Case Study 2: Reducing pesticide pollution and managing waste

Page 2: Ea 26 30

Case study 3: Generating electricity from slurry

� Food Waste + slurry electricity for the grid

� The capacity of the farm is for 15,000 tonnes of food waste per year .

� A Waste Management Licence will be required

Page 3: Ea 26 30

Main Challenges� Power company are currently unsure if they

want to use it. They charge £75 000 to connect to the grid

� Obtaining planning permission and

agreeing a location with the planners

Green belt using existing facilities