East Jordan Iron Works
Infra-riser installation for Georgia DOT evaluation
![Page 2: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/2.jpg)
Advantages of the Infra-riser
• Reduces traffic vibration into the manhole structure which great extends the life of the structure and surrounding pavement.
• When installed properly, the Infra-riser reduces water infiltration into the structure.
• Meets LEED requirements for recycled materials. All Infra-riser adjustment risers are made from 92% recycled materials.
• Infra-riser is a lightweight alternative to concrete risers and/or brick and mortar which reduces installation time and injuries.
![Page 3: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/3.jpg)
Georgia Convention Center location center lane MH1A.
![Page 4: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/4.jpg)
Georgia Convention Center location center lane used 26”x34”x1/2” riser. MH1B
![Page 5: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/5.jpg)
Adhesive used on both sides of riser, installed on existing V-1480 ring. MH1C
![Page 6: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/6.jpg)
Placing manhole on top of structure. MH1C
![Page 7: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/7.jpg)
Concrete finishing. MH1D
![Page 8: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/8.jpg)
Completed manhole MH1E
![Page 9: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/9.jpg)
Planet Smoothie MH2A using V-1326 ring and 26”x34”x1/2” Infra-riser.
![Page 10: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/10.jpg)
Planet Smoothie MH2B.
![Page 11: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/11.jpg)
Planet Smoothie MH2C located 200yds west of N. Commerce Dr.
![Page 12: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/12.jpg)
Planet Smoothie MH3A using USF 170 ring and cover located 300yds west of N. Commerce Dr.
![Page 13: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/13.jpg)
Planet Smoothie MH3B using 26”x34”x1” Infra-riser.
![Page 14: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/14.jpg)
Planet Smoothie MH3C completed installation.
![Page 15: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/15.jpg)
North Commerce Drive intersection with USF 170 ring and V-1326 12 hole cover. Installation required 26”x34”x1/2” riser
and 26”x34”x1 ½” riser for 2” rise. MH4A.
![Page 16: East Jordan Iron Works](https://reader034.vdocument.in/reader034/viewer/2022042607/5596fa361a28ab76228b4762/html5/thumbnails/16.jpg)