Case Study 2: Reducing pesticide pollution and managing waste
Case study 3: Generating electricity from slurry
� Food Waste + slurry electricity for the grid
� The capacity of the farm is for 15,000 tonnes of food waste per year .
� A Waste Management Licence will be required
Main Challenges� Power company are currently unsure if they
want to use it. They charge £75 000 to connect to the grid
� Obtaining planning permission and
agreeing a location with the planners
Green belt using existing facilities