    Masonry Works

    1) Quality TS D-2.2

    Sand : < 5 mm

    Stone : Specific Gravity Gs 2.5

    Dma! < "# cm$ 2%& of t'ic(ness

    2) Type TS D-2.&.2

    Source of Stone emar(s

    Type * Quarry

    Type + Quarry

    all ot'er stone masonry structures

    Type ,

    &) Test item

    reuency

    /aterial 0 Test reuency

    ,ement same as ,oncrete or(s

    Type of

    Stone/asonry

    atio of cement-sand4by volume)

    =ne part of >ortland cementto t'ree part sand 41 : &)

    protection or( su6?ect toa6rasion and attac( 6y 6ouldersand ravel usually used under t'efloin ater

    =ne part of >ortland cementto four part sand 41 : ")

    =ne part of >ortland cementto four part sand 41 : ")

    e-use ofdemolis'ed stone

    masonry

  • 7/26/2019 E30 Masonry

    4/15

  • 7/26/2019 E30 Masonry

    5/15

    &1"#

    Portable Mechanical Mixer 185#

    Mortar 4in volume)

    Type ,ement Sand %, 4@)

    * 1 & 55 TS D-2.&

    Taret SiAe of +o! os.

    ei't Bolume a 6 c v of

    4() 4ltr) 4cm) 4cm) 4cm) 4ltr) +o!

    ater 1&.; 1&.;

    ,ement 25.# ;.# .# .# .# 2.## #.2C

    Sand &C." 2&.C .# .# .# 2.## #.;;

    4ltr) "5.8

    Mortar 4in volume)

    Type ,ement Sand %, 4@)

    + 1 " 55 ooden +o! for measurin reuired

    uantity of areate$ sand and ravel.

    Taret SiAe of +o! os.

    ei't Bolume a 6 c v of euired Strent' of /ortar

    4() 4ltr) 4cm) 4cm) 4cm) 4ltr) +o! 5#ater 1&.; 1&.; 4TS D-2.&)

    ,ement 25.# ;.# .# .# .# 2.## #.2C

    Sand 52.5 &1.; .# .# .# 2.## 1.1; Dia : 5# mm

    4ltr) 5&.8 7ei't : 1## mm

    nitei't

    Cement (%m& T'ese value s'ould 6eprepared in advance.Sand (%m&

    2; E (%cm2

    c

    a6

  • 7/26/2019 E30 Masonry

    6/15

    /-2

    Test Specimen

  • 7/26/2019 E30 Masonry

    7/15

    Notes for Masonry Works

    1) >reparation of oundationSame as t'e ,anal oundation

    2) Fnstallation of eep 7ole

    Gradation ane of ilter /aterial 4Sand 0 Gravel)

    1

    #.1

    2@

    5#H8#cm2#cm

    15cm

    >B, >ipeD:5#mm3:;#HC#cm

    >alm ilter

    Sand 0 Gravel

    2#cm

    cm

    /asonry!cavation

    "#

    8#

    ;#

    1##

    >ercenta2e4@)

    2@

  • 7/26/2019 E30 Masonry

    8/15

    i) eplace it' t'e concrete Type Dii) eplace it' t'e filter material under

    suita6le compaction.

    Desin 3ine

    =ver !c.

  • 7/26/2019 E30 Masonry

    9/15

    PIRIMP CONTRACT NO.:Sub-Project: CONTRACTOR:

    Serial. No. :

    Date : Weather : Fine, Cloudy, RainContract No : Contractor :

    Name of Canal: Name of Structure:

    Portion of structure: Block/Lift No

    Ref DW! No: "asonry #y$e : % , B , C

    Check item &es No N/% Check time Note

    ' Watera( Free from im$urities

    ) Sand

    a( Washed *efore use

    *( Free from or+anic matters and other contamination

    c( Sieed *y - mm siee *efore use

    . Stone

    a( Free from crack/seam

    *( %$$ro$riate ma stone si0e 123 cm and )/. of 4all thickness(

    c( Clean from adhesie material/ need 4ashin+

    2 "ortar

    a( Pro$er cement/sand mi $ro$ortion for 5oint mortar

    C.C/ 0IT 3R T3. M43R5 W3R/

  • 7/26/2019 E30 Masonry

    10/15

    Technicall appro"ed b : Accepted b :

    Sign: Sign :

    Name: Name: :

    The Consultant The #ngineer

    $esignated #ngineer $esignated #ngineer

  • 7/26/2019 E30 Masonry

    11/15

    CONTRO% T'O$

    NO (OR)S AS*RIN+ AS*RIN+ CRIT#RIA , , R#$ IN) ON STAN$AR$ O

    IT#&S CONTRO% $INSION $RA(IN+ AS*RIN+ POINTS

    C'ART %IST

    21 &asonr ,ase #% 3. &easuring numbers: &easuring &easuring Appl to

    %ining 0/1 031 C 9 6 m; n < 3 no=6 m points: points: indi"idual

    01 C > 6 m; n < more less construction

    ,loc@ %ining Thic@ness than 6 than 6

    0T1 . &easuring o! thic@ness 0T1 0/; T; %1 0/; T; %1

    Riprap 031 % 9 m; n <

    Slope %ength 01 %> m; n < 3

    0%1

    2. *nit construction

    %ength &easure dimension as

    0 C 1 shoBn in structural

    draBing0s1

    *ne"enness

    ,ase %ine 3. &easuring numbers !or Onl Appl to

    51 oundation 0/1 linner structure important unit

    Concrete 031 C 9 86 m n 3 no=86 m structure construction

    3

    /

  • 7/26/2019 E30 Masonry

    12/15

    PIRIMP CONTRACT NO.:

    Sub Project: CONTRACTOR :

    Name o! Canal &iF Tpe

    Side o! Canal A E das

    No. $AT# Station Compressi"e Strength

    Gdg.$=&= rom To Ha"e

    H3 H H2

    3 = = 76 5 5 7.6

    = = 8E 6 75 75.6

    2 = = E3 36 E8.6

    5 = = E 7 EE 7.6

    8 = = 7 8 73 76.

    7 = = 3 E6 8 7.

    = = 72 6 8 6

    Control C%art 6 Co#7ressie trengy% of Mortar(To e 7re7ared y ea+% +anal8 stru+ture8 or orro* area)

    $esignStrength

    Age o!&ortar

    86 0@g=cm1

    0@g=cm150.0

    100.0

    150.0

    0

    2

    4

    6

    28 (/2)

  • 7/26/2019 E30 Masonry

    13/15

    $ate Sign $ate sign $ate Sign

    Name Name Name

  • 7/26/2019 E30 Masonry

    14/15

    ID= =TSJ for /asonry or(s

    KDo not use stones it' specific ravity of less t'an 2.5.KDo not use stones it' Dma! of more t'an "#cm or specifiedt'ic(ness.KDo not allo 'and mi!in. 4>orta6le mi!er)KDo not place stones in position it'out cleanin 0 ettin.

    KSmall stones s'all not 6e placed in loer cores.Ket curin 46urlap) s'ould 6e (ept at least days.