EA DMP ProjectEnterprise Architecture ‐ Depot Modernisation Project
Imraan Khan (PRASA Enterprise Architecture), May 2015
![Page 2: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/2.jpg)
PRASA has embarked on a multi‐billion rolling stock renewal project. The new trains require modern infrastructure and systems. In readiness, PRASA has approved an Depot Modernisation (DMP) initiative to renew and modernise depots.
The aim of Enterprise Architecture Depot Modernisation Project (EA DMP) is to develop the standards framework, identify PRASA‐wide initiatives, baseline architectures, target architectures, gap analysis, and a roadmap.
The objective of the EA DMP is to support and ensure that an organisation’s goals and objectives in terms of business capability, application, data and integration service provisioning as well as technology infrastructure support are addressed in a holistic way, in line with enterprise project initiatives and standards.
What is EA DMP Initiative?
![Page 3: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/3.jpg)
EA DMP – The Complete DMP Journey
START
2015
2014
2011
EA DMP Project
completed
10Engagement with ICT Enterprise Architecture for architectural detail
9Siyaya produced audit
reports for Braamfontein and Salt River
8Siyaya produced depot conceptual design document
7Train to Ground
communication requirements were discussed in details
6Siyaya chosen as local consulting partner for depot modernisation.
11Framework
Reference Model developed
12Baseline
Architecture developed
13Target, gaps and opportunities, and
Roadmap developed
14DMP ICT
requirements (specifications).
1New rolling stock envisioned at
PRASA
2New train triggered requirements for Depot,
station modernisation, other telecommunications, infrastructure etc.
2013 2012
3GIBB/SMEC concept
designs
4Turnkey tender
5Siyaya db appointed
![Page 4: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/4.jpg)
EA DMP ‐ High Level Scope and Deliverables
High Level Scope
• This project seeks to deliver enterprisearchitecture design in the Depot ModernisationProject proposed by PRASA, to ensure alignmentof the DMP project teams as well as with otherproject initiatives
• The project will gather and analyse informationon design and requirements of the current DMParchitecture, document the target enterprisearchitecture, and provide the roadmap totransition the DMP project to the envisionedend state.
• The EA Project will provide guidance to theoverall DMP project, by consolidating businessand enterprise integration requirements end‐to‐end in line with PRASA’s envisioned Business,Data, Application, Integration, Technologyarchitecture and ongoing enterprise projectinitiatives.
• Framework to describe enterprise integration and standards dependencies
Architecture Framework
•Current state of business, data, application, integration and technology architectures
Baseline Architecture
• Target state of business, data, application integration and technology architectures
Target Architecture
•Gaps and opportunities for depot based on baseline and target findings
Gaps and Opportunities
•High level prioritisation of proposed opportunities and initiatives
Roadmap
• ICT requirement specifications.
DMP ICT requirements
![Page 5: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/5.jpg)
PRASA EA – PRASA Target Business Capabilities Model
![Page 6: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/6.jpg)
EA DMP ‐ Depot Baseline Business Capabilities Model
![Page 7: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/7.jpg)
EA DMP ‐ Depot Target Business Capabilities Model
![Page 8: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/8.jpg)
EA DMP ‐ Depot Target Applications Model
![Page 9: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/9.jpg)
EA DMP – Depot Architecture Modernisation Overview
E N T E R P R I S EI N T E R F A C ES
E N T E R P R I S ER E P L A C E M E N T S
SOLUTIONS/FUTURE CAPABILITIES NEEDED
E N T E R P R I S EI N I T I A T I V E SSAP PM, PURCHASES,
WAREHOUSING
T2G(NEW ROLLING STOCK)
INTEGRATED SIGNALLING
MARKLOGIC / SAP HANA / TALEND ESB
IIMOMS
ISAMS
D E P O TA R C H I T E C T U R E
ENTERPRISE STANDARDS ALIGNMENT
BRAAMFONTEIN
P R A S A D E P O T S
WOLMERTON
SALTRIVER
SPRINGFIELD
DURBAN YARD
NEW TECHNOLOGIES NEEDED
E N T E R P R I S E M O D E R N I S A T I O ND E P O T M O D E R N I S A T I O N
GAPS/NEW APPLICATIONS NEEDED
ICT (AIWS / FIBRE / GSMR ( FIXED WIFI) /
CISCO IP/MLPS
![Page 10: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/10.jpg)
EA DMP – New Interface Requirements (Cntd)
![Page 11: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/11.jpg)
EA DMP – New Application Requirements
INTERLOCKING CONTROL
TRAIN IDENTIFICATION & TRACKING MANAGEMENT
OPERATIONAL SAFETY (HSE) MANAGEMENT
YARD & DEPOT OPERATIONS MANAGEMENT
DEPOT INFORMATION & DISPLAY MANAGEMENT
TRAIN POSITION MANAGEMENT
(GAPS/NEW APPLICATIONS NEEDED)
D E P O TA R C H I T E C T U R E
CCTV ANALYTICS/DEPOT SURVEILLANCE
SECURITY INFORMATION MANAGEMENT
![Page 12: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/12.jpg)
EA DMP – New Interface Requirements
![Page 13: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/13.jpg)
EA DMP – New Interface Requirements (Cntd)
![Page 14: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/14.jpg)
EA DMP – New Interface Requirements (Cntd)
![Page 15: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/15.jpg)
EA DMP ‐ Depot Target Technology Reference Model
System
Security
Infrastructure
System
Man
agem
ent Infrastructure
Middleware Infrastructure
Database Infrastructure
Computing Platforms and Peripherals
Communications Infrastructure
Infrastructure Applications
System Engineering Infrastructure
Application Delivery Infrastructure
Facilities
Microsoft SharepointEDocs MS Office
Windows Server ArcGIS IIS Apache
SAP PI Microsoft Active Directory Microsoft Sharepoint ArcSDE
MS SQL Server ORACLE RDBMSMS Access
VSphereHP Servers Windows 7HP Workstations Windows Server
CITRIX XENAPP IRAS Oracle Super cluster
Fibre SAN
CISCO Call Manager
CISCO Call Centre
CISCO Call Monitoring CISCO Data Voice NICE
IRAS
CISCO VPN
CISCO Config Engine
Zabbix EntuityMS Exchange
CISCO IP PhonesCISCO switches and router
ArcGIS Visual Studio AutoCAD
Babylon FAS
Team
Viewer
CA Unicenter
Kaspersky
CISCO VPNEn
terprise Va
ult
Backup
EXEC
Business Objects
Nagios
Power Designer
CCTV Alarm Systems APC UPS
IP/MPLS
Right Fax
VNC
CROMOS MS FoxproObject Star Dbase 4
Red Hat Solaris
ECMContact Centre Applications SAP ECC
UCC T2G Communication
BPM
Talend
Database Security Solution SAP HANA
Desktop virtualization Windows 8.x
UCCAIWS T2G Communication GSM/R
ITIL Support Solution
Access Right management System
System Vulnerability Solution
SmartBoard Blackbox IPExisting TechnologyFuture Technology
Legends
Legacy TechnologyServer Room Infrastructure
![Page 16: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/16.jpg)
EA DMP – New Technology Requirements
SERVER
STORAGE
NETWORK
SERVER ROOM
END USER COMPUTING
NEW TECHNOLOGY REQUIREMENTS
D E P O TA R C H I T E C T U R E
ICT INFRASTRUCTURE SERVICE DASHBOARDS
![Page 17: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/17.jpg)
EA DMP – Server Room Requirements
Requirements
Depot Server Room
Specifications
PHYSICAL SPACE
POWER SUPPLY
Anti‐static floor finishing (no wax) for raised floor tiles or sheet vinylNo windows because of security,
humidity and dustDoors 42 to 48 inches wide, and at
least 8 feet tall
Input Power Quality ‐ rectified
Redundant power supply devices. Emergency/ back‐up power not tied into the building life safety
system
Separate, dedicated power panels for the computer equipment and HVAC. Design systems so that
ultimate build out does not exceed 300 watts per square foot
All entrances properly secured, and with alarms
Maximum electrical intensity of computing equipment of 300 watts
per square foot
FIRE SUPPRESSION
COOLING SYSTEM
FACILITIES MANAGEMENT
![Page 18: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/18.jpg)
Requirements
Depot Server Room
Specifications
PHYSICAL SPACE
POWER SUPPLY
FIRE SUPPRESSION
Adequate fire suppression system; pre‐action system recommended
Fire‐rated cabling if cooling systems and cabling are combined in the same space above ceiling
COOLING SYSTEM
Cooling and Air Distribution – N+1 air conditioners monitored
centrally
AC System is room‐specific and humidity controlled
AC duct unit is at least 4 feet from computer rack system, so that
condensation or other leaks don't harm computer equipment, and access for maintenance is possible
Critical alarms related to the functioning of the AC system and physical data of the room mapped into the Facilities Management and
Energy Management System
FACILITIES MANAGEMENT
EA DMP – Server Room Requirements (Continue)
![Page 19: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/19.jpg)
EA DMP – ICT Infrastructure Service Dashboard Requirements
Requirements
ICT INFRASTRUCTURE
SERVICE DASHBOARDS
Specifications
STORAGE
SERVER
Threshold warningsTotal storage space
Available storage spaceStorage space consumption per application
Server availabilityServer resource consumptionLoad threshold warnings
Trends of sever resource usageServer vulnerabilitiesServer resources
NETWORK
Network availabilityBandwidth consumption
Trend analysis
![Page 20: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/20.jpg)
EA DMP – Storage Requirements
Requirements
Storage Requirements
Specifications
ENTERPRISE CONTENT STORAGE
CCTV STORAGE
Engineering Drawings: 2‐5 MB per drawing, ~250MB per modelProcess Models: 1‐3 MB per
processUnstructured Data: ~1 MB per file
New Rolling Stock CCTV: 4TB per train (Bi‐weekly)
Surveillance Video: ~50 MB per 5min HD IP Camera recording
Current File Size of SQL Servers Databases: ~800GB
Daily Backup Size: ~200GB
Multimedia: ~8 MB per 3 min Audio and ~50 MB per 3 min Video
Database backups: ~5TBEnterprise content backups: ~5MB per file, ~10 MB per audio, ~50MB per 5 min video, ~250 MB per 3D
Model
DATABASE STORAGE
BACKUP AND ARCHIVING
![Page 21: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/21.jpg)
EA DMP – Server Requirements
Requirements
Server Infrastructure Requirements
Specifications
APPLICATION SERVERS
DISASTER RECOVERY
Virtual Machines Minimum Requirements:2x CPU per VM
50 GB for Operating System and 150 GB for non OS partition
RAM 4GBNetwork: 2 virtual ports
VM Servers: As recommended by production servers and VM minimum requirements
VM Servers: As recommended by T2G design specStation Server
Operating system : CentOS 6.4 CPU: Intel Xeon 2.66 Ghz 6 Cores
RAM: 1 GB Hard Drive: 30 GB
Network: 2 Ports 1 Gbps Ethernet
T2G SERVERS
![Page 22: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/22.jpg)
EA DMP – Network Requirements
Requirements
Network Infrastructure Requirements
Specifications
WIRELESS NETWORK
LAN/WAN
shall cover all IEEE 802.11 a,b,g,n definitions
UTP CAT 6 for Network Points and Optic Fibre between buildings and floors and for all distances longer
than 80 Meters
Shall cover yards/depots for overnight download/upload of T2G
data
shall cover all offices, school buildings, lifting shop and running
shed with wireless network
shall cover all offices, school buildings, lifting shop and running
shed with Ethernet network
![Page 23: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/23.jpg)
EA DMP – End User Computing Requirements
Requirements
End User Computing Requirements
Specifications
DESKTOP
LAPTOP
PC with greater than 2.0 Gigahertz or higher processor clock speed
Quad core Processors, Intel Core i78 Gigabytes (GB) of RAM
300 Gigabytes (GB) of available hard disk space
Higher‐resolution video adapterDVD RW ComboUSB Keyboard
22” Full HD LED ScreenOptical wireless mouse
Windows 7, 64‐bit3 years next business day, onsite warranty
Intel Core i5 processor of greater than 2.0 Ghz
Dual core or higherMinimum of 4 GB RAM
Display Size (inches): 15.6’’ WXGA or higher wide screen led display
500 GB Hard DriveGigabit Ethernet
Wi‐Fi, Bluetooth and optional WWAN (3G and higher)
4 x USB ports with USB 3.0 StandardDVD‐RW/CD‐RW
Three years day of business on site warranty
TABLETS
MULTIFUNCTION PRINTERS
IP TELEPHONE
![Page 24: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/24.jpg)
EA DMP – End User Computing Requirements
Requirements
End User Computing Requirements
Specifications
DESKTOP
LAPTOP
Print best quality (1200 x 600 dpi)35 copies per minute
Black and whiteDuplex UnitA3, A4 & A5
Reduction and enlargement copying1GB MB memory80GB Hard drive
Fast Ethernet network interface card
The handset must comply to IEEE 802.1 p/q tagging and switching standard
The handset must have a 100/1000BASE‐T Ethernet connection through two RJ‐45
ports, one for the LAN connection and the other for connecting a downstream
Ethernet device such as a PCThe handset must support G.711a, G.711, G.729a, G.729b,G.729ab and iLBC codecsThe handset must supports Voice‐Activity‐
Detection (VAD)
TABLETS
MULTIFUNCTION PRINTERS
IP TELEPHONE
Wi‐Fi, Bluetooth and optional WWAN (3G and higher)
Three years day of business on site warrantyRuggedized
![Page 25: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/25.jpg)
EA DMP ‐ Initiative Business Benefits
PRASA’s business goals and objectives
The EA DMP supports and ensures alignment to PRASA’s goals and objectives in terms of business capability and process alignment; application, data and integration service provisioning; as well as technology infrastructure support in a holistic way.
PRASA Enterprise architecture definition,
establishment and alignment
This project must be aligned within the greater context to ensure that optimal value is delivered to PRASA. EA helps ensure consistent designs across DMP delivery projects that complies with PRASA enterprise standards, principles, project initiatives, and industry best practices.
Other project dependencies
EA’s understanding of the PRASA Enterprise project requirements will assist the DMP development team in highlighting risks, and ensuring alignment between projects and to prevent duplication of effort.
Enterprise integration and data sharing
EA design will enable the DMP technology involved and allow for effective communication and information sharing between business units and their underlying applications. Therefore it is necessary to understand the key shared processes, data and system integration elements.
![Page 26: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/26.jpg)
Backup Slides
![Page 27: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/27.jpg)
EA DMP ‐ Depot Target Application Improvement Opportunities
1 3 74 9 102
1
2
3
4
5
6
7
8
9
10Depot Target Application Improvement Opportunities / Initiatives
Implementation Complexity
Busin
ess V
alue
3
2
1
5 6 8
1 3 74 9 102 5 6 8
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
7
25
26
2728
29
30
3132
33
34
35
37
36
38
39
40
41
4243
44
4546
47
48495051
39
52
53
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45
46
47
48
49
50
51
52
53
Retain Babylon, Dellmeier, PSIM; Implement ISAMS
Retain Babylon; Implement ISAMS
Retain Babylon; Buy/Implement ISAMS
Replace Softtime; Buy/Implement IIMOMS & STAR
Replace Clockwise; Buy/Implement IIMOMS & STAR
Replace Link Organiser; Buy/Implement IIMOMS & STAR
Replace Link Organiser; Buy/Implement IIMOMS & STAR
Replace Clockwise, Link Organiser, Softtime; Buy/Implement IIMOMS
Modify Railcom;Implement Mobile Workforce
Replace TDMS; Retain CA Serv Desk & Mobe; Buy/Implement IIMOMS
Retain PSIM; Implement ISAMS Replace TDMS; Buy/Implement IIMOMS & Mobile Workforce
Replace ICAS, Clockwise, Fleetmax, Softtime, TAMS, TDMS, TLS, TOMS and VDU; Buy/Implement: IIMOMS
Replace Softime, TOMS; Buy/Implement IIMOMS
Buy Quality Management solutionReplace EMPAC; Buy Occupations Management solution
Buy Train Set Management solution solution
Buy Train ID & Tracking Management solution; Buy/Implement IIMOMS
Buy Interlocking and Movement Control Management solution
Buy Scada Network Management solution
Retain Dellmeier; Modify Railcom; Replace MDTW and TOMS; Buy/Implement IIMOMS
Buy/Implement IIMOMS
Replace Cognos; Consolidate: Crystal, SAP BO; Implement: Mark Logic, SAP Hana
Replace: VDU Dispatcher; Implement: Signalling (Aramis, Ebicos 900 & Roman)
Retain ArcGIS Buy/Implement Telemetry (T2G)
Replace EMPAC, FMMS; Buy/Implement IIMOMS and SAP Plant Maintenance (PM)
Replace Optimiza, Pilog; Buy/Implement IIMOMS and SAP PM & Purchases
Retain Autocad Replace EB; Buy/Implement IIMOMS,SAP Plant Maintenance (PM)
Buy/Implement IIMOMS, SAP Plant Maintenance (PM), SAP Warehousing
Buy/Implement IIMOMS, SAP Plant Maintenance (PM)
Replace CTRACK, EXECUFLEET, FLEETMAX;Buy/Implement IIMOMS, STAR, SAP PM
Replace EMPAC; Modify Babylon & Station Audit Replace: EMPAC, FMMS;
Buy/Implement: IIMOMS, SAP PMBuy/Implement IIMOMS, SAP PM, SAP Warehousing;
Buy/Implement: IIMOMS, SAP PM, Occupations Management solution
Buy Energy Management solution
Buy Telecoms Management solution Replace TDMS; Buy/Implement: IIMOMS
Buy/Implement IIMOMS Train Position Management solution
Consolidate/modify Bulk SMS, GoMetro, Railcom, Train Fares & MS Office Suite; Buy/Implement: IIMOMS, T2G Solutions
Consolidate/modify Bulk SMS, GoMetro, Railcom, Train Fares & MS Office Suite; Buy/Implement: IIMOMS, T2G Solutions
Buy/Implement IIMOMS Train Position Management solution
Replace Clockwise, FRAS;Implement SAP FINReplace Payroll;Implement SAP HCMBuy/Implement: SAP Hana, SAP MII, Mark Logic Big Data Analytics, Talend
Retain ICAS
Retain eDocs
Retain Epic and Projectwise
Retain mySAP SRM
Buy Strategic Network Management solution
Buy Strategic Asset Management solution
![Page 28: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/28.jpg)
EA DMP ‐ Depot Target Technology Improvement Opportunities
1 2 3 5 6 7 8 9 104
1
2
3
4
5
6
7
8
9
10
1
1
Depot Target Improvement Opportunities / Project Initiatives
Implementation Complexity
Busine
ss Value
14
2
3 4
14
16
7
5
9
10
11
13
126
15
Depot Server Room
2 Fibre allocation and governance
3 MPLS Connectivity
4
5
7 ICT Modernisation - End user computing platform upgrade
8 ICT Modernisation - Server Infrastructure Refresh
9 ICT Modernisation - Database Security solution
10
IP based communication infrastructure
11
UCC - Contact Centre
12 System Vulnerability Protection
13
Depot users access rights management
15
ITIL Support
16 BPM - Business Process Modelling
Artificial Intelligent Wireless Solution (AIWS) - Infrastructure
Train to Ground Communication infrastructure
Enterprise Content Management (ECM)
8
6
ESB – Enterprise Integration
![Page 29: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/29.jpg)
EA DMP ‐ Depot Target Integration ModelISAMS
COMMON INTEGRATION SERVICES (RENDERED BY ESB)
CCTV DATA ANALYTICS
ACCESS CONTROL
SECURITY GATES
AUDIO & VIDEO STREAMING & SURVEILLANCE
SECURITY CONTROL
ACCESS TOKEN (CARD)
SIGNALLING (SGN)
TIMETABLE MANAGEMENT
TRACK & TRACE (TELEMETRY /
GPS)
GEO LOCALISATION
INTERLOCKING /MOVEMENT CONTROL
CENTRALISEDTRAFFIC
CONTROL (CTC)
TRACK LAYOUT TRACK OCCUPATION
NEW ROLLING STOCK (T2G)
GEO LOCALISATION
UHT / GSM‐R AUDIO
STREAMING
TRACK & TRACE (TELEMETRY /
GPS)
MAINTENANCE MANAGEMENT (TRAIN SET)
CCTV DATA ANALYTICS
ON‐BOARD & T2G OPERATIONS MANAGEMENT
MEDIA PACKAGE
REAL‐TIME PASSENGER
INFORMATION
INTEGRATED SERVICE
SCHEDULING
MAINTENANCE OPERATIONS MANAGEMENT
YARD AND DEPOT
OPERATIONS
MOBILE ASSET (TRAIN & BUS) MANAGEMENT
FLEET OPERATIONS MANAGEMENT
DOCUMENT MANAGEMENT
SERVICE COORDINATION MANAGEMENT
FINANCE, COST & ACCOUNTING MANAGEMENT
ALARM MANAGEMENT
(IN/OUT – ISAMS)
EXCEPTION MANAGEMENT
(IN/OUT – IIMOMS)
INCIDENT (INCL EMERGENCY) MANAGEMENT
(IN/OUT – IIMOMS)
NOTIFICATION MANAGEMENT
(OUTBOUND – DMP)
OPERATIONS (VISIBILITY) EVENT (IN/OUT – IIMOMS)
DEPOT INFORMATION DISPLAY
(OUTBOUND – DMP)
SERVICE REPORTING
(IN/OUT – IIMOMS)
STAKEHOLDER MANAGEMENT
STRATEGIC NETWORK PLANNING
MAINTENANCE MANAGEMENT
(IN/OUT – SAP PM)
TELECOMS & ICT MANAGEMENT
STRATEGIC ASSET DEVELOPMENT
HUMAN CAPITAL MANAGEMENT
SECURITY FOOTAGE METADATA
(INBOUND – ISAMS)
DOCUMENT MANAGEMENT (IN/OUT – ECM)
DEPOT SECURITY MANAGEMENT
KNOWLEDGE & TRAINING
MANAGEMENT
IIMOMS (DISPATCHING)
INTEGRATED SERVICE
PLANNING
SERVICE COORDINATION MANAGEMENT
OPERATIONS VISIBILITY & MONITORING
TRAIN ARRIVAL & DEPARTURE
TIMES
TIMETABLE MANAGEMENT
TRAIN NUMBERS
TRAIN IDENTIFICATION AND TRACKING
PASSENGER INFORMATION MANAGEMENT
TIME / CALENDAR MANAGEMENT
(INBOUND – DMP)
OPERATIONS VISIBILITY & MONITORING
TRAIN SET
ACCESS MANAGEMENT
EMERGENCY MANAGEMENT
CCTV ANALYTICS/DEPOT
SURVEILLANCE
ALARM MANAGEMENT
ALARM MANAGEMENT
DETECTION MANAGEMENT
TRAIN SET
CORPORATE SECURITY
MANAGEMENT
TRAIN IDENTIFICATION AND TRACKING
TRAIN ARRIVAL & DEPARTURE
TIMES
TRAIN IDENTIFICATION AND TRACKING
TRAIN ARRIVAL & DEPARTURE
TIMESTRAIN POSITION
DEPOT INFORMATION MANAGEMENT
DEPOT INFORMATION
DISPLAY
DEPOT INFORMATION MANAGEMENT
TRACK LAYOUT
INCIDENT MANAGEMENT
INCIDENT MANAGEMENT
RESOURCE ALLOCATION
INTEGRATED SCHEDULING
EXCEPTION MANAGEMENT
YARD AND DEPOT
OPERATIONS
FLEET OPERATIONS MANAGEMENT
SERVICE REVIEW & REPORTING
INTERLOCKING /MOVEMENT CONTROL
DEPOT OPERATIONS MANAGEMENT
SERVICE REVIEW & REPORTING
DEPOT SUPPORT MANAGEMENTDEPOT MAINTENANCE MANAGEMENT
MATERIALS MANAGEMENT
PROJECT MANAGEMENT
DEPOT SCHEDULING
Preventative and Corrective
MAINTAINANCE PLANNING
RESOURCE ALLOCATION
MAINTAINANCE SCHEDULING
TELECOMS & ICT INFRASTRUCTURE
PHYSICAL / DATA CENTRE
COMMS / TELEPHONY / CHANNELS
FACILITIES MANAGEMENT
NETWORK
CABLING
SECURITY MANAGEMENT
DATABASE MANAGEMENT
MIDDLEWARE
STORAGE
SYSTEMS MANAGEMENT
SERVERS
APPLICATIONS
TIMETABLE MANAGEMENT
OPERATIONS VISIBILITY & MONITORING
TIMETABLE MANAGEMENT
(INBOUND – IIMOMS
INTERLOCKING /MOVEMENT CONTROL (INBOUND – SGN)
TRAIN IDENTIFICATION AND TRACKING EVENT (OUTBOUND – DMP)
SCADA (NETWORK) EVENT
(INBOUND – OCC/GNC)
TRACK (OCCUPATION / LAYOUT) EVENT (INBOUND – SGN)
TRAIN (POSITION / SET / NUMBERS) EVENT
(INBOUND – SGN)
TRAIN ARRIVAL & DEPARTURE TIMES
(INBOUND – IIMOMS)
ACCESS MANAGEMENT (IN/OUT – ISAMS)
RESOURCE ALLOCATION MANAGEMENT
(IN/OUT – SAP FI/HR)
MATERIALS MANAGEMENT
(IN/OUT – SAP PM)
SAP ERP
FINANCE, COST & ACCOUNTING MANAGEMENT
HUMAN CAPITAL MANAGEMENT
PLANT MAINTENANCE
ECM
DOCUMENT MANAGEMENT
Colour Label DMP Interface Capability / ServiceInherent Solution Capability
Other PRASA Capability
MAINTENANCE INFORMATION MANAGEMENT
FIXED ASSET (INFRASTRUCTURE) MANAGEMENT
LINEAR ASSET MANAGEMENT
MAINTENANCE ENGINEERING SUPPORT
EQUIPMENT MANAGEMENT
CONFIGURATION MANAGEMENT
DISPATCH (SIGNALLING) MANAGEMENT SUPPLY CHAIN
MANAGEMENT
DEPOT MODERNISATION
TRAIN POSITION
TRAIN NUMBERS
SERVICE STATUS MANAGEMENT
(IN/OUT – IIMOMS)
CHANNEL MANAGEMENT (IN/OUT – ICT)
Rolling Stock FLEET
OPERATIONS PLANNING
EXCEPTION MANAGEMENT
OPERATIONAL SAFETY (HSE) MANAGEMENT
SCADA (NETWORK)
MANAGEMENT
QUALITY MANAGEMENT
OCCUPATIONS MANAGEMENT
OCCUPATIONS EXECUTION
MANAGEMENT
TRACK & TRACE (TELEMETRY / GPS) (INBOUND – T2G)
GEO LOCALISATION EVENT
(INBOUND – GIS
RFID (SECURITY DETECTED EVENT) (INBOUND – ISAMS)
SIGNAL INSTRUCTION EVENT
(INBOUND ‐ SGN)
SERVICE REQUEST MANAGEMENT
(IN/OUT – IIMOMS)
ASSET STATUS MANAGEMENT
(IN/OUT – SAP PM)
![Page 30: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/30.jpg)
EA DMP ‐ Depot Target Data Model
![Page 31: EA DMP Project · Project proposed by PRASA, to ensure alignment of the DMP project teams as well as with other project initiatives • The project will gather and analyse information](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9afa5fefb61e11d65cc3a3/html5/thumbnails/31.jpg)
Thank You