e-governance roadmap (egrm) report dehradun, government of … · 2016. 11. 25. · e-governance...
TRANSCRIPT
e-Governance Roadmap (eGRM) Report
Dehradun, Government of Uttarakhand
May-2007
This document is a confidential document of Govt. of Uttarakhand. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, whether electronic, mechanical, photocopying, recording, or otherwise, without the written permission of
Government of Uttarakhand.
Prepared By: Wipro Consulting
TABLE OF CONTENTS
1 NATIONAL E-GOVERNANCE PLAN & CAPACITY BUILDING . 7
1.1 ABOUT NEGP ....................................................................7 1.2 ABOUT THIS PROJECT ...........................................................7 1.3 OUR APPROACH..................................................................8
2 VISION AND GOALS ......................................................... 10
2.1 E-GOVERNANCE VISION ...................................................... 10 2.2 IT READINESS FOR THE STATE OF UTTARAKHAND ......................... 11 2.3 PRESENT STATUS .............................................................. 12 2.4 IT READINESS: COMPARISON WITH OTHER STATES ....................... 15 2.5 STAKEHOLDERS AND EXPECTATIONS ........................................... 17
3 SOCIO ECONOMIC ASSESSMENT ...................................... 20
3.1 ECONOMY....................................................................... 20 3.2 CLIMATE & DEMOGRAPHY............................................... 24 3.3 HEALTHCARE AND POVERTY ALLEVIATION................................... 26 3.4 CONCLUSIONS ................................................................. 27
4 STRATEGY (PROPOSED INITIATIVES).............................. 29
4.1 CORE INITIATIVES ............................................................. 29 4.2 CORE INFRASTRUCTURE....................................................... 31 4.3 CORE APPLICATIONS .......................................................... 37 4.4 DEVELOPMENT OF DEPARTMENTAL APPLICATIONS.......................... 38 4.5 SERVICE DELIVERY CHANNELS ............................................... 40 4.6 DEVELOPMENT - COMPARATIVE STATUS .................................... 42
5 GOVERNMENT PROCESS RE-ENGINEERING (GPR)............ 44
6 UTTARAKHAND E-GOVERNANCE BLUEPRINT.................... 45
6.1 E-GOVERNANCE ROADMAP: .................................................. 46 6.2 ON-GOING PROJECTS OF NIC:............................................... 50 6.3 ON-GOING PROJECTS OF PMU E-GOVERNANCE / ITDA: ................. 51 6.4 OTHER ON-GOING PROJECTS................................................. 52
7 SUMMARY AND NEXT STEPS............................................. 52
8 ANNEXURE – I: E-GOVERNANCE PROJECTS LIST.............. 54
9 ANNEXURE – II: DATA CAPTURED DURING THE STUDY.... 56
9.1 HEALTH DEPARTMENT ......................................................... 56 9.2 FOREST DEPARTMENT ......................................................... 57 9.3 TOURISM DEPARTMENT ....................................................... 59 9.4 INDUSTRIES DEPARTMENT .................................................... 60 9.5 FOOD AND CIVIL SUPPLIES DEPARTMENT ................................... 61
UTTARAKHAND – e-Governance Roadmap
9.6 LABOUR DEPARTMENT......................................................... 63 9.7 RURAL DEVELOPMENT ......................................................... 65 9.8 SECRETARIAT ADMINISTRATION.............................................. 66 9.9 PANCHAYATI RAJ INSTITUTIONS (PRI’S) ................................... 67 9.10 CO-OPERATIVES ............................................................... 69 9.11 TRANSPORT..................................................................... 70 9.12 AGRICULTURE .................................................................. 72 9.13 REVENUE (PROPERTY REGISTRATION) ...................................... 73 9.14 EMPLOYMENT ................................................................... 74 9.15 FINANCE-TREASURIES ........................................................ 75
3
UTTARAKHAND – e-Governance Roadmap
List of Exhibits:
Exhibit 1: Our Approach to the study.
Exhibit 2: E-Governance Vision – Uttarakhand
Exhibit 3: Existing Institutional Framework
Exhibit 4: E-Readiness for the state (2005)
Exhibit 5: Movement Potential of Uttarakhand post e-gov Initiatives Vis-à-Vis other states
Exhibit 6: District map of Uttarakhand. SWOT analysis of Uttarakhand State.
Exhibit 7: Sector Contribution of Net Domestic Product at current prices Ongoing
Initiatives and roll out plan at ITDA Uttarakhand
Exhibit 8: Employment status 2004-05
Exhibit 9: Agriculture Scenario in Uttarakhand
Exhibit 10: Uttarakhand major forest statistics
Exhibit 11: Infrastructure (Electrification & Roads) Status
Exhibit 12: Power Supply Position –Uttarakhand Vis-a`-Vis northern States
Exhibit 13: Comparison Peak Demand / Demand Met (Uttarakhand vis-à-vis Other
Northern States)
Exhibit 14: Status Industrial Investment and Employment.
Exhibit 15: Population demographics – Uttarakhand
Exhibit 16: Population (Total & SC, ST), Sex Ratio, Literacy Scenario Uttarakhand vis-à-
vis All India
Exhibit 17: Indicators for Education sector in Uttarakhand
Exhibit 18: Uttarakhand State's Health Indicators vis-a-vis India & Other States
Exhibit 19: Health Care Infrastructure – Uttarakhand
Exhibit 20: Indicative data for a citizen charter
Exhibit 21: State Information Architecture
Exhibit 22: Architectural Framework for USWAN
Exhibit 23: Service Delivery Channels & Strategic approach
Exhibit 24: Proposed Institutional Framework
Exhibit 25: Govt. Process Re-engineering
Exhibit 26: E-Governance Blue-print –Uttarakhand
Exhibit 27: E-Governance Roadmap
Exhibit 28: On-going projects of NIC
Exhibit 29: On-going projects of PMU e-Governance / ITDA
4
UTTARAKHAND – e-Governance Roadmap
5
List of Abbreviations:
ACA Additional Central Assistance
AIDS Acquired Immune Deficiency Syndrome
ASP Application Service Provider
BOOT Build Own Operate Transfer
BSNL Bharat Sanchar Nigam Ltd
CBRM Capacity Building Roadmap
CDR Credit Deposit Ratio
CDV Citizen Data Vault
CHC Community Health Centre
CIC Community Interface Centre
CM Chief Minister
CS Chief Secretary
CSC Citizen Service Centre
DIT Department of Information Technology, GoI
DPR Detail Project Report
DST Department of Science and Technology
EAS Employment Assurance Scheme
EBPP Electronic Bill Presentation and Payment
ECS Electronic Clearing System
EGRM e-Governance Roadmap
FCS Food and Civil Supply
G2B Government to Business
G2C Government to Citizen
G2E Government to Employee
GIS Geographical Information System
GoI Government of India
GoU Government of Uttarakhand
GPR Government Process Re-engineering
GSDP Gross State Domestic Product
HRMS Human Resource Management System
Ha. Hectare
ICT Information and Communication Technology
IT Information Technology
ITDA Information Technology Development
Agency
JV Joint Venture
MI Minor Irrigation Department
MMP Mission Mode Project
MPHS Multi Purpose household Survey
MW Mega Watt
UTTARAKHAND – e-Governance Roadmap
6
MU Million Unit
NACO National AIDS Control Organisation
NCAER National Council of Applied Economics and
Research
NeGP National e-Governance Plan
NGO Non Government Organisation
NDP Net Domestic Product
NIC National Informatics Centre
NISG National Institute of Smart Government
NSSO National Sample Survey Organisation
O&M Operations and Maintenance
PDS Public Distribution System
PEMT Project e-Governance Mission Team
PKI Public Key Infrastructure
PHC Primary Health Centers
PMT Project Management Team
PMU Project Management Unit
PoP Point of Presence
PPP Public Private Partnership
PR Panchayati Raj
PRI Panchayati Raj Institution
PSC Project Steering Committee
PSP Private Sector Participation
PWD Public Works Department
RD Rural Development
RFP Request for Proposal
RTO Regional Transport Office
SC Sub-Centers
SDC State Data Centre
SEMT State e-Governance Mission Team
SGSY Swarnajayanti Gram Swarojgar Yojna
SRO Sub Registrar Office
SSI Small Scale Industry
ST Schedule Tribe
STP Software Technology Park
SWAN State Wide Area Network
SWOT Strength Weakness Opportunity Threat
USWAN Uttarakhand State Wide Area Network
TS Portal Teacher Student Portal
UFS Uttarakhand Forest Statistics
VoIP Voice Over Internet Protocol
WAN Wide Area Network
UTTARAKHAND – e-Governance Roadmap
7
1 National e-Governance Plan & Capacity Building
1.1 About NeGP
The National e-Governance Plan (NeGP), has been initiated by the Government of
India (GoI) to institute and enable mechanisms for Government to deliver citizen
services using the benefits of Information Technology. This program provides
support to the e-Governance initiatives being taken up by the Central and State
Government Departments (including Local Bodies). It proposes to achieve this by:
• Rapid deployment and scale-up of select "Mission mode Projects" (MMPs -projects
with significant citizen interface)
• Creation of a national IT backbone for fast, reliable and efficient connectivity,
data storage and access
• Common Service Centers for delivery of citizen services and information
• Creation of Internet portals for 24x7 access to government information and
services.
To achieve the above, the NeGP also provides for significant investments in areas
such as Program Management, Government Process Reengineering, Training,
Assessment & Awareness and Capacity Building.
1.2 About this Project
The e-Governance initiatives planned under NeGP have a wide scope and require to
be implemented on a massive scale. Moreover, these initiatives are to be ultimately
managed by the State Governments. It is also well recognized that for States to play
their role effectively, significant capacities need to be built / upgraded. Thus, for the
success of NeGP, it is necessary to enhance the capacities in the State Governments
and its Nodal Agencies.
With this perspective, the Planning Commission in the year 2004-05 had
incorporated a special Budget entry and had allocated funds as Additional Central
Assistance (ACA) to all the States for initiating the NeGP programme as
communicated by Planning Commission, GoI to State Chief Secretaries. Planning
Commission had issued broad guidelines for use of the ACA indicating that the first
priority is Capacity Building.
Given the context, the Information Technology Development Agency, Govt. of
Uttarakhand has engaged M/s Wipro Limited as consultants for performing the
study Capacity Building within the State Government.
UTTARAKHAND – e-Governance Roadmap
1.3 Our Approach
The Approach that has been followed for this Project is described in the figure below.
• Summary of EGRM• Summary of CBRM• Funding Requirements.
• Summary of EGRM• Summary of CBRM• Funding Requirements.
E-Governance Roadmap(EGRM)
E-Governance Roadmap(EGRM)
Capacity Building Roadmap (CBRM)Capacity Building Roadmap (CBRM)
Detailed Project Report (DPR)
Detailed Project Report (DPR)
Study PhaseStudy Phase Analysis PhaseAnalysis Phase
Socio Economic AnalysisSocio Economic Analysis
Shortlisting departmentsDept. Meetings
Shortlisting departmentsDept. Meetings
Vision, Current Projects, Needs of the State
Vision, Current Projects, Needs of the State
• Institutional structurefor e-governance
• Staffing of SeMT • Institutional structure
for Training• Training Needs
Assessment
• Institutional structurefor e-governance
• Staffing of SeMT • Institutional structure
for Training• Training Needs
Assessment
Dept. InitiativesCore ProjectsDept. InitiativesCore Projects
Prioritization ofDepartmentsInitiatives
Prioritization ofDepartmentsInitiatives
EGRM• Vision • Strategy• Blueprint
EGRM• Vision • Strategy• Blueprint
Citizen SurveyCitizen Survey
• Summary of EGRM• Summary of CBRM• Funding Requirements.
• Summary of EGRM• Summary of CBRM• Funding Requirements.
E-Governance Roadmap(EGRM)
E-Governance Roadmap(EGRM)
Capacity Building Roadmap (CBRM)Capacity Building Roadmap (CBRM)
Detailed Project Report (DPR)
Detailed Project Report (DPR)
Study PhaseStudy Phase Analysis PhaseAnalysis Phase
Socio Economic AnalysisSocio Economic Analysis
Shortlisting departmentsDept. Meetings
Shortlisting departmentsDept. Meetings
Vision, Current Projects, Needs of the State
Vision, Current Projects, Needs of the State
• Institutional structurefor e-governance
• Staffing of SeMT • Institutional structure
for Training• Training Needs
Assessment
• Institutional structurefor e-governance
• Staffing of SeMT • Institutional structure
for Training• Training Needs
Assessment
Dept. InitiativesCore ProjectsDept. InitiativesCore Projects
Prioritization ofDepartmentsInitiatives
Prioritization ofDepartmentsInitiatives
EGRM• Vision • Strategy• Blueprint
EGRM• Vision • Strategy• Blueprint
Citizen SurveyCitizen Survey
Exhibit 1: Our Approach to the study
1.3.1 E-Governance Roadmap (EGRM)
The approach for this project, as described in the exhibit above can be divided into
two phases
Phase – I: Study Phase: During this phase one to one meetings were conducted
with the Heads and the Key people of the identified departments with the aim of
completing collecting the following information from them:
• Roles and Functions of the department
• Current e-Governance initiatives and their status
• Current IT Infrastructure
• Future e-Governance initiatives and IT Infrastructure planned
• Current IT Staff and Training mechanism
A dipstick study of 15 departments was conducted as listed in Annexure-II for this
purpose.
8
UTTARAKHAND – e-Governance Roadmap
9
Phase – II: Analysis Phase: During this phase, the consultants deployed
themselves offsite and conducted a detailed analysis of all the data captured during
Phase-I through interactions with Capacity Building experts within the consultant
team.
1.3.2 Capacity Building Roadmap (CBRM)
The second deliverable of the project will be the Capacity Building Roadmap covering
the nature & size of capacities required at various levels and training requirement. It
would address the composition and infrastructure requirements of the SeMT keeping
in view the existing and planned e-Governance initiatives of the state as mentioned
in the e-Governance Roadmap.
1.3.3 Detailed Project Report (DPR)
The Detailed Project Report would cover the details of the SeMT (State e-Governance
Mission Team) including but not restricted to the structure of the team, the skill sets
required and an estimation of funding required for undertaking the capacity building
of SeMT as assessed in the study. The DPR would be drawn up based on the staffing
and the operational plan to set-up the SeMTs and would be submitted to the
Department of Information Technology (Government of India) for their approval and
funding.
UTTARAKHAND – e-Governance Roadmap
2 Vision and Goals
2.1 E-Governance Vision
The e-Governance vision for the state of Uttarakhand is as follows:
“The Vision is to have the state of Uttarakhand fully digitized – a networked society where information flow and access across all
sections of the society , enabled through effective ICT infrastructure , would propel the economic growth of the state leading to a very high
quality of life of its citizens .”
Exhibit 2: E-Governance Vision – Uttarakhand
MISSION
To improve the quality of governance in the state by facilitating easy and friendly
access to government services for all stakeholders in the state.
GOALS
The goal for the State Of Uttarakhand is to be amongst the Top 5 states in the
country in the delivery of e-Governance services to its citizens within the next three
years.
OBJECTIVES
1. To replace discretion based decision making with a transparent, objective,
effective and efficient process of decision making.
2. To reduce the cycle time of all processes, including citizen centric processes,
to result in reduced turnaround time and faster delivery of services thus
benefiting the citizen ultimately.
3. To reduce of cost, effort and time spent by the Government in the delivery of
services. A minimum saving of 20% in efforts to be achieved.
4. To reduce paper work and also bureaucratic procedures to enhance the
productivity of Govt. departments
5. To consolidate the variety of data sources and channel length for improved
quality of information.
6. To capture Data at the time of generation in processing centers to eliminate
delays and errors.
10
UTTARAKHAND – e-Governance Roadmap
11
7. To enable dissemination of information for variety of stakeholders in the
state, through specially designed information and communication faculties.
8. To improve citizen interface (poor/ BPL, etc)
9. To improve the targeting and penetration of various schemes.
10. To increase satisfaction level of citizen with Govt. by building a system of
citizen response management (CRM).
11. Empowerment of all participants in the process to make these more efficient.
Enablers
As per the policy, the following enablers relevant to e-Governance have to be
ensured:
Uttarakhand believes that Human Resource Development is the key to any initiatives
in IT sector. Proactive steps have been taken and more are on the anvil, to create an
empowered citizenry as well as a knowledge industry workforce. The key objective
here is not only to bridge the digital divide but also to not let it emerge in the first
place.
In Governance, transparency, public accountability, ease of transaction and effective
delivery would be the key objectives.
It would also involve process re-engineering of archaic government processes.
Government of India has already announced special industrial and investor friendly
package for Uttarakhand, which is supplemented now, by the new industrial policy
and package announced by the State Government. IT has been declared as a thrust
sector attracting special incentives from the State Government. Needless to say that
to attain this vision, a world-class IT infrastructure needs to be put in place.
2.2 IT Readiness for the State of Uttarakhand
IT Readiness for the State of Uttarakhand in terms of development and delivery of
services includes the following:
a) Institutional Framework for IT b) Infrastructure c) Development of back-end and front-end applications d) Delivery System
The present status of the state in terms of each of these has been described in detail.
UTTARAKHAND – e-Governance Roadmap
2.3 Present Status
2.3.1 Institutional Framework for IT
One of the reasons for this rapid improvement in readiness is because of the
presence of a fairly strong institutional framework in the state for IT related Projects.
At present, the Institutional Framework for IT in the state of Uttarakhand is as
follows:
Programme Steering Council (CM)
12
Exhibit 3: Existing Institutional Framework
The comparison with the Proposed Institutional Framework under NeGP is given later
where in the gaps in the existing Institutional Framework vis-à-vis the framework
proposed by NeGP have also been mentioned. The Capacity Building Roadmap shall
cover the requirement of matching these gaps.
2.3.2 IT Infrastructure
Creation of a Reliable, Robust and Redundant IT infrastructure would be a sine qua
non for attainment of the vision. It also poses special challenges given our
mountainous terrain and dispersed as well as small pockets of population. The
infrastructure also needs to address specific segments of users.
Use of Information Technology in Government requires a different infrastructure,
which supports speech quality audio, picture quality video and quick data transfers.
a) Computer Availability:
Computer and Internet penetration, form an important part of creation of
infrastructure. Already around nine thousand computers have been distributed in
schools under initiatives like Aarohi. In a unique scheme named Project
“Gyanotkarsh”, State has joined hands with the State Bank of India to provide
Core Committeefor IT (CS )
ITDA / PMU
NIC
Team / Cell in Few Vendors
Department Nodal Officers for each IT
Project
Project Steering Committees (PSCs)
PMT
Core Committeefor IT (CS )
ITDA / PMU
Project Steering NICCommittees (PSCs)
Project Steering Committees (PSCs)
Team / Cell in Few
Department Nodal
Vendors Officers for each IT
Project
Department Nodal
PMT
Officers for each IT Project
UTTARAKHAND – e-Governance Roadmap
13
the low-interest/easily repayable loans to all government employees and teachers
for purchase of computers for the home segment.
b) Bridging the Digital Divide:
i. Shikhar: For training equivalent to DOEACC Level ‘B’ certification at a
nominal cost. Currently being undertaken in 37 colleges across 11
districts and 17 Polytechnics. Infrastructure in the form of a computer
laboratory, a theory room, an office and course material for the
training is ensured
ii. Aarohi: Course material on basic level computer usage like MS Office,
etc. is provided to the students and computers have been distributed
in 1500 schools.
iii. Teach to Future & Shiksha: Under this project the Government of
Uttarakhand is undertaking training of teachers in the government
schools (Shiksha) & in non-government schools (Shiksha & Teach to
Future) and thus ensuring training of the students in the school for use
of IT tools.
iv. CISCO: Training under the CISCO program of CCNA through setting up
of Local and Regional Academies. Currently being undertaken in nine
engineering colleges in the state and planned to be extended to further
9-10 engineering colleges.
v. Further an IT Centre for Excellence has already been planned for and
is coming up in Nainital and another academy in Narendra Nagar.
2.3.3 Development of Back-end and Front-end applications
The development of applications at the Back-end and the Front-end is the next
important requirement for the delivery of services through e-Governance. Following
is a list of projects under this category:
2.3.3.1 Uttara Portal
♦ The Uttara Portal has been developed and hosted at IIT Roorkee and is
undergoing Beta Testing
2.3.3.2 World Bank Funded Projects
a) Badri-Kedar, Gangotri-Yamnotri, Hemkund Sahib Portal: The Badri-
Kedar, Gangotri-Yamnotri, Hemkund Sahib Portal project has reached the
stage of validation.
b) E-Class: The prototype development for the E-Class project has been
completed and demonstrated to the users. The lesson objects are being
made.
UTTARAKHAND – e-Governance Roadmap
14
c) Agriculture Portal: The portal is under implementation and the Pilot will
be launched soon.
d) Urban Development Project: The project is in software development
stage and design of the Map Approval System is complete.
e) HRMS Project: The pilot has been initiated.
f) PWD Project: The project is in the pilot stage.
g) Teacher Student Portal: The project is reaching the pilot stage.
h) MPHS: The project is in its Second Phase where survey has been
completed in 23 towns.
i) CDV: The project is reaching pilot stage.
j) PKI: The project is reaching pilot stage.
k) Social Welfare Project: The pilot run of the project is going on in
Dehradun.
2.3.3.3 NIC Projects
NIC has initiated and implemented computerization across the state of Uttarakhand.
The primary projects that have been conceptualized, developed and implemented are
in the following areas:
a) Land Records Computerization at Tehsil Level
b) Food Grains Management System
c) Computerization of all functions of RTO office at Dehradun
d) Agriculture Marketing Information System
e) Computerization of PGR system of Lokayukta office at Dehradun
f) Computerization of functions of Sub-Registrar Office at Dehradun,
Roorkee, Haridwar and Haldwani
g) VAT (Commercial Tax) Computerization at Dehradun
h) Computerization of Employment Exchange
i) Integrated Pay and Accounts office i.e. computerization of Treasuries at
26 locations
j) Computerization of PGR System at CM Office
k) Computerization of Annual Survey of Industries
l) Computerization and creation of database for statistical reporting
m) Computerization of case registration and leave management at High Court
2.3.4 Delivery System
Through e-governance, the State of Uttarakhand believes is anytime, any place
delivery of a government service to its citizens. The choice must rest with the citizen
and not with the governmental infrastructure. The State shall therefore use
technologies to overcome the handicap imposed by its terrain to deliver such
services.
UTTARAKHAND – e-Governance Roadmap
The State thus envisions a very wide vista of these services, which should be
provided to its populace. These, inter alia, may relate to Rural Development sector
whether it be Animal Husbandry or Fisheries or Horticulture or Floriculture or
Medicinal Plants etc. It shall be the endeavor to use these services for empowering
the population. It also means providing all services electronically in the urban sector,
whether they relate to Municipality or Development Authorities or other regulatory
bodies such as Transport, Electricity, or Water.
Presently the e-delivery of services in the state is at a nascent stage. Few initiatives
have been reported like Online Billing system of Uttarakhand Power Corporation
Limited (UPCL), Land records of Revenue Department etc. Further currently about 50
odd CIC’s are Operating under various different schemes. There is plan to set up
around 2804 CSCs in the state under NeGP. The same has been initiated and the
project is at RFP stage.
2.4 IT Readiness: Comparison with other states
Although the state of Uttarakhand has not been rated highly in the National e-
Governance Readiness Index (2005), the state has been taking rapid strides
towards moving up the Pyramid and achieving Leadership position in the last two
years. In fact, it has moved one step up from the 2004 index.
Exhibit 4: E-Readiness for the state (2005)
The above index uses a framework for ranking of states, which consists of three
categories namely Environment, Readiness and Usage with each category carrying
15
16
UTTARAKHAND – e-Governance Roadmap
Exhibit 5: Movement Potential of Uttarakhand post e-gov Initiatives Vis-à-Vis other states
W
climb up the e-readiness pyramid. It will reach the level comparable to the current
entation of these projects in
Uttarakhand, as has been seen in this study, is much stronger as compared to the
ourced
f an
an equal weightage. It may be noted that our study has revealed that in terms of
Readiness, the state of Uttarakhand is making exponential improvements.
UAPJ
KL KN
AP
DL
PJKL
DLUA
KN
AP
JH
JKBH
UP
POTENTIAL
CURRENT STATE
JH
JKBHUP
MZ
MZ
L,L H,L
H,HL,H
UAPJ
KL KN
AP
DL
PJKL
DLUA
KN
AP
JH
JKBH
UP
POTENTIAL
CURRENT STATE
JH
JKBHUP
MZ
MZ
L,L H,L
H,HL,H
UA: Uttarakhand MZ: Mizoram PJ: Punjab KL: Kerala DL: Delhi JH: Jharkhand JK: Jammu & Kashmir BH: Bihar UP: Uttar Pradesh KN: Karnataka AP: Andhra Pradesh
ith the proposed initiatives under section 6 the state of Uttarakhand would rapidly
aspiring Leaders like Punjab, Kerala, Delhi and Goa.
This is solely because the speed and model of implem
states in the current aspiring Leaders category of the study. The model of
implementation, wherein ITDA has been made as the Nodal Agency for the e-
Governance Projects and the composition of the ITDA, wherein skilled, outs
personnel have been deployed on contract basis together with the setting up o
outsourced Project Management (PM) team for all the World Bank e-Governance
initiatives (as mentioned in section 2.3.3.2) is quite robust.
UTTARAKHAND – e-Governance Roadmap
17
However, to ensure successful implementation and sustenance of all these initiativ
the State will have to focus more on building its capacities in
es,
terms of IT Manpower
and IT Infrastructure. This report and especially the subsequent Capacity Building
takeholders and Expectations
Citizens
with various issues related to their life and
the Govt. machinery. In a state where the State Government
remains the biggest employment provider in the organized sector, the citizen look
• New appointments in state government
information regarding employment options
• Support for self –employment.
• Education Equality in Rural and Urban.
ded education that leads to employment opportunity.
• Health care centers in each village.
infrastructure in every health centre.
• Availability of basic medicines in these centres.
sy to get.
• All weather roads connecting all places in the state.
xisting roads by proper maintenance.
• Proper drainage, sanitation facilities and supply of drinking water.
Roadmap (CBRM) will be a step in that direction.
2.5 S
2.5.1
The citizens of Uttarakhand came out
interactions with
forward to the govt. for continuing to provide them with opportunities for livelihood.
The various significant expectations have been arranged under the following heads:
Employment
• Availability of
Education
• Value ad
Health
• Good
• Making health care affordable and ea
Civic Amenities
• Good care of e
• Power Supply throughout the day.
UTTARAKHAND – e-Governance Roadmap
18
Agriculture and Allied activities
• Information regarding loans, subsidies and schemes and allotted quota of seeds
available under various Centrally and State Sponsored schemes
ing avenues available across the state as well as
the neighboring ones for selling the perishable goods.
Ot
• mation like district wise notification of beneficiary list, the fund
allocated against each scheme and other details of implementation of all the
and State sponsored schemes.
• Access to information on the schemes subsidies, loan etc. supported by the
•
e inery to be involved in the
implementation of any type of e-Governance initiatives become a very important
pectation is that whatever ICT initiative is to be
taken in the future should make their work easier. The other most relevant needs
their levels of knowledge about IT and other
skills.
pensions easily accessible to them
The tionaries from any kind of e-Governance
initiative should bring about a streamlining of various policies and procedures they
have to encounter, bring greater transparency in government interactions and make
all interactions much quicker. They expect the government to facilitate a good
• Access to information on market
• Access to information on the use of fertilizers, pesticides and bio- fertilizers and
high yielding variety of seeds.
• Cold storages for storage of perishable agricultural products in the transit routes
between the farms and the marketing venues.
• Maintenance of roads for the speedy transportation of perishable goods to the
market place.
hers
Access to infor
Centre
Departments.
Develop an effective grievance handling system.
2.5.2 Government Departments
Th Government Departments being the mach
group of stakeholders. Their core ex
and expectations are outlined below:
• Standardization of the government procedures and processes that result in a
reduction in the effort to be put in by them.
• Provision of training to increase
• Proper management system that makes their service related matter such as
transfers, postings, seniority, retirement and
as well as transparency in these issues.
2.5.3 Business
prime expectation of the business func
UTTARAKHAND – e-Governance Roadmap
19
investment climate in the state giving them the protection and basic economic
infrastructure. The main expectations are spelled out below.
nt in complying with
standards, statutory compliances, speedy disposal of filings, applications for
• involvement in major welfare projects.
• Providing basic economic infrastructure like good roads, round the clock power
supply and good communication links.
• Access to information regarding all tenders and contracts awarded by various
government departments.
• Transparency in the interactions with the governme
licenses and permits.
Greater access to funds and grants and
• Transparency in all interactions with the government machinery.
UTTARAKHAND – e-Governance Roadmap
3 Socio Economic Assessment
Uttarakhand became the 27th state of the Republic of India on November 9, 2000.
It was carved out of Uttar Pradesh. Uttarakhand lies in
the Northern part of India amidst the magnificent
Himalayas and dense forests.
Uttarakhand is comprised of two regions, the western
half known as Gharhwal and the eastern region going
by the name of Kumaon.
The State can be geographically grouped into
three distinct regions, the High mountain
region, the Mid-mountain region and the Terai
region. Dehradun is the interim-capital city. It
consists of 13 districts viz., Almora, Pauri
Garhwal, Tehri Garhwal, Bageshwar, Chamoli,
Haridwar, Champawat, Nainital, Dehradun,
Udham Singh Nagar, Uttarkashi, Pithoragarh,
Rudraprayag.
Exhibit 6: District map of Uttarakhand.
The region is mostly hilly (approx 88 percent) and the remaining 12 percent falls in
the plains. The state is very rich in natural resources especially water and forests as
it has many glaciers, rivers, forests, mountain peaks.
3.1 Economy
Out of Total NDP of Uttarakhand of Rs. 11539.34 Crore in 2001-02, the share of
primary, secondary, tertiary sector is Rs. 4179.72 Crore, Rs. 2357.76 Crore and Rs.
5001.86 Crore respectively. In percentage terms it means a representation of 36.22,
20.43, and 43.35 respectively, out of the total NDP.
Sector contribution in NDP (Rs. Cr.) at current prices in 2000-01
4179.72
2357.76
5001.86 Primary SecondaryTertiary
Exhibit 7: Sector Contribution of Net Domestic Product at current prices
20
UTTARAKHAND – e-Governance Roadmap
3.1.1 Employment Scenario
The Employment scenario of the Uttarakhand state is depicted in the table. The table
clearly indicates that the state government is the biggest employer of the state. The
Number of Registered unemployed is around 3, 06,289 as per the 2004-05 Figures.
EMPLOYMENT Employment Statistics
Year Units
Employment Exchanges 2004-2005 23
Registrations during the Year 2004-2005 74697
Employed during the Year 2004-2005 2049
No. of Unemployed Person Registered in Live Register
2004-2005 306289
Total State Govt. Employee 2004-2005 101595
Exhibit 8: Employment status 2004-05
3.1.2 Agriculture
Agriculture contributes around 29 percent to the State’s Gross Domestic product.
Agriculture in Uttarakhand is fraught with another peculiar characteristic. The
topography of the area is steep; the rainfall is high (1200-1600 mm) and the soils
range from sandy to sandy loam. The net irrigated area is around 43%.
Agriculture Scenario in Uttarakhand Area in thousand ha. S. No. Item Hill Plain Total
1 Net Area Sown (Approximately. 14%)
454 (57%)
339 (43%)
793 (100%)
2 Gross Cropped Area 718 532 1250
3 Net Irrigated Area (% to net sown area)
0.49 (10.7%)
2.97 (87.6%)
3.47 (43.63%)
4 Av. Size of Operational Holdings (ha.) 0.779 1.276 0.927
5 Contribution to state Gross Domestic Product in% - - 29.86
Source: Administrative report, Dep’t of agriculture Exhibit 9: Agriculture Scenario in Uttarakhand.
3.1.3 Forestry
Forest products contribute vastly to natural resources for the state. They also are a
revenue-generating source for the new state of Uttarakhand as well as some of the
population that is dependent on it. According to the Forest UFS 2004-05 the forest
area is 64.79% of the Total geographical area of the State of Uttarakhand. Nearly 46
% of the Forest area falls under the Protected forests.
21
UTTARAKHAND – e-Governance Roadmap
22
Forest Area at a Glance Unit
Geographical area in Uttarakhand Sq. Km 53,483.00
Population Lakhs 84.89
Total Forest Area Sq. Km 34,650.56
Per Capita Forest Area Ha. 0.41 Total Forest Area as % of Geographical Area % 64.79
Total forest area under forest dep't according to legal status Sq. Km 24,413.18
Forest area legally under forest dep't as % of geographical area % 45.65
Total forest area under the management of forest dep't Sq. Km 24,323.03
Forest area managed by forest dep't as %of geographical area % 45.48
Source: Uttarakhand Forest Statistics 2004-05
Exhibit 10: Uttarakhand major forest statistics
3.1.4 Power and Roads Infrastructure
Despite being rich in natural resources, there is a shortfall of Power in the state of
Uttarakhand. Due to a tremendous increase in development activities in various
fields like educational institutions, telecommunications, industry (IT parks, Industrial
Parks, etc.) electronic media and above all the residential and commercial activities
the Requirement of power for all categories of consumers viz. domestic, commercial,
industrial, public lighting etc has been increasing every year. As the state is a new
state with only six years of inception, the rate of increase of Infrastructure
availability has failed to keep pace with the rate of growth of demand.
INFRASTRUCTURE Electrified villages 78.60%
Metal roads 16,652 kms.
Distribution of villages on the basis of distance from road : Less than 1 km 41.51%
1 to 3 kms 17.25%
3 to 5 kms 13.32%
More than 5 kms 27.92%
Source: State Statistical Report -2001
Exhibit 11: Infrastructure (Electrification & Roads) Status
May-06 April, 2006 - May 2006 State /
U.T. Requirement
(MU) Availability
(MU) Shortage
(%) Requirement
(MU) Availability
(MU) Shortage
(%)
Uttarakhand 458 455 -0.7 897 859 -4.2
Total North India
17,082 15,406 -9.8 32336 28301 -12.5
All India 56,908 51,791 -9.0 113868 101666 -10.7
UTTARAKHAND – e-Governance Roadmap
Source: Power Ministry Presentation, Status Report
Exhibit 12: Power Supply Position –Uttarakhand Vis-a`-Vis northern States
May-06 April ,2006 - May 2006 State / U.T.
Requirement (MW)
Availability (MW)
Shortage (%)
Requirement (MW)
Availability (MW)
Shortage (%)
Uttarakhand 908 885 -2.5 939 885 -5.8 Total North India 27,993 25,255 -9.8 27993 25255 -9.8
All India 93,964 83,094 -11.6 95583 83094 -13.1 Source: Power Ministry Presentation, Status Report
Exhibit 13: Comparison Peak Demand / Demand Met (Uttarakhand vis-à-vis Other Northern
States)
In addition, the electrification of villages in the remote areas of the State as per the
2001 census is as below:
1. Total No. of rural households: 11, 96,157
2. Households electrified: 6, 02,255
3. %age of electrified rural households: 50.35%
3.1.5 Industries
At present the Uttarakhand government is working hard towards attracting industries
into the state with help of an Industrial Policy that promotes the growth of different
industries in the state and provides various attractive schemes.
The state has several traditional industries like the handicrafts, wool based, wax
based, forest products based, which have been a major contributor to the
employment of the Rural population. There are several handicraft industries in
Uttarakhand for instance carpet weaving, woodcarving, brassware and copper based
industries. There are also various sunrise industries like biotechnology, agro and food
processing industries, Information Technology, Floriculture, industries based on
herbal & medicinal plants where the industrial policy of the state is presently
focusing on as potential growth areas for the state.
The Table indicates the employment generated and the investment that has been
made in the state by small, medium and heavy industries
23
UTTARAKHAND – e-Governance Roadmap
MEDIUM/ HEAVY INDUSTRIES 191 Nos. Investment Rs. 2694.66 crores
Employment 50,802
SMALL SCALE INDUSTRIES 41216 Nos. Investment Rs. 305.58 crores
Employment 1,53,229
Exhibit 14: Status Industrial Investment and Employment
3.2 CLIMATE & DEMOGRAPHY
3.2.1 Climate and Flora & Fauna
The state has two distinct climatic regions: the predominant hilly terrain has Alpine
conditions characterized by cold winters with snowfall for quite a long time, good
rainfall in the monsoon, and mild summers and the small plain region with tropical
conditions having hot and humid and reasonably chilly Winters.
The alpine and tropical rainforests that cover most parts of the state make natural
habitats of some of the best-known wildlife creatures India has on offer. The state is
home to Royal Bengal Tigers and large number of pachyderms Alpine forests in the
region include Valley of Flowers National Park and a number of National Parks of
international repute that attract tourists in hoards.
3.2.2 Demographics
Various ethnic groups live side by side in Uttarakhand both in the Hilly regions and
the Plains. In the hilly regions, the agrarian-pastoral way of life is majorly followed.
Various communities and tribes like the Bhotia traders, Jaunsari, Buksha, Tharu, and
Raji (heterodox Hindus and Buddhists), and Sikh migrants from West Punjab have
settled in the state. A few Muslim groups are also native to the area, although most
of them have settled recently. The Muslim Gujjar herders also migrate to the hills.
The population of Uttarakhand as per 2001 census was 84.79 lakhs comprising of
43.26 lakhs of males and 41.36 lakhs females. The decennial Growth Rate has been
19.20 %. According to 2001 census, density of population of Uttarakhand was 159
persons per sq. Km. as against 82 persons per sq. Km. in 1991 census showing an
increase of 128 persons per sq. Km. during last decade.
The Population of Uttarakhand is around 0.82% of the total population of the
country, which is clearly indicated by the Table below.
24
UTTARAKHAND – e-Governance Roadmap
25
Area Population Density Sex Ratio
Sq.Km. Persons Per Sq. Km.
Females/1000males
Himachal Pradesh
55,673 6,077,248 109 970
Uttarakhand 53,566 8,479,562.00 159 964 Uttar Pradesh 238,566 166,052,859 696 898 All India 3,287,263 1,027,015,247 324 933
Exhibit 15: Population demographics – Uttarakhand
The Population Distribution analysis of the State is divided according to the two
major regions: The Garhwal region & the Kumaon region. The Garhwal region
contributes to approximately 58.01% of the total population, which is around 49.15
Lakh. Uttarakhand stands 17th in literacy rate with an overall literacy of 72.28%
(Male literacy: 84.01% and Female literacy: 60.26%). The State Sex Ratio and the
literacy Rates are also clearly defined in the exhibit below.
The state has 13203 primary, 3144 junior high and 1526 secondary / sr. secondary
schools with 11.47 lakhs students enrolled upto junior high school and 2.46 lakhs
students enrolled in secondary / sr. secondary school. The state has 1526 secondary
/ senior secondary schools with 2.46 lakhs of students enrollment.
Region Wise Distribution of Population: Uttarakhand
Region Total Population
Males Females Rural population
Urban Population
Garhwal 49,15,593 25,16,759 23,98,834 35,68,885 13,46,708
Kumaon 35,63,969 17,99,642 17,64,327 27,40,432 8,23,537
Total 84,79,562 43,16,401 41,63,161 63,09,317 21,70,245
Sex Ratio (Females per 1000 Males)
State/ Union Territory Total Population
Child Population in the age group 0-6
Population aged 7 & above
1991 2001 1991 2001 1991 2001 India 927 933 945 927 923 935 Uttarakhand 936 964 948 906 933 976
Population (Persons) State/ Union Territory Urban
Urban as % of Total Population
Rural Rural as % of Total Population
Total
India 285,354,954 27.78 741,660,293 72.22 1,027,015,247
Uttarakhand 2,170,245 25.59 6,309,317 74.41 8,479,562
Number of Literates and Literacy rates by Sex
Literates Literacy Rate (%) India/ States/ Union Territories Persons Male Female Persons Male Female
UTTARAKHAND – e-Governance Roadmap
26
INDIA 566,714,995 339,969,048 226,745,947 65.38 75.85 54.16
Uttarakhand 5,175,176 3,044,487 2,130,689 72.28 84.01 60.26
Population
India/State/UT Scheduled Castes (SC) Population
Scheduled Tribes (ST) Population
Proportion of SC population
Proportion of ST population
India 166,635,700
84,326,240 16.2 8.2
Uttarakhand 1,517,186
256,129 17.9 3.0
Exhibit 16: Population (Total & SC, ST), Sex Ratio, Literacy Scenario Uttarakhand vis-à-vis All India
EDUCATION: Indicators for Uttarakhand
Indicator Uttarakhand All India
Literacy Rate - 2001 (%) 72.28 65
Male Literacy Rate - 2001 (%) 84.01 76
Female Literacy Rate - 2001 (%) 60.26 54
Rural Literacy Rate - 2001 (%) 69.95 59
Rural Male Literacy Rate - 2001 (%) 82.74 71
Rural Female Literacy Rate - 2001 (%) 55.52 47
Urban Literacy Rate - 2001 (%) 81.50 80
Urban Male Literacy Rate - 2001 (%) 87.21 86
Urban Female Literacy Rate – 2001 (%) 74.77 73 Exhibit 17: Indicators for Education sector in Uttarakhand
3.3 Healthcare and Poverty Alleviation
According to the state government of Uttarakhand about 4,16,018 persons were
identified as living below the poverty line in the year 2002. Health care delivery
system in the State is organized at three levels, each level supported by a referral
centre. The levels are:
1. Primary Care level comprising of Sub-centers (SC), Primary Health Centers (PHC)
and Community Health Centers (CHC). Essential basic health care is provided at
this level.
2. Secondary care level comprising of CHCs and District Hospital as referral centers
where comparatively more complex curative services are provided with basic
specialist facilities.
3. Tertiary Care level where specialist and super specialist care are provided. It
included State level hospital
ITEM UTTARAKHAND INDIA
Decadal Growth 19.20% 21.34%
Crude Birth Rate 26 26
UTTARAKHAND – e-Governance Roadmap
27
ITEM UTTARAKHAND INDIA
Crude Death Rate 6.5 8.7
Infant Mortality Rate 52 70
Infant Mortality Rate 52 70
Total Fertility Rate 3.06 2.85
Sex Ratio 964 933
Source : Presentation by Govt of Uttarakhand
Exhibit 18: Uttarakhand State's Health Indicators vis-a-vis India & Other States
This network of Civil Hospitals, Primary Health Centres, Primary Health Sub-centres,
Community Health Centres, Dispensaries and Drug De-addiction Centres provides
services such as public health, control of communicable diseases, health education,
family welfare, maternal and child health care in Uttarakhand.
Health Care Infrastructure Number of Medical College Hospitals (MCH) 1
Number of District Headquarter Hospital (DHH) 16
Number of Total Allopathic Hospitals (As on 1.1. 2001) 391 Number of Community Health Centres (CHC) (As of 31.03.2001) 36 Number of Primary Health Centres (PHC) (as of 31.03.2001) 228
Number of sub-centres (SC) (As of 31.03.2001) 1609 Source: State Finances, RBI &Census2001
Exhibit 19: Health Care Infrastructure – Uttarakhand
3.4 Conclusions
The highlights of the Socio-economic data for the state of Uttarakhand are as
follows:
1. The state is in a young stage with just six years since its formation. It has a
huge potential for growth in the so-called sunrise industries like
biotechnology, floriculture, herbal and medicinal plants, food and agro
processing and Information Technology.
2. The area of the state is pre-dominantly hilly (approx 88 percent) making e-
Governance and IT all the more important to reduce the distances and
increase speed of reaching to the residents in rural areas where traditional
modes of transport and service delivery take a long time
3. The state is rich in Forest resources which is revenue generating source for
the government and also source for some sunrise industries like herbal &
medicinal plants
UTTARAKHAND – e-Governance Roadmap
4. The combination of a hilly terrain, rich natural forest cover and good law &
order situation gives the state a huge potential for Tourism related
development
5. A low density of population, reasonable literacy rate (higher than the national
average) and presence of education centers in Roorkee and Dehradun, etc.
are positive indicators for the state although the penetration of education into
the rural and semi-urban areas is of concern.
All the above factors are somewhat weighed down by the inadequate availability of
infrastructure like roads and power in the state. Although the data for Power
availability does not show much gap between demand and supply, in this study, non-
availability of power came out as a single largest hurdle in the development of the
state in general and success of e-Governance initiatives in particular.
28
UTTARAKHAND – e-Governance Roadmap
29
4 Strategy (Proposed Initiatives)
As part of the E-governance Roadmap for the state of Uttarakhand, the following
initiatives are proposed:
4.1 Core Initiatives
4.1.1 Policies
It is necessary to formulate various policies and standards for enabling development
of e-Governance applications. Some of the policies essential have been enumerated
as below:
4.1.1.1 IT Policy
The state of Uttarakhand has already drafted an IT policy for achieving the goals as
mentioned in its IT Vision. The IT Policy describes the following as its main objectives
relevant to e-Governance:
1. Encourage the use of IT in the Government for management and decision support
systems and to Re-engineer the processes
2. To upgrade the quality of life of citizens of the State by facilitating easy access to
consumer applications of IT.
3. To encourage private sector initiatives for the development of world class IT
infrastructure adequate for the needs of the citizens, the industry and the
government.
4.1.1.2 HR Policy
Human Resource forms the main component of the IT industry and it has been
covered as such in the IT Policy as one of the focus areas of the State Government.
However, given the importance of Human Resource for the overall development of
the state, a separate HR Policy may be defined keeping in view the IT Vision and
Development and e-Government objectives of the state.
4.1.1.3 IT Standards and Data Standards
The state has defined its IT Standards for the creation of Uttara Portal but it needs to
be updated so as to match the rapid changes in Technology and its Availability. It is
important to have IT Standards defined and updated at the early stages itself so as
to ensure that all the initiatives use compatible technology. Due to the large size of
the operations of the State Government both in number of departments and
expanse, it becomes imperative that the IT Standards be defined at a level, which
minimizes any issues arising out of incompatible or obsolete technology.
UTTARAKHAND – e-Governance Roadmap
30
4.1.1.4 Security Policy
The IT Standards of the state already includes the Security Policy but it needs to
further detailed out so as to define all the parameters covering the IT Security
including processes, documents and people. With the coming up of the State Wide
Area Network, the State Data Centre and the multiple current and future IT
initiatives the amount of digitized data will increase at a rapid pace. It then becomes
utmost priority to not only ensure Application Security but also, Security of all
associated IT Infrastructure and Assets.
4.1.2 Government Process Re-engineering (GPR)
The successful implementation of e-Governance projects requires a great deal of
restructuring of administrative processes, and a redefinition of administrative
procedures and formats, which meet resistance in almost all departments at all
levels. IT is to be used as a driver for implementing the Government Process Re-
engineering initiatives in the state. Details have been given in Section 6.
4.1.3 Citizen Charter
The state does not have a Citizen Charter at present related to the service delivery
through the e-Governance initiatives. Since, a majority of e-Governance initiatives
are ongoing their impact and hence the ensuing Citizen Charter will be visible at a
later stage.
A Citizen Charter will define the service delivery timelines for the different G2B and
G2C interfaces of the state. The Citizen Charter is thus a very effective tool to
project the right image of the state to all the stakeholders. It also ensures that the
expectations of service delivery are told to the employees of the state, so that they
are aware of their responsibilities, which is a strong step towards ensuring that the
service delivery timelines are met. An indicative list of sections to be mentioned in
the Citizen Charter is included here for reference:
♦ Organization Structure
♦ List of Public Information Officers
♦ Appellate authority within the department
♦ Information available in electronic forms
♦ Service Levels (indicative table follows)
♦ Grievance Redressal Mechanism
UTTARAKHAND – e-Governance Roadmap
31
S. No. Department and Services Service Level
1 Tourism - Online Registration and filing of
Luxury taxes (By Hotels) and their old status
No. of days for registration
acceptance
2 Food and Civil Supplies – Online application
for applying for Ration Cards
No. of days for making
ration card
Exhibit 20: Indicative data for a Citizen Charter
The information available in electronic form, the service levels and the services for
each of the departments may be finalized during the Detailed Project Report (DPR)
preparation exercise in each of these departments. The DPR study for each of these
departments will also cover all the linkages of the departments and the various
services with other departments / institutions and any other bodies within the state.
The necessary funding requirement for these DPR exercises will be covered in the
Capacity Building Roadmap document.
4.2 Core Infrastructure
Core Infrastructure forms a backbone for the e-Governance in the state. Core
Infrastructure could be used by all Government Departments and its agencies, and
thereby reduce project costs for each department. Conceptually the backbone
requirement for every e-Governance projects is as follows:
At the back-end repository of all the data and applications (State Data
Centres)
Connectivity of the back-end to all the front-ends which includes department
offices (State Wide Area Network)
The front-end delivery of services (Common Service Centres)
The State Government intends to provide connectivity, access and services from
Secretariat/State Headquarters to the Block level including Horizontal connectivity to
all important government offices at each of these levels. The Uttarakhand State Wide
Area Network would be commonly used by various departments and institutions
while delivering services to the common citizens.
The state is already implementing a number of e-Governance initiatives in parallel,
and an important pre-requisite to these e-Governance initiatives is that the state
should as soon as possible roll out the core infrastructure to enable the maximum
reach of the ongoing e-Governance initiatives.
UTTARAKHAND – e-Governance Roadmap
The State has already decided to roll out SWAN with it’s Vertical Connectivity till
Block level by early next year and the Connectivity of 4Mbps from State to District &
2Mbps from District to the Block Level. This connectivity will be scalable as per
requirements. The conceptual framework of the State Information architecture is
provided below.
STATE DATA CENTRE
Other Offices / directorates (Horizontal Connectivity)
Secretariat
Database Servers
Dep’t /Core Application Servers
District Offices
Other Offices (Horizontal Connectivity)
Block Offices
UTTA
RA
NC
HA
L SWAN
D R
Site
INTERNET
Other Offices
Horizontal Connectivity
Kiosks
CIC / CSC’s Individual
OFC
OFC
OFC
OFC
OFC
OFC
ISDN Back-up
ISDN Back-up
STATE DATA CENTRE
Other Offices / directorates (Horizontal Connectivity)
SecretariatSecretariat
Database Servers
Dep’t /Core Application Servers
District OfficesDistrict Offices
Other Offices (Horizontal Connectivity)
Block OfficesBlock Offices
UTTA
RA
NC
HA
L SWAN
D R
Site
INTERNET
Other Offices
Horizontal Connectivity
Kiosks
CIC / CSC’s Individual
OFC
OFC
OFC
OFC
OFC
OFC
ISDN Back-up
ISDN Back-up
OFC
OFC
OFC
OFC
OFC
OFC
ISDN Back-up
ISDN Back-up
UT
TA
RA
KH
AN
D S
WA
N
Exhibit 21: State Information Architecture
32
UTTARAKHAND – e-Governance Roadmap
33
4.2.1 State Data Centre (SDC)
The state data centre is in the conceptualization phase and is under the current
initiatives of the state. State Data Centre (SDC) shall provide international standard
compliant, reliable, highly available and secured computing facility to host critical
statewide applications, data and websites. SDC will provide system hosting
(operation, management and maintenance) services for the Government's central IT
infrastructure and departmental information systems. It will also provide disaster
recovery (DR) facilities for the Government's mission critical systems. The SDC
should have a network control centre and a central help desk that will monitor the
government-wide data network and critical network devices. At present the state
has outsourced the Data Centre to CDAC, NOIDA.
4.2.2 State Wide Area Network (SWAN)
Considering the large number, type and reach of e-Government services and
applications (G2B, G2G, and G2E) that are planned over the next 3 to 5 years, there
was felt a need for a State Wide Area Network to enable the efficient communication
of data, voice and video among the various offices of the state government at the
state, district, subdivisions, and block level. The State of Uttarakhand embarked
upon the USWAN program under the National e-Governance Action Plan (NeGAP).
Under NeGAP, the SWAN is to extend connectivity to the Block level through State
Wide Area Networks (SWANs). Support for the establishment of SWAN infrastructure
up to the Block level is being provided by Department of Information Technology,
GoI. SWAN shall be an integrated and reliable communication backbone connecting
all government offices/departments or Kiosks in Uttarakhand.
Minimum bandwidth to be made available would be 2 Mbps up to district level as well
as up to block level on a dedicated basis through leased lines / satellite.
Architecture of USWAN
The State Wide Area Network (USWAN) aims to provide a reliable, integrated and
robust connectivity infrastructure catering to high speed and high capacity delivery
of voice, data and video transmissions along with setting up an open standard based,
interoperable, scalable network infrastructure providing a ubiquitous communication
backbone for the State’s distributed information processing environment in addition
to enabling connectivity to various government departments
The USWAN shall have hierarchal structure from State HQ to District HQ to Sub
Division HQ / Block HQ. The network shall follow STAR topology ultimately with
horizontal PoP connected at different levels.
UTTARAKHAND – e-Governance Roadmap
B loc k-1 B loc k-2 Block -n Bloc k-1 B loc k-2 Block -n
314 Blo ck
2 MB PS lin es
8 MB PS lin es
B loc k-1B loc k-1 B loc k-2B loc k-2 Block -nBlock -n Bloc k-1Bloc k-1 B loc k-2B loc k-2 Block -nBlock -n
314 Blo ck
2 MB PS lin es
8 MB PS lin es
121 Bl ocks / Tehsil s
13 D istr icts
Di stri ct 1 D i stri ct 2 D istrict 3D istrict 4 Di stri ct 5 Di stri ct 13
4 MBPS lines
Exhibit 22: Architectural Framework for USWAN.
Three Levels of SWAN
1. Vertical Connectivity
This connectivity shall act as the backbone of USWAN. Presently it has been
suggested as SHQ---DHQ---SDHQ / BHQ. This has to be reliable, integrated and
robust telecommunications infrastructure catering to high speed and high capacity
delivery of voice, data and video transmissions providing a ubiquitous
communication backbone for the State’s distributed information processing
environment.
2. Last Mile connectivity
This connectivity defines the connectivity required for horizontal PoPs identified by
the Government to be connected to network through SHQ, DHQ and SDHQ/BHQ.
Interconnectivity of SHQ, DHQ and SDHQ/BHQ is not the part of the last mile. These
locations can be at district level or block level.
3. Local connectivity
34
UTTARAKHAND – e-Governance Roadmap
35
This may be considered a part of overall SWAN structure for the state. Defines how
nodes/equipment are connected to each other in an office premises or in a building
identified to be connected to SWAN through last mile.
4.2.3 Service Delivery Infrastructure
The third of the core infrastructure is providing front office to the citizens for efficient
delivery of services. Currently there are about 50 odd CIC’s Operations under
different schemes. The Total of 2804 CSC’s are to be rolled out in the state, which
would enable the information flow across all levels of the state, right from state to
Village level.
The key elements to consider in achieving progress on the front office are:
Customers; the customers could be citizens, businesses or other government
departments
Services identified for delivery through the channels
Channels for exchange of information / delivery
The customers can be classified into three key segments viz., Citizens (including
residents and tourists), Businesses operating in the State of Uttarakhand and
Business Partners (e.g. suppliers and other governmental organizations).
The GOU customers can be grouped under the following categories based on the type
of the relationship they have with government. These categories are:
Citizens: The citizens are the residents and tourists of Uttarakhand. ‘Residents’
constitute the largest customer segment and the most frequent users of the majority
of services of the GOU departments and information. Their relationship with
government can be summarized as follows:
Use the government infrastructure in terms of roads, drainage networks,
irrigation networks, public parks, etc.
Access the departmental services such as payment of taxes, registration of
transactions, issue of various types of certificates, etc.
Report problems and provide suggestions.
Payment of Bills and other transactions
Businesses: This refers to the public and private sector organizations that access the
services and information from the Government departments. Their relationship with
these type of organizations can be summarized as follows:
Pre-establishment services such as registration, licenses, etc.
Post-establishment services such as payment of taxes, filing of returns, etc
UTTARAKHAND – e-Governance Roadmap
36
Employees: The employees working for the government constitute this segment.
They avail services from the government such as payroll, benefits, etc.
The key customer requirements that need to be addressed by E-Government are:
Simple and accessible windows for various segments of customers through e-
Government to all Government information and services .
Minimize the time spent on repeated visits to government offices.
Customers should no longer be required to submit the same information /
documents repeatedly
Feedback mechanism to be established
The services identified for delivery are discussed on the next section.
The Service delivery Infrastructure is already in the ongoing phase in the state of
Uttarakhand and a number of CSC’s are already operational under different schemes
of the state, but the scale has to be increased. The number of applications through
which citizen services can be given should also be increased at these CSC’s & Kiosks.
4.2.4 Uttara portal: Uttara is the State Portal of Uttarakhand, developed under the UNDP Pro-poor
IT Initiatives by IIT Roorkee and maintained by them with funds being provided by
GoU. It is hosted at a small Data Centre located at IIT Roorkee.
Uttara is envisioned to be the mother portal of all other portals like the
Agriculture Portal, Teacher –Student Portal, Badri-Kedar portal, Haridwaronline
portal, etc which come up in the state. It shall also be the hub for all single window
e-governance transactions at a future date. Uttara in its present stage is the Beta
Version. There are 107 departmental and 8 other websites on Uttara having bi-
lingual content. The major heads under which information is available / proposed to
be made available are Government Orders, Mandi Rates, Weather Information,
Tenders / Advertising, Online Grievance Filing, Online Examination Results,
Application Forms, General News, Employment News, Expert Advice, Online
Application Filing, Quick links, Announcements, etc.
UTTARAKHAND – e-Governance Roadmap
37
4.3 Core Applications
The applications that will be spread commonly across all the departments of the
State are part of the Core Applications categorization. Some of these applications
have already been envisaged by the ITDA/NIC and their implementation has already
begun while there are still other applications that need to be implemented. Together
both these categories comprise the Core Applications’ Roadmap of the State.
4.3.1 Applications common to all departments
Recommended Core Applications
Name Description
1. GIS Application Considering the inhospitable terrain of the state where more than
a majority of the state is hilly in nature and faces inhospitable
weather for a reasonable duration in a year, the state may go for
a GIS application initiative. The application initiative would cover
the broad requirements of the entire state and linked to the
concerned departments for specific data and information.
2. E-Tendering & e-Procurement
E-tendering has been envisaged by the state in the Phase-III of
the Uttara Portal project. The relevance and importance of the
project for the State, suggests that it may be taken up as a
separate project in itself and integrated with the Uttara portal at a
later stage.
3. Integrated Scheme Monitoring System (ISMS)
The project would involve creation of a centralized database of all
the government-sponsored schemes including both state and
central government schemes. It may also include any externally
funded schemes. The individual departments and institutions
would be able to use this centralized scheme application and
related information database for effective distribution.
4. HRMS* This application covers all aspects of personnel management of
the Government employees of the State. It is linked to IPAO for
salary purpose and is being developed under World Bank Project.
5. Information Management & Grievances Redressal System
A centralised application for management of information and
records and their querying is to be developed. Updation of
various websites, Grievances redressal system, Assembly
questions, Right to Information Act etc. will be part of this
integrated application.
6. Inventory Management System
All departments across the State have inventory management
functions which will be automated by use of this application.
UTTARAKHAND – e-Governance Roadmap
38
Recommended Core Applications
Name Description
7. Attendance Monitoring System
An attendance monitoring application for all Government
employees and at later stage, for schools etc. would be
developed based on biometrics.
8. Court Case & offences Management System
Court cases and offences are managed & monitored by most of
the departments. A centralized application linking to e-Courts
initiative of Government of India would be developed.
9. Budget & Audit Management System
An automated workflow for budget & audit management would be
developed so that monitoring, release and other activities related
to Finance are fully automated.
10. Digital Library Digital Libraries have been created in 3 Universities of the State.
A centralised project, which demarcates the subjects to be taken
up by each digital library for digitisation and allows sharing
between all educational institutions, will be developed.
11. Unique ID & Integration of all databases
A unique ID for each citizen of Uttarakhand will be developed by
merging separate databases created for various applications like
Voter ID card, Ration card, Land record, MPHS etc.
12. Infrastructure Project Management System
All infrastructure development projects have standard life cycles
for which an integrated application will be developed.
13. Online Transaction System
Online transaction system including payments, issuance of
certificates & legal documents, etc. will be developed and hosted
on Uttara for all departments.
14. Single Window Integrated Workflow Automation System
This application will include office workflow automation, online
application filing and processing for all departments.
15. IPAO * Integrated Pay and Accounts office (IPAO) has been developed for
treasuries of the State by NIC which will be fully implemented.
4.4 Development of Departmental Applications
e-Governance applications in the state are being developed presently either through
NIC or through various software agencies under World Bank aided projects.
However, there are still few departments, which have not been taken by either of
UTTARAKHAND – e-Governance Roadmap
39
these agencies for development. It is proposed as a part of strategy that DPR of all
such applications, in fact, of whole departments, which have not been taken up so
far shall be prepared under this project and the development of these applications
shall be outsourced either to NIC or to a reputed software house. The funding for the
setting up of the Project e-Governance Mission Teams (PeMT) shall be organized by
Government of India.
Some of the applications, which are not being taken up by either of the present two
channels (NIC/PMU) are indicated as below:
S.No. Application Department: Health 1.1 Computerization of the Food and Drug Control process 1.2 Computerization of Purchase and Stores of Medicines and Instruments 1.3 Enhancement of Integrated Disease Surveillance Application Department: Forest 2.1 GIS for department 2.2 Forest Fire Eruption Control and Management 2.3 Planning and Monitoring of Schemes 2.4 Forest Protection and Offences System
2.5 FMIS (Forest Management Information System)
Department: Tourism 3.1 Database – Hotels & Tax Filing Status 3.2 Database for ongoing & New Projects
Department: Industries
4.1 Computerization of Registration of SSIs and maintaining records of all Industrial Units
4.2 Computerization of the Implementation and Monitoring of PMRY
4.3 Computerization of Single Window Clearance System
Department: Food & Civil Supplies 5.1 Comprehensive computerization of the Department 5.1.1 Creation of beneficiaries database & issuance of ration cards at the village level 5.1.2 Distribution, Tracking and Management System of the rationed articles 5.1.3 Website development and hosting 5.2 Monitoring of distribution of food coupons Department: Labour
6.1 Online Registration of jobseekers & Maintenance /updating of profiles of jobseekers 6.2 Admissions and counseling Department: Rural Development 7.1 Comprehensive computerization of the Department 7.1.1 Creation of beneficiaries database at the village level 7.1.2 Integrated capturing of Survey related data 7.1.3 Website development and hosting 7.1.4 Computerization of core and support processes 7.2 Survey Data Management
UTTARAKHAND – e-Governance Roadmap
40
S.No. Application
Department: Secretariat Administration 8.1 Comprehensive computerization of the Department 8.2 Computerized Gate Pass Issuance and Security Management Software 8.3 Maintenance of Asset (Furniture and equipment) database and mapping allotment Department: Panchayati Raj Institutions
9.1 Scheme Monitoring and Aggregate Reporting; Assessment and Analysis; Creation of comprehensive database of all schemes under Panchayati Raj
9.2 Website development for PRI Department: Co-operatives 10.1 Application for Monitoring of PACS 10.2 Banking solution for DCBs 10.3 Application and database for Herbal Products
This list is indicative and does not include all the applications required in their
departments. The comprehensive requirement of each department will be finalized at
the time of preparing DPR for the department.
4.5 Service Delivery Channels
It is proposed to deliver these services to the citizens in the following manner:
1. Developing and Setting up Uttara Portal
2. Linking of the Uttara Portal to all Government Back-end applications and
Data Center
3. Setting up citizen service centers under the national e-Governance plan of
DIT under PPP model. The partners shall be developing front-end
applications and delivering the services to citizens for which government
shall reimburse them the cost of development and operation and
maintenance.
4. The linkage of the CSC to data center and Uttara Portal will be through
internet.
UTTARAKHAND – e-Governance Roadmap
41
An indicative list of services and their probable delivery channels are indicated below.
This is by no means a comprehensive list of services & requires to be detailed further
during DPR preparation.
Service Delivery Channel
Services CIC/ CSC
Website / Portal / Internet
Tele-phone
Segment
Food & Civil Supplies Providing Information to Citizens about the Nearest rationed shops , food Grains availability
G2C
Online application for applying for ration cards. G2C
Procurement of Food Grains G2B
Tourism Information and Reservation facilities G2C G2B
Online Registration , and filing of Luxury taxes ( By Hotels ) and their old status
G2B
Industries Single Window Clearance (Application filing , Registration , Payment & Status ) for SSI's
G2B
Labour Detailed Information on labour laws / Acts G2C; G2B
Employment market Information. G2C
Enabling online application form downloading, Filling up and it’s updated status
G2C
Online registration of Complaints & status availability
G2B ; G2C
E-Classrooms G2C
Health Providing Various Types of Information pertaining to Departmental Schemes , about Facilities available at CHC's / PHC's
G2C
Online Tendering facility for Medical Facilities (Infrastructure, Drugs )
G2B
Rural Development & Panchayati Raj Institutions Information on all Central Government, State Government and Externally aided schemes. Status of schemes and future plans.
Providing information about the rural market, traditional items etc.
G2C
Co-operatives
Providing Banking information to the stakeholders G2C G2B
Exhibit 23: Service Delivery Channels & Strategic approach
UTTARAKHAND – e-Governance Roadmap
4.6 Development - Comparative Status
The state of Uttarakhand has already formulated an IT Vision and is in the process of
formulating the IT Strategy for itself. In addition to this, the state is undertaking a
number of IT initiatives to improve service delivery to citizens and internal
performance of the various departments.
A list of these initiatives and their current status is presented below:
The NeGP proposes the following institutional framework for the states to ensure
strong e-Governance growth and sustenance:
Exhibit 24: Proposed Institutional Framework
On performing a one to one comparison of the Institutional Framework as proposed
under the NeGP and as existing in Uttarakhand, the following points emerge:
1. The State has a Programme Steering Council headed by the Chief Minister (CM),
which is the State e-Governance Council.
2. The state has an Apex Committee in the form of a Core Committee for IT headed
by the Chief Secretary (CS)
3. The state has Departmental Committees in the form of Project Steering
Committees to spear head the current IT projects, which are being implemented.
These will be converted to Project e-Governance Mission Team (PeMT).
42
UTTARAKHAND – e-Governance Roadmap
43
4. The state has a SeMT (State e-Governance Mission Team) like institutional
structure in the form of the ITDA/PMU (Information Technology Development
Agency/ Project Management Unit), which is the Nodal agency for IT development
and e-Governance projects in the state. The composition of the current SeMT needs
to be enhanced keeping in mind the Capacity Building guidelines issued by the
Center and the increasing requirements of the state. (This will be covered in the
Capacity Building Roadmap.)
5. The Departmental Nodal officers for IT projects in that department have been
identified. However, the state does not have PeMT (Project e-Governance Mission
Team) in the respective departments. During the study it was found that very few
departments have either planned or formed IT Cells. The proposal for formation of
PeMTs (Project e-Governance Mission Teams) have already been sent to the
Government of Uttarakhand.
At present the Vendors and NIC are performing implementation of the existing e-
Governance projects and these are being monitored by the ITDA. Apart from one or
two departments that have identified Manager level resources, the presence of IT
skilled staff is negligible within the departments. The IT staff in the departments is
thus mostly limited to Data Entry Operators.
UTTARAKHAND – e-Governance Roadmap
5 Government Process Re-engineering (GPR) The successful implementation of e-Governance projects requires a great deal of
restructuring of administrative processes, and a redefinition of administrative
procedures and formats, which meet resistance in almost all departments at all
levels.
Government Process Reengineering (GPR) shall involve rethinking and the radical
redesign of Government
processes to achieve
dramatic improvements in
critical measures of
performance, such as cost,
quality, service and speed.
This phase would include
constructing an inventory of
the processes involved and
determining the critically
important core processes,
assessing the effectiveness
and efficiency of the
existing processes in order
to determine improvement Exhibit 25: Govt. Process Re-engineering
priorities. The decisions on priorities in a GPR should be on based on three factors -
importance, opportunity and feasibility. The GPR would necessary result in one of the
following:
Issuance of a Government Order by the concerned department
Issuance of a Government Order/Notification with approval from the State
Government (Administrative Approval) which may require approval of Chief
Secretary or Chief Minister.
Those processes, which would require change of an Act under the State or
Centre List.
The State Government of Uttarakhand should be sensitive to the fact that GPRs
would require all of the above-mentioned scenarios for several projects. The State
Government should frame necessary guidelines for taking up e-Governance, which
would require GPR.
44
UTTARAKHAND – e-Governance Roadmap
6 Uttarakhand e-Governance Blueprint
The e-Governance blueprint of Uttarakhand and the Focus sectors/Departments of the State are
depicted in a pictorial form below. The strategy of implementing the core projects, mission mode
projects and the other department initiatives has been given in section 4. The Blue print given as
below summarizes the relative positions of these important parts of e-Governance
implementation in the state.
ISMS
Inventory Mgt.
CORE INFRASTRUCTURE
S
Other Core
Applica-tions
HRMS
Co-
operatives
Labour & Employ-
ment
Finance including
Treasuries*& Commercial
Tax*
Secretariat Adminis-
tration
Food & Civil
Supplies
Tran sport*
Water Resources &
Irrigation
Rural Dev. & Panchayati
Raj
MPHS
CDV PKI (Unique ID)
GIS E- Tend-
ering
Uttara Portal
CSCs Data Centre
Information Mgt.
Core Policies
U-SWAN
Urban Develop-
ment
Revenue including
Registration* & Land
Records*
Educa-tion
Forest
Energy
Agri-culture
Partially impleme
Recommended In
Ongoing / Implem
* NIC initiativeExhibit
CORE PROJECT
Tour-ism S
Health
DEPARTMENTAL PROJECT
IndustriesPWD
Police
SWD Law
45
nted projects/initiatives
itiatives
ented Initiatives
s 26: E-Governance Blueprint –Uttarakhand
UTTARAKHAND – e-Governance Roadmap
6.1 E-Governance Roadmap:
E-Governance Roadmap for Uttarakhand
2006 2007 2008 2009 1. Define Policy and standards
Define HR Policy Define IT Standards and Data
Standards in detail
Define Security Policy 2. Implementation on-going projects (NIC Project are mentioned in another table) Uttara Portal Education-TS Portal e-Class Agriculture Portal Social Welfare Project Urban Development of Local Bodies Public Works Department Project MPHS- CDV-PKI Badri-Kedar Portal HRMS 3. Formulate Citizen Charter 4. Core Infrastructure Projects Anchor
Deptt. SWAN Establishment &
Operationalization ITDA
State Data Centre Establishment & Operationalization
ITDA
Common Service Centre Establishment Operationalization ITDA Uttara Portal Operationalization ITDA 5. Core Applications GIS Establishment Operationalization DMMC /
Revenue Information management & Grievances Redressal System including RTI& Assembly Question, website updation, etc.
Pilot Operationalization (Roll Out)
CM Secretariat
Inventory Management System
Establishment Operationalization SAD
Attendance Monitoring System Establishment Operational-ization
Personnel
Scheme Monitoring System Establishment Operationalization Planning
e-Tendering & e-Procurement Establishment Operationalization Finance
Court Case & offences Mgmt. System Establishment Operational-ization
Law
Budget & Audit Management System Establishment Operationalization Finance Digital Library Establishment Operation
al-zation Higher
Education Unique ID & Integration of all databases
Establishment Operationalization IT & Planning
Infrastructure Project Management System
Establishment Operationalization PWD
Online Transaction System Establishment Operationalization Finance
Single Window Integrated Workflow Automation System
Establishment Operationalization SAD
46
UTTARAKHAND – e-Governance Roadmap
47
6. Departmental Application
2006 2007 2008 2009
Agriculture AGRISNET, Crop Information System
RD & PR Creation of Beneficiary Database
RD&PR Automation System Scheme Management System
Finance Commercial Tax Computerization
Pension Management System Integration of all Applications
Revenue e-District Implementation
Integration of all Applications at district level
Food & Civil Supplies Creation of Beneficiary Database
Workflow Automation, Ration Card Automation System
Food Coupon Monitoring system
Police Common Integrated Police Application Jail Administration System
Integration of all Applications
Transport Computerization of Transport Corporation, Integrated check post
Labour & Employment Admission & Counseling Management System
Education Integration of all Applications
Forest Forest Management Information System, Scheme Management System, Forest Fire Control System
Integration of all Applications
Tourism Tourism Information System, e-Governance in GMVN, KMVN & UTDB
Integration of all Portals
Co-operatives PACS Monitoring System, Banking solution for DCBs, Herbal Products Database
& Application Health Birth & Death
Registration System, Food & Drug Control Automation System, Inventory Management System
Enhancement of Disease Surveillance System Telemedicine
Industries Single Window clearance system, PMRY Computerization
Secretariat Administration Asset Management System, Gate Pass issuance & Management System
Law City Civil Court Computerization
Energy Computerization of Corporations, Loan Management System
UTTARAKHAND – e-Governance Roadmap
48
Public Works Integration of all developed Applications
Water Resources & Irrigation Computerization of Peyjal Dept, Application software for Irrigation Department
Initiatives already under way in these departments are listed elsewhere
Suggested list of Department in Government of India who can provide funding for Departmental Projects
List of Departments/Projects Funding Departments in GoI
Infrastructure Projects DIT, GoI
Core Applications DIT, GoI
Agriculture Ministry of Agriculture, GoI
RD & PR Ministry of Rural Development & Ministry of
Panchayatiraj, GoI
Finance Ministry of Finance, GoI
Revenue Ministry of Rural Development & Ministry of Communications & Information Technology, GoI
Food & Civil Supplies Ministry of Consumer Affairs: Food & Public Distribution, GoI
Police Ministry of Home Affairs, GoI
Transport Ministry of Road Transport & Highways & Ministry of Communications & Information Technology, GoI
Urban Development Ministry of Urban Development & Poverty Alleviation, GoI
Labour & Employment Ministry of Labour, GoI
UTTARAKHAND – e-Governance Roadmap
49
Education Ministry of Education, GoI
Forest Ministry of Environment & Forests, GoI
Tourism Ministry of Tourism, GoI
Co-operatives Ministry of Agriculture, Ministry of Panchayatiraj &
Ministry of Rural Development, GoI
Health Ministry of Health & Family Welfare, GoI
Industries Ministry of Small Scale Industries, GoI
Secretariat Administration Ministry of Personnel, GoI
Law Ministry of Law & Justice, GoI
Energy Ministry of Power, GoI
Public Works Ministry of Urban Development, GoI
Water Resource & Irrigation Ministry of Water Resources, GoI
Exhibit 27: E-Governance Roadmap
UTTARAKHAND – e-Governance Roadmap
6.2 On-going projects of NIC:
50
NIC Projects S. No Initiative Present Status Department: Finance: Commercial Tax
1 Commercial Tax ComputerizationCurrently the Dealer Registration application module is under implementation and the rest are under development.
2 Budget Information System In maintenance phase Department: Finance – Treasuries
3 Computerization Of treasuries ( 25 treasuries )
Computerization of all treasuries of the state. Implemented across all 25 Treasuries across the state, usage is being driven
4 Contributory Pension Management System
Under development
Department: Rural Development 5 Dev-Bhoomi - Land Records
Computerization 1. Data updation work completed. 2. Record of Right (ROR) data available on internet. 3. 53 Tehsil Land Records Computer centers made fully functional and 19 another centers to be operational soon. 4. Mutation workflow process is on-going
6 Land Records touch Screen KioskApplications
Pilot process application in progress
Department: Law – Courts 7 City Civil Court Computerization Roll Out to be extended to all the district courts in
the state , Department: Agriculture
8 AGMARKNET - Uttarakhand Krihi utpadan mandies
20 Mandi Samities (2 in Phase-I , 13 in Phase-II , 5 in Phase -III have been covered
9 Uttarakhand State Seed and Organic Production Certification Agency: Website of Uttarakhand State Seed and Organic Production Certification Agency
Implemented and in maintenance phase
Department: Water Resources - Irrigation 10 Computerization of Peyjal
Department Three Modules installed & implemented
Department: Home 11 Common Integrated Police
Application (CIPA) Nine Police stations under computerization at US Nagar on pilot basis.
Department: Revenue – Registration 12 Computerization of Sub-registrar
Offices 6 Offices Computerized.
Department: Labour 13 Employment exchange
computerization 3 employment exchanges already computerized
UTTARAKHAND – e-Governance Roadmap
51
NIC Projects Department: Transport
14 Computerization of transport department
VAHAN Software Implemented at Dehradun; SAARTHI Software under Implementation; Software for National Permits implemented at State Transport authority; Computerization (at Transport Commissioner office) of revenue collection from central pool for vehicles entering from other states.
Department: Planning 15 Unique-ID project Under initial stage of implementation
Department: Education 16 Data Processing of 7th All India
School Education Survey project and Web Portal development
Data processing and report generation has been completed.Data of 5 States has been hosted on the Internet
Energy 17 Loan Management System Under testing
Exhibit 28: On-going projects of NIC
6.3 On-going projects of PMU e-Governance / ITDA:
PMU e-Governance /ITDA projects S. No Initiative Present Status HRMS
1 Development of Human Resource Management Systems (HRMS) Application.
Pilot stage.
PWD 2 Project Management
Application for PWD. Pilot stage.
Uttara Portal 3 Creation of Uttarakhand
Portal. Beta version in operation.
CDV, MPHS & PKI 4 Development of CDV, MPHS &
PKI/Smart Card Infrastructure.
Survey in progress.
Project “Saksham” 5 Project “Saksham” facilitates
the Computer awareness / training programme on MS-Office (Word, Excel, and PowerPoint), Internet and e-Mail to State Government employees of Uttarakhand.
4500 Employees trained.
Teacher Student Portal 6 Development and
implementation of Teacher Student Portal.
Approaching Pilot stage.
UTTARAKHAND – e-Governance Roadmap
PMU e-Governance / ITDA projects S. No Initiative Present Status IT Enabled Course Curriculum
7 Development and implementation of IT enabled course curriculum in Science & Mathematics for 9th to 12th classes.
Prototypes completed.
Department of Social Welfare 8 Development and
implementation of application software for Social welfare department.
Pilot stage.
Urban Development Department 9 Development and
implementation of application software for Urban development department.
Pilot stage for part of the application.
Agriculture Portal 10 Development and
implementation of Agriculture Portal.
Pilot stge.
BK-GY-HS Portal 11 Content collection and
Development of Badri-Kedar-Gangotri-Yamnoti and Hemkund Sahib Portal.
Validation of content in progress.
Exhibit 29: On-going projects of PMU e-Governance / ITDA
6.4 Other On-going projects
Several departments have made their web sites and are using several software developed for
their departments at different times. Project Aarohi, Project Shikhar, Teach to Future & Shiksha
etc. as listed in section 2.3.2 are also being implemented.
7 Summary and Next Steps
The e-Governance Roadmap shall help it in achieving leadership position and the goals as
envisaged in the e-Governance Vision and IT Policy of the state.
It is expected that Government would make the proposed roadmap a part of its enabling
mechanism for disseminating IT in all sectors of Governance. The Roadmap gives the IT vision to
the state at the top most level which will help IT evolve as a priority and a core area in
Governance. Once the Government implements the e-Governance initiatives of the prioritized
departments, it would lead to:
52
UTTARAKHAND – e-Governance Roadmap
Improvement in the Service delivery of departments
Improvement in the internal efficiencies of such departments
Increase in accountability and transparency levels
Next Steps:
To achieve the objectives set in the Vision and the Strategy, the Government should at the
earliest undertake the following steps:
Establish SeMT and PeMTs (discussed in the next report, CBRM)
Conduct process study / Prepare concept paper of some of the departments departments
(covered in this section). This will lead to preparation of the roadmaps for individual
departments.
Prepare Detailed Project Reports of the NeGP / Priority Departments
Prepare/Update standards and policies related to security, funding (PPP / User charges)
and other core initiatives like:
o E-Governance technology architecture, framework and guidelines
o Updated IT Standards policy for all e-Governance initiatives
o Detailed Security policy guidelines
o Human resource strategy – for leadership, implementation and operations.
o Policy on back ends (department automation - role of private sector, role of
government, safeguards, right to information, privacy, etc.).
o Policies and guidelines for PPP models / outsourcing of e-Governance projects.
o Policies and guidelines on Government Process Re-engineering
o Policies on front ends such as citizen ports, kiosks & Integrated citizen service
centers
o Policy on usage common infrastructure such as SWAN, Data Center
o Polices and guidelines on electronic payment gateway
o Policies and guidelines and knowledge management
53
UTTARAKHAND – e-Governance Roadmap
8 Annexure – I: e-Governance Projects list
The list of e-governance initiatives in the state of Uttarakhand as per NIC.
. No Initiative Present Status Technology Future Initiatives Scope
1 Commercial Tax Computerization
Currently the Dealer Registration application module has been rolled out
ASP.Net Browser Based System 3-tier Architecture
In Future other modules in the application will be rolled out. Those are: 1. Return Filing 2. Challan Management 3. Forms Issuance & Usage
The Project consists of online dealers registration across 28 sectors across the state and has the capability to online perform the functions under the Commercial Tax Department like registration , return filing , challan , Form issuance etc.
2 Dev-Bhoomi - Land Records Computerization*
1. Data Updation work completed. 2. Record of Right (ROR) data available on internet. 3. 53 Tehsil Land Records Computer centres made fully functional and 19 another centres to be operational soon. 4. Mutation workflow process is on-going
Browser based
3 tier Application software with Unicode language support
ASP.Net SQL Server
The Project consists of computerization of all the processes under the land records department.
3 City Civil Court Computerization
1. Computerized generation of Cause List and case Filing process at District court in Nainital.
Roll Out to be extended to all the district courts in the state ,
4 Computerization Of treasuries ( 25 treasuries
1. Computerization of all treasuries of the state. 2. Online system for data Processing. 3. Online Cheque Generation. 4. Pay and Pension Disbursement 5. Cash Book (Receipt & Payment) 6. Posting Schedule. 7. Cheque Writer Reports.
Oracle 9i , D2K & Linux
Implemented across all 25 Treasuries across the state.
5 AGMARKNET - Uttarakhand Krihi utpadan mandies *
20 Mandi Samities ( 2in Phase-I , 13in Phase-II , 5 in Phase -III have been covered
Agricultural Marketing Information System (AGMARKNET) is a centrally sponsored project of NIC to establish a nation wide information network for speedy collection and dissemination of market information for its efficient an timely utilization by the farmer community. Information w.r.t arrival and prices is captured on daily basis from all the 20 mandies.
6 Computerization of Peyjal Department
SRS for computerization approved, system in development stage. Three Modules installed & implemented 1. Personal & pay information
system. 2. Message handling system 3. Customer relation management.
ASP.Net , SQL Server
Installation & implementation of all 15 Modules in future stage after successful roll out of the 3modules implemented in current stage .
Web-Based MIS for Uttarakhand Jal Sansthan & peyjal Nigam is being developed for its 15 modules including key modules like computerized billing and demand collection system , scheme & resources management .
7 Common Integrated Police Application (CIPA)
Nine Police stations under computerization at US Nagar on pilot basis.
This Project aims at comuterization of all police stations in the state.
54
UTTARAKHAND – e-Governance Roadmap
55
. No
Initiative Present Status Technology Future Initiatives Scope
8 E-payroll of state Government
Running
ASP.Net SQL Server.
Implemented
Covers all 1, 10,000 employees of the state, who can view their salary details on the web. Features include scheme wise pay bill , employee pay slip , pay schedules , advances & recovery reports , Income Tax module , GPF Module , Web enabled MIS reports .
9 Computerization of Sub-registrar Offices
1. 6 Offices Computerized.
ASP.Net SQL Server
All Offices to be Computerized to enable online registration of deeds.
10 Employment exchange computerization
1. 3 employment exchanges already computerized 2. Computerization of Internal work like generation of employers quick list of candidates , Generation of call letters
1. Client - Server Architecture In Future: Web based system using J2EE , Linux Server ( Postgre SQL Server)
All employment exchanges (25) would be computerized and online registration of unemployed can be facilitated through the website.
The Software is will be implemented across all states after the pilot test in the state of Uttarakhand.
11 Computerization of transport department
1. VAHAN Software Implemented at Dehradun 2. SAARTHI Software under Implementation. 3. Software for National Permits implemented at State Transport authority. 4. Computerization (at Transport Commissioner office) of revenue collection from central pool for vehicles entering from other states.
The VAHAN & SAARTHI to be implemented completely across the state and all the modules under the two names also to be implemented. The two Sotwares to be implemented across all the 15 transport departments.
The Project Consists of online registration, fee, fitness, tax calculation & collection, permit and enforcement modules. At State transport authority
Other Applications & MIS
1 MPR for Rural development Schemes. Implemented
ASP.Net SQL Server
2 MIS for Revenue Department
Implemented ASP.Net
SQL Server
3 Computerization of agriculture census 2000-01(*)
Implemented ASP.Net
SQL Server
4 Load Management system for Department of energy
Implemented ASP.Net
SQL Server
5 Online compilation for Prices of Commodities / Items
ASP.Net
SQL Server
6 Chief Minister Letter Monitoring system Implemented
ASP.Net SQL Server
7 Online Module for wage Compilation
Implemented ASP.Net
SQL Server
8 IISFM project for FCI at Uttarakhand
Implemented ASP.Net
SQL Server
9 Integrated pension management system (IPMS)
Implemented ASP.Net
SQL Server
10 Sarv Shiksha Abhiyan
Implemented & Running (at selected schools )
ASP.Net SQL Server
Other Initiatives :
1 Around 55 websites hosted at NIC server.
2 Around 25-30 Applications Hosted
UTTARAKHAND – e-Governance Roadmap
9 Annexure – II: Data Captured during the study
9.1 Health Department
The Health department of Uttarakhand, as per the 2001 figures, consisted of 228 Primary Health
Centers, 36 Community Health Centers and 16 District Hospitals. The Health department has a
budget of around Rs. 500 Crores (Both Plan and Non-Plan) and about 14000 staff including some
2000 Medical Officers. At present there is a limited IT Staff in the department consisting mainly
of a few data entry operators.
9.1.1 Key Processes of the department
S
No.
Key Processes Manual Automated Service Facing
Administrative Business Citizen 1 Registration of Births and
Deaths
2 Inspection of Health Institutions / Treatment Areas, etc. by Sanitation Inspectors
3 Food and Drug Control: inspect Drugs’ contents, Issue licenses, monitor performance of licensees
4 Maintenance of Hospitals, PHCs and CHCs, etc.
5 Registration of Medical Officers, Doctors, Institutions through Autonomous Councils
6 Purchase, Storage, Supply of medicines in CMSD (Central Medical Store Division)
7 Implementation and Monitoring of Disease Control Programs for AIDS, Malaria, etc.
Partial
8 Preparing reports on a periodic basis on the number of cases (new, old), testing data, funds control, targets achieved, etc.
9 Providing training services to Medical Officers and Staff of the department through own instructors, etc.
9.1.2 Current ICT Initiatives
At present the Health Department of Uttarakhand State has provided computers to almost all the
State Offices and District locations. The department is also using certain applications mainly
56
UTTARAKHAND – e-Governance Roadmap
Management Information Systems (MIS applications) for individual Disease Control Programs like
CMIS, CPFMS and Sentinel Surveillance for AIDS. Almost each Disease Control Program has an
individual MIS of its own. Additionally there is an integrated application under the Integrated
Disease Surveillance Program (IDSP), which is not being utilized fully.
In terms of connectivity, VSAT connectivity has been planned between 13 locations and the
equipment for the same has arrived. The equipment has not been installed. At present, there is
very limited connectivity between offices in the same city and there is no connectivity with the
districts. It is also worth mentioning here that there is a plan to connect the Hospitals under the
Telemedicine Project.
9.1.3 Recommended ICT Initiatives
S. No. New Initiatives Scope 1.1 Computerization of
Registration of Births and Deaths
A web based application for registration of births and deaths and issuance of certificates. The application should be implemented such that registration can be made from the authorized offices.
1.2 Computerization of the entire Food and Drug Control process
An application to issue licensees to the manufacturers of Drugs, etc.; monitoring of the licensees and maintaining their performance/compliance records.
1.3 Computerization of Purchase and Stores of Medicines and Instruments
An application to digitize the entire Logistics and Inventory Management of Medicines and Instruments including running of CMSD (Central Medicine and Stores Department)
1.4 Enhancement of Integrated Disease Surveillance Application
Application exists, connectivity and trained manpower is required for running the same and keeping it updated at all field offices/locations as required by the Health Department
1.5 Connectivity to districts, blocks and godowns
Connecting the Districts (CMO offices) with the State Head Quarters (Directorate) and the Secretariat Office. Also connecting Big Hospitals, District Hospitals, CHCs etc. with the District CMO offices.
9.2 Forest Department
The recorded forest area in Uttarakhand is 64.8% of the total area. The forest Department in
Uttarakhand is divided into Circles, divisions, ranges and beats. The department has 12 circles, 9
divisions, 284 ranges and 1503 beats. The annual budget of the department is around 380 Crore
(both plan and non-plan).
The state has this year allocated a sum of Rs. 40 lakhs for setting up an IT cell and for all other
IT related activities.
57
UTTARAKHAND – e-Governance Roadmap
9.2.1 Key Processes of the department
S
No.
Key Processes Manual Automated Service Facing
Administrative Business Citizen 1
Management of the forests
& Wildlife
Partial
2 Sale of Resin and Monitoring
sale of Timber, firewood,
Produce & minor forest
produce, etc.
3 Soil and moisture
conservation
4 Aforestation of barren &
degraded areas
5 Forest Protection & Offences
6 Fire Management
7 Planning & Budgeting
8 Van Panchayats & FDA / JFM
9.2.2 Current ICT Initiatives
Presently the hardware (computers) is provided in the department till Range level. Connectivity
within the department is very limited and the headquarters at Rajpur Road is on LAN and internet
connectivity is provided on a need basis to selected users in the this headquarters.
At present some applications are there in the department. A GIS Package is installed at
headquarters for preparation of Working Plans, Forest Maps, etc. and has very limited usage due
to lack of adequate resources. An MS Access based database is being used locally at
Headquarters level for Fire Management Control & Personnel Management. Website for the
department is under development and has been partially developed. It is planned that an email
facility for the employees will be integrated within the Website for aiding internal communication.
58
UTTARAKHAND – e-Governance Roadmap
9.2.3 Recommended ICT Initiatives
New Initiatives Scope
Forest Fire Eruption Control and Management
An application, integratable with the existing GIS Application needs to be developed and implemented along with involvement of the Fire department
Planning and Monitoring of Schemes
An integrated web based application for planning and monitoring of various Activities of Forest Dep’t like Various Schemes running in the Dep’t and aids preparation of Proposed and Revised Estimates, wherein department staff from field offices can update data related to schemes, etc. from their sites like Range Offices and Division and Sub-Division Offices. Allows aggregation and drill-down reports circle wise, range wise, etc.
Forest Protection and Offences System
The entire process of Forest Protection like FIR, maintaining records of offences and offenders, closure of offences, etc. can be computerized.
FMIS (Forest Management Information System)
An Integrated FMIS Encompassing all major activities of the Forest department is planned and needs to be clearly conceptualized. Other small applications for the department may become modules of this department wide application.
MS Access Application
The Application is being used for Fire Management Control at Headquarter level. The Functionality Needs to be scaled up and used till Division level.
9.3 Tourism Department
Tourism department has been identified as a major contributor to the GDP growth in the state’s
Economy. The government plans to develop tourism as a major source of employment and
income/revenue generation and as a pivot of the economic and social development of the
State. During April-June 2004-05, Uttarakhand attracted 65.11 lakh of tourists. About 29.97
lakh tourists visited Haridwar. The Tourism Development Board is the highest body to function as
a Promoter, Adviser, Regulator and Licensing Authority for tourism development in the State .
The Budget of the department is nearly 100-120 Cr .The Department has 13 District offices and
also has a presence at 9 other important tourist locations. The state also has two independent
bodies working under the directorate of tourism.
Kumaon Mandal Vikas Nigam ( KMVN) Garwhal Mandal Vikas Nigam (GMVN)
9.3.1 Key Processes of the department:
S No.
Key Processes Manual Automated Service Facing
Administrative Business Citizen 1 Marketing &
Publicity
2 Projects & Planning
3 Administration
4 Regulation
59
UTTARAKHAND – e-Governance Roadmap
9.3.2 Current ICT Initiatives:
The department is in the process of building a website for itself namely the Badri-Kedar portal.
Apart from this there are currently no ICT initiatives in the tourism department. Hardware is
provided at the state head office partially. There is no connectivity in the department at present.
9.3.3 Recommended ICT Initiatives:
New Applications Scope Projects & Planning Application (includes projects database)
An Integrated application which allows the Users to online feed data at Diff Points (Directorate office , District office ) about the Status of Projects running under them , the utilization of Budgets , their Report generation (aggregated and drill-down) & their infrastructure development under these projects
Administration An application, which allows the administration dep’t to keep track of the physical infrastructure & the Transport facilities used.
Database – Hotels, Their Tax Filing Status
The Database would Enable to keep track of all the Existing & upcoming hotels and their tax filing (Luxury tax ,etc ), their records and status maintenance.
Connectivity to districts, blocks and other important Tourist offices
Connecting the Districts with the State Head Quarters (Directorate) and the Secretariat Office.
Computers Should be provided at State, District & Other Tourist Offices of the Dep’t
The Computers & associated Infrastructure should be provided at all the Tourism offices of the State
9.4 Industries Department
The Industries department is a very important department of the state machinery and has it’s presence in all the 13 districts of the state. The annual Budget for the year 2006-07 is 58.6 Crore and the department has also allocation of around 3-4
Lakhs as IT budget. The staff strength is around 370 in the directorate of industries.
9.4.1 Key Processes of the Department:
S No.
Key Processes Manual Automated Service Facing
Administrative Business Citizen 1 Small Scale Industries’
Registration, Surveys and ensuring support services and maintaining records
2 Implementation of Prime Minister’s Rozgaar Yojna (PMRY) at district level and its Monitoring
3 Implementation and Monitoring of various Special and Incentive schemes as per budget
60
UTTARAKHAND – e-Governance Roadmap
9.4.2 Current ICT Initiatives:
Currently the department is using MS access database for SSIs Survey. Apart from this the
Department is using no applications at any of the offices .The department is connected through
the LAN at Directorate level and Secretariat and 5-6 District offices.
9.4.3 Recommended ICT Initiatives:
Applications Scope Computerization of Registration of SSIs and maintaining records of all Industrial Units
A web based application for registration of SSIs (Provisional) and maintaining records, together with the Survey related data of all Industrial Units
GIS software for Industrial Estates A simplistic GIS based software for monitoring the plot allotment, and maintaining other data of units in Industrial Estates
Computerization of the Implementation and Monitoring of PMRY
An web based application to issue forms, receive filled up forms, maintain records of disbursals, rejection, and to support integrated reporting from all districts on the progress of the PMRY scheme. Application should be able to work through CSCs
Computerization of Single Window Clearance System
An application to receive applications through Single Window System, maintain status of despatch and Pending status of receipt of clearances from various departments.
Website for Industries department A website with directories of all industrial units in the state, policies, scheme incentives, etc.
Medium and Heavy Industry Database
Database, continuous updation and monitoring of Medium and Heavy Industries in the state
Connectivity to districts Internal LANs
Connecting the Districts (DICs) with the State Head Quarters, Directorate. Also connecting important bodies like SIDCUL and KVIB Establishing LANs at the DICs
Providing Computers Increase penetration of Computers at district level
9.5 Food and Civil Supplies Department
The Food and Civil Supplies department is an important constituent of the strategy for poverty
alleviation as it handles the Public Distribution System (PDS). The department caters largely to
the Rural Households and also to a number of household under the urban housing of
Uttarakhand. The Public Distribution System serves dual purpose of supplementing the supply of
food grains in addition to the local production and secondly to ensure availability at fair prices.
61
UTTARAKHAND – e-Governance Roadmap
9.5.1 Key Processes of the Department :
S No.
Key Processes Manual Automated Service Facing
Administrative Business Citizen 1 Public Distribution
System (PDS) procurement and distribution of the essential commodities on a monthly basis , District wise
2 Statistics
3 Accounts: budget allocation of the department, monitoring of the personal deposits and monitors the difference due to revisions of pay of sugar.
4 Administration
5 Monitoring system /Inventory Management
6 Complaints redressal
9.5.2 Current ICT Initiatives:
As per the table above all the key processes of the department are manual. Presently the
department has partial hardware avaliability and no applications are being used by the
department .The department has a high degree of interface of the rural and poor affecting their
subsistence. Hence the department has a key improvement potential in its “back-office”
processing and improving the efficiency in procurement and distribution of the foodgrains.
62
UTTARAKHAND – e-Governance Roadmap
9.5.3 Recommended ICT Initiatives :
New Applications Scope Comprehensive computerization of the Department
This includes: • Creation of beneficiaries database & issuance of ration cards at
the village level • Distribution, Tracking and Management System of the rationed
articles • Website development and hosting • Integration of other e-Governance initiatives
MPHS linked distribution monitoring Monitoring and targeting for schemes’ distribution through utilization of data collected through the MPHS system and internal survey data. Maintaining records of citizen / family wise distribution under the PDS.
Inventory and Logistics Management Application
An application to track movement of distribution material, receipts and supplies, keeping track of private transporters and their performance records.
Complaint redressal system Addressing all the complaints pertaining to distribution of coupons, issue of ration card and complaints related to ration shops
Ration card holders in the State
List of all the families that are eligible for attaining the ration card for making use of the PDS scheme.
Hardware required at the Secretary office (Admin & Accts.), Warehouses and Taluk offices
There is a need for acquiring hardware at all levels within the Food & Civil supplies department.
9.6 Labour Department
The department functions under the two broad heads:
Labour
Training & Employment
The labour department has 13 offices in each district, catering to the needs of each of the 13
district respectively. The 87 ITI’s in the state out of which 14 are yet to be opened also fall under
the purview of the labour department.
9.6.1 Key Processes of the department:
S No. Key Processes Manual Automated Service Facing Administrative Business Citizen 1 Registration in Employment
office Partial
3 Inspections and prosecutions : Inspection the Industries & commercial Establishments for the Proper Enforcement of Labour Laws & Acts
4 Grievance redressal : Settling all Industrial Disputes
5 Notification of vacancies : To the Registered citizens in the employment exchanges
6 Administration
63
UTTARAKHAND – e-Governance Roadmap
9.6.2 Current ICT Initiatives:
The department is currently using the software procured by the GOI for its employment
exchanges and all the District employment offices have connectivity. In terms of hardware
availability, computers are available at all district employment offices (DEO’s).
9.6.3 Recommended ICT Initiatives:
New Applications Scope Registration, Monitoring and control application
An application for allowing registration, maintaining records of dues, compliance to safety standards. The application may cover the shops, industrial establishments’ monitoring (under the Factories & Boilers Act)
Website A website for the department including detailed importance to individual ITI s. It should allow web based monitoring of the individual ITI s.
Grievance redressal System Online registering and monitoring of the complaints
Registration, database of job-seekers and workers
Allow registration of unemployed and maintain a records of workers in the state with facility to issue ID Cards to the workers.
Admissions and counseling of the Training department
Efficient procedure for counselling and implementing transparency in the allocation of the seats
E-learning / E-classrooms Better reach of training programs and vocational courses to the citizens in order to create a huge pool of qualified professionals
Integrated Database at all Employment exchanges
The Employment exchanges may be Connected & Integrated through a single application (as above) which can further be integrated to Citizen kiosks for status viewing,
Database for the Training wing
• The Database should Contain Statistics of all Government ITI’s & Polytechnics (Division / District-wise)
• Teaching and other staff Connection of the District Employment offices.
The Connectivity Across the District offices would enable efficient working and monitoring of activities in the department & also would enable scanning of manpower ( with Specific skill sets across the various offices in the state
Networking of all Existing ITI & State Headquarters
The Connectivity would better enable the Administration to keep track of the activities and enable online monitoring of the Professional Institutions
64
UTTARAKHAND – e-Governance Roadmap
9.7 Rural Development
The department has immense importance in improving the rural scenario of the state through the
implementation of various schemes for rural development sponsored both by GOI and the state
government. The department has 13 district offices and under that there are 95 blocks within the
functioning of the department.
The departmental has a budget of Rs 271 Crore of central assistance and 168.64 Crore of state
assistance. Currently there is no Specific budget for IT in the department. The Total Staff
Strength is around 4000 at present. The Presence of IT Related Staff is minimum. There is
around 1 person per district for IT and 1 specifically for IT at the Secretariat. The new Block
Development Officers are equipped with Basic Technology Skills.
9.7.1 Key Processes of the department: S. No.
Key Processes Manual Automated Service Facing
Administrative Business Citizen 1 Monitoring of Various
Schemes: Monitors the progress of these schemes in terms of the funds distributed, funds available, citizens/families/self help groups identified, benefits delivered, etc. and generates monthly progress reports.
Partially
2 Surveys : Every 5 Yr Survey for Reviewing the Scheme status and also provide feedback for improved launch of new schemes
9.7.2 Current ICT Initiatives:
Talking about the current initiatives in the department, the current applications used are only the
MIS by NIC and in DIT formats. Database used is scheme based. In Terms of Connectivity the
department has limited connectivity to some districts through the dial up mode. At Present the
Computer infrastructure is available but the availability of the economic infrastructure like Power
and Roads is a still a constraint. Non-availability of Power prevents effective use of computers.
65
UTTARAKHAND – e-Governance Roadmap
9.7.3 Recommended ICT initiatives:
New Initiatives Scope Comprehensive computerization of the Department
This includes: • Creation of beneficiaries database at the village level • Integrated capturing of Survey related data • Website development and hosting • Integration with Panchayati Raj Institutions applications
Monitoring of Schemes
Integrated web based application for monitoring of all schemes and their various aspects.
Survey database and reporting
Application for performing intelligent analysis of data collected through surveys. List of all data against various indicators (13 at present) for each village of the state
Connectivity at Panchayats, Kiosk at the Panchayat Level, Connectivity to Blocks
For entering of data related to various schemes Increase connectivity to Blocks
Power availability Better Power availability or alternate sources of electricity for running IT equipment and ensuring their usage
9.8 Secretariat Administration
The Secretariat administration department works towards the proper and systematic functioning
of the state Secretariat and responsible for maintaining the proper infrastructure, maintaining
personal data of all secretariat employees, Security aspects of the secretariat. The department
has around 700 employee strength and an annual budget of 20 Cr.
9.8.1 Key Processes of the department S No.
Key Processes Manual Automated Service Facing
Administrative Business Citizen 1 Maintain Personal
Files of all Secretariat Employees
2 Availability, Allotment and Maintenance of Furniture & other equipment for all offices at the Secretariat
3 Issuing Pass for Visitors to the Secretariat
4 Allotment of employees to different departments
66
UTTARAKHAND – e-Governance Roadmap
9.8.2 Current ICT Initiatives
At present there are no applications or databases in the department. There is connectivity within
the department through the Secretariat LAN. Adequate infrastructure in terms of Computer
hardware & Printers has been provided. An HRMS application is already under development and
would cover the specific requirement of this department for maintaining records of all employees
in the Secretariat.
9.8.3 Recommended ICT initiatives: New Initiatives Scope Comprehensive computerization of the Department
This includes: • Creation of database for complete records of all employees • Ensuring sharing of information and data between the officers of the
department • Integration of other e-Governance initiatives
Computerized Gate Pass Issuance and Security Management Software
Integrated web based application for security management of the Secretariat and issuance of gate passes, etc. for all the visitors.
Maintenance of Asset (Furniture and equipment) database and mapping allotment
Application for maintaining records of what, when, to who and details of furniture and other equipment like phones allotted to all employees within the Secretariat.
9.9 Panchayati Raj Institutions (PRI’s)
The Development of rural areas in the State imply improving the productivity of agriculture and
other economic activities in the rural areas, improving the coverage and quality of infrastructure,
and improving the quality of services, which contribute directly to upgrading the quality of human
resources. The Department of Panchayati Raj is implementing number of schemes for
improvement. The Geographical Spread of the department is as below:
• State Headquarters (1)
• Zila Panchayats (13)
• Block Panchayats (95)
• Gram Panchayats (7027)
The department broadly functions towards implementation and monitoring of various schemes
running under the state funding, centre funding and several other schemes defined under the
state act. It also prepares annual plans and scheme proposals for the development of the
respective panchayat area jurisdictions. There is no specific budget for IT within the department.
67
UTTARAKHAND – e-Governance Roadmap
9.9.1 Key Processes of the department
S
No. Key Processes Manual Automated Service Facing
Administrative Business Citizen 1 Monitoring of various
Panchayats schemes (Under State, centre and NGO funding)
2 Every 5 year elections of Panchayats
3 Preparation of Annual Plans & Budgets for the development of the Panchayat area by Panchayats
4 Construction of Panchayat Bhawans at diff Panchayats at their maintenance.
5 Maintenance of essential statistics of the village.
9.9.2 Current ICT Initiatives:
Currently there are no ICT initiatives being taken up by the Panchayati Raj department. There
are presently no software applications and connectivity within and across the different levels of
the department. Limited Internet connectivity is available at state directorate level and
infrastructure has been provided at directorate level.
9.9.3 Recommended ICT initiatives: New Initiatives Scope Comprehensive computerization of the Department
This includes: • Creation of database for all Schemes under Panchayati Raj • Distribution, Tracking and Management of the Budgets and funds allocated
to various schemes • Website development and hosting • Integration with Rural Development initiatives
Scheme Monitoring and Aggregated Reporting Assessment and Analysis
Integrated web based application for monitoring of schemes and the fund utilization. The application should be able to provide aggregated and drill down reports of all data from Villages to Blocks, etc. The application should be able to provide assessment of situation prior to the 73rd amendment and after.
Database for all schemes and their Budget expenditure.
There are various schemes running at various levels at the funds for these flow from various points and are distributed by the directorate to various district Panchayats.
Connectivity and Kiosks at Panchayats
For updating data related to various schemes and also able to see other schemes running at the Panchayat level Connectivity should be provided at Panchayat level.
Hardware required at District and village Panchayat level
There is a need for acquiring hardware at all levels within the Panchayati Raj. Upgraded infrastructure should be provided at Directorate level.
68
UTTARAKHAND – e-Governance Roadmap
9.10 Co-operatives
Co-operatives attain an important role when rural sector is looked into and becomes an important
department in the growth of the rural economy. The Development of Co-operatives has also been
identified as area for improvement under the e-governance initiative. The Geographical spread of
the department is spread into Primary agricultural Credit societies (PACS), District Co-operative
banks (DCB’s), Apex Institutions at State level. There are around 756 PACS, 10 DCB offices
except Rurdraprayag, Champawat and Bageshwar. The Major activities of the department
Focuses on the improvement of agriculture economy, its Dependent citizens and timely
availability of credit and agricultural inputs to them. The department is also responsible for
marketing and selling of agricultural produce.
9.10.1 Key Processes of the department
S No.
Key Processes Manual Automated Service Facing
Administrative Business PACS (Primary Agriculture Credit Society)
1 Giving agriculture Credits
2 Marketing of agricultural Produce.
3 Mini Banking for member farmers
Partial
District Co-operative Banks
1 Financing PACS
2 Creating Salary Earner
Societies
Apex Institutions
1 Storage Activities
2 Drug Manufacturing
3 Supply of Agriculture Inputs.
4 Consumer Business
9.10.2 Current ICT Initiatives:
The Present scenario of ICT initiatives is at a very nascent stage. At application level IFFCO
foundation has prepared software package for PACS (primary agricultural Credit Societies) on
pilot basis, and will install and roll out fully at all PACS after successful pilot runs. There is no
database being used presently and connectivity is limited to the Directorate level.
69
Computer infrastructure is available at Directorate level (Apex institution) and computerization of
2 District co-operative banks have been done (Nainital & U S Nagar).
UTTARAKHAND – e-Governance Roadmap
9.10.3 Recommended ICT initiatives: Applications Scope
Comprehensive computerization of the Department
This includes: • Creation of database for all activities running at PACS , DCB’s. • Website development and hosting • Computerization of core and support processes. • Integration with Rural Development website. • Distribution, Tracking and Management of the funds allocated to
PACS from DCB’s.
Monitoring of PACS by Apex Institutions.
Integrated web based application for monitoring of all activities and their funds.
Application for Marketing Agriculture produce.
Application should be developed for the marketing of agriculture produce, data for which should be available through Kiosks and CSC’s.
Banking An Integrated application which could integrate the functioning of the various DCB’s and apex institutions and facilitate the banking facility and managing of funds from apex body – DCB’ and further below at PACS level
Drug Manufacturing (Herbal Medicines)
An application can be developed for both monitoring the herbal medicine produce at various points and also market the produce through the web based mechanism. The application can also be made available at Kiosks for viewing the various herbal products and their details .and also methods for best cultivation of the herbs.
Supply of agriculture Inputs An application can be prepared for the procurement of various agriculture inputs like fertilizers and should be capable for online tender calling and submission.
Database for Herbal Products There are various herbal medicines being manufactured and marketed by the Co-operatives, hence an online database can be created for the products.
Database for various storages made at godowns.
Various agriculture produce and other types of produce are stored at these godowns which should be made available online.
Connectivity at PACS
Kiosk at PACS Level (Gram Sabha’s)
Connectivity across PACS, DCB’s and Apex Institutions.
For Entering data related to various Activities and also able to see other activities running at the other PACS in the state. Connectivity should be provided at these gram sabha Level at future stage. Connectivity should be provided across these three levels. Initially the DCBs and the Apex Institutions may be connected through SWAN and in the medium to long term the PACS may be connected.
Hardware required at District and PACS Level
There is a need for acquiring more hardware at all levels within the PACS and gram sabha’s. Upgraded infrastructure should be provided at Apex/Directorate level.
9.11 Transport
Transport Department is one of the Key departments in providing citizen services to the citizens.
The department has been instrumental in introduction of IT in the service delivery. The
geographical spread of the Department is in terms of RTOs & ARTOs on the districts of the State
and providing services to the citizens.
70
UTTARAKHAND – e-Governance Roadmap
9.11.1 Key Processes of the department
S
No. Key Processes Manual Automated Service Facing
Administrative Business Citizen 1 Issue of Licenses
(Learning, Driving, Conductor) and their renewal
√ √
2 Registration of vehicles & Issuance of Vehicle Numbers
√ √ √
3 Issue of certificates (Fitness certificates, Pollution under control (PUC))
√ √
4 Issue of Permits (National & International, State and Contract Carriage Permits etc)
√ √ √
5 Collection & Recovery of Taxes (Road Taxes)
√ √ √
6 Transfer of Ownership
√ √ √
7 Admission and Cancel of Hypothecation
√ √ √
8 Checking of vehicles on road
9 Quasi-judicial function (Appeals)
10 Checking of vehicles at check posts
√
9.11.2 Current ICT Initiatives:
The computerization of the Department has started with implementation of Vahan & Sarathi.
VAHAN Software has been implemented at Dehradun and SAARTHI Software under
71
UTTARAKHAND – e-Governance Roadmap
Implementation. Software for National Permits implemented at State Transport authority and
Computerization of revenue collection from central pool for vehicles entering from other states.
9.11.3 Recommended ICT initiatives:
Applications Scope
Roll Out of Vahan Implementation of Vahan in other RTOs and ARTOs of the State
Implementation of Sarathi
Sarathi need to be implemented in the Transport offices of the State for computerization of Licenses operations and it need to be rol out subsequently.
Computerization of Transport Corporation
Computerization of the Transport Corporation operations need to be undertaken for better efficiency and automating the business processes.
Integrated Check Post
Check Post computerization is required to build an application for automating the transport operations on the check post and adequate interfaces need to be built with the Excise, Police dept in the Check Post.
9.12 Agriculture
9.12.1 Key Processes of the department
Stakeholder Sr.
No. Key Processes Manual Automated
Admin Business Citizen 1 Educate farmers on applied
technologies
2 Arrange availability and quality of all inputs like fertilizer, Seeds, Pesticides
3 Implement the programs of irrigation water and degraded land development
4 Ensure remunerative prices for crops
5 Water harvesting & conserve the rain fed water
6 Testing and Analysis of soil samples.
7 Management of Land Resources
72
UTTARAKHAND – e-Governance Roadmap
9.12.2 Current ICT Initiatives:
The computerization initiatives in the Department has started with AGMARKNET initiatives, which
is covering the Uttarakhand Krishi utpadan mandies. 20 Mandi Samities (2 in Phase-I , 13 in
Phase-II , 5 in Phase –III) have been covered till date. Uttarakhand State Seed and Organic
Production Certification Agency has created its Website of Uttarakhand State Seed and Organic
Production Certification Agency. It has been implemented and in maintenance phase.
9.12.3 Recommended ICT initiatives:
Applications Scope
AGRISNET AGRISNET initiative of GoI need to be implemented in the State.
Roll out of AGMARKET AGMARKET initiative need to be rolled out other mandies of the State.
Crop Information System
A comprehensive Crop information system need to be implemented with details of the crops, their production predictions, yearly export etc. At the same time, it should be able to capture other relevant details corresponding to every crop.
9.13 Revenue (Property Registration)
The Department of Revenue, Government of Uttarakhand deals with maintaining and updating of
revenue records, transaction by way of sale, mortgage, collection of revenue, consolidation of
holdings, etc. The functionaries of this department come into close contact with the general
public in connection with various activities/transactions dealing with immovable property. The
department also operates a large number of Acts and Rules, which have a direct bearing with the
public.
9.13.1 Key Processes of the department
Stakeholder Sr.
No
.
Key Processes Manua
l Automated Admi
n
Busines
s Citizen
1 Registration of document
2 MIS generation and reports (partially))
3 Searching (partially)
5 Preservation of Document
6 Valuation Calculation √
7 Archival of Documents
73
UTTARAKHAND – e-Governance Roadmap
9.13.2 Current ICT Initiatives:
The computerization of Registration operation has started in the State in the Sub Registry Offices
through automation of the Registration process. MIS Report generation has happened partially as
the software to be implemented in the full fledged way. It has been implemented in the 6 Sub
registry offices till date.
9.13.3 Recommended ICT initiatives:
Applications Scope
Computerization of Property Registration
Implementation of the software in all the Sub Registry’s of the State and incorporation of the valuation module in the Same.
Integration of Applications
All the initiatives implemented in the Departments need to be integrated.
9.14 Employment
9.14.1 Key Processes of the department Stakeholder Sr.
No. Key Processes Automated Manual
Admin Business Citizen
1 Registration of Aspirants
2 Searching of Job Profile
3 Issuance of Job Notification
4 Providing information of
resources to different
departments
9.14.2 Current ICT Initiatives:
The computerization of the Employment Exchanges has started in the department as part of the
computerization initiatives. The complete working of the Employment exchange in terms of its
operations and citizen interface has been tried to be computerized as part of its overall vision. 3
Employment Exchanges has been computerized till date.
9.14.3 Recommended ICT initiatives:
Applications Scope
Roll Out of the Employment Exchange Computerization
Rolling out the Employment Exchange computerization initiative in other offices as t has been done in 3 Employment Exchanges of the State.
Admission & Counseling Management System
A comprehensive system need to be developed for the departmental needs.
74
UTTARAKHAND – e-Governance Roadmap
9.15 Finance-Treasuries
9.15.1 Key Processes of the department Stakeholder Sr.
No. Key Processes Manual Automated
Admin Business Citizen
1 Custodian and distribution agency
for judicial and non judicial stamps
and maintain its accounts
2 Maintenance of accounts for
district panchayat local boards and
corporations.
3 To accept deposits from public.
4 Administrative works like
appointment , promotion, transfer,
pay fixation, pay revision etc for
the establishment of staff/offices
5 Release payments.
6 Release of pension
7 Submission of accounts to the
Office of the Auditor General
8 Maintenance of loan accounts of
employees
9 Maintenance of group insurance
accounts.
10 Audit functions
11 Stores verification.
9.15.2 Current ICT Initiatives:
The computerization initiatives has started with the Treasuries computerization, in terms of its
business processes for operations and inter departmental interactions. It has been taken up
initially for 25 treasuries in the State. Apart from it, an application software development has
started for the contributory Pension Management System.
75
UTTARAKHAND – e-Governance Roadmap
9.15.3 Recommended ICT initiatives:
Applications Scope
Computerization of Treasuries
Roll Out of the Computerization of Treasuries initiative in rest of the treasuries of the State.
Pension Management System
An application need to be developed for the Pension process automation in terms of application for pension to the disbursement of pension to the qualified beneficiaries.
Integration of all initiatives
All the initiatives recommended and the existing initiatives need to be integrated.
76