e. richards ee chamber installation. summary position of the ee chambers general view of eel...
TRANSCRIPT
E. Richards
EE Chamber installation
Summary
Position Of the EE chambers
General view of EEL chambers
EEL5 chamber
Installation of other chambers ex. EEL11
10/6/08
Position of The EE chambers
10/6/08
General view of EEL chambers
10/6/08
EEL5 chamber
10/6/08
Installation of other chambers ex. EEL11
Barrel vacuum pumps must be removed Removal of gangways using “Wisconsin Tooling” or CMS tooling.
10/6/08
Installation of other chambers ex. EEL11
Installation of EEL support structure with modified Wisconsin Tooling
10/6/08
Installation of other chambers ex. EEL11
Installation of the chamber with modified Wisconsin tooling and “grabber”
10/6/08
Installation of other chambers ex. EEL11
Replace modified gangways
Reinstall vacuum pump
10/6/08