e. fred steennis on behalf of
DESCRIPTION
THE INTRIGUING BEHAVIOUR OVER TIME OF PD'S FROM DEFECTS IN MV CABLES AND ACCESSORIES LESSONS LEARNED WITH SCG, an on-line monitoring system. E. Fred Steennis on behalf of. E.Fred Steennis – Netherlands – Session 1 – Paper 0875. Content. how to measure PD’s on-line in MV cables some results - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/1.jpg)
Frankfurt (Germany), 6-9 June 2011
E. Fred Steennison behalf of
E.Fred Steennis – Netherlands – Session 1 – Paper 0875
THE INTRIGUING BEHAVIOUR OVER TIME OF PD'S FROM DEFECTS IN MV
CABLES AND ACCESSORIESLESSONS LEARNED WITH SCG,
an on-line monitoring system
![Page 2: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/2.jpg)
Frankfurt (Germany), 6-9 June 2011
Content
how to measure PD’s on-line in MV cables some results lessons learned – the intruiging behaviour
of PD’s conclusions
![Page 3: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/3.jpg)
Frankfurt (Germany), 6-9 June 2011
Content
how to measure PD’s on-line in MV cables some results lessons learned – the intruiging behaviour
of PD’s conclusions
![Page 4: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/4.jpg)
Frankfurt (Germany), 6-9 June 2011
How to measure PD’s on-line
applied method = SCG SCG means: Smart Cable Guard
CU SIU
up to 8 km
![Page 5: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/5.jpg)
Frankfurt (Germany), 6-9 June 2011
How to measure PD’s on-line
with SCG diagnose cables (≤ 8 km)
data via internet to KEMA server, 1 h updates
customers have accessto their PD plots
KEMA experts recom-mend on action if needed
![Page 6: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/6.jpg)
Frankfurt (Germany), 6-9 June 2011
Content
how to measure PD’s on-line in MV cables some results lessons learned – the intruiging behaviour
of PD’s conclusions
![Page 7: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/7.jpg)
Frankfurt (Germany), 6-9 June 2011
Some results
4 days
PILC of 666 m with water at 396 m
![Page 8: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/8.jpg)
Frankfurt (Germany), 6-9 June 2011
Some results
3 weeks
XLPE cable of 4.3 km with joint at 1678 m
![Page 9: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/9.jpg)
Frankfurt (Germany), 6-9 June 2011
Some results
> 4 weeks
XLPE cable of 7 km with various weak spots
![Page 10: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/10.jpg)
Frankfurt (Germany), 6-9 June 2011
Some results
3 months
PILC of 2.2 km with liquid filled joint at 1794 m
top view
![Page 11: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/11.jpg)
Frankfurt (Germany), 6-9 June 2011
Content
how to measure PD’s on-line in MV cables some results lessons learned – the intruiging behaviour
of PD’s conclusions
![Page 12: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/12.jpg)
Frankfurt (Germany), 6-9 June 2011
Lessons learned – PD’s are intruiging
How effective is SCG?
4 years SCG 158 km cable monitored
41 defects found in 7 cases (17 %) : no PD at all in 34 cases (83 %) : clear PD activity and
time to act
SCG is effective in warning for upcoming failures
![Page 13: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/13.jpg)
Frankfurt (Germany), 6-9 June 2011
Lessons learned – PD’s are intruiging
SCG . . . . how much time for repair?
![Page 14: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/14.jpg)
Frankfurt (Germany), 6-9 June 2011
Lessons learned – PD’s are intruiging
SCG . . . . how much time for repair?
water in PILC joints with hot conductor screen interruption in XLPE liquid filled joints in PILC
![Page 15: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/15.jpg)
Frankfurt (Germany), 6-9 June 2011
Lessons learned – PD’s are intruiging
SCG . . . . how much time for repair?
water in PILC: days *)
joints with hot conductor screen interruption in XLPE liquid filled joints in PILC
*) between start of heavy PD activity and failure
![Page 16: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/16.jpg)
Frankfurt (Germany), 6-9 June 2011
Lessons learned – PD’s are intruiging
SCG . . . . how much time for repair?
water in PILC: days *)
joints with hot conductor: days *)
screen interruption in XLPE liquid filled joints in PILC
*) between start of heavy PD activity and failure
![Page 17: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/17.jpg)
Frankfurt (Germany), 6-9 June 2011
Lessons learned – PD’s are intruiging
SCG . . . . how much time for repair?
water in PILC: days *)
joints with hot conductor: days *)
screen interruption in XLPE: weeks *)
liquid filled joints in PILC
*) between start of heavy PD activity and failure
![Page 18: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/18.jpg)
Frankfurt (Germany), 6-9 June 2011
Lessons learned – PD’s are intruiging
SCG . . . . how much time for repair?
water in PILC: days *)
joints with hot conductor: days *)
screen interruption in XLPE: weeks *)
liquid filled joints in PILC: months - years *)
*) between start of heavy PD activity and failure
![Page 19: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/19.jpg)
Frankfurt (Germany), 6-9 June 2011
Content
how to measure PD’s on-line in MV cables some results lessons learned – the intruiging behaviour
of PD’s conclusions
![Page 20: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/20.jpg)
Frankfurt (Germany), 6-9 June 2011
Conclusions
SCG can diagnose PILC, XLPE or mix up to 8 km, with 1 % length accuracy exp. so far: 4 years; 158 km monitored effective to see defects on time: 83 % ! PD’s from many types of defects only visible
for a few days before the failure, in others cases there is (much) more time SCG most effective if monitoring over longer time
![Page 21: E. Fred Steennis on behalf of](https://reader036.vdocument.in/reader036/viewer/2022081520/5681586a550346895dc5cbc3/html5/thumbnails/21.jpg)
Frankfurt (Germany), 6-9 June 2011
THANK YOU FOR YOU ATTENTION