STORAGE

    EE. ROOM

    JANITOR'S

    STORAGE

    LOADING

    AUXSHAFT

    SUITE

    ROOM

    AUXSHAFT

    I.T ROOM/CCTV ROOMSUPPORTING FACILITY

    GREEN

    ROOF

    GREEN

    ROOF

    GREEN

    ROOF

    GREEN

    ROOF

    SHAFT

    NURSE

    STATION

    NURSE

    STATION

    SHAFT

    NURSE

    STATION

    NURSE

    STATION

    CO

    ND

    EN

    SIN

    G

    UN

    IT

    LE

    DG

    E

    UTILITY

    ROOM

    UTILITY

    ROOM

    LE

    DG

    E

    EE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-14PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    ARB

    ARARB

    ALLEN R. BUENAVENTURA MCM

  • SCALE: 1:100MTS

    4TH FLOOR PLAN

    FLOOR FINISH PLAN

    FOURTH FLOOR FINISH PLAN

    A-15

    1

    1

    3

    8

    2

    6

    4

    7

    5

    A

    B

    C ED GF H J K LI M O P Q R

    UP

    8 BEDS

    WARD

    8 BEDS

    WARD

    ISOLATION

    ROOM

    WAITING AREA

    MALE TOILET

    FEMALE TOILET

    PWD

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 17

    20

    UP

    DN

    123456789

    10

    14131211 15 191817

    20

    SUITE

    ROOM

    SUITE

    ROOM

    ISOLATION

    ROOM

    ELEVATOR

    ELEVATOR

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    DN

    8 BEDS

    WARD

    8 BEDS

    WARD

    EE. ROOM

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 111519 18 1720

    8 BEDS

    WARD

    UP

    DN

    12345678910

    14131211 15 191817 20

    8 BEDS

    WARD

    TREATMENT

    RM.

    TREATMENT

    RM.

    KIOSK

    KIOSK

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    EE. ROOM

    JANITOR'S

    STORAGE

    INFO

    LIBRARY

    DEPT. CHAIR

    TOILET

    OFFICE

    INFO

    LIBRARY

    DEPT. CHAIR

    TOILET

    OFFICE

    ELEVATOR

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATORELEVATOR

    SERVICEELEVATOR

    ELEVATOR

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATOR ELEVATOR

    DEPARTMENT OF PEDIATRICS DEPARTMENT OF ANESTHESIOLOGY

    GARBAGE BIN

    EE. ROOM

    JANITOR'S

    STORAGE

    GARBAGE BIN

    SUITE

    ROOM

    AUXSHAFT

    SUITE

    ROOM

    AUXSHAFT

    STORAGE

    OFFICE

    STORAGE

    STORAGE

    STAFF

    SERVER ROOM

    OFFICE

    BMS

    CCTV ROOM

    BIOMEDICAL

    ENGINEERING

    EQUIPMENT

    ROOM

    DECON.

    ROOM

    CSSR

    SHAFT

    NURSE

    STATION

    NURSE

    STATION

    SHAFT

    NURSE

    STATION

    NURSE

    STATION

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 1720

    ELEVATOR

    ROOF

    DECK

    OPEN

    LE

    DG

    E

    OPEN

    LE

    DG

    E

    UTILITY

    ROOM

    UTILITY

    ROOM

    EE ROOM

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-15PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    ARB

    ARARB

    ALLEN R. BUENAVENTURA MCM

  • SCALE: 1:100MTS

    5TH FLOOR PLAN

    FLOOR FINISH PLAN

    FIFTH FLOOR FINISH PLAN

    A-16

    1

    C ED GF H J K LI M

    1

    3

    8

    2

    6

    4

    7

    5

    A

    B

    UP

    8 BEDS

    WARD

    8 BEDS

    WARD

    ISOLATION

    ROOM

    WAITING AREA

    MALETOILET

    FEMALETOILET

    PWD

    UP

    DN

    123456789

    10

    14131211 15 191817

    20

    SUITE

    ROOM

    SUITE

    ROOM

    ISOLATION

    ROOM

    ELEVATOR

    ELEVATOR

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    DN

    8 BEDS

    WARD

    8 BEDS

    WARD

    EE. ROOM

    4 BEDS

    WARD

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 111519 18 1720

    8 BEDS

    WARD

    UP

    DN

    12345678910

    14131211 15 191817 20

    8 BEDS

    WARD

    TREATMENT

    RM.

    TREATMENT

    RM.

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    PRIVATE ROOM

    INFO

    LIBRARY

    DEPT. CHAIR

    TOILET

    OFFICE

    INFO

    LIBRARY

    DEPT. CHAIR

    TOILET

    OFFICE

    KIOSK

    KIOSK

    EE. ROOM

    UP

    DN

    1 2 3 4 5 6 7 8 9

    10

    14 13 12 111519 18 17

    20

    SERVICEELEVATOR

    ELEVATOR

    NURSE

    STATION

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATOR

    EQUIPMENT

    STORAGE

    EE ROOM

    DIRTY

    LINEN

    CLEAN

    LINEN

    TOILET

    ELEVATORELEVATORELEVATOR ELEVATOR

    INTERNAL MEDICINE DEPARTMENT

    JANITOR'S

    STORAGE

    GARBAGE BIN

    EE. ROOM

    JANITOR'S

    STORAGE

    GARBAGE BIN

    4 BEDS

    WARD

    SUITE

    ROOM

    AUXSHAFT

    SUITE

    ROOM

    AUXSHAFT

    I.T ROOM/CCTV ROOMSUPPORTING FACILITY

    MEDICAL RECORDSROOM

    WORKSPACE

    OFFICE

    SHAFT SHAFT

    NURSE

    STATION

    NURSE

    STATION

    NURSE

    STATION

    UTILITY

    ROOM

    UTILITY

    ROOM

    OPEN

    LE

    DG

    E

    OPEN

    LE

    DG

    E

    UTILITY

    ROOM

    UTILITY

    ROOM

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-16PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    ARB

    ARARB

    ALLEN R. BUENAVENTURA MCM

  • SCALE: 1:100MTS

    ROOF DECK PLAN

    FLOOR FINISH PLAN

    ROOF DECK FLOOR FINISH PLAN

    ELEVATOR

    ELEVATOR

    ELEVATOR ELEVATOR

    ELEVATOR

    ELEVATOR

    ELEVATOR

    UP

    DN

    1 2 3 4 5 6 7 8 9 10

    14 13 12 111519 18 1720

    UP

    DN

    12345678910

    14131211 15 191817 20

    ELEVATOR ELEVATOR

    DN

    C ED GF H J K LI M

    1

    3

    8

    2

    6

    4

    7

    5

    A

    B

    A-17

    1

    SHEET NO.SUBMITTED BY:PROJECT TITLE:

    LOCATION:

    ROLLY P ONOFRE

    POLICE LIEUTENANT COLONEL

    OIC, INFRASTRUCTURE DIVISION

    RECOMMEND APPROVAL:PREPARED BY:

    DESIGNED:

    APPROVED:

    DATE:

    REG. NO.:

    PTR NO.:

    ISSUED AT:

    VALIDITY:

    ISSUED ON:

    TIN NO.:

    A-17PHILIPPINE NATIONAL POLICE MEDICAL PLAZA

    CAMP PANOPIO B. TUAZON, BRGY. KAUNLARAN, QUEZON CITY

    APPROVED BY:

    OMEGA JIREH D FIDEL

    POLICE BRIGADIER GENERAL

    DIRECTOR, ENGINEERING SERVICE

    SHEET CONTENTS:

    ABELARDO C MATILLANO

    POLICE COLONEL

    CHIEF OF STAFF, ENGINEERING SERVICE

    BENJAMIN C VILLASIS, JR

    POLICE COLONEL

    DEPUTY DIRECTOR, ENGINEERING SERVICE

    PROJECT ARCHITECT

    115-813-770-000

    009127

    11406266

    ARB

    ARARB

    ALLEN R. BUENAVENTURA MCM