E39 Svegatjørn - Rådal Information about the project Project manager Arne Eltvik 1 27.10.2014 Information meeting for contractors

Upload: vantuyen

Post on 30-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

E39 Svegatjørn - Rådal

Information about the project

Project manager

Arne Eltvik

1 ● 27.10.2014 Information meeting for contractors

Page 2: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

E39 Svegatjørn - Rådal

• Information meeting and not a tendering competition

conference

• The entire project and contract division

• Main amounts and scopes for contracts

• We will open for questions, but will not be answering with

respect to details today.

• Description and details will be made available in the tender

documents

• Clarifications and answers to these questions must wait until

the tendering phase

• The call for tenders is dependent on decisions made in the

Norwegian Parliament

2 ● 27.10.2014 Information meeting for contractors

Page 3: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

E39 Svegatjørn - Rådal

3

Bergen E39 Svegatjørn - Rådal

Trondheim

Kristiansand

Oslo

… part of something more

Information meeting for contractors ● 27.10.2014

Page 4: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

E39 Svegatjørn – Rådal

Where will the projects be

located?

4

Bergen Airport

● 27.10.2014 Information meeting for contractors

Page 5: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

E39 Svegatjørn – Rådal

● Rv. 580 Flyplassvegen- Sørås - Nordås. Length 3 km four-lane road of which 2 km are tunnel

● E39 Svegatjørn – Nordås. Length 15 km four-lane road of which 13 km are tunnel

● Improvement of county road (Fv) 163 at Lysefjord

Information meeting for contractors ● 27.10.2014

5

Page 6: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

E39 Svegatjørn - Rådal

1. HSE Health, safety and the working environment 2. Quality

3. The environment

4. Costs

5. Time

• HSE coordinator with full focus

• The vision is no damages or injuries

• to materials or persons

• Neighbours

• Vulnerable and other road users

• The environment

• Great challenges

• Traffic

• Transportation of large amounts of rock mass

• Blasting 6

Information meeting for contractors ● 27.10.2014

Page 7: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

E39 Svegatjørn – Rådal

1. HSE (Health, Safety and the working Environment)

2. Quality

3.The natural environment 4. Costs

5. Time

• Environment coordinator with full focus

• Pollution of water:

• Discharge of excavation water

• Fills in water

• Run-off from landfills, temporary storage facilities and rigging areas

• Run-off from construction work (excavation/blasting/filling)

• Leakage from equipment and materials

• Dust and mud from rock mass transport

• Construction noise

7

Information meeting for contractors ● 27.10.2014

Page 8: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

Motorway (4-lane)

E39 Svegatjørn – Rådal

● 27.10.2014 Information meeting for contractors

8

Page 9: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

Excess of blasted rock mass

● In Bergen, there is excess amounting to 2 million m3 blasted rock.

● Excess from Lysehorn tunnel in Os will be landfilled in Endalausmarka

● Between Svegatjørn and Endalausmarka eventuelly excess will be deposited in Endalausmarka.

E39 Svegatjørn - Rådal

● 27.10.2014 Information meeting for contractors

9

Page 10: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

Special solutions

● Separate water tunnels leading water by gravitation to fjords

● Main water pipeline in tunnels

E39 Svegatjørn - Rådal

● 27.10.2014 Information meeting for contractors

10

Page 11: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

Contract divisions

K11 Rådal-Nordås-Flyplassvegen (road, tunnel and concrete)

K10 Svegatjørn-Fanavegen

(road, tunnel and concrete)

K20 Electro and controls (the entire project)

E39 Svegatjørn – Rådal

● 27.10.2014 Information meeting for contractors

11

Page 12: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

Tender evaluation

E39 Svegatjørn – Rådal

● 27.10.2014 Information meeting for contractors

• No prequalification

• NS 8406 :2009

• Both tenders (K10 and K11) at the same time

• Tendering deadlines for K10 and K11 on the same date

• Discount at one or both if award both contracts.

• Have to be lowest in both included discount.

• Reservation due to capasity to award both if lowest in both.

• NPRA is free to choose one of the tenders.

• Award lowest tender (if qualifications and formalities are in order).

The official contract language is Norwegian

12

Page 13: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

Open procurement announcement (TED/DOFFIN)

Tendering conference and site inspection

Public opening of tenders Tendering deadline

Assessment of tenderer’s qualifications

Assessment of tenders

Award of contract (intent)

Contract signed

Interaction period Start construction

Complaints period

Tender

phase

Min

52 d

ays

Insurance statement and bond accepted

● 27.10.2014 Information meeting for contractors

E39 Svegatjørn – Rådal

Open Tendering

13

Page 14: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

Distinct phases of award procedure

Formalities in order?

Tender in time, complete etc

Assessment of tenderers

Qualifications

Assessment of tenders Award lowest or economically most

advantageous tender

● 27.10.2014 Information meeting for contractors

E39 Svegatjørn – Rådal

14

Page 15: E39 Svegatjørn - Rådal • Clarifications and answers to these questions must wait until ... E39 Svegatjørn – Rådal 1. HSE ... • No prequalification • NS 8406 :2009

Qualification

● Qualification process is a phase in the competition, preceding the evaluation of the tenders themselves.

● All qualification requirements must be responded to.

– Breachments may leave the Owner no alternative than to reject the tender.

– This also applies to documentation in Norwegian.

● Qualification requirements vary. The NPRA uses a method we have developed.

● 27.10.2014 Information meeting for contractors

E39 Svegatjørn – Rådal

15