e3s 0309 en - vtec · 264,97 265,45 265,26 3.00 3.00 3.00 8. 0 kleinsteinpflaster g eh s t e ig 30...

8
moklansa E3S Electronic Rail Lubrication System moklansa

Upload: others

Post on 06-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: E3S 0309 en - VTEC · 264,97 265,45 265,26 3.00 3.00 3.00 8. 0 Kleinsteinpflaster G eh s t e ig 30 GER. R=12 m LK + n h. S CHLE P K U V E lg =2 4. 3 m l g = 3 1. 6 m l g= 3 2.9 m

moklansa

E3SElectronic Rail Lubrication System

moklansa

Page 2: E3S 0309 en - VTEC · 264,97 265,45 265,26 3.00 3.00 3.00 8. 0 Kleinsteinpflaster G eh s t e ig 30 GER. R=12 m LK + n h. S CHLE P K U V E lg =2 4. 3 m l g = 3 1. 6 m l g= 3 2.9 m

moklansa

E3SElectronic

Rail Lubrication System

Wear and Noise in Curves and Points

Points and curves are the nerve centre of railway traffic. Increased wear on rails, switch tongues, check rails and wheels is accompanied by noise pollution which can at times be considerable. Intelligent lubri-cation of the guiding surface, leading edge and, if necessary, a thin film applied to the rail head offers some remedy.

Wear to wheels, rails and switch tongues can be substantially reduced by the instal-lation of the moklansa E3S. Maintenance work, such as build-up welding of the rail flanks or reworking of the tyre is reduced, while extending the life of the tracks and points.

Effective noise reduction is to the benefit of residents and helps to improve the accep-tance of rail traffic.

Controlled Lubrication

moklansa E3S - The Electronic Rail Lub-rication System has established itself over the years in continuous use at DB AG (Germany Railways Ltd) as well as rail operators, local traffic services and the industry at home and abroad. The basic prin- ciple is compelling: lubricant precisely dosed to specific requirements is applied exactly between the wheel flange and the rail flank, the passing wheel picks up the lubricant, rolls it over and thus distributes it automatically along the critical points of wear.

This process comprises three system components: The installation core controls the lubri-cation process and contains the inter- changeable grease reservoir.

The sensor station registers the approa-ching rail vehicle and notifies the control centre in the installation core, which then triggers the lubrication process.

The lubrication path with lubrication channels or lubrication ridges applies the lubricant to pinpoint accuracy be- tween flange and rail flank.

The EBA approval certificate is available for the moklansa E3S (EBA = German Federal Railway Office).

Lubricated to Straight to the Point

Page 3: E3S 0309 en - VTEC · 264,97 265,45 265,26 3.00 3.00 3.00 8. 0 Kleinsteinpflaster G eh s t e ig 30 GER. R=12 m LK + n h. S CHLE P K U V E lg =2 4. 3 m l g = 3 1. 6 m l g= 3 2.9 m

The moklansa E3S system is suitable for all common rail profiles and wheel flange types.

Lubrication channelsThanks to a special drilling technique, the rail can be equipped with lubrication chan-nels, the outlets of which are located pre-cisely on the rail flank, leading edge or on the rail head. Lubrication ridges are inte-grated at the check rails, if required later on, for wheel lubrication. In addition, mo- bile (feedable) lubrication ridges are availab-le. They can be used in combination with grooved rails, even on covered tracks.

By aligning the lubrication channel con-nections towards the centre of the track, high-pressure pipes can be safely installed under protective cover strips, in inspection boxes or in connector boxes.

Bus SystemDue to the high reaction speed of the bus system, there is almost no delay between process activation (grease request by the rail vehicle) and the emergence of grease at the grease channels. In combination with a minimum quantity output, the multiple lubri-

cation of each and every bogie of a vehicle with the smallest of grease quantities has been solved in the best way.

Multiple lubrication paths can be supplied with track lubricant at any time or simulta-neously, as well as separately. Due to the long distances between lubrication path and installation core (up to 80 metres), double-track curves, complete Y-tracks or entire track harps are supplied with track lubricant by only one installation core.

Grease switchSystems with grease switch are suitable for branches, e.g. the tip of an Y track. Here too, an installation core supplies the lubri-cation paths for two tracks independently.

Film Lubrication of the Track The precise dosage by the moklansa E3S enables even the most accurate moistening of driving surfaces. In combination with the lubrication of the rail flank, the moistening of the contact surface of the inner curved rails enables quiet driving in bends. Before starting the moistening of the contact sur-faces, brake tests according to BOStrab are recommended.

Arrangement of lubrication channels

on grooved rail profile

Arrangement of lubrication channels

on vignol rail profile

Arrangement of lubrication ridges

on the check rail

Arrangement of the mobile lubrication

ridge for wheel lubrication

Optimized for Grooved and Vignol Rails

Installation core Cabinet design

Installation core Box design

Lubric

atio

n pat

h

Sensor station

Lubric

atio

n pat

h

Page 4: E3S 0309 en - VTEC · 264,97 265,45 265,26 3.00 3.00 3.00 8. 0 Kleinsteinpflaster G eh s t e ig 30 GER. R=12 m LK + n h. S CHLE P K U V E lg =2 4. 3 m l g = 3 1. 6 m l g= 3 2.9 m

moklansa

E3SElectronic

Rail Lubrication System

Geometric Precision

The quantities of grease moklansa E3S supplies to the respective lubrication chan-nels are absolutely identical, and are not influenced by differences in hose length or fluctuations in temperature. The required flow rate can be adjusted with precision and kept constant at all times. The stored-program control of moklansa E3S proces-ses all relevant operating parameters. Lu- bricant flow rate, lubrication intervals, even the number of lubrication impulses per vehicle are infinitely variable. The system can be adjusted individually to the respec-tive operating requirements. The settings and operating conditions are shown in a display panel.

A temperature-dependent quantity output is also an option. All adjustable operating parameters are selected individually with three independent temperature bands.

Economical, Safe and Reliable

The moklansa E3S dispenses the well-adhering lubricant extremely sparingly, which was specially developed for this system. The grease supply is used eco-nomically, so that soiling to the track bed and vehicle are avoided. Of course, the moklansa E3S can also be monitored via the operating control centre. Furthermore,

external information can be processed, for example a rain sensor shuts down the sys-tem.

A robust gear pump is responsible for con-veying the lubricant and for the generation of pressure. This pump, which has been modified for the conveyance of lubricants has been applied in the field of oil hydrau-lics many hundreds of thousands of times – moklansa has been using it successfully from the beginning for stationary rail lubri-cation systems.

Maintenance-friendly Thanks to Exchangeable ReservoirsIt couldn‘t be simpler to refill the moklansa E3S: The refillable grease reservoirs can be replaced in no time, with no mess or spil-lage. Breakdowns due to contamination or air locks can be practically ruled out.

To refill the grease reservoirs, many cus-tomers make use of the moklansa grease refill centre. However, we also provide filling stations for self-fillers as an accessory.

The new refillable pressure reservoirs with modified membrane technology further increase economic efficiency. The higher fil-ling pressure reduces the remaining quan-tities and optimises the process sequence. The reservoirs are available in two sizes.

no more no less

Page 5: E3S 0309 en - VTEC · 264,97 265,45 265,26 3.00 3.00 3.00 8. 0 Kleinsteinpflaster G eh s t e ig 30 GER. R=12 m LK + n h. S CHLE P K U V E lg =2 4. 3 m l g = 3 1. 6 m l g= 3 2.9 m

More Grease for Longer Running Times

The following moklansa E3S versions are available:

box design with one or two grease reservoirs - Assembly next to the track system on a base or jig

- Assembly under the ground in the ground box in the middle of the track or next to the track system

cabinet design with up to three grease reservoirs

The cabinet design is set up next to the track system at a distance of not more than 80 metres from the lubrication path. The reservoirs are emptied simultaneous-ly. 3-Container cabinets can also be deli-vered with „Single emptying in succession“ option.

With the moklansa E3S as a multi-reservoir system, larger quantities of lubricant can be made available, allowing less frequent and more flexible refill intervals. Equipped with two to three exchangeable reservoirs connected in series, the empty reservoirs can even be changed while the system is running. In due time before the complete emptying of the grease reservoirs, a war-ning message appears on the display that is transferred to the master display with remote maintained systems.

The display of the control unit has a text display that indicates operating states and settings. That facilitates the setting of the system as well as the modification of indivi-dual operating parameters.

Page 6: E3S 0309 en - VTEC · 264,97 265,45 265,26 3.00 3.00 3.00 8. 0 Kleinsteinpflaster G eh s t e ig 30 GER. R=12 m LK + n h. S CHLE P K U V E lg =2 4. 3 m l g = 3 1. 6 m l g= 3 2.9 m

moklansa

E3SElectronic

Rail Lubrication System

and all that goes with it

System planning

Our consultant engineers will assist you right from the design phase and the selec-tion of a suitable location, bringing with them extensive experience from a variety of projects.

CAD support in the planning phase ensu-res the optimum positioning of all system components, taking the local conditions into account.

Service On Site

moklansa E3S is delivered ready for ope-ration, then installed and connected. This includes fitting the lubrication channels into the rail section. The level of precision required for this is achieved with a specially developed drilling implement.

With our Full Service Package we offer not only inspection and maintenance, but also assure the uninterrupted operability of your system.

We train your specialists either in our trai-ning rooms in Dortmund or else in Inhouse seminars.

Schm

ierbereich

Schmierb

ereich

Sensor

Sensor

Schmierbereich

Plastermulde

Pflastermulde

W¸rfelsteine 3-reihig

W¸rfelsteine 3-reihig

M2

M2

+12+3

+3 +12Kleinsteinpflaster

PVC200,umm.

lg=11.6m

W+0

W+0

+3+3

+14+14

W+14

+14

+0

+14+0

+0

2m

+3+12

+12

+3+12

+3+12

+0

+0+0

+0

+12G3

G3

G3

+12

Absenkung

Absenkung

Pflastermulde

Sch‰chte an neues Niveau anpassen

264,58

264,79

265,12

265,41

264,75

264,73

264,84

264,76

265,17

264,97 265,45

265,26

3.00

3.00

3.00

8.50

Kleinsteinpflaster

Gehsteig

R30

GER.

R=12m

LKW + Anh.

SCHLEPPKURVE

lg=24.3m

lg=31.6m

lg=32.9m

lg=18.7m

Bˆschung od.Fl‰

che angleichen

KE=KAGE=KA

GERADE

R32.5

KE=KA

KE=KA

GA

GER.

R40R20

101

Achse

101a

Achse

GE

KE=GA

KE=KA

KE=KA

UE=KA

‹A

+14+3

+3

+15

+3+3

+3+3

+3+3

+3+3

+14 +14

bauseits festlegen

Maststandort M54M

54

M52

M51

M50

M50c

M50a

M50b

M49a

Pflastermulde

2m

AC113Ac111 S

Anschlufl an Bestand

+3

+3

+3

+3

ZAUN

B e s t a n d

R4

R4

Kleinstein-

pflaster

BGP

264.22264.10

262.445

262.300

262.172

262.202

262.080

261.932

261.950

261.840

261.705

259.33260.11

260.18

260.36

263.69

262.93

263.30

263.69

264.42

264.16

263.84263.98

264.67264.38

264.115

263.948

265.470

256.651

261.68

Gehsteig

Gehsteig

Gehsteig

lg=18.4m

GARTENMAUER

Betonsteine

21/21

PSÿ60

ESÿ45

ESÿ45

ESÿ45

ESÿ45ESÿ45

ESÿ45

ESÿ45

ESÿ45

ESÿ45

ESÿ45

ESÿ45neu

MZR250 lg=7.4mMZR250 lg=9.1m

PVC300,umm. lg=9.6m

lg=10.6m

PVC300,umm.

EH261.60SH260.20

PVC300umm.

lg=6.6m

PVC300umm.

lg=5.2m

ENTW.SCH.

PVC300umm.

lg=16.0m

D150 lg=11.4m

PVC150umm.

lg=1.2mSH260.0

besteh. KanalAnschlufl an

MZR 250

MZR 250

TSR 150

TSR 150

EH262.75SH261.50

EH262.71SH261.40

PVC300umm.

lg=10.4m

PVC300umm.

lg=14.3m

PVC300umm.

lg=3.9m

5a7a

6a

KM 0.040'000 Achse 111

KM 0.010 Achse 2

KM 0.050'000 Achse 111

KM 1.544'145

HP

¸=0cm

¸=3cm

¸=3cm

A35

A30

R80

GERADE

15 R

R10

GER.

R 12.5GER.

GER.

GE=KA

KE=GA

KE=GA

GE=KAKE=GA

GE=KA

GA

GE

UE=KA

109a

Achse

UE=UA

KE=UA

KE=GA

lg = 34.257mPICCOLOM

INIGASSE

(Achse 113)

VERLEGUNG

Gleis Achse 5KM 0.051'517

Ende Verlegung Marktm¸hlgasse

( Achse 111 )

KM 0.000'000 KM 1.504'161 Einm¸ndung B1

( Achse 101 )

( Achse 101 )

KM 1.500'000 Beginn Verlegung B1 - Wienerstrafle

KM 1.500'000 Beginn Verlegung Kremsm¸nstererstrafle

¸=0cm

A40

A25

R35

R100

A40

A22.5A20

A50

KM 0.082'526 Achse109 KM 0.071'318 ENDE Achse109a

KM 0.045'019 Achse109

KM 0.000'000 BEGINN Achse109a

KM 0.115'833 ENDE Achse109

ACHSE 109

Achse 101Achse 101

UE=KA

UE=UA

KE=UA

UE=UA

KE=UA

QUERUNG

HOFDURCHFAHRT

KM 1.592

30m

30m

10m

18m10m

18m4m

4m

12.5m

2m

4m

4m

50m

16m

15m

16m50m

15m

6m

30m

2.5m

6m

6m

15m

15m

13.5m

13.5m

2.5m

6m

0.00

0.10

1.50

1,5+44.145

1,6+25.178

A 40

1,6+10.633

GERADE

1,6+10.633

GERADEA 25

1,6+03.545

A 25R 30

1,5+82.712

R 30

A 21.963

1,5+60.224

A 21.963

A 54.9081,5+44.145

KM 0.000'000 BEGINN Achse7

1.60

104

95

96

101

102

103

94

Achse 5

Achse 7

KE=UA

KE=UA

UE=KA

Achse 5

Achse 7

5Achse

UE=GA

UE=KA

GE=UA

0.0

UE=KA

GE=UA

GA

KE=UA

UE=UA

KE=UAA37.500

R100

A37.500

GER.

74000

345600

74000

345600

1.753

2.40

1.144

0.629

2.40

1.50

1.50

1.901.20

2.5%

2.5%

2.5%

6%

1.75%1.75%

3%

3%

3.9%

4%

4%

2.5%

1.9549

4.422

7.969

1.50002.75022.7502

1.5000

3.7000

3.6152

1.5039

2.0000

1.5000

Gehsteig

Gehsteig

8.338

10.204

6.500

6.503

6.974

2.50

2.50

3.000

3.540

3.50

3.00

3.00

0.50

1.50

3.00

3.50

4.930

3.039.319

10.241

5.569

5.97

4.876

8.023

5.794

7.999

4.080

4.796

5.417

4.649

6.328

4.972

6.6275.109

6.300

6.355

5.713

4.435

4.835

4.614

4.307

4.712

0.111'435 Achse 110

0.102'716 Achse 110

1.567'036 Achse 101

1.557'878 Achse 101

0.020'670 Achse 109

1.443'847 Achse 101

1.490'287 Achse 101

0.086'994 Achse 109

0.097'637 Achse 109

0.030'529 Achse 109

1.548'597 Achse 101

1.453'578 Achse 101

1.517'362 Achse 101

1.528'727 Achse 1010.040'676 Achse 109

1,6+30.000 Achse 5

1,6+40.000 Achse 5

0,0+26.383 Achse 7

0,0+36.270 Achse 7

1,5+30.000 Achse 5

0,0+15.443 Achse 7

1,5+40.000 Achse 5

1,5+70.000 Achse 5

1,5+90.000 Achse 5

1,6+00.000 Achse 5

1,6+20.000 Achse 5

1,5+20.000 Achse 5

261.19

261.27

261.03

260.89

261.05

258.50

258.39

258.60

258.80

259.25259.92

259.92

259.95

259.86

260.22

260.14

259.86

259.81

259.91

259.81

259.06

258.98

259.01

258.66

258.39

258.51

258.43

258.50

258.77258.77

258.64258.56

258.40

258.55258.35

258.32

258.41

258.60

258.46

258.36

258.36

258.17

259.25

259.46

259.11

258.36

258.35258.42

258.36

258.49259.10

258.81

258.39

258.39

259.03

258.93

260.33

260.25

260.37

260.23

260.91

260.63

260.64

262.03

201.68

261.49261.15

260.95

260.52

261.28

261.30

261.68

261.62

261.62

261.52

261.14

258.51258.60

261.38

0.00

263.16

262.14

262.15

262.15

262.17

258.30

263.25

264.68

265.74

265.92

265.76

266.40

265.56

265.55

265.45

265.57

265.72

265.73

265.75

265.76

265.72

265.75

265.33

265.36265.98

266.11

266.24266.35

266.17

266.00

265.92

265.71265.39

262.95

263.60

263.44

264.36

264.18

264.91

265.05

265.20

265.15

264.86

263.64

264.28

263.40

263.18

262.72

262.73

262.81

263.83

264.64 265.08

265.11

265.11

265.36

265.35

265.52

265.53265.55

265.40

265.17

265.26265.20

265.09

264.87

264.69

265.00

265.59265.38

265.34

265.18

264.98

263.62

263.83

264.02

264.11

263.48263.54

263.25

263.15

263.13

263.15

263.10

262.73

262.95

263.09

263.40

263.29

263.83

264.00

264.17

264.54

264.53

264.44

264.61

264.66

264.80

264.67

264.75

264.30

264.61

264.42

259.86

260.20260.27

260.22

260.52

260.13

260.12

260.25

262.13

262.14

262.36

262.97

262.39

262.25

262.44

262.42

262.48

262.61

262.54

262.06

262.58

262.58

260.27

260.27

260.36

259.87

259.58

259.25

259.32

259.31

259.30 259.35

259.42

259.24

258.71258.61

258.36

258.35258.42

262.23

262.33

262.42

262.48

262.44

262.35

262.34

262.36

262.30

262.39262.67

261.98262.06

263.11262.89

262.05

261.87

261.86

262.21

262.39

261.87

262.49

262.35

258.21

258.19

258.25

258.32258.40

258.59

258.42

258.39

258.33

258.26

258.34

258.38258.41

258.59

258.45

258.45

258.34

258.30258.14

258.36

259.03

259.70

261.90

261.84

261.86

260.71

260.98260.17

259.82

259.45

259.45

259.32

259.08258.75

258.63

258.61

258.58

258.60

258.92

258.86

259.31

259.14

259.26

258.62

259.53

263.87

263.69

263.48

263.41

262.39

262.92

262.86262.60

262.74

262.69

262.65

262.39

262.54

262.39

262.30

262.37

262.34

262.21

265.85

262.20

262.13

262.04

262.13

262.32

262.21

262.89262.78

262.65

262.80

262.64

262.47

262.42

262.34

262.30

262.28

262.22

262.25

262.25

262.21

262.18

262.15262.11

262.02

261.97

201.68

261.88

264.63

264.56

264.69

264.23

264.21

264.12

264.42

264.46264.43

264.36

264.33

264.24

259.29

261.13

261.07

261.60

261.80

261.61

261.75

261.47

261.47

264.12

263.97

264.18

265.54 264.18

264.15264.10

264.21

264.20

264.08

264.40

264.26

264.37

264.12

264.13

263.99

263.86

264.07

264.07

264.10

264.14

264.10

264.17

264.23

264.27

264.28

264.34

264.38

264.44

264.37

264.36

Gertrud u. GertrudeKubin

EZ 289

Dr. Brigitte Moerkelsberger

EZ 110

EZ 272

EZ 272

der Stadtgem. LinzForster Margarete

(Landesstrassenverwaltung)

Land Oberoesterreich

EZ 483

Stadt LinzEZ 49

(Bundesstrassenverwaltung)

Republik Oesterreich

EZ 197

Linz

Stadtgem.

Gut der

oeffentl.

EZ 267

Mag. Marlene Potye

Leitner

Robert u. Maria

Robert u. Maria

Leitner

EZ 61

EZ 61

EZ 60

EZ 60

Gertrud u. Gertrude

Gertrud u. Gertrude

Kubin

EZ 289

EZ 272

Leitner Robert u. Maria

EZ 61

Donaubauer Artur

EZ 38

EZ 38

Krimhilde

KrimhildeMauhart

Mauhart

EZ 62

EZ 275

EZ 275

Sch

8125

2125

.381

.380

HOEHEBEZ

6866

18754

125

1125

3125

1.50

.49

.380

.149

1142

3875

2.37

110

2109

.389

908

109/4

FAH

RT

Muellt.

Tor

HE

HE

259.04

260.68PP 44

PP 36

Schaltk.

PP 30

HE

Sch

Sch

SchSch

Sch

Sch

Gitter

GE

262.20

PP 33

Schaltk.

Schaltk.

EP 41

DURCHFAHRT

Tor

Asphalt

GA

RAG

EN

GARAGEGARA

GE

GARAGE

GAR

AGEN

GARAGEN

PARKPLATZ

GEHWEG

GEHWEG

GEHWEG

P A

R K

P L

A T

Z

Schaltk.

Schaltk.

Schaltk.

HE

HE

H E F

H E FZWINGER

HUNDE-H E F

H E F

HEHE

HE

H E FH E F

H E F

H E F

H E F

HE

KF

KF

KF

KF

HE

DURCHFAHRT

KFHE

KF

KF

KF

KF

264.68

262.83

262.33

258.78

258.49

PP 35

PP 32

PP 34

PP 29

Sch

Sch

Sch

GARAGE

GEHWEG

GEHWEG

HE

GE

HE

GE

GE

GE

GE

KF

KF

KF

KF

KF

KF

K6 (Bestand)

HNr. 3

HNr. 1

HN

r. 8

HN

r. 6

HNr. 4

HNr. 2

HNr. 1-3

HNr. 493

HNr. 492

HNr. 490

KD

KD

W

W

W

HOEHEBEZ

HOEHEBEZ

HOEHEBEZ

HOEHEBEZ

HOEHEBEZ

HOEHEBEZ

HOEHEBEZ

Sch

Sch

W

KD

KDW

KD

KD

KD

W

KD

G

KD

KD

KD

W

KD

KD

KD

SPARKASSE

Sch

Sch

W

WKD

1.00

Ground box for installation

in the centre of the track

Ground box for installation

next to the track

Inspection box for installation

on grooved rails

Page 7: E3S 0309 en - VTEC · 264,97 265,45 265,26 3.00 3.00 3.00 8. 0 Kleinsteinpflaster G eh s t e ig 30 GER. R=12 m LK + n h. S CHLE P K U V E lg =2 4. 3 m l g = 3 1. 6 m l g= 3 2.9 m

Remote monitoring

The moklansa E3S enables remote moni-toring and data transfer via mobile radio. Operating parameters can be accessed and set and malfunction messages can be forwarded via text message or e-mail. Modified operating parameters are auto-matically sent to a preset fax address for documentation purposes.

Power Supply

The moklansa E3S system is connected to the 230V/AC mains supply. No further sources of power are required.

If the locations are far from the power sup-ply, the following variants are available:

solar energy current transformer interchangeable battery pack

Accessories

A comprehensive range of accessories is available, allowing moklansa E3S to be adapted for individual site conditions and operating parameters:

mid-track, low-level ground boxes, con-nector boxes and distributor boxes

protective cover strips attached to the lower flange of the rail

photovoltaic driving terminals DC/DC transformer battery pack rain sensors breeze concrete plates underframes filling stations

Filling station

DC/DC transformer

Solar energy

Power supply with battery pack

Page 8: E3S 0309 en - VTEC · 264,97 265,45 265,26 3.00 3.00 3.00 8. 0 Kleinsteinpflaster G eh s t e ig 30 GER. R=12 m LK + n h. S CHLE P K U V E lg =2 4. 3 m l g = 3 1. 6 m l g= 3 2.9 m

Short overview

DimensionsBox design housing box B 800 x T 600 x H 350 1 or 2 reservoirs mounted on foundation base, mounting frame or fitted in a ground box.

Cabinet design housing box B 800 x T 450 x H 1100 1 or 2 reservoirs assembled on base, concrete slab or breeze concrete plate

Cabinet design housing box B 1100 x T 400 x H 1100 3 reservoirs assembled on base, concrete slab or breeze concrete plate

Power supply 230 V/AC, 24 V/DC, DC/DC transformer 600 V/24V solar technology or interchangeable battery pack

Control compact PLC with key operation, operating states and inputs can be read on the display. Function diodes, potential-free contact for remote transmission.

Vehicle detection Inductive approach initiators, installed in a sensor terminal box or a sensor station.

Alternative: By external signalling.

Grease reservoir two-chamber reusable container (DIN 4807), effective volume 9 litres each or refillable pressure reser-voir, effective volume 4 resp. 9 litres each

Lubricant transfer Directly on the contact surfaces by special lubrication channels integrated into the rail or check rail or for the lubrication of the wheel with feedable lubrication ridges.

Rail flank lubricant KUB 2 K-20 – established over many years, specially designed for rail flank lubrication.

KUB 1 K-30 – with further improved moistening proper- ties. Is particularly suitable for moistening the head if the dosage is accordingly small.

If external products are used, we recommend a compa-tibility test with the polymers used.

Options Temperature-dependent quantity and cycle control. BCD-coded interfaces for data exchange.

Complete data exchange including alarm chain with GSM technology.

moklansa GmbH

Gottlieb-Daimler-Straße 15 59439 Holzwickede

Tel: +49 (0) 23 01-94 93 68-0 Fax: +49 (0) 23 01-94 93 68-9

[email protected] www.moklansa.de

Maschinen- und Anlagenbau

moklansa

E3SElectronic

Rail Lubrication System

© C

opyr

ight

mok

lans

a G

mbH

Our sales and distribution partners:

VTEC - Gesellschaft für den Vertrieb von innovativen Produkten für den Oberbau, Vertriebsberatung mbH

Westfalendamm 265 D-44141 Dortmund

Tel: +49 (0) 231- 5 65 59 95-0 Fax: +49 (0) 231- 5 65 59 95-5

[email protected] www.VTEC-GmbH.de

Your contact in Switzerland:

RTS Swiss AG Zugerstr. 74 CH-6340 Baar

Tel: +41 (0) 4 17 69 35 82 Fax: +41 (0) 4 17 69 35 84

[email protected] www.rtsag.ch

moklansa

Railtechnik Swiss AG