east range school district - s3.amazonaws.com-+083115+-+7... · east orange school district –...
TRANSCRIPT
EAST ORANGE SCHOOL DISTRICT
WHITNEY HOUSTON ACADEMY
215 DODD STREET EAST ORANGE, NEW JERSEY
FACILITY ENERGY REPORT
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 1 of 35
TABLE OF CONTENTS
I. HISTORIC ENERGY CONSUMPTION/COST ................................................................. 2
II. FACILITY ENERGY USE INDEX (EUI) .......................................................................... 9
III. FACILITY DESCRIPTION .............................................................................................. 11
IV. MAJOR EQUIPMENT LIST ............................................................................................ 13
V. ENERGY CONSERVATION MEASURES ..................................................................... 14
VI. ADDITIONAL RECOMMENDATIONS ......................................................................... 35
Appendix A – ECM Cost & Savings Breakdown
Appendix B – New Jersey Smart Start® Program Incentives
Appendix C – Portfolio Manager “Statement of Energy Performance”
Appendix D – Major Equipment List
Appendix E – Investment Grade Lighting Audit
Appendix F – Renewable / Distributed Energy Measures Calculations
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 2 of 35
I. HISTORIC ENERGY CONSUMPTION/COST The energy usage for the facility has been tabulated and plotted in graph form as depicted within this section. Each energy source has been identified and monthly consumption and cost noted per the information provided by the Owner. Electric Utility Provider: Public Service Electric & Gas Electric Utility Rate Structure: General Lighting & Power (GLP) Third Party Supplier: Direct Energy Natural Gas Utility Provider: Public Service Electric & Gas Utility Rate Structure: General Service Gas (GSG) Third Party Supplier: South Jersey Energy Co. Fuel Oil Utility Provider: National Terminal, Inc. Utility Rate Structure: Time of Delivery Price The electric usage profile represents the actual electrical usage for the facility. The electric utility measures consumption in kilowatt-hours (KWH) and maximum demand in kilowatts (KW). One KWH usage is equivalent to 1000 watts running for one hour. One KW of electric demand is equivalent to 1000 watts running at any given time. The basic usage charges are shown as generation service and delivery charges along with several non-utility generation charges. Rates used in this report reflect the historical data received for the facility. The gas usage profile within each facility report shows the actual natural gas energy usage for the facility. The gas utility measures consumption in cubic feet x 100 (CCF), and converts the quantity into Therms of energy. One Therm is equivalent to 100,000 BTUs of energy. The oil usage profile shows the actual oil consumption for the facility. The oil provider measures consumption in gallons. One Gallon of #2 oil is equivalent to 140,000 BTUs of energy.
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 3 of 35
Table 1 Electricity Billing Data
Note: There are several estimated meter readings for this facility's electric utility bills, with many not properly adjusted to actual readings. Given the inaccuracies in utility billing it is likely this facility consumes more energy than reported.
Utility Provider: PSE&GRate: GLP
Meter No: 9196730Account No: 65 788 195 09
Third Party Utility Provider: Direct Energy TPS Meter / Acct No: -
MONTH OF USE CONSUMPTION KWH TOTAL BILL
May-14 36,990 $5,724
Jun-14 7,320 $1,318
Jul-14 5,784 $1,117
Aug-14 5,976 $2,276
Sep-14 6,570 $975
Oct-14 6,120 $917
Nov-14 7,380 $1,082
Dec-14 7,770 $1,133
Jan-15 8,640 $1,258
Feb-15 6,990 $1,082
Mar-15 7,500 $1,098
Apr-15 8,970 $1,331
Totals 116,010 28.2 Max $19,311
AVERAGE DEMAND 25.3 KW average
AVERAGE RATE $0.166 $/kWh
25.8
25.8
24.3
ELECTRIC USAGE SUMMARY
DEMAND KW
24.6
24.6
24.6
28.2
24.9
24.9
24.6
27.0
24.6
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 4 of 35
Figure 1 Electricity Usage Profile
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 5 of 35
Table 2 Natural Gas Billing Data
Utility Provider: PSE&GRate: GSG
Meter No: 1691390Account No: 65 788 195 09
Third Party Utility Provider: South Jersey Energy Co. TPS Meter No:
MONTH OF USECONSUMPTION
(THERMS)TOTAL BILL
May-14 412.46 $472.92
Jun-14 28.31 $34.63
Jul-14 50.28 $49.88
Aug-14 97.55 $98.20
Sep-14 37.93 $41.05
Oct-14 33.74 $36.77
Nov-14 93.76 $90.59
Dec-14 33.78 $42.82
Jan-15 88.75 $90.16
Feb-15 6.35 $16.40
Mar-15 76.22 $73.33
Apr-15 169.37 $149.33
TOTALS 1,128.48 $1,196.08
AVERAGE RATE: $1.06 $/THERM
-
NATURAL GAS USAGE SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 6 of 35
Figure 2 Natural Gas Usage Profile
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 7 of 35
Table 3 Fuel Oil Billing Data
Utility Provider: National Terminal, Inc. Point of Delivery ID: -
Rate: Based on Time of Delivery Price
MONTH OF USECONSUMPTION
(GALLONS)TOTAL BILL
Mar-14 10,896.00 $33,746.55
Apr-14 881.00 $2,204.97
May-14 0.00 $0.00
Jun-14 0.00 $0.00
Jul-14 0.00 $0.00
Aug-14 0.00 $0.00
Sep-14 0.00 $0.00
Oct-14 1,551.00 $3,974.85
Nov-14 5,296.00 $13,289.43
Dec-14 8,172.00 $17,473.19
Jan-15 13,579.00 $24,538.54
Feb-15 14,245.00 $29,574.99
TOTALS 54,620.00 $124,802.52
AVERAGE RATE: $2.28 $/Gallon
FUEL OIL USAGE SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 8 of 35
Figure 3 Fuel Oil Usage Profile
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 9 of 35
II. FACILITY ENERGY USE INDEX (EUI) Energy Use Index (EUI) is a measure of a building’s annual energy utilization per square foot of building. This calculation is completed by converting all utility usage consumed by a building for one year, to British Thermal Units (BTU) and dividing this number by the building square footage. EUI is a good measure of a building’s energy use and is utilized regularly for comparison of energy performance for similar building types. Building Benchmarking data is collected and analyzed within the Commercial Building Energy Consumption Survey (CBECS), performed by the Energy and Information Administration (EIA). Building data is grouped by function types and tabulated, from which a median site and source energy intensity is determined. The national median or PEER Group Comparable in this instance is the middle value of the national population meaning half the buildings use more energy, and half use less. The PEER Group EUI allows us to compare the relative efficiency of the audited building to that of an average building with the same or similar primary function (i.e. group type). Source use differs from site usage when comparing a building’s energy consumption with the national average. Site energy use is the energy consumed by the building at the building site only. Source energy use includes the site energy use as well as all of the losses to create and distribute the energy to the building. Source energy represents the total amount of raw fuel that is required to operate the building. It incorporates all transmission, delivery, and production losses, which allows for a complete assessment of energy efficiency in a building. The type of utility purchased has a substantial impact on the source energy use of a building. The EPA has determined that source energy is the most comparable unit for evaluation purposes and overall global impact. Both the site and source EUI ratings for the building are provided to understand and compare the differences in energy use. The site and source EUI for this facility is calculated as follows:
BuildingSiteEUIElectricUsageinkBtu FuelUsageinkBtu
BuildingSquareFootage
BuildingSourceEUIElectricUsageinkBtu SSRatio FuelUsageinkBtu SSRatio
BuildingSquareFootage
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 10 of 35
Table 3 Energy Use Index Summary
kWh Therms Gallons kBtu kBtu
ELECTRIC 116,010.0 396,058 3.140 1,243,623
NATURAL GAS 1,128.5 112,848 1.050 118,490
FUEL OIL 54,620.0 7,592,180 1.010 7,668,102
TOTAL 8,101,086 9,030,214
BUILDING TYPE
BUILDING AREA 103,000 SQUARE FEET
BUILDING SITE EUI 78.65 kBtu/SF/YR 58.2 kBtu/SF/YR
BUILDING SOURCE EUI 87.67 kBtu/SF/YR 141.4 kBtu/SF/YR
38%
ENERGY USE INTENSITY CALCULATION
ENERGY TYPEBUILDING USE
SITE ENERGY
SITE-SOURCE RATIO
SOURCE ENERGY
*Site - Source Ratio data is provided by the Energy Star Performance Rating Methodology for Incorporating Source Energy Use document.
AUDITED BUILDING PEER COMPARISON
K-12 School K-12 School
More Efficient than PEER Comparison
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 11 of 35
III. FACILITY DESCRIPTION
The Whitney Houston Academy is located at 215 Dodd Street in East Orange, New Jersey. This 103,000 SF facility was originally built in 1910. The facility is a 3-story building with a basement level and two mezzanine levels. The school is comprised of classrooms, offices, an auditorium, a gym, a cafeteria, storage rooms, restrooms, and utility rooms.
Occupancy Profile
The school is in use 8:00 am till 3:00 pm, 5 days a week, with staff staying after hours for cleaning and some student activities. There are approximately 69 employees and 367 students which occupy the facility.
Building Envelope
Exterior walls for the building are masonry brick faced construction with drywall interior. The windows throughout the facility are in poor condition. Typical windows are single-pane operable with aluminum frames. The roof is a combination of A-Frame Style with wood trusses, wood sheathing, a vapor barrier, and tar shingles that comprises the main central structure; and then flat built up roofing on the gymnasium, auditorium, and east and west classroom wings.
HVAC Systems
The Houston Academy is primarily conditioned by a heating only central steam system, with limited air conditioning being provided by individual window air conditioning and thru-wall units.
The steam heating plant consists of two Bethlehem Corporation Continental fire-tube boilers. The boilers are oil-fired rated at 60 gallons per hour of fuel input, or approximately 8,400 MBH. These boilers are 1977 vintage, and given their age are estimated to have an efficiency of 68%. Steam is produced by the boilers at 5 PSI. Fuel oil is stored in an approximately 2,000 gallon tank located outside.
There is a large condensate receiving station located in the boiler room that had a significant leak, resulting in much of the return being dumped down the drain. We recommend repairing or replacing the receiving station if the boiler plant is to remain.
The steam heating is distributed to radiators, cabinet heaters, unit ventilators and some baseboard throughout the classrooms, offices, hallways, gymnasium, cafeteria, and auditorium.
The classrooms fitted with air conditioning have window units that range in capacity from ¾ to 1 ½ tons and range from 3 to 10 years of age. The main office and principals office has thru-wall packaged terminal heat pump units, which are primarily used for cooling. The units provide one ton of cooling with an efficiency of 9.3 EER.
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 12 of 35
Exhaust System
The school facility has general exhaust fans located on the roof with fractional horsepower motors, and a utility exhaust set located in the 3rd floor attic space. HVAC System Controls
The building is controlled by a pneumatic system operating off a time clock. Rooms have pneumatic thermostats with limited occupant controllability. The building has one compressor located in the boiler room with one 1.65 kilowatt motor. The boilers are also controlled by a Heat-Timer panel located in the boiler room. Domestic Hot Water
Domestic hot water for the building is supplied by a single natural gas fired HTP water heater. The unit is rated at 125 MBH with a 72 gallon storage tank. The unit has an estimated thermal efficiency of 80% based on input and recovery ratings. Plumbing System The Whitney Houston Academy utilizes sinks rated at 2.2 gallons per minute. Additionally, water closets and urinals located in the restroom areas have a rating of 1.6 and 1.0 gallons per flush, respectively.
Kitchen Equipment
The kitchen equipment at the facility consists of two (2) electric ovens 24.5 kW each, three (3) reach-in refrigerators, and two (2) reach–in freezers.
Miscellaneous Equipment
Typical classrooms each had three to four computers, if not more, along with a standard television, and smart board system.
Lighting
Refer to the Investment Grade Lighting Audit Appendix for a detailed list of the lighting throughout the facility and estimated operating hours per space.
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 13 of 35
IV. MAJOR EQUIPMENT LIST
The equipment list contains major energy consuming equipment that through implementation of energy conservation measures could yield substantial energy savings. The list shows the major equipment in the facility and all pertinent information utilized in energy savings calculations. An approximate age was assigned to the equipment in some cases if a manufactures date was not shown on the equipment’s nameplate. The ASHRAE service life for the equipment along with the remaining useful life is also shown in the Appendix.
Refer to the Major Equipment List Appendix for this facility.
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 14 of 35
V. ENERGY CONSERVATION MEASURES Energy Conservation Measures are developed specifically for this facility. The energy savings and calculations are highly dependent on the information received from the site survey and interviews with operations personnel. The assumptions and calculations should be reviewed by the owner to ensure accurate representation of this facility. The following ECMs were analyzed:
Table 1 ECM Financial Summary
ECM #1 Interior Lighting Upgrades $61,295 $7,772 7.9 90.2%
ECM #2 Exterior Lighting Upgrades $1,590 $509 3.1 380.6%
ECM #3 Lighting Controls Upgrades $1,640 $86 19.1 -21.3%
ECM #4 Steam Trap Replacement $29,000 $6,685 4.3 245.8%
ECM #5Fuel Oil to Natural Gas
Conversion$45,000 $43,478 1.0 1349.3%
ECM #6 Boiler Replacement $605,000 $60,603 10.0 150.4%
ECM #7 Plug Load Controls $7,100 $109 65.1 -77.0%
REM #1 25 kW Solar Array $118,957 $9,411 12.6 97.8%
Notes:
ECM NO.
DESCRIPTIONSIMPLE
PAYBACK (Yrs)
SIMPLE LIFETIME
ROI
ENERGY CONSERVATION MEASURES (ECM's)
NET INSTALLATION
COSTA
RENEWABLE ENERGY MEASURES (REM's)
ECM NO.
DESCRIPTIONNET
INSTALLATION COST
ANNUAL
SAVINGSB
ANNUAL SAVINGS
SIMPLE PAYBACK
(Yrs)
SIMPLE LIFETIME
ROI
A. Cost takes into consideration applicable NJ Smart StartTM incentives.B. Savings takes into consideration applicable maintenance savings.
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 15 of 35
Table 2 ECM Energy Summary
ECM #1 Interior Lighting Upgrades 28.0 46,817 0 0
ECM #2 Exterior Lighting Upgrades 1.0 3,069 0 0
ECM #3 Lighting Controls Upgrades 0.0 521 0 0
ECM #4 Steam Trap Replacement 0.0 0 0 2,932
ECM #5Fuel Oil to Natural Gas
Conversion0.0 0 -76,468 54,620
ECM #6 Boiler Replacement 0.0 0 -60,312 54,620
ECM #7 Plug Load Controls 0.0 655 0 0
REM #1 25 kW Solar Array 22.9 29,640 0 0
ELECTRIC DEMAND
(KW)
ELECTRIC CONSUMPTION
(KWH)
ECM NO.
DESCRIPTION
ECM NO.
DESCRIPTION ELECTRIC DEMAND
(KW)
FUEL OIL (GALLONS)
FUEL OIL (GALLONS)
ENERGY CONSERVATION MEASURES (ECM's)
ANNUAL UTILITY REDUCTION
ANNUAL UTILITY REDUCTION
RENEWABLE ENERGY MEASURES (REM's)
NATURAL GAS (THERMS)
NATURAL GAS (THERMS)
ELECTRIC CONSUMPTION
(KWH)
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 16 of 35
Table 3 ECM Emissions Summary
ECM #1 Interior Lighting Upgrades 71,162 131 304
ECM #2 Exterior Lighting Upgrades 4,665 9 20
ECM #3 Lighting Controls Upgrades 792 1 3
ECM #4 Steam Trap Replacement 65,677 0 0
ECM #5Fuel Oil to Natural Gas
Conversion328,812 (704) 0
ECM #6 Boiler Replacement 517,841 (555) 0
ECM #7 Plug Load Controls 996 2 4
Notes:
ENERGY CONSERVATION MEASURES (ECM's)
ECM NO.
DESCRIPTION
GREENHOUSE GAS EMISSIONS REDUCTION
CO2
EMISSIONS (LBS)
NOX
EMISSIONS (LBS)
SO2
EMISSIONS (LBS)
A. Emissions Reduction based on NJCEP published factors for electric & gas.
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 17 of 35
Table 4 Facility Project Summary
Note the measure totals in this table do not take into account interactive effects of measures; see Method of Analysis Section III in Executive Report for further explanation. NOTE: Since Concord Engineering also suggests upgrading to new natural gas boilers, only one of these measures should be implemented, as they conflict with each other. Concord recommends replacing the boilers in their entirety over converting the existing boilers at the facility to natural gas. This project does not qualify for additional incentives through the Pay for Performance Program; please see the Installation Funding Options section for additional program options.
Interior Lighting Upgrades $7,772 $69,715 $8,420 $61,295 7.9
Exterior Lighting Upgrades $509 $1,930 $340 $1,590 3.1
Lighting Controls Upgrades $86 $1,700 $60 $1,640 19.1
Steam Trap Replacement $6,685 $29,000 $0 $29,000 4.3
Fuel Oil to Natural Gas Conversion
$43,478 $45,000 $0 $45,000 1.0
Boiler Replacement $60,603 $605,000 $0 $605,000 10.0
Plug Load Controls $109 $7,100 $0 $7,100 65.1
Total Project $75,764 $714,445 $8,820 $705,625 9.3
FACILITY PROJECT SUMMARY TABLE
ENERGY CONSERVATION
MEASURES
ANNUAL ENERGY
SAVINGS ($)
PROJECT COST ($)
CUSTOMER COST
SIMPLE PAYBACK
SMART START
INCENTIVES
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 18 of 35
ECM #1: Interior Lighting Upgrades Description: The majority of the interior lighting throughout the Whitney Houston Academy is provided by 2x4 and 1x4 fluorescent fixtures with newer generation 700 Series 32W T8 lamps and T12 lamps in addition to various CFL and incandescent A-lamp bulbs. It is recommended that all fixtures within the building be replaced with LED equivalent tube lamps and screw-in bulbs due to their efficiency and low power usage. This ECM includes replacing and retrofitting all of the interior lighting throughout the school with new LED type lamps and fixtures. It is recommended that the School District consult with a lighting engineer prior to retrofitting or replacing interior fixtures to ensure code required minimum light levels will be met. Energy Savings Calculations: The Investment Grade Lighting Audit Appendix outlines the hours of operation, proposed new fixtures/retrofits, costs, savings, and payback periods for each set of interior fixtures in the school.
Maintenance Savings and Project Costs: No maintenance cost savings were estimated for this measure. Project Costs are based off RS Means Unit Cost Data and Vendor quotes.
DESCRIPTION SAVINGSElectric Demand Savings (kW) 28.0Electric Usage Savings (kWh) 46,817
Electric Cost Savings ($) $7,772
LIGHTING UPGRADE SAVINGS SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 19 of 35
Energy Savings Summary:
Installation Cost ($): $69,715
NJ Smart Start Equipment Incentive ($): $8,420
Net Installation Cost ($): $61,295
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $7,772
Total Yearly Savings ($/Yr): $7,772
Estimated ECM Lifetime (Yr): 15
Simple Payback 7.9
Simple Lifetime ROI 90.2%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $116,580
Internal Rate of Return (IRR) 9%
Net Present Value (NPV) $31,486.63
ECM #1 - ENERGY SAVINGS SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 20 of 35
ECM #2: Exterior Lighting Upgrade Description: The exterior lighting at the school includes exterior building lighting. The exterior of the building is currently lit by PAR lamps and high pressure sodium wall packs, with the area around the school lit by pole mounted high pressure sodium lamps. Concord Engineering recommends upgrading all of the exterior lighting to an energy-efficient lighting system that includes LED wall packs and LED bulb replacements. Energy Savings Calculations: A detailed Investment Grade Lighting Audit can be found in Investment Grade Lighting Audit Appendix that outlines the proposed retrofits, costs, savings, and payback periods.
Maintenance Savings and Project Costs: No maintenance cost savings were estimated for this measure. Project Costs are based off RS Means Unit Cost Data and Vendor quotes.
DESCRIPTION SAVINGSElectric Demand Savings (kW) 1.0Electric Usage Savings (kWh) 3,069
Electric Cost Savings ($) $509
LIGHTING UPGRADE SAVINGS SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 21 of 35
Energy Savings Summary:
Installation Cost ($): $1,930
NJ Smart Start Equipment Incentive ($): $340
Net Installation Cost ($): $1,590
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $509
Total Yearly Savings ($/Yr): $509
Estimated ECM Lifetime (Yr): 15
Simple Payback 3.1
Simple Lifetime ROI 380.6%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $7,642
Internal Rate of Return (IRR) 32%
Net Present Value (NPV) $4,491.83
ECM #2 - ENERGY SAVINGS SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 22 of 35
ECM #3: Interior Lighting Controls Upgrade Description: Sometimes lights in a school are left on unnecessarily. In many cases the lights may be left on because of the inconvenience to manually switch lights off when a room is left or on when a room is first occupied. In some instances lights might be left on due to the misconception that it is better to keep the lights on rather than to continuously switch lights on and off. Although increased switching reduces lamp life, the energy savings outweigh the lamp replacement costs. The payback timeframe for when to turn the lights off is approximately two minutes. If the lights are expected to be off for at least a two minute interval, then it pays to shut them off.
Lighting controls come in many forms. Sometimes an additional switch is adequate to provide reduced lighting levels when full light output is not needed. Occupancy sensors detect motion and will switch the lights on when the room is occupied. Occupancy sensors can either be mounted in place of a current wall switch, or on the ceiling to cover large areas. In addition, daylight control systems can be implemented using daylighting control systems that dim the electric lighting in response to interior daylight levels. The light output of the fluorescent lamps (T8) is varied by using electronic dimming ballasts. Photosensors, typically mounted in the ceiling, are used to measure the quantity of daylight in the space then determine the amount of dimming required to maintain adequate lighting levels in the total space. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the “Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways,” document posted for public use April 2005. The study has found that buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the report:
Occupancy Sensors for Lighting Control 20% - 28% energy savings.
Savings resulting from the implementation of this ECM for energy management controls are estimated to be 20% of the total light energy controlled by occupancy sensors. This ECM includes installation of ceiling or switch-mount sensors for the teacher’s lounge, offices, and restrooms. Sensors shall be manufactured by Sensorswitch, Watt Stopper or equivalent. The Investment Grade Lighting Audit Appendix of this report includes the summary of lighting controls which can be implemented in this ECM and outlines the proposed lighting/daylighting controls, costs, savings, and payback periods. The calculations adjust the lighting power usage by the applicable percent savings for each area that includes lighting controls.
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 23 of 35
Energy Savings Calculations:
kWh/YrEnergyLightControlledSavings%SavingsEnergy
kWh
$CostElecAvekWhSavingsEnergySavings.
Maintenance Savings and Project Costs: No maintenance cost savings were estimated for this measure. Project Costs are based off RS Means Unit Cost Data and Vendor quotes. Energy Savings Summary:
DESCRIPTION SAVINGSElectric Demand Savings (kW) 0.0Electric Usage Savings (kWh) 521
Electric Cost Savings ($) $86
LIGHTING CONTROLS SAVINGS SUMMARY
Installation Cost ($): $1,700
NJ Smart Start Equipment Incentive ($): $60
Net Installation Cost ($): $1,640
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $86
Total Yearly Savings ($/Yr): $86
Estimated ECM Lifetime (Yr): 15
Simple Payback 19.1
Simple Lifetime ROI -21.3%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $1,290
Internal Rate of Return (IRR) -3%
Net Present Value (NPV) ($613.34)
ECM #3 - ENERGY SAVINGS SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 24 of 35
ECM #4: STEAM TRAP REPLACEMENT PROGRAM Description:
Steam traps are required for the proper operation of steam distributions systems. Traps are mechanical devices installed on steam pipes to remove condensate from steam flow. Unfortunately steam traps have a tendency to leak. On average 20% of steam traps are leaking in existing installations. Steam traps only have an average life of five (5) years.
This ECM would replace approximately one hundred three (103) balanced pressure thermostatic steam traps. Where repairing is not feasible, the thermostatic traps will be replaced. Schedule 80 piping and extra heavy fittings will be used, and all piping and fittings between the unions will be replaced along with the steam traps. In addition, a complete steam trap survey will be performed along with tagging and implementing a 3-year, revolving, steam trap maintenance program. Energy Savings Calculations:
Maintenance Savings and Project Costs: No maintenance cost savings were estimated for this measure. However we recommend the district institute a regular scheduled trap maintenance program. Project Costs are based off RS Means Unit Cost Data and Vendor quotes.
Steam Trap Sizes
Trap Orifice
Diamter (in)
Steam Loss lb/hr
(15 PSI)
Quantity of
Traps
EstimatedQuantity
Failed
Annual Steam Loss
lbs
Annual Steam Loss
GallonsCost
Savings3/4" Trap 3/8" 13.70 103 21 322,860 2,932 $6,685
TOTAL 103 21 322,860 2,932 $6,685
STEAM TRAP LOSS CALCULATION
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 25 of 35
Energy Savings Summary:
Installation Cost ($): $29,000
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $29,000
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $6,685
Total Yearly Savings ($/Yr): $6,685
Estimated ECM Lifetime (Yr): 15
Simple Payback 4.3
Simple Lifetime ROI 245.8%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $100,275
Internal Rate of Return (IRR) 22%
Net Present Value (NPV) $50,805.10
ECM #4 - ENERGY SAVINGS SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 26 of 35
ECM #5 – Fuel Conversion to Natural Gas Description: The Whitney Houston Academy currently uses fuel oil to fire the boilers at the facility. Concord Engineering recommends converting to natural gas. While the conversion of existing equipment over to natural gas may not save energy, it will reduce energy costs. This ECM would replace the fuel oil used to fire the boilers with natural gas at Whitney Houston Academy. It is recommended new dual fuel burners being installed on the boiler to be primarily fired off natural gas. It is also recommended the district consult with the utility company to ensure adequate gas pressure is available at the site to support operation of the boilers. Since Concord Engineering also suggests upgrading to new natural gas boilers, only one of these measures should be implemented, as they conflict with each other. Concord recommends replacing the boilers in their entirety over converting the existing boilers at the facility to natural gas. Energy Savings Calculations: Fuel conversion does not take into account any change in boiler efficiency.
FuelUsage kbtu FuelUsage Units FuelConversionFactorBtuUnit
NaturalGasUsage therm FuelUsage kBtu1therm100kBtu
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 27 of 35
ECM INPUTS EXISTING PROPOSED SAVINGS
Description Fuel Oil
Natural Gas Conversion
Existing Fuel Oil Usage (Gallons) 54,620 0
Fuel Oil Conversion (Btu/Gal) 140,000 140,000
Natural Gas (Btu/therm) 100,000 100,000
Fuel Usage (kBtu) 7,646,800 7,646,800
Fuel Oil #2 ($/Gallon) $2.280 $2.280Natural Gas ($/therm) $1.060 $1.060
Fuel Oil #2 Usage (Gallons) 54,620 0 54,620
Natural Gas Usage (Therm) 0 76,468 (76,468)
Energy Cost ($) $124,534 $81,056 $43,478
COMMENTS:
FUEL CONVERSION ANALYSIS
ENERGY SAVINGS CALCULATIONS
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 28 of 35
Maintenance Savings and Project Costs: No maintenance cost savings were estimated for this measure. Project Costs are based off RS Means Unit Cost Data. Energy Savings Summary:
Installation Cost ($): $45,000
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $45,000
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $43,478
Total Yearly Savings ($/Yr): $43,478
Estimated ECM Lifetime (Yr): 15
Simple Payback 1.0
Simple Lifetime ROI 1349.3%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $652,170
Internal Rate of Return (IRR) 97%
Net Present Value (NPV) $474,037.54
ECM #5 - ENERGY SAVINGS SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 29 of 35
ECM #6: Boiler Replacement Description: The Whitney Houston School has two Bethlehem Corporation Continental fire-tube boilers. The boilers are oil-fired rated at 60 gallons per hour of fuel input, or approximately 8,400 MBH. These boilers are 1977 vintage, and given their age are estimated to have an efficiency of 68%. By converting the boilers to natural gas and installing new boilers substantial energy and cost savings could be realized. This ECM would install two Weil-McLain H Series gas/oil steam boiler rated at 8,660 MBH input to replace the two existing boilers. The owner should consult a professional engineer prior to installation of this measure to verify load requirements and consult with the utility regarding adequate gas pressure. Energy Savings Calculations:
UnitsBTU
HeatValueFuel%.EffHeatingUnitsUseFuelExistingquiredReHeatBldg
ThermBTU
ValueHeatFuel%.EffHeating
BTUquiredReHeatBldg
UsageGasHeatingoposedPr
Therm$
CostFuelAveThermsUsageGasHeatingCostEnergy
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 30 of 35
Maintenance Savings and Project Costs: No maintenance cost savings were estimated for this measure. Project Costs are based off RS Means Unit Cost Data.
ECM INPUTS EXISTING PROPOSED SAVINGSECM INPUTS Oil Fired Steam Steam NG
Existing Fuel Oil Use (Gal) 54,620
Boiler Efficiency (%) 68.0% 85.6% 18%
Nat Gas Heat Value (BTU/Therm)
139,000 100,000
Equivalent Building Heat Usage (MMBTUs)
5,163 5,163
Gas Cost ($/Therm) $1.06 $1.06
Oil Cost ($/Gallon) $2.28 $2.28
ECM RESULTS EXISTING PROPOSED SAVINGS
Natural Gas Usage (Therms) 0 60,312 -60,312
Fuel Oil Usage (Gallons) 54,620 0 54,620
Energy Cost ($) $124,534 $63,930 $60,603
COMMENTS:
BOILER REPLACMEENT/CONVERSION CALCULATIONS
ENERGY SAVINGS CALCULATIONS
Boiler Efficiency Based on age of boiler and IBR Rating
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 31 of 35
Energy Savings Summary:
Installation Cost ($): $605,000
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $605,000
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $60,603
Total Yearly Savings ($/Yr): $60,603
Estimated ECM Lifetime (Yr): 25
Simple Payback 10.0
Simple Lifetime ROI 150.4%
Simple Lifetime Maintenance Savings 0
Simple Lifetime Savings $1,515,080
Internal Rate of Return (IRR) 9%
Net Present Value (NPV) $450,292.25
ECM #6 - ENERGY SAVINGS SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 32 of 35
ECM #7: Plug Load Management Description: The Whitney Houston Academy has many types of plug in type equipment from computer monitors, copiers/printers, window air conditioning units, and other office equipment. As technology continues to advance and be integrated into society and the work environment, the devices in most instances require electrical power either a battery or power outlet. The increase in use of these devices is contributing vastly to the increase in electric usage at facilities and according to a study performed by the California Energy Commission can account for more than 20% of electricity use. In most instances these devices are left plugged in and sometimes on continuously whether occupants are present or not leading to a significant amount of wasted energy. By managing these loads with intelligent outlet receptacles facility and energy management staff can reduce the consumption of these devices and better control energy waste. The installation of a plug load management system with wireless controlled outlets will enable facility staff and energy managers to control the power draw of these systems during unoccupied periods. For cost estimating purposes a total of 50 outlets would be controlled by this system, further refinement of this number should be performed before installation. The basis of this measure is a “Bert” plug load management system with a network interface control system.
Energy Savings Calculations: Data published by the DOE’s Energy and Information Administration Commercial Buildings Consumption Survey states energy use breakouts for various types of buildings. This survey data was used to estimate the building energy consumption associated with Office Type Equipment. Savings are based on a ten (10%) percent reduction of the electric usage associated with interior equipment usage.
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 33 of 35
Energy Savings Summary:
ECM INPUTS EXISTING PROPOSED SAVINGS
Plug Load Usage Electric (kBtu) 22,342 20,108 2,234
Savings Percentage - 10.0%
Electric Site Conversion (kWh/kBtu) 3.412 3.412
Electric Cost ($/kWh) $0.166 $0.166
ECM RESULTS EXISTING PROPOSED SAVINGS
Electric Usage (kWh) 6,548 5,893 655
Energy Cost ($) $1,087 $978 $109
COMMENTS:
PLUG LOAD MANAGEMENT SAVINGS CALCULATIONS
ENERGY SAVINGS CALCULATIONS
Installation Cost ($): $7,100
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $7,100
Maintenance Savings ($/Yr): $0
Energy Savings ($/Yr): $109
Total Yearly Savings ($/Yr): $109
Estimated ECM Lifetime (Yr): 15
Simple Payback 65.1
Simple Lifetime ROI -77.0%
Simple Lifetime Maintenance Savings $0
Simple Lifetime Savings $1,635
Internal Rate of Return (IRR) -14%
Net Present Value (NPV) ($5,798.77)
ECM #7 - ENERGY SAVINGS SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 34 of 35
REM #1: 25 kW Solar System Description: Whitney Houston Academy has available roof space that could accommodate solar arrays. Based on the available area a 25 kilowatt solar array could be installed. The array will produce approximately 29,640 kilowatt-hours annually that will reduce the overall electric usage of the facility by 25%. The owner should consult a structural engineer prior to installing any solar array to insure the roof can accommodate the additional weight. Energy Savings Calculations: See Renewable / Distributed Energy Measures Calculations Appendix for detailed financial summary and proposed solar layout areas. Financial results in table below are based on 100% financing of the system over a fifteen year period. Energy Savings Summary:
Installation Cost ($): $118,957
NJ Smart Start Equipment Incentive ($): $0
Net Installation Cost ($): $118,957
SREC Revenue ($/Yr): $4,491
Energy Savings ($/Yr): $4,920
Total Yearly Savings ($/Yr): $9,411
Estimated ECM Lifetime (Yr): 15
Simple Payback 12.6
Simple Lifetime ROI 18.7%
Simple Lifetime Maintenance Savings $67,359
Simple Lifetime Savings $141,164
Internal Rate of Return (IRR) 2.2%
Net Present Value (NPV) ($6,609.43)
REM #1 - ENERGY SAVINGS SUMMARY
East Orange School District – Whitney Houston Academy Energy Audit
Concord Engineering Group, Inc. 1C15143 August 31, 2015 – FINAL Page 35 of 35
VI. ADDITIONAL RECOMMENDATIONS The following recommendations include no cost/low cost measures, Operation & Maintenance (O&M) items, and water conservation measures with attractive paybacks. These measures are not eligible for the Smart Start Buildings incentives from the office of Clean Energy but save energy none the less.
A. Chemically clean the condenser and evaporator coils periodically to optimize efficiency. Poorly maintained heat transfer surfaces can reduce efficiency 5-10%.
B. Maintain all weather stripping on windows and doors.
C. Clean all light fixtures to maximize light output.
D. Provide more frequent air filter changes to decrease overall system power usage and maintain better IAQ.
E. Turn off computers when not in use. Ensure computers are not running in screen saver mode.
F. Replace any old CRT Monitors with LED/LCD Type Monitors, which can draw as much as a quarter the power of an equivalent CRT monitor.
G. Ensure outside air dampers are functioning properly and only open during occupied mode.
H. Repair/Replace the large condensate receiving station if the boiler plant is to remain
APPENDIX A1 of 1
LIFETIME ENERGY SAVINGS
LIFETIME MAINTENANCE
SAVINGSLIFETIME ROI SIMPLE PAYBACK
INTERNAL RATE OF RETURN (IRR)
NET PRESENT VALUE (NPV)
MATERIAL LABORREBATES,
INCENTIVES
NET INSTALLATION
COSTENERGY MAINT. / SREC TOTAL (Yearly Saving * ECM Lifetime)
(Yearly Maint Svaing * ECM Lifetime)
(Lifetime Savings - Net Cost) / (Net Cost)
(Net cost / Yearly Savings)
($) ($) ($) ($) ($/Yr) ($/Yr) ($/Yr) (Yr) ($) ($) (%) (Yr) ($) ($)
ECM #1 Interior Lighting Upgrades $44,752 $24,963 $8,420 $61,295 $7,772 $0 $7,772 15 $116,575 $0 90.2% 7.9 9.37% $31,483.21
ECM #2 Exterior Lighting Upgrades $1,550 $380 $340 $1,590 $509 $0 $509 15 $7,642 $0 380.6% 3.1 31.52% $4,491.83
ECM #3 Lighting Controls Upgrades $1,150 $550 $60 $1,640 $86 $0 $86 15 $1,290 $0 -21.3% 19.1 -2.86% ($613.34)
ECM #4 Steam Trap Replacement $16,500 $12,500 $0 $29,000 $6,685 $0 $6,685 15 $100,275 $0 245.8% 4.3 21.86% $50,805.10
ECM #5 Fuel Oil to Natural Gas Conversion $25,000 $20,000 $0 $45,000 $43,478 $0 $43,478 15 $652,170 $0 1349.3% 1.0 96.61% $474,037.54
ECM #6 Boiler Replacement $325,000 $280,000 $0 $605,000 $60,603 $0 $60,603 25 $1,515,080 $0 150.4% 10.0 8.80% $450,292.25
ECM #7 Plug Load Controls $5,000 $2,100 $0 $7,100 $109 $0 $109 15 $1,635 $0 -77.0% 65.1 -14.47% ($5,798.77)
REM #1 25 kW Solar Array $71,374 $47,583 $0 $118,957 $4,920 $4,491 $9,411 25 $235,273 $112,266 97.8% 12.6 6.12% $44,917.06
Notes: 1) The variable Cn in the formulas for Internal Rate of Return and Net Present Value stands for the cash flow during each period.2) The variable DR in the NPV equation stands for Discount Rate3) For NPV and IRR calculations: From n=0 to N periods where N is the lifetime of ECM and Cn is the cash flow during each period .
REM RENEWABLE ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY
ECM COST & SAVINGS BREAKDOWN
CONCORD ENGINEERING GROUP
East Orange School District - Whitney Houston Academy
INSTALLATION COST YEARLY SAVINGS
ECM LIFETIMEDESCRIPTIONECM NO.
ECM ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY
Appendix B Page 1 of 6
Concord Engineering Group, Inc. 520 BURNT MILL ROAD VOORHEES, NEW JERSEY 08043 PHONE: (856) 427-0200 FAX: (856) 427-6508
SmartStart Building Incentives The NJ SmartStart Buildings Program offers financial incentives on a wide variety of building system equipment. The incentives were developed to help offset the initial cost of energy-efficient equipment. The following tables show the current available incentives from July 1, 2015 to June 30, 2016, further details including how to apply, forms, and calculated incentive values can be found the Clean Energy Website. (www.njcleanenergy.com)
Electric Chillers
Water-Cooled Chillers
Constant Speed: Base: $8 - $30 per ton
Performance Add: $2 - $2.25 per ton Variable Speed:
Base: $12 - $44 per ton Performance Add: $2 - $4.00 per ton
Air-Cooled Chillers
Constant Speed: Base: $20 per ton
Performance Add: $3.50 per ton Variable Speed:
Base: $90 - $92 per ton Performance Add: $4.00 per ton
Energy Efficiency must comply with ASHRAE 90.1-2013
Gas Cooling Gas Absorption Chillers (Indirect & Direct-Fired)
$185 - $450 per ton
Desiccant Systems
$1.00 per cfm – gas or electric
Electric Unitary HVAC
Unitary AC and Split Systems $73 - $92 per ton Air-to-Air Heat Pumps $73 - $92 per ton
Water-Source Heat Pumps $81 per ton Packaged Terminal AC & HP $65 per ton
Central DX AC Systems $40- $72 per ton Dual Enthalpy Economizer Controls $250 Occupancy Controlled Thermostat
(Hospitality & Institutional Facility) $75 per thermostat
A/C Economizing Controls < 5 tons $85/unit; >5 tons $170/unit Energy Efficiency must comply with ASHRAE 90.1-2007
Appendix B Page 2 of 6
Gas Heating
Hot Water Gas Fired Boilers < 300 MBH
Non-Condensing: $0.95 per MBH,
Minimum $400 per unit Condensing:
$2.00 per MBH, Minimum $1000 per unit
Hot Water Gas Fired Boilers ≥ 300 - 1500 MBH
Non-Condensing: $1.75 per MBH
Condensing: $2.20 per MBH
Minimum $1000 per unit
Hot Water Gas Fired Boilers >1500 - ≤ 2500 MBH
Non-Condensing: $1.50 per MBH
Condensing: $2.20 per MBH
Hot Water Gas Fired Boilers >2500 - ≤ 4000 MBH
Non-Condensing: $1.30 per MBH
Condensing: $2.00 per MBH
Steam, Except Natural Draft, Gas fired Boilers < 300 MBH
$1.40 per MBH, Minimum $400 per unit
Steam, Except Natural Draft, Gas fired Boilers ≥ 300 – 1500 MBH
$1.20 per MBH
Steam, Except Natural Draft, Gas fired Boilers > 1500 – 2500 MBH
$1.20 per MBH
Steam, Except Natural Draft, Gas fired Boilers > 2500 – 4000 MBH
$1.00 per MBH
Steam, Natural Draft < 300 MBH
$1.40 per MBH, Minimum $300 per unit
Steam, Natural Draft ≥ 300 - 1500 MBH
$1.00 per MBH
Steam, Natural Draft >1500 - ≤ 2500 MBH
$0.90 per MBH
Steam, Natural Draft >2500 - ≤ 4000 MBH
$0.70 per MBH
All Types Gas Fired Boilers > 4000 MBH
(Calculated through Custom Measure Path)
Gas Furnaces $400 per unit, AFUE ≥ 95%
Boiler Economizing Controls $1,200 - $2,700
Low Intensity Infrared Heating $300 - $500 per unit
Natural Gas Water Heating Gas Water Heaters ≤ 50 gallons, 0.67
energy factor or better $50 per unit
Gas-Fired Water Heaters > 50 gallons $1.00 - $2.00 per MBH
Gas-Fired Booster Water Heaters $17 - $35 per MBH
Gas Fired Tankless Water Heaters $300 per unit
Appendix B Page 3 of 6
Ground Source Heat Pumps
Closed Loop $450 per ton, EER ≥ 16 $600 per ton, EER ≥ 18 $750 per ton, EER ≥ 20
Energy Efficiency must comply with ASHRAE 90.1-2007
Variable Frequency Drives Variable Air Volume $65 - $155 per hp
Chilled-Water Pumps ≥ 20 hp $60 per VFD rated hp
Rotary Screw Air Compressors ≥ 25 hp $5,250 to $12,500 per drive Centrifugal Fan Applications on
Constant Volume HVAC Systems $80 per VFD rated hp, maximum
$6,000 per drive Cooling Towers ≥ 10 hp $60 per VFD rated hp
Boiler Fans > 5 HP $65 to $155 per hp
Boiler Feed Water Pumps > 5 HP $60 to $155 per hp
Commercial Kitchen Hood up to 50 HP Retrofit $55 – $300 per hp
New Hood $55 - $250 per hp
Prescriptive Lighting
T-8 reduced Wattage (28w/25w 4’, 1-4 lamps)
Lamp & ballast replacement $10 per fixture
For retrofit of T-8 fixtures by permanent de-lamping & new reflectors
(Electronic ballast replacement required)
$5 per fixture
T-5 and T-8 High Bay Fixtures $25 - $150 per fixture
HID ≥ 100w Replace with new induction fixture.
(must be 30% less watts/fixture than HID system)
$70 per fixture
HID ≥ 100w Retrofit with induction lamp, power coupler and generator
(must be 30% less watts/fixture than HID system)
$50 per fixture
Appendix B Page 4 of 6
Prescriptive Lighting - LED
LED Architectural Floor and Spot Luminaires
$50 per fixture
LED Bollard Fixtures $50 per fixture
LED Display Case Lighting $30 per display case
LED Fuel Pump Canopy $100 per fixture
LED High-Bay and Low-Bay Fixtures for Commercial & Industrial Bldgs.
$150 per fixture
LED High-Bay-Aisle Lighting $150 per fixture
LED Linear Ambient Luminaires (Indirect, Indirect/Direct, Direct/Indirect, Direct)
2’ Fixtures - $20/fixture 3’ Fixtures - $30/fixture 4’ Fixtures - $45/fixture 6’ Fixtures - $60/fixture 8’ Fixtures - $75/fixture
LED Linear Replacement Lamps (2’ & 4’ only)
$5 per lamp
Luminaires for Ambient Lighting of Interior Commercial Spaces
(1x4, 2x2, 2x4 New Fixtures and Retrofit Kits)
1x4 LED - $15 per fixture 2x2 LED - $15 per fixture 2x4 LED - $25 per fixture
LED Outdoor Pole/Arm-Mounted Area and Roadway Luminaries
$100 per fixture
LED Outdoor Pole/Arm-Mounted Decorative Luminaries
$50 per fixture
LED Outdoor Wall-Mounted Area Luminaries
$100 per fixture
LED Parking Garage Luminaries $100 per fixture
LED Retrofit Kits for Large Outdoor Pole / Arm-Mounted Area and
Roadway Luminaires $150 per fixture
LED Refrigerator/Freezer case lighting replacement of fluorescent in medium
and low temperature display case
$30 per 4 foot $42 per 5 foot $65 per 6 foot
LED Shelf-Mtd. Display & Task Lights $15 per linear foot
Appendix B Page 5 of 6
LED Stairwell and Passageway Luminaires
$40 per fixture
LED Track or Mono-Point Directional Lighting Fixtures
$30 per fixture
LED Wall-Wash Lights $30 per fixture
EnergyStar Commercial Lighting Fixtures
$5 to $10 per fixture
EnergyStar Screw and Pine-Based Bulbs
$5 to $10 per lamp
Lighting Controls – Occupancy Sensors
Wall Mounted (Existing Facilities Only)
$20 per control
Remote Mounted (Existing Facilities Only)
$35 per control
Daylight Dimming Controls $45 per fixture controlled
Occupancy Based hi-low Dimming Control
$35 per fixture controlled
Occupancy Sensor Remote Mounted High-Bay (Existing Facilities Only)
$35 per control
Refrigeration Doors/Covers
Energy-Efficient Doors/Covers for Installation on Open Refrigerated Cases
$100 per door
Aluminum Night Curtains for Installation on Open Refrigerated Cases
$3.50 per linear foot
Refrigeration Controls
Door Heater Controls $50 per control Electric Defrost Controls $50 per control Evaporator Fan Controls $75 per control Novelty Cooler Shutoff $50 per control
Refrigerator / Freezer Case Premium Efficiency Motors
Fraction ECM Motor < 1 HP $40 per ECM for replacement of
existing shaded-pole motor
Appendix B Page 6 of 6
Food Service Equipment
Combination Oven/Steamer (Electric) $1,000/oven
Combination Oven/Steamer (Natural Gas)
$750/oven
Convection Oven (Electric) $350/oven
Convection Oven (Natural Gas) $500/oven
Rack Oven (Natural Gas) $1,000/single oven, $2,000/double oven
Conveyor Oven (Natural Gas) $500/small deck $750/large deck
Fryer (Electric) $200/vat
Fryer (Natural Gas) $749/vat
Large Vat Fryer (Electric) $200/vat
Large Vat Fryer (Natural Gas) $500/vat
Griddle (Electric) $300/griddle
Griddle (Natural Gas) $125/griddle
Steam Cooker (Electric) $1,250/steamer
Steam Cooker (Natural Gas) $2,000/steamer
Insulated Holding Cabinets $200 to $300/unit
Glass Door Refrigerators $75 to $150/unit
Solid Door Refrigerators $50 to $200/unit
Glass Door Freezers $200 to $1,000/unit
Solid Door Freezers $100 to $600/unit
Ice Machines $50 to $500/unit
Dishwashers $400 to $1,500/unit
Other Equipment Incentives
Performance Lighting
$1.00 per watt per SF below program incentive threshold, currently 5% more energy efficient than ASHRAE 90.1-
2007 for New Construction and Complete Renovation
Custom Electric and Gas Equipment Incentives
not prescriptive
Custom Measures
$0.16 KWh and $1.60/Therm of 1st year savings, or a buy down to a 1 year
payback on estimated savings. Minimum required savings of 75,000
KWh or 1,500 Therms and an IRR of at least 10%.
Page 1 of 9
ENERGY STAR® Data Verification Checklist
74ENERGY STAR ®
Score1
Whitney Houston Academy
Registry Name: Whitney Houston AcademyPrimary Function: K-12 SchoolGross Floor Area (ft²): 103,000Built: 1873
For Year Ending: 04/30/2015Date Generated: 08/13/2015
1. The ENERGY STAR score is a 1-to-100 assessment of a building’s energy efficiency as compared with similar building nationwide, adjusting for climate and businessactivity.
Property & Contact Information
Property AddressWhitney Houston Academy215 Dodd StreetEast Orange, New Jersey 07017
Property ID: 4440557
Property OwnerEast Orange School District199 4th Avenue, 5th FloorEast Orange, NJ 07017(____)____-______
Primary ContactRacquel Ferguson199 4th Avenue, 5th FloorEast Orange, NJ 07017(973) [email protected]
1. Review of Whole Property Characteristics
Basic Property Information
1) Property Name: Whitney Houston Academy
Is this the official name of the property?
If “No”, please specify: _____________________________________
Yes No
2) Primary Function: K-12 School
Is this an accurate description of the primary use of this property? Yes No
3) Location:
215 Dodd StreetEast Orange, New Jersey 07017
Is this correct and complete?
Yes No
4) Gross Floor Area: 103,000 ft² Yes No
Page 2 of 9
Does this represent the entire property? (i.e., no part of the building/property wasexcluded/subtracted from the total) If “no” please specify what space has been excluded.
5) Average Occupancy: 90
Is this occupancy accurate for the entire 12 month period being assessed? Yes No
6) Number of Buildings: 1
Does this number accurately represent all structures? Yes No
Notes:
Indoor Environmental Standards
1) Ventilation for Acceptable Indoor Air Quality
Does this property meet the ASHRAE Standard 62 for ventilation for acceptable indoorair quality?
Yes No
2) Acceptable Thermal Environmental Conditions
Does this property meet the ASHRAE Standard 55 for thermal comfort? Yes No
3) Adequate Illumination
Does this property adhere to the IESNA Lighting Handbook for lighting quality? Yes No
Notes:
2. Review of Property Use Details
K-12 School: Building Use
1) Gross Floor Area: 103,000 ft²
Is this the total size, as measured between the principal exterior surfaces of theenclosing fixed walls of the building(s)? This includes all areas inside the building(s)such as: occupied tenant areas, common areas, meeting areas, break rooms,restrooms, elevator shafts, mechanical equipment areas, and storage rooms. Gross
Yes No
Page 3 of 9
Floor Area should not include interstitial plenum space between floors, which may housepipes and ventilation. Gross Floor Area is not the same as rentable, but rather includesall area inside the building(s). Leasable space would be a sub-set of Gross Floor Area.In the case where there is an atrium, you should count the Gross Floor Area at thebase level only. Do not increase the size to accommodate open atrium space at higherlevels. The Gross Floor Area should not include any exterior spaces such as balconiesor exterior loading docks and driveways.
2) Gymnasium Floor Area: 0 ft²
Does the gymnasium floor area include all areas devoted to a gymnasium, includinggymnasium/athletic areas, spectator areas, locker rooms, and other associated spaces?
Yes No
3) High School: No
Is the property a high school (teaching grades 10, 11, and/or 12)? If the propertyteaches to high school students at all, the user should check ‘yes’ to ‘high school’. Forexample, if the school teaches to grades K-12 (elementary/middle and high school), theuser should check ‘yes’ to ‘high school’.
Yes No
4) Number of Workers on Main Shift: 69
Is this the number of workers present during the main shift? Note that this is not a totalcount of workers, but rather a count of workers who are present at the same time. Forexample, if there are two daily eight hour shifts of 100 workers each, the Number ofWorkers on Main Shift value is 100. Number of Workers on Main Shift may includeemployees of the property, sub-contractors who are onsite regularly, and volunteerswho perform regular onsite tasks. Number of Workers should not include visitors to thebuildings such as clients, customers, or patients.
Yes No
5) Student Seating Capacity: 367
Is this the maximum number of students for which the school was designed? Thisshould include the seating capacity of the entire school. If portable classrooms havebeen added to the school, include the capacity of these classrooms, as they expand theoverall capacity of the school.
Yes No
6) Months in Use: 10
Is this the total number of months that the property is open for standard activities? Yes No
7) Weekend Operation: No
Does the property include regular activities on the weekend beyond the scope ofmaintenance, cleaning, and security personnel? Weekend activity could include anytime when the property is used for classes, performances, or other school or communityactivities. The Yes selection is appropriate for any property that is open on one or bothdays of the weekend during one or more seasons of the year.
Yes No
8) Number of Computers: 330
Is this the total number of desktop computers, laptops, and data servers at the property?This number should not include tablet computers, such as iPads, or any other types ofoffice equipment. The count should only reflect computers that are owned by the school.It should not include any computers that are brought onsite by students or staff.
Yes No
9) Cooking Facilities: 100% Yes
Does the property have a commercial cooking area designed to provide and serve foodto occupants and/or visitors? This may include restaurants and cafeterias. If the propertycontains only employee break room kitchens, this field should be marked No.
Yes No
Page 4 of 9
10) Number of Walk-in Refrigeration/Freezer Units: 0
Is this the total count of walk-in units at the property? Walk-in Refrigeration/Freezersare typically very large units located in storage areas or commercial kitchens that wouldnot be accessible to all building occupants. This count should only include large storageunits that a person actually walks into in order to store or retrieve perishable goods.
Yes No
11) Percent That Can Be Heated: 100
Is this the total percentage of the property that can be heated by mechanical equipment? Yes No
12) Percent That Can Be Cooled: 0
Is this the total percentage of the property that can be cooled by mechanical equipment?This includes all types of cooling from central air to individual window units.
Yes No
13) School District: East Orange
Is this the administrative school district in which the property is located? Yes No
Notes:
3. Review of Energy Consumption
Data Overview
Site Energy Use SummaryElectric - Grid (kBtu) 424,627.6 (6%)Natural Gas (kBtu) 104,238 (1%)Fuel Oil (No. 2) (kBtu) 6,856,561.1 (93%)Total Energy (kBtu) 7,385,426.6
Energy IntensitySite (kBtu/ft²) 71.7Source (kBtu/ft²) 81.2
National Median ComparisonNational Median Site EUI (kBtu/ft²) 91.6National Median Source EUI (kBtu/ft²) 103.7% Diff from National Median SourceEUI
-21.7%
Emissions (based on site energy use)Greenhouse Gas Emissions (MetricTons CO2e)
571.2
Power Generation Plant or Distribution Utility:Public Service Electric & Gas Co
Note: All values are annualized to a 12-month period. Source Energy includes energy used in generation and transmission to enable an equitable assessment.
Summary of All Associated Meters
The following meters are associated with the property, meaning that they are added together to get the total energy use for theproperty. Please see additional tables in this checklist for the exact meter consumption values.
Meter Name Fuel Type Start Date End Date Associated With
Electric Grid Meter Electric 12/10/2013 In UseWhitney HoustonAcademy
Page 5 of 9
Meter Name Fuel Type Start Date End Date Associated With
Natural Gas Natural Gas 12/10/2013 In UseWhitney HoustonAcademy
Fuel Oil (No. 2) Fuel Oil No 2 10/16/2014 In UseWhitney HoustonAcademy
Total Energy Use
Do the meters shown above account for the total energy use of this property during thereporting period of this application?
Yes No
Additional Fuels
Do the meters above include all fuel types at the property? That is, no additional fuels such asdistrict steam, generator fuel oil have been excluded.
Yes No
On-Site Solar and Wind Energy
Are all on-site solar and wind installations reported in this list (if present)? All on-site systemsmust be reported.
Yes No
Notes:
Electric Meter: Electric Grid Meter (kWh (thousand Watt-hours))
Associated With: Whitney Houston AcademyStart Date End Date Usage Green Power?
04/10/2014 05/13/2014 29,820 estimate No
05/13/2014 06/11/2014 36,990 estimate No
06/11/2014 07/11/2014 7,320 No
07/11/2014 08/11/2014 0 estimate No
08/11/2014 09/10/2014 11,760 estimate No
09/10/2014 10/10/2014 6,570 No
10/10/2014 11/07/2014 6,120 estimate No
11/07/2014 12/10/2014 7,380 estimate No
12/10/2014 01/13/2015 7,770 estimate No
01/13/2015 02/10/2015 9,640 No
Page 6 of 9
Start Date End Date Usage Green Power?
02/10/2015 03/12/2015 6,990 estimate No
03/12/2015 04/13/2015 7,500 estimate No
04/13/2015 05/12/2015 8,970 No
Total Consumption (kWh (thousandWatt-hours)):
146,830
Total Consumption (kBtu (thousandBtu)):
500,984
Total Energy Consumption for this Meter
Do the fuel consumption totals shown above include consumption of all energy trackedthrough this meter that affect energy calculations for the reporting period of this application(i.e., do the entries match the utility bills received by the property)?
Yes No
Notes:
Natural Gas Meter: Natural Gas (therms)
Associated With: Whitney Houston AcademyStart Date End Date Usage
04/10/2014 05/13/2014 78.11 estimate
05/13/2014 06/11/2014 412.46 estimate
06/11/2014 07/11/2014 28.31
07/11/2014 09/10/2014 97.55 estimate
09/10/2014 10/10/2014 37.93
10/10/2014 11/07/2014 33.74 estimate
11/07/2014 12/10/2014 93.76 estimate
12/10/2014 01/13/2015 33.78 estimate
01/13/2015 02/10/2015 88.75
02/10/2015 03/12/2015 6.35 estimate
03/12/2015 04/13/2015 76.22 estimate
04/13/2015 05/12/2015 169.37
Total Consumption (therms): 1,156.33
Total Consumption (kBtu (thousandBtu)):
115,633
Total Energy Consumption for this Meter Yes No
Page 7 of 9
Do the fuel consumption totals shown above include consumption of all energy trackedthrough this meter that affect energy calculations for the reporting period of this application(i.e., do the entries match the utility bills received by the property)?
Notes:
Fuel Oil No 2 Meter: Fuel Oil (No. 2) (Gallons (US))
Associated With: Whitney Houston AcademyDelivery Date Quantity
10/16/2014 881
10/22/2014 651
10/31/2014 900
11/11/2014 1,300
11/17/2014 1,596
11/19/2014 800
11/24/2014 1,222
11/29/2014 378
12/04/2014 1,200
12/08/2014 514
12/08/2014 854
12/12/2014 1,571
12/15/2014 667
12/17/2014 915
12/19/2014 837
12/22/2014 500
12/24/2014 418
12/31/2014 696
01/03/2015 600
01/06/2015 1,028
01/08/2015 950
01/10/2015 1,088
01/12/2015 926
01/14/2015 1,168
01/16/2015 973
01/17/2015 673
01/19/2015 953
Page 8 of 9
Delivery Date Quantity
01/21/2015 637
01/23/2015 1,082
01/24/2015 527
01/26/2015 1,051
01/28/2015 1,029
01/30/2015 1,043
01/31/2015 451
02/02/2015 1,025
02/04/2015 1,049
02/06/2015 1,097
02/07/2015 516
02/09/2015 1,020
02/11/2015 997
02/13/2015 1,009
02/14/2015 548
02/16/2015 989
02/18/2015 992
02/20/2015 996
02/21/2015 474
02/23/2015 1,043
02/25/2015 893
02/28/2015 501
02/28/2015 1,096
03/03/2015 1,446
03/05/2015 999
03/07/2015 950
03/10/2015 902
03/16/2015 950
03/19/2015 1,291
Total Consumption (Gallons (US)): 50,862
Total Consumption (kBtu (thousandBtu)):
7,018,956
Total Energy Consumption for this Meter
Do the fuel consumption totals shown above include consumption of all energy trackedthrough this meter that affect energy calculations for the reporting period of this application(i.e., do the entries match the utility bills received by the property)?
Yes No
Page 9 of 9
Notes:
4. Signature & Stamp of Verifying Licensed Professional
___________________ (Name) visited this site on ___________ (Date). Based on the conditions observed at the timeof the visit to this property, I verify that the information contained within this application is accurate and in accordancewith the Licensed Professional Guide.
Signature: _______________________ Date: _________
Licensed Professional
____ ________,(____)____-________________________
NOTE: When applying for the ENERGY STAR, the signature of theVerifying Professional must match the stamp. Professional Engineer Stamp
(if applicable)
ENERGY STAR® Statement of EnergyPerformance
74ENERGY STAR®
Score1
Whitney Houston Academy
Primary Property Function: K-12 SchoolGross Floor Area (ft²): 103,000Built: 1873
For Year Ending: April 30, 2015Date Generated: August 13, 2015
1. The ENERGY STAR score is a 1-100 assessment of a building’s energy efficiency as compared with similar buildings nationwide, adjusting forclimate and business activity.
Property & Contact Information
Property AddressWhitney Houston Academy215 Dodd StreetEast Orange, New Jersey 07017
Property OwnerEast Orange School District199 4th Avenue, 5th FloorEast Orange, NJ 07017(____)____-______
Primary ContactRacquel Ferguson199 4th Avenue, 5th FloorEast Orange, NJ 07017(973) [email protected]
Property ID: 4440557
Energy Consumption and Energy Use Intensity (EUI)
Site EUI71.7 kBtu/ft²
Annual Energy by FuelElectric - Grid (kBtu) 424,628 (6%)Natural Gas (kBtu) 104,238 (1%)Fuel Oil (No. 2) (kBtu) 6,856,561 (93%)
National Median ComparisonNational Median Site EUI (kBtu/ft²) 91.6National Median Source EUI (kBtu/ft²) 103.7% Diff from National Median Source EUI -22%
Source EUI81.2 kBtu/ft²
Annual EmissionsGreenhouse Gas Emissions (Metric TonsCO2e/year)
571
Signature & Stamp of Verifying Professional
I ___________________ (Name) verify that the above information is true and correct to the best of my knowledge.
Signature: _______________________Date: ___________
Licensed Professional
____ ________,(____)____-________________________
Professional Engineer Stamp(if applicable)
MAJOR EQUIPMENT LISTConcord Engineering
Terminal Units
Terminal UnitsTag WAC 1 WAC 2 WAC 3
Unit Type Window Unit Window Unit Window Unit
Qty 1 1 1
LocationTeacher's Room 1st
FloorCR 112 CR 106
Area ServedTeacher's Room 1st
FloorCR 112 CR 106
Manufacturer AIRTEMP Heat Controller Inc. Comfort-Aire
Model No. B7D18E2A-B RAD-121-5-A RAD-121B
Serial No. CS532424091F BT 234123 036Y -
Cooling Type Packaged DX Packaged DX Packaged DX
Cooling Capacity (Tons) 1.44 1 1
Cooling Efficiency 11 9.8 9.8
Heating Type No Heating No Heating No Heating
Heating Input (MBH) N/A N/A N/A
Heating Efficiency N/A N/A N/A
Approx Age 5 3 5
ASHRAE Service Life 10 10 10
Remaining Life 5 7 5
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D - Major Equipment List -Whitney Houston Academy Page 1 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Terminal Units
Terminal UnitsTag
Unit Type
Qty
Location
Area Served
Manufacturer
Model No.
Serial No.
Cooling Type
Cooling Capacity (Tons)
Cooling Efficiency
Heating Type
Heating Input (MBH)
Heating Efficiency
Approx Age
ASHRAE Service Life
Remaining Life
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
WAC 4 WAC 5 WAC 6
Window Unit Window Unit Window Unit
1 1 1
CR 106 CR 100 CR 202
CR 106 CR 100 CR 202
Heat Controller Inc.Electrolux Major
AppliancesEmerson
RAD-101-5-B FAM155R1A 16HD14-H
BU170554045X - FN 833132 1721
Packaged DX Packaged DX Packaged DX
0.833 1.258 -
9.8 10.7 -
No Heating No Heating No Heating
N/A N/A N/A
N/A N/A N/A
3 5 10
10 10 10
7 5 0
Appendix D - Major Equipment List -Whitney Houston Academy Page 2 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Terminal Units
Terminal UnitsTag
Unit Type
Qty
Location
Area Served
Manufacturer
Model No.
Serial No.
Cooling Type
Cooling Capacity (Tons)
Cooling Efficiency
Heating Type
Heating Input (MBH)
Heating Efficiency
Approx Age
ASHRAE Service Life
Remaining Life
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
WAC 7 WAC 8 WAC 9
Window Unit Window Unit Window Unit
1 1 1
CR 203 CR 203 CR 58
CR 203 CR 203 CR 58
Electrolux Home Products
EmersonElectrolux Home
Products
FRA186MT2 16HD14-H FRA156MT1
KK20506356 FN 833115 1721 KK24103401
Packaged DX Packaged DX Packaged DX
1.54 1.33 1.26
10.7 10.5 10.7
No Heating No Heating No Heating
N/A N/A N/A
N/A N/A N/A
3 10 3
10 10 10
7 0 7
Appendix D - Major Equipment List -Whitney Houston Academy Page 3 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Terminal Units
Terminal UnitsTag
Unit Type
Qty
Location
Area Served
Manufacturer
Model No.
Serial No.
Cooling Type
Cooling Capacity (Tons)
Cooling Efficiency
Heating Type
Heating Input (MBH)
Heating Efficiency
Approx Age
ASHRAE Service Life
Remaining Life
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
WAC 10/11 WAC 12/13 WAC 14
Window Unit Window Unit Window Unit
2 2 1
CR 1 CR 10 CR 9
CR 1 CR 10 CR 9
Heat Controller, Inc. - Emerson
RADS-101J RC24087O2D 16HD14-H
- - FN 833115 1721
Packaged DX Packaged DX Packaged DX
0.833 - 1.33
10.8 - 10.5
No Heating No Heating No Heating
N/A N/A N/A
N/A N/A N/A
10 10 10
10 10 10
0 0 0
Appendix D - Major Equipment List -Whitney Houston Academy Page 4 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Terminal Units
Terminal UnitsTag
Unit Type
Qty
Location
Area Served
Manufacturer
Model No.
Serial No.
Cooling Type
Cooling Capacity (Tons)
Cooling Efficiency
Heating Type
Heating Input (MBH)
Heating Efficiency
Approx Age
ASHRAE Service Life
Remaining Life
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
WAC 15 PTAC
Window Unit Packaged Terminal AC
1 2
CR 8 Main Office, Principal
CR 8 Main Office, Principal
-Friedrich Air
Conditioning Co.
- PDH15K5SD-C
- LJCM01696
Packaged DX Packaged DX
- 1.225
- 9.3
No Heating Electric Heatpump
N/A 13.29
N/A 2.9
10 14
10 15
0 1
Appendix D - Major Equipment List -Whitney Houston Academy Page 5 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Boilers
BoilersTag B1 A2
Unit Type Fire-Tube (Steam) Fire-Tube (Steam)
Qty 1 1
Location Boiler Room Boiler Room
Manufacturer The Bethlehem Corporation The Bethlehem Corporation
Model No. - -
Serial No. F114A200LS-7607-4236A F114A200LS-7608-4236A
Input Capacity (Btu/h) 8,400,000 8,400,000
Output Capacity (Btu/h) 5,460,000 5,460,000
Approx. Efficiency % 65% (Est) 65% (Est)
Fuel Type Fuel Oil #2 Fuel Oil #2
Approx Age 38 38
ASHRAE Service Life 25 25
Remaining Life 0 0
Comments 60 GPH Oil #2
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D - Major Equipment List -Whitney Houston Academy Page 6 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Dom HWH
Domestic Water HeatersTag DHW 1
Unit Type Gas Water Heater
Qty 1
Location Boiler Room
Area Served -
Manufacturer HTP
Model # CG125N73
Serial # HTP10003
Storage Size (Gal) 72
Input Capacity (MBH/KW) 125
Recovery (Gal/Hr) 121.2
Efficiency % 80%
Fuel Natural Gas
Approx Age 3
ASHRAE Service Life 15
Remaining Life 12
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D - Major Equipment List -Whitney Houston Academy Page 7 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Pumps
Pumps
TagCondensate Trap
Pumps 1 and 2Pump 3
Unit Type Condensate
Qty 2 1
Location Boiler Room Boiler Room
System ServedCondensate Pump and
ReceiverFuel Pump
Manufacturer - -
Model # - -
Serial # - -
Horse Power 0.5 -
Flow Rate (GPM) -
Head Pressure (FTHD) -
Motor Manufacturer US Motors A.O. Smith
Motor Frame 56J -
Electrical Power (V/P/HZ)
115/208-230/1/60 -
Motor RPM 3450 1745
Motor Efficiency % - -
Pump VFD
Approx Age
ASHRAE Service Life 18 18
Remaining Life 18 18
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Yes No N/A Yes No N/A
Appendix D - Major Equipment List -Whitney Houston Academy Page 8 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Large Exhaust Fans
Large Exhaust FansTag USF-1
Unit Type Utility Set Fan
Qty 1
Location Attic Storage 3
Area Served -
Manufacturer -
Model # -
Motor (HP) 1
Electrical (V/H/P) -
Approx Age 15
ASHRAE Service Life 20
Remaining Life 5
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D - Major Equipment List -Whitney Houston Academy Page 9 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Kitchen-Misc
Kitchen / Misc. Tag Full Fridge 1 Oven 1 Full Fridge 2
Unit TypeResidential Refrigerator
Oven Reach-in Refrigerator
Qty 1 1 2
LocationTeacher Room 1st
FloorCafeterria B Cafeteria B
Manufacturer Crosley Corp. Vulcan-Hart Beverage-Air
Model No. CRTE183AW0 RET10 Horizon Series
Serial No. BA42425216 72103805 -
Fuel Electric Electric Electric
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Appendix D - Major Equipment List -Whitney Houston Academy Page 10 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Kitchen-Misc
Kitchen / Misc. Tag
Unit Type
Qty
Location
Manufacturer
Model No.
Serial No.
Fuel
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Full Fridge 2 Snapple Mini Fridge Oven 2
Reach-in RefrigeratorResidential Refrigerator
Oven
1 2 1
Cafeteria BCafeteria B/Cafeteria
ACafeteria A
Continental Beverage-Air Vulcan-Hart
- UR30G RET10
- 6371170 72103802
Electric Electric Electric
Appendix D - Major Equipment List -Whitney Houston Academy Page 11 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Kitchen-Misc
Kitchen / Misc. Tag
Unit Type
Qty
Location
Manufacturer
Model No.
Serial No.
Fuel
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Freezer 1 Freezer 2 Mini Fridge 1
Reach-in Refrigerator Reach-in RefrigeratorResidential Refrigerator
1 1 1
Cafeteria A Cafeteria A CR 1
Traulsen - Sanyo
- - SR-170W
- - 941005703
Electric Electric Electric
Appendix D - Major Equipment List -Whitney Houston Academy Page 12 of 13
MAJOR EQUIPMENT LISTConcord Engineering
Kitchen-Misc
Kitchen / Misc. Tag
Unit Type
Qty
Location
Manufacturer
Model No.
Serial No.
Fuel
Comments
Note:
"N/A" = Not Applicable. "-" = Info Not Available
Mini Fridge 2 Mini Fridge 2Residential Refrigerator
Residential Refrigerator
1 1
CR 9 CR 8
Haier GE
BC-111 GMR04BANEWW
- MS011227
Electric Electric
Appendix D - Major Equipment List -Whitney Houston Academy Page 13 of 13
CEG Project #:
Facility Name:
Address:
City, State, Zip
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings,
kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
12 1 - Classroom 109 16002-Lamp T8 Electronic
1x4 Pendant Prismatic Lens2 62 6 0.37 595 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 6 0.18 288 0.19 307 $51 0 No New Controls 0 0.0% 0 $0 $360.00 $270.00 $630.00 $60.00 11.18 $0.00 $0.00 $0.00 YES -
12 1 - Classroom 110 16002-Lamp T8 Electronic
1x4 Pendant Prismatic Lens2 62 6 0.37 595 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 6 0.18 288 0.19 307 $51 0 No New Controls 0 0.0% 0 $0 $360.00 $270.00 $630.00 $60.00 11.18 $0.00 $0.00 $0.00 FALSE -
51 - Classroom 110
Closet400
2-Lamp T8 Electronic2x4 Recessed Prismatic
Lens2 62 2 0.12 50 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 2 0.06 24 0.06 26 $4 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 44.71 $0.00 $0.00 $0.00 FALSE -
51 - Classroom 109
Closet400
2-Lamp T8 Electronic2x4 Recessed Prismatic
Lens2 62 2 0.12 50 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 2 0.06 24 0.06 26 $4 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 44.71 $0.00 $0.00 $0.00 FALSE -
12 1 - Classroom 108 16002-Lamp T8 Electronic
1x4 Pendant Prismatic Lens2 62 9 0.56 893 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 9 0.27 432 0.29 461 $76 0 No New Controls 0 0.0% 0 $0 $540.00 $405.00 $945.00 $90.00 11.18 $0.00 $0.00 $0.00 FALSE -
1241 - Classroom 108
Coat Room400 13W CFL 1 13 1 0.01 5 Replace Philips LED A19 6W 1 6 1 0.01 2 0.01 3 $0 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 69.92 $0.00 $0.00 $0.00 FALSE -
12 1 - Classroom 107 16002-Lamp T8 Electronic
1x4 Pendant Prismatic Lens2 62 9 0.56 893 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 9 0.27 432 0.29 461 $76 0 No New Controls 0 0.0% 0 $0 $540.00 $405.00 $945.00 $90.00 11.18 $0.00 $0.00 $0.00 FALSE -
471 - Classroom 107
Closet400
4-Lamp T12 Magnetic2x4 Surface Mounted
4 164 1 0.16 66 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 18 0.12 48 $8 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 15.19 $0.00 $0.00 $0.00 FALSE -
21 1 - Teachers Room 16004-Lamp T8 Electronic
2x4 Surface Mount Prismatic Lens
4 114 1 0.11 182 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 72 0.07 110 $18 6
Dual Technology Occupancy Sensor - Switch
Mnt.1 20.0% 14 $2 $90.00 $45.00 $135.00 $15.00 6.55 $50.00 $50.00 $100.00 FALSE 41.83
61 - Teachers Room
Toilet500
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 1 0.06 31 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 15 0.03 16 $3 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 35.77 $0.00 $0.00 $0.00 FALSE -
3 1 - Classroom 111 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 6 0.68 1,094 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 6 0.27 432 0.41 662 $110 0 No New Controls 0 0.0% 0 $0 $540.00 $270.00 $810.00 $90.00 6.55 $0.00 $0.00 $0.00 FALSE -
61 - Classroom 111
Closet 1400
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 1 0.06 25 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 12 0.03 13 $2 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 44.71 $0.00 $0.00 $0.00 FALSE -
61 - Classroom 111
Closet 2400
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 1 0.06 25 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 12 0.03 13 $2 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 44.71 $0.00 $0.00 $0.00 FALSE -
37 1 - Boys Restroom 22003-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
3 93 3 0.28 614 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 297 0.14 317 $53 5Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 59 $10 $270.00 $135.00 $405.00 $45.00 6.85 $200.00 $50.00 $250.00 FALSE 25.35
1371 - Boys Restroom
Entry400 42W CFL 1 42 1 0.04 17 Replace 28W LED A-Lamp 1 28 1 0.03 11 0.01 6 $1 5
Dual Technology Occupancy Sensor -
Remote Mnt.0 20.0% 2 $0 $70.00 $27.50 $97.50 $10.00 94.13 $0.00 $0.00 $0.00 FALSE 0.00
Smart Start Incentive
East Orange, NJ 07017
215 Dodd St.
1C15143
Whitney Houston Academy
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
Appendix E - Lighting Audit - Whitney Houston Academy Page 1 of 10
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings,
kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
3 1 - Classroom 112 4004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 6 0.68 274 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 6 0.27 108 0.41 166 $27 0 No New Controls 0 0.0% 0 $0 $540.00 $270.00 $810.00 $90.00 26.19 $0.00 $0.00 $0.00 FALSE -
61 - Classroom 112
Closet2600
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 1 0.06 161 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 78 0.03 83 $14 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 6.88 $0.00 $0.00 $0.00 FALSE -
3 1 - Classroom 113 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 6 0.68 1,094 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 6 0.27 432 0.41 662 $110 0 No New Controls 0 0.0% 0 $0 $540.00 $270.00 $810.00 $90.00 6.55 $0.00 $0.00 $0.00 FALSE -
1381 - Classroom 113
Closet400 150W Incandescent 1 150 1 0.15 60 Replace 23W LED A Lamp 1 23 1 0.02 9 0.13 51 $8 0 No New Controls 0 0.0% 0 $0 $57.00 $27.50 $84.50 $10.00 8.83 $0.00 $0.00 $0.00 FALSE -
8 2-B - Stair 2 22002-Lamp T8 Electronic1x8 Pendant w/ Tube
Guard2 110 2 0.22 484 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 2 0.12 264 0.10 220 $37 0 No New Controls 0 0.0% 0 $0 $240.00 $90.00 $330.00 $40.00 7.94 $0.00 $0.00 $0.00 FALSE -
8 2-B - Stair 3 22002-Lamp T8 Electronic1x8 Pendant w/ Tube
Guard2 110 2 0.22 484 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 2 0.12 264 0.10 220 $37 0 No New Controls 0 0.0% 0 $0 $240.00 $90.00 $330.00 $40.00 7.94 $0.00 $0.00 $0.00 FALSE -
6 1 - Closet 106 4002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 1 0.06 25 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 12 0.03 13 $2 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 44.71 $0.00 $0.00 $0.00 FALSE -
1 1 - Stair 6 2200 26W CFL 1 26 1 0.03 57 Replace 20W LED A Lamp 1 20 1 0.02 44 0.01 13 $2 0 No New Controls 0 0.0% 0 $0 $20.00 $27.50 $47.50 $10.00 17.11 $0.00 $0.00 $0.00 FALSE -
75 1 - Stair 6 2200 1-Lamp CFL (18W) 1 18 1 0.02 40 Replace Philips LED A19 10.5W 1 10.5 1 0.01 23 0.01 17 $3 0 No New Controls 0 0.0% 0 $0 $13.00 $27.50 $40.50 $10.00 11.14 $0.00 $0.00 $0.00 FALSE -
82 1 - Stair 6 22004-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
4 114 1 0.11 251 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 99 0.07 152 $25 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 4.76 $0.00 $0.00 $0.00 FALSE -
15 1 - Stair 6 22002-Lamp T8
1x4 Surface Mounted Utility
2 62 2 0.12 273 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 132 0.06 141 $23 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 8.13 $0.00 $0.00 $0.00 FALSE -
21Mez - Spanish
Classroom/Office1600
4-Lamp T8 Electronic2x4 Surface Mount
Prismatic Lens4 114 2 0.23 365 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 2 0.09 144 0.14 221 $37 0 No New Controls 0 0.0% 0 $0 $180.00 $90.00 $270.00 $30.00 6.55 $0.00 $0.00 $0.00 FALSE -
2Mez - Spanish
Classroom/Office1600
4-Lamp T8 Electronic1x8 Surface Mounted w/
Tube Guard4 220 2 0.44 704 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
6 90 2 0.18 288 0.26 416 $69 0 No New Controls 0 0.0% 0 $0 $360.00 $135.00 $495.00 $60.00 6.30 $0.00 $0.00 $0.00 FALSE -
29Mez - Spanish
Classroom/Office1600
2-Lamp T8 Electronic1x8 Surface Mounted w/
Tube Guard2 110 1 0.11 176 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
4 60 1 0.06 96 0.05 80 $13 0 No New Controls 0 0.0% 0 $0 $120.00 $45.00 $165.00 $20.00 10.92 $0.00 $0.00 $0.00 FALSE -
6 3 - Art Classroom 202 16002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 12 0.74 1,190 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 12 0.36 576 0.38 614 $102 0 No New Controls 0 0.0% 0 $0 $720.00 $540.00 $1,260.00 $120.00 11.18 $0.00 $0.00 $0.00 FALSE -
63 - Tech Classroom
2031600
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 6 0.37 595 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 6 0.18 288 0.19 307 $51 0 No New Controls 0 0.0% 0 $0 $360.00 $270.00 $630.00 $60.00 11.18 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit - Whitney Houston Academy Page 2 of 10
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings,
kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
138 Attic Storage 400 150W Incandescent 1 150 1 0.15 60 Replace 23W LED A Lamp 1 23 1 0.02 9 0.13 51 $8 0 No New Controls 0 0.0% 0 $0 $57.00 $27.50 $84.50 $10.00 8.83 $0.00 $0.00 $0.00 FALSE -
82 B - Classroom 58 16004-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
4 114 10 1.14 1,824 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 10 0.45 720 0.69 1,104 $183 0 No New Controls 0 0.0% 0 $0 $900.00 $450.00 $1,350.00 $150.00 6.55 $0.00 $0.00 $0.00 FALSE -
82 B - Lunchroom "B" 20004-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
4 114 20 2.28 4,560 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 20 0.90 1,800 1.38 2,760 $458 0 No New Controls 0 0.0% 0 $0 $1,800.00 $900.00 $2,700.00 $300.00 5.24 $0.00 $0.00 $0.00 FALSE -
6B - Lunchroom "B"
Storage400
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 2 0.12 50 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 24 0.06 26 $4 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 44.71 $0.00 $0.00 $0.00 FALSE -
821 - Auditorium
Hallway2200
4-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens4 114 2 0.23 502 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 2 0.09 198 0.14 304 $50 0 No New Controls 0 0.0% 0 $0 $180.00 $90.00 $270.00 $30.00 4.76 $0.00 $0.00 $0.00 FALSE -
24 1 - Auditorium 16001-Lamp T8 Electronic0.5x4 Surface Mount
Prismatic Lens1 32 8 0.26 410 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones1 15 8 0.12 192 0.14 218 $36 0 No New Controls 0 0.0% 0 $0 $240.00 $360.00 $600.00 $40.00 15.50 $0.00 $0.00 $0.00 FALSE -
33 1 - Auditorium 1600 6-Lamp 27W CFL 6 162 6 0.97 1,555 Replace 20W LED A Lamp 6 120 6 0.72 1,152 0.25 403 $67 0 No New Controls 0 0.0% 0 $0 $720.00 $165.00 $885.00 $360.00 7.84 $0.00 $0.00 $0.00 FALSE -
104 1 - Stage 1600 1-Lamp 27W CFL 1 27 1 0.03 43 Replace 20W LED A Lamp 1 20 1 0.02 32 0.01 11 $2 0 No New Controls 0 0.0% 0 $0 $20.00 $27.50 $47.50 $10.00 20.17 $0.00 $0.00 $0.00 FALSE -
82B - Cafeteria B
Hallway2200
4-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens4 114 1 0.11 251 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 99 0.07 152 $25 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 4.76 $0.00 $0.00 $0.00 FALSE -
61B - Cafeteria B
Hallway2200
4-Lamp T12 Magnetic1x4 Surface Mounted
Prismatic Lens4 164 1 0.16 361 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 99 0.12 262 $43 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 2.76 $0.00 $0.00 $0.00 FALSE -
6 B - Vision Academy 20002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 11 0.68 1,364 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 11 0.33 660 0.35 704 $117 0 No New Controls 0 0.0% 0 $0 $660.00 $495.00 $1,155.00 $110.00 8.94 $0.00 $0.00 $0.00 FALSE -
6 B - Cafeteria "A" 20002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 2 0.12 248 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 120 0.06 128 $21 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 8.94 $0.00 $0.00 $0.00 FALSE -
29 B - Cafeteria "A" 20002-Lamp T8 Electronic
1x8 Surface Mounted w/ Tube Guard
2 110 8 0.88 1,760 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
4 60 8 0.48 960 0.40 800 $133 0 No New Controls 0 0.0% 0 $0 $960.00 $360.00 $1,320.00 $160.00 8.73 $0.00 $0.00 $0.00 FALSE -
88 B - Kitchen 20004-Lamp T8 Electronic
1x4 Recessed Prismatic Lens
4 114 2 0.23 456 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 2 0.09 180 0.14 276 $46 0 No New Controls 0 0.0% 0 $0 $180.00 $90.00 $270.00 $30.00 5.24 $0.00 $0.00 $0.00 FALSE -
5 1 - Kindergarten 1 16002-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
2 62 8 0.50 794 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 8 0.24 384 0.26 410 $68 0 No New Controls 0 0.0% 0 $0 $480.00 $360.00 $840.00 $80.00 11.18 $0.00 $0.00 $0.00 FALSE -
61 - Kindergarten 1
Bathroom500
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 1 0.06 31 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 15 0.03 16 $3 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 35.77 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit - Whitney Houston Academy Page 3 of 10
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings,
kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
3 1 - Kindergarten 2 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 7 0.80 1,277 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 7 0.32 504 0.48 773 $128 0 No New Controls 0 0.0% 0 $0 $630.00 $315.00 $945.00 $105.00 6.55 $0.00 $0.00 $0.00 FALSE -
61 - Kindergarten 2
Bathroom500
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 2 0.12 62 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 30 0.06 32 $5 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 35.77 $0.00 $0.00 $0.00 FALSE -
3 1 - Kindergarten 3 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 6 0.68 1,094 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 6 0.27 432 0.41 662 $110 0 No New Controls 0 0.0% 0 $0 $540.00 $270.00 $810.00 $90.00 6.55 $0.00 $0.00 $0.00 FALSE -
61 - Kindergarten 3
Bathroom500
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 1 0.06 31 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 15 0.03 16 $3 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 35.77 $0.00 $0.00 $0.00 FALSE -
12 1 - Kindergarten 4 16002-Lamp T8 Electronic
1x4 Pendant Prismatic Lens2 62 6 0.37 595 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 6 0.18 288 0.19 307 $51 0 No New Controls 0 0.0% 0 $0 $360.00 $270.00 $630.00 $60.00 11.18 $0.00 $0.00 $0.00 FALSE -
211 - Kindergarten 4
Closet400
4-Lamp T8 Electronic2x4 Surface Mount
Prismatic Lens4 114 1 0.11 46 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 18 0.07 28 $5 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 26.19 $0.00 $0.00 $0.00 FALSE -
90 1 - Gymnasium 2000Metal Halide 250W
Recessed Prismatic Lens1 295 8 2.36 4,720 Replace Cree High Bay LED 160W 1 160 8 1.28 2,560 1.08 2,160 $359 0 No New Controls 0 0.0% 0 $0 $3,600.00 $720.00 $4,320.00 $1,200.00 8.70 $0.00 $0.00 $0.00 FALSE -
3 1 - Classroom 5 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 6 0.68 1,094 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 6 0.27 432 0.41 662 $110 0 No New Controls 0 0.0% 0 $0 $540.00 $270.00 $810.00 $90.00 6.55 $0.00 $0.00 $0.00 FALSE -
13 1 - Classroom 5 16004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 3 0.49 787 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 216 0.36 571 $95 0 No New Controls 0 0.0% 0 $0 $270.00 $135.00 $405.00 $45.00 3.80 $0.00 $0.00 $0.00 FALSE -
121 - Classroom 5
Closet400
2-Lamp T8 Electronic1x4 Pendant Prismatic Lens
2 62 1 0.06 25 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 12 0.03 13 $2 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 44.71 $0.00 $0.00 $0.00 FALSE -
3 1 - Hallway 3A 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 7 0.80 1,756 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 7 0.32 693 0.48 1,063 $176 0 No New Controls 0 0.0% 0 $0 $630.00 $315.00 $945.00 $105.00 4.76 $0.00 $0.00 $0.00 FALSE -
125 1 - Hallway 3A 22004 - Lamp T8 Rapid Start
Electronic2x2 Recessed Prismatic
4 63 2 0.13 277 Re-Lamp / De-Lamp / Reflector
Seesmart LED 2' Tube 9W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 27 2 0.05 119 0.07 158 $26 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $30.00 6.85 $0.00 $0.00 $0.00 FALSE -
105B - Auditorium Crawl
Space400
4-Lamp T12 Magnetic2x4 Surface Mounted
Prismatic Lens4 164 2 0.33 131 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 2 0.09 36 0.24 95 $16 0 No New Controls 0 0.0% 0 $0 $180.00 $90.00 $270.00 $30.00 15.19 $0.00 $0.00 $0.00 FALSE -
21 B - Stage 16004-Lamp T8 Electronic
2x4 Surface Mount Prismatic Lens
4 114 6 0.68 1,094 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 6 0.27 432 0.41 662 $110 0 No New Controls 0 0.0% 0 $0 $540.00 $270.00 $810.00 $90.00 6.55 $0.00 $0.00 $0.00 FALSE -
3 1 - Classroom 9 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 3 0.34 547 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 216 0.21 331 $55 0 No New Controls 0 0.0% 0 $0 $270.00 $135.00 $405.00 $45.00 6.55 $0.00 $0.00 $0.00 FALSE -
31 - Classroom 8
(Nurse's)2000
4-Lamp T8 Electronic2x4 Recessed Prismatic
Lens4 114 3 0.34 684 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 270 0.21 414 $69 0 No New Controls 0 0.0% 0 $0 $270.00 $135.00 $405.00 $45.00 5.24 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit - Whitney Houston Academy Page 4 of 10
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings,
kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
3 1 - Classroom 7 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 6 0.68 1,094 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 6 0.27 432 0.41 662 $110 0 No New Controls 0 0.0% 0 $0 $540.00 $270.00 $810.00 $90.00 6.55 $0.00 $0.00 $0.00 FALSE -
211 - Classroom 7
Closet400
4-Lamp T8 Electronic2x4 Surface Mount
Prismatic Lens4 114 1 0.11 46 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 18 0.07 28 $5 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 26.19 $0.00 $0.00 $0.00 FALSE -
13 1 - Main Office 20004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 4 0.66 1,312 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 4 0.18 360 0.48 952 $158 0 No New Controls 0 0.0% 0 $0 $360.00 $180.00 $540.00 $60.00 3.04 $0.00 $0.00 $0.00 FALSE -
3 1 - Principal's Office 20004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 2 0.23 456 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 2 0.09 180 0.14 276 $46 6Dual Technology
Occupancy Sensor - Switch Mnt.
1 20.0% 36 $6 $180.00 $90.00 $270.00 $30.00 5.24 $50.00 $50.00 $100.00 FALSE 16.73
3 1 - Waiting Room 20004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 2 0.23 456 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 2 0.09 180 0.14 276 $46 0 No New Controls 0 0.0% 0 $0 $180.00 $90.00 $270.00 $30.00 5.24 $0.00 $0.00 $0.00 FALSE -
3 1 - Guidance 20004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 2 0.23 456 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 2 0.09 180 0.14 276 $46 6Dual Technology
Occupancy Sensor - Switch Mnt.
1 20.0% 36 $6 $180.00 $90.00 $270.00 $30.00 5.24 $50.00 $50.00 $100.00 FALSE 16.73
24 1 - Main Office Entry 22001-Lamp T8 Electronic0.5x4 Surface Mount
Prismatic Lens1 32 1 0.03 70 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones1 15 1 0.02 33 0.02 37 $6 0 No New Controls 0 0.0% 0 $0 $30.00 $45.00 $75.00 $5.00 11.28 $0.00 $0.00 $0.00 FALSE -
12 1 - Classroom 13 16002-Lamp T8 Electronic
1x4 Pendant Prismatic Lens2 62 6 0.37 595 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 6 0.18 288 0.19 307 $51 0 No New Controls 0 0.0% 0 $0 $360.00 $270.00 $630.00 $60.00 11.18 $0.00 $0.00 $0.00 FALSE -
61 - Classroom 13
Closet400
2-Lamp T8 Electronic1x4 Surface Mount
Prismatic Lens2 62 1 0.06 25 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 12 0.03 13 $2 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 44.71 $0.00 $0.00 $0.00 FALSE -
82 2 - Hallway 2 22004-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
4 114 3 0.34 752 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 3 0.14 297 0.21 455 $76 0 No New Controls 0 0.0% 0 $0 $270.00 $135.00 $405.00 $45.00 4.76 $0.00 $0.00 $0.00 FALSE -
3 2 - Hallway 1 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 9 1.03 2,257 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 9 0.41 891 0.62 1,366 $227 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 4.76 $0.00 $0.00 $0.00 FALSE -
5 2 - Hallway 3 22002-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
2 62 3 0.19 409 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 3 0.09 198 0.10 211 $35 0 No New Controls 0 0.0% 0 $0 $180.00 $135.00 $315.00 $30.00 8.13 $0.00 $0.00 $0.00 FALSE -
5 2 - Hallway 4 22002-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
2 62 3 0.19 409 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 3 0.09 198 0.10 211 $35 0 No New Controls 0 0.0% 0 $0 $180.00 $135.00 $315.00 $30.00 8.13 $0.00 $0.00 $0.00 FALSE -
84 2 - Hallway 5 22001-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
1 32 8 0.26 563 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 8 0.24 528 0.02 35 $6 0 No New Controls 0 0.0% 0 $0 $480.00 $360.00 $840.00 $80.00 130.07 $0.00 $0.00 $0.00 FALSE -
82 2 - Hallway 5 22004-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
4 114 1 0.11 251 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 99 0.07 152 $25 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 4.76 $0.00 $0.00 $0.00 FALSE -
3 2 - Hallway 5 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 2 0.23 502 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 2 0.09 198 0.14 304 $50 0 No New Controls 0 0.0% 0 $0 $180.00 $90.00 $270.00 $30.00 4.76 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit - Whitney Houston Academy Page 5 of 10
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings,
kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
79 2 - Classroom 101 16002-Lamp T8
10"x4 Pendant Prismatic2 62 9 0.56 893 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 9 0.27 432 0.29 461 $76 0 No New Controls 0 0.0% 0 $0 $540.00 $405.00 $945.00 $90.00 11.18 $0.00 $0.00 $0.00 FALSE -
61 2 - Classroom 101 16004-Lamp T12 Magnetic1x4 Surface Mounted
Prismatic Lens4 164 1 0.16 262 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 72 0.12 190 $32 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 3.80 $0.00 $0.00 $0.00 FALSE -
79 2 - Classroom 102 16002-Lamp T8
10"x4 Pendant Prismatic2 62 9 0.56 893 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 9 0.27 432 0.29 461 $76 0 No New Controls 0 0.0% 0 $0 $540.00 $405.00 $945.00 $90.00 11.18 $0.00 $0.00 $0.00 FALSE -
82 2 - Classroom 102 16004-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
4 114 1 0.11 182 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 72 0.07 110 $18 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 6.55 $0.00 $0.00 $0.00 FALSE -
79 2 - Classroom 103 16002-Lamp T8
10"x4 Pendant Prismatic2 62 9 0.56 893 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 9 0.27 432 0.29 461 $76 0 No New Controls 0 0.0% 0 $0 $540.00 $405.00 $945.00 $90.00 11.18 $0.00 $0.00 $0.00 FALSE -
6 2 - Classroom 103 16002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 1 0.06 99 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 48 0.03 51 $8 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 11.18 $0.00 $0.00 $0.00 FALSE -
79 2 - Classroom 104 16002-Lamp T8
10"x4 Pendant Prismatic2 62 10 0.62 992 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 10 0.30 480 0.32 512 $85 0 No New Controls 0 0.0% 0 $0 $600.00 $450.00 $1,050.00 $100.00 11.18 $0.00 $0.00 $0.00 FALSE -
79 2 - Classroom 105 16002-Lamp T8
10"x4 Pendant Prismatic2 62 9 0.56 893 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 9 0.27 432 0.29 461 $76 0 No New Controls 0 0.0% 0 $0 $540.00 $405.00 $945.00 $90.00 11.18 $0.00 $0.00 $0.00 FALSE -
79 2 - Classroom 106 16002-Lamp T8
10"x4 Pendant Prismatic2 62 9 0.56 893 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 9 0.27 432 0.29 461 $76 0 No New Controls 0 0.0% 0 $0 $540.00 $405.00 $945.00 $90.00 11.18 $0.00 $0.00 $0.00 FALSE -
37 2 - Girl's Bathroom 22003-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
3 93 3 0.28 614 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 297 0.14 317 $53 5Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 59 $10 $270.00 $135.00 $405.00 $45.00 6.85 $200.00 $50.00 $250.00 FALSE 25.35
137 2 - Girl's Bathroom 2200 42W CFL 1 42 1 0.04 92 Replace 28W LED A-Lamp 1 28 1 0.03 62 0.01 31 $5 5Dual Technology
Occupancy Sensor - Remote Mnt.
0 20.0% 12 $2 $70.00 $27.50 $97.50 $10.00 17.11 $0.00 $0.00 $0.00 FALSE 0.00
3 Stairwell 1 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 1 0.11 251 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 1 0.05 99 0.07 152 $25 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 4.76 $0.00 $0.00 $0.00 FALSE -
78 Stairwell 1 22002-Lamp T8 Electronic
1x8 Pendant Direct2 110 3 0.33 726 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 3 0.18 396 0.15 330 $55 0 No New Controls 0 0.0% 0 $0 $360.00 $135.00 $495.00 $60.00 7.94 $0.00 $0.00 $0.00 FALSE -
37 Stairwell 4 26003-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
3 93 1 0.09 242 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 1 0.05 117 0.05 125 $21 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 5.79 $0.00 $0.00 $0.00 FALSE -
78 Stairwell 4 22002-Lamp T8 Electronic
1x8 Pendant Direct2 110 3 0.33 726 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 3 0.18 396 0.15 330 $55 0 No New Controls 0 0.0% 0 $0 $360.00 $135.00 $495.00 $60.00 7.94 $0.00 $0.00 $0.00 FALSE -
7 Stairwell 5 22002-Lamp T12 Magnetic
1x8 Surface Mount Direct2 131 2 0.26 576 Re-Lamp / De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 2 0.12 264 0.14 312 $52 0 No New Controls 0 0.0% 0 $0 $240.00 $90.00 $330.00 $40.00 5.59 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit - Whitney Houston Academy Page 6 of 10
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings,
kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
137 Stairwell 5 2200 42W CFL 1 42 1 0.04 92 Replace 28W LED A-Lamp 1 28 1 0.03 62 0.01 31 $5 0 No New Controls 0 0.0% 0 $0 $70.00 $27.50 $97.50 $10.00 17.11 $0.00 $0.00 $0.00 FALSE -
71 Stairwell 7 22002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 4 0.25 546 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 4 0.12 264 0.13 282 $47 0 No New Controls 0 0.0% 0 $0 $240.00 $180.00 $420.00 $40.00 8.13 $0.00 $0.00 $0.00 FALSE -
121 3 - Boys Toilet 2200 100W Incandescent 1 100 1 0.10 220 Replace Philips 18W LED A-Lamp 1 18 1 0.02 40 0.08 180 $30 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 1.09 $0.00 $0.00 $0.00 FALSE -
71 3 - Teachers Room 16002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 4 0.25 397 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 4 0.12 192 0.13 205 $34 6
Dual Technology Occupancy Sensor - Switch
Mnt.1 20.0% 38 $6 $240.00 $180.00 $420.00 $40.00 11.18 $50.00 $50.00 $100.00 $20.00 12.55
71 3 - Office 205 20002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 3 0.19 372 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 3 0.09 180 0.10 192 $32 6
Dual Technology Occupancy Sensor - Switch
Mnt.1 20.0% 36 $6 $180.00 $135.00 $315.00 $30.00 8.94 $50.00 $50.00 $100.00 $20.00 13.39
71 3 - Office 20002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 3 0.19 372 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 3 0.09 180 0.10 192 $32 6
Dual Technology Occupancy Sensor - Switch
Mnt.1 20.0% 36 $6 $180.00 $135.00 $315.00 $30.00 8.94 $50.00 $50.00 $100.00 $20.00 13.39
71 3 - 3rd Floor Hallway 22002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 5 0.31 682 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 5 0.15 330 0.16 352 $58 0 No New Controls 0 0.0% 0 $0 $300.00 $225.00 $525.00 $50.00 8.13 $0.00 $0.00 $0.00 FALSE -
3 3 - Attic Storage 4004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 3 0.34 137 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 54 0.21 83 $14 0 No New Controls 0 0.0% 0 $0 $270.00 $135.00 $405.00 $45.00 26.19 $0.00 $0.00 $0.00 FALSE -
84 B - Boys Bathroom 22001-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
1 32 1 0.03 70 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 66 0.00 4 $1 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 130.07 $0.00 $0.00 $0.00 FALSE -
71 B - Girls Bathroom 22002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 1 0.06 136 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 66 0.03 70 $12 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 8.13 $0.00 $0.00 $0.00 FALSE -
71 B - Classroom S-12 16002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 5 0.31 496 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 5 0.15 240 0.16 256 $42 0 No New Controls 0 0.0% 0 $0 $300.00 $225.00 $525.00 $50.00 11.18 $0.00 $0.00 $0.00 FALSE -
21B - Instrument Practice S-13
16004-Lamp T8 Electronic
2x4 Surface Mount Prismatic Lens
4 114 11 1.25 2,006 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 11 0.50 792 0.76 1,214 $202 0 No New Controls 0 0.0% 0 $0 $990.00 $495.00 $1,485.00 $165.00 6.55 $0.00 $0.00 $0.00 FALSE -
84 B - S-13 Storage 4001-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
1 32 4 0.13 51 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 4 0.12 48 0.01 3 $1 0 No New Controls 0 0.0% 0 $0 $240.00 $180.00 $420.00 $40.00 715.36 $0.00 $0.00 $0.00 FALSE -
121 B - S-13 Storage 400 100W Incandescent 1 100 1 0.10 40 Replace Philips 18W LED A-Lamp 1 18 1 0.02 7 0.08 33 $5 0 No New Controls 0 0.0% 0 $0 $15.00 $27.50 $42.50 $10.00 5.97 $0.00 $0.00 $0.00 FALSE -
79 B - Custodian's Office 20002-Lamp T8
10"x4 Pendant Prismatic2 62 1 0.06 124 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 60 0.03 64 $11 6
Dual Technology Occupancy Sensor - Switch
Mnt.1 20.0% 12 $2 $60.00 $45.00 $105.00 $10.00 8.94 $50.00 $50.00 $100.00 FALSE 50.20
131 B - Custodian's Office 20004-Lamp T8 Electronic
1x4 Pendant Prismatic Lens4 114 1 0.11 228 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 90 0.07 138 $23 6
Dual Technology Occupancy Sensor - Switch
Mnt.0 20.0% 18 $3 $90.00 $45.00 $135.00 $15.00 5.24 $0.00 $0.00 $0.00 FALSE 0.00
Appendix E - Lighting Audit - Whitney Houston Academy Page 7 of 10
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings,
kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
83 B - Custodian's Office 20001-Lamp T12 Magnetic
1x4 Pendant Prismatic Lens1 48 2 0.10 192 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 120 0.04 72 $12 6
Dual Technology Occupancy Sensor - Switch
Mnt.0 20.0% 24 $4 $120.00 $90.00 $210.00 $20.00 15.90 $0.00 $0.00 $0.00 FALSE 0.00
3 B - S-5 Classroom 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 9 1.03 1,642 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 9 0.41 648 0.62 994 $165 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 6.55 $0.00 $0.00 $0.00 FALSE -
131 B - Basement Hallway 22004-Lamp T8 Electronic
1x4 Pendant Prismatic Lens4 114 4 0.46 1,003 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 4 0.18 396 0.28 607 $101 0 No New Controls 0 0.0% 0 $0 $360.00 $180.00 $540.00 $60.00 4.76 $0.00 $0.00 $0.00 FALSE -
82 B - Basement Hallway 8004-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
4 114 1 0.11 91 Re-Lamp/De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 1 0.05 36 0.07 55 $9 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 13.10 $0.00 $0.00 $0.00 FALSE -
71 B - Basement Hallway 22002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 4 0.25 546 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 4 0.12 264 0.13 282 $47 0 No New Controls 0 0.0% 0 $0 $240.00 $180.00 $420.00 $40.00 8.13 $0.00 $0.00 $0.00 FALSE -
71B - Cafeteria Stairwell
12200
2-Lamp T810"x4 Surface Mounted
Prismatic2 62 2 0.12 273 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 132 0.06 141 $23 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 8.13 $0.00 $0.00 $0.00 FALSE -
41 B - Cafeteria 20002-Lamp T8 Electronic1x8 Surface Mounted
2 110 8 0.88 1,760 Re-Lamp / De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 8 0.48 960 0.40 800 $133 0 No New Controls 0 0.0% 0 $0 $960.00 $360.00 $1,320.00 $160.00 8.73 $0.00 $0.00 $0.00 FALSE -
71 B - Cafeteria 20002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 2 0.12 248 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 120 0.06 128 $21 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 8.94 $0.00 $0.00 $0.00 FALSE -
58 B - Cafeteria Storage 4002-Lamp T12 Magnetic1x8 Surface Mounted
2 131 1 0.13 52 Re-Lamp / De-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones4 60 1 0.06 24 0.07 28 $5 0 No New Controls 0 0.0% 0 $0 $120.00 $45.00 $165.00 $20.00 30.76 $0.00 $0.00 $0.00 FALSE -
137 B - Cafeteria Storage 400 42W CFL 1 42 1 0.04 17 Replace 28W LED A-Lamp 1 28 1 0.03 11 0.01 6 $1 0 No New Controls 0 0.0% 0 $0 $70.00 $27.50 $97.50 $10.00 94.13 $0.00 $0.00 $0.00 FALSE -
18B - Boiler
Rooom/Storage Area400
2-Lamp T12 Magnetic1x4 Pendant
2 82 16 1.31 525 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 16 0.48 192 0.83 333 $55 0 No New Controls 0 0.0% 0 $0 $960.00 $720.00 $1,680.00 $160.00 27.51 $0.00 $0.00 $0.00 FALSE -
13 1 - Hallway 1A 22004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 1 0.16 361 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 1 0.05 99 0.12 262 $43 0 No New Controls 0 0.0% 0 $0 $90.00 $45.00 $135.00 $15.00 2.76 $0.00 $0.00 $0.00 FALSE -
116 1 - Hallway 1A 22002-Lamp T12 Magnetic
2x4 Recessed Prismatic2 62 3 0.19 409 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 3 0.09 198 0.10 211 $35 0 No New Controls 0 0.0% 0 $0 $180.00 $135.00 $315.00 $30.00 8.13 $0.00 $0.00 $0.00 FALSE -
6 1 - Hallway 1A 22002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 1 0.06 136 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 66 0.03 70 $12 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 8.13 $0.00 $0.00 $0.00 FALSE -
71 1 - Hallway 6A 22002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 4 0.25 546 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 4 0.12 264 0.13 282 $47 0 No New Controls 0 0.0% 0 $0 $240.00 $180.00 $420.00 $40.00 8.13 $0.00 $0.00 $0.00 FALSE -
56 1 - Hallway 6A 22002-Lamp T12
10"x4 Surface Mounted Prismatic
2 82 1 0.08 180 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 66 0.05 114 $19 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 5.00 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit - Whitney Houston Academy Page 8 of 10
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings,
kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
1 1 - Gym Vestibule 2200 26W CFL 1 26 5 0.13 286 Replace 20W LED A Lamp 1 20 5 0.10 220 0.03 66 $11 0 No New Controls 0 0.0% 0 $0 $100.00 $137.50 $237.50 $50.00 17.11 $0.00 $0.00 $0.00 FALSE -
5 1 - Hallway 2A 22002-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
2 62 2 0.12 273 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 2 0.06 132 0.06 141 $23 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 8.13 $0.00 $0.00 $0.00 FALSE -
13 1 - Classroom 5 16004-Lamp T12 Magnetic
2x4 Recessed Prismatic Lens
4 164 3 0.49 787 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 216 0.36 571 $95 0 No New Controls 0 0.0% 0 $0 $270.00 $135.00 $405.00 $45.00 3.80 $0.00 $0.00 $0.00 FALSE -
3 1 - Classroom 5 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 6 0.68 1,094 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 6 0.27 432 0.41 662 $110 0 No New Controls 0 0.0% 0 $0 $540.00 $270.00 $810.00 $90.00 6.55 $0.00 $0.00 $0.00 FALSE -
79 1 - Classroom 5 16002-Lamp T8
10"x4 Pendant Prismatic2 62 1 0.06 99 Re-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 48 0.03 51 $8 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 11.18 $0.00 $0.00 $0.00 FALSE -
3 1 - Classroom 6 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 9 1.03 1,642 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 9 0.41 648 0.62 994 $165 0 No New Controls 0 0.0% 0 $0 $810.00 $405.00 $1,215.00 $135.00 6.55 $0.00 $0.00 $0.00 FALSE -
71 1 - Classroom 6 16002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 1 0.06 99 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 48 0.03 51 $8 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 11.18 $0.00 $0.00 $0.00 FALSE -
3 1 - Hallway 4A 22004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 2 0.23 502 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 2 0.09 198 0.14 304 $50 0 No New Controls 0 0.0% 0 $0 $180.00 $90.00 $270.00 $30.00 4.76 $0.00 $0.00 $0.00 FALSE -
5 1 - Hallway 4A 22002-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
2 62 1 0.06 136 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
2 30 1 0.03 66 0.03 70 $12 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 8.13 $0.00 $0.00 $0.00 FALSE -
71 1 - Hallway 5A 22002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 6 0.37 818 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 6 0.18 396 0.19 422 $70 0 No New Controls 0 0.0% 0 $0 $360.00 $270.00 $630.00 $60.00 8.13 $0.00 $0.00 $0.00 FALSE -
104 1 - 5A Vestibule 2200 1-Lamp 27W CFL 1 27 4 0.11 238 Replace 20W LED A Lamp 1 20 4 0.08 176 0.03 62 $10 0 No New Controls 0 0.0% 0 $0 $80.00 $110.00 $190.00 $40.00 14.67 $0.00 $0.00 $0.00 FALSE -
31 1 - 5A Vestibule 22002-Lamp T12 Magnetic
1x4 Surface Mount Prismatic Lens
2 82 1 0.08 180 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 66 0.05 114 $19 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 5.00 $0.00 $0.00 $0.00 FALSE -
6 1 - Hallway 7A 22002-Lamp T8 Electronic
1x4 Surface Mount Prismatic Lens
2 62 2 0.12 273 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 2 0.06 132 0.06 141 $23 0 No New Controls 0 0.0% 0 $0 $120.00 $90.00 $210.00 $20.00 8.13 $0.00 $0.00 $0.00 FALSE -
3 1 - Library 16004-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
4 114 18 2.05 3,283 Re-Lamp / De-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 18 0.81 1,296 1.24 1,987 $330 0 No New Controls 0 0.0% 0 $0 $1,620.00 $810.00 $2,430.00 $270.00 6.55 $0.00 $0.00 $0.00 FALSE -
131 1 - Classroom 12 16004-Lamp T8 Electronic
1x4 Pendant Prismatic Lens4 114 6 0.68 1,094 Re-Lamp/De-Lamp
Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones3 45 6 0.27 432 0.41 662 $110 0 No New Controls 0 0.0% 0 $0 $540.00 $270.00 $810.00 $90.00 6.55 $0.00 $0.00 $0.00 FALSE -
71 1 - Classroom 12 16002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 1 0.06 99 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 48 0.03 51 $8 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 11.18 $0.00 $0.00 $0.00 FALSE -
Appendix E - Lighting Audit - Whitney Houston Academy Page 9 of 10
Fixture Reference #
LocationAverage
Burn Hours
DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr Work Description Equipment DescriptionLamps per
FixtureWatts per
FixtureQty of
FixturesTotal kW
Usage kWh/Yr
Energy Savings,
kW
Energy Savings, kWh
Energy Savings, $
Control Ref #
Controls DescriptionQty of
Controls
Hour Reduction
%
Energy Savings,
kWh
Energy Savings, $
Material Total Labor Total AllRebate
EstimateSimple
PaybackTotal
MaterialsTotal Labor Total All
Simple Payback
Smart Start Incentive
LIGHTING CONTROLS COSTRETROFIT ENERGY SAVINGSEXISTING FIXTURES PROPOSED FIXTURE RETROFIT PROPOSED LIGHTING CONTROLS LIGHTING RETROFIT COSTS
37 1 - Boys Bathroom 22003-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
3 93 3 0.28 614 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 297 0.14 317 $53 5Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 59 $10 $270.00 $135.00 $405.00 $45.00 6.85 $200.00 $50.00 $250.00 FALSE 25.35
104 1 - Boys Bathroom 2200 1-Lamp 27W CFL 1 27 1 0.03 59 Replace 20W LED A Lamp 1 20 1 0.02 44 0.01 15 $3 5Dual Technology
Occupancy Sensor - Remote Mnt.
0 20.0% 9 $1 $20.00 $27.50 $47.50 $10.00 14.67 $0.00 $0.00 $0.00 FALSE 0.00
37 1 - Girls Bathroom 22003-Lamp T8 Electronic
2x4 Recessed Prismatic Lens
3 93 3 0.28 614 Re-Lamp / Reflector
Seesmart LED Tube 15W 4Kwith semi Specular Reflector Kitbypass ballast and provide new
tombstones
3 45 3 0.14 297 0.14 317 $53 5Dual Technology
Occupancy Sensor - Remote Mnt.
1 20.0% 59 $10 $270.00 $135.00 $405.00 $45.00 6.85 $200.00 $50.00 $250.00 FALSE 25.35
104 1 - Girls Bathroom 2200 1-Lamp 27W CFL 1 27 1 0.03 59 Replace 20W LED A Lamp 1 20 1 0.02 44 0.01 15 $3 5Dual Technology
Occupancy Sensor - Remote Mnt.
0 20.0% 9 $1 $20.00 $27.50 $47.50 $10.00 14.67 $0.00 $0.00 $0.00 FALSE 0.00
71 1 - Toilet Room 22002-Lamp T8
10"x4 Surface Mounted Prismatic
2 62 1 0.06 136 Re-Lamp Seesmart LED Tube 15W 4Kbypass ballast and provide new
tombstones2 30 1 0.03 66 0.03 70 $12 0 No New Controls 0 0.0% 0 $0 $60.00 $45.00 $105.00 $10.00 8.13 $0.00 $0.00 $0.00 FALSE -
95 Exterior 3000High Pressure Sodium
(175W)Wall Pack
1 207 3 0.62 1,863 ReplaceRAB Exterior 26W LED Wall
Pack 1 26 3 0.08 234 0.54 1,629 $270 0 No New Controls 0 0.0% 0 $0 $810.00 $270.00 $1,080.00 $300.00 2.88 $0.00 $0.00 $0.00 FALSE -
51 Exterior 3000High Pressure Sodium 70WPole Mounted Opaque Lens
1 93 8 0.74 2,232 Existing to Remain No Change 1 93 0 0.74 2,232 0.00 0 $0 0 No New Controls 0 0.0% 0 $0 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 FALSE -
48 Exterior 3000PAR Lamp 150WSurface Mounted
1 150 4 0.60 1,800 Replace ELS 30w Par38 LED 1 30 4 0.12 360 0.48 1,440 $239 0 No New Controls 0 0.0% 0 $0 $740.00 $110.00 $850.00 $40.00 3.39 $0.00 $0.00 $0.00 FALSE -
TOTAL 572 52.3 90,969 564 23 41,083 29.0 49,886 $8,281 11 3 521 $86 $46,302 $25,343 $71,645 $8,760 7.59 $1,150 $550 $1,700 $60.00 18.98
Appendix E - Lighting Audit - Whitney Houston Academy Page 10 of 10
Appendix FPage 1 of 3
Location Description
Area (Sq FT) Panel Qty
Panel Sq Ft
Panel Total Sq
FtTotal KWDC
Total Annual kWh
Total KWAC
Panel Weight
(41.9 lbs) W/SQFT
Whitney Houston Academy
2584SHARP
ND-240QCJ105 17.5 1,842 25.20 29,640 22.9 4,400 13.68
= Proposed PV Roof Layout = Proposed PV Parking Layout
Notes:
1. Estimated kWH based on the National Renewable Energy Laboratory PVWatts Version 1 Calculator Program.
Appendix FPage 2 of 3
Project Name: LGEA Solar PV Project - Whitney Houston Academy
Location: East Orange, NJDescription: Photovoltaic System 100% Financing - 15 year
Simple Payback Analysis
Total Construction Cost $118,957Annual kWh Production 29,640
Annual Energy Cost Reduction $4,920Average Annual SREC Revenue $4,491
Simple Payback: Years
Life Cycle Cost AnalysisAnalysis Period (years): 15 Financing %: 100%
Discount Rate: 3% Maintenance Escalation Rate: 3.0%Average Energy Cost ($/kWh) $0.166 Energy Cost Escalation Rate: 3.0%
Financing Rate: 6.00% Average SREC Value ($/kWh) $0.152Period Additional Energy kWh Energy Cost Additional SREC Interest Loan Net Cash Cumulative
Cash Outlay Production Savings Maint Costs Revenue Expense Principal Flow Cash Flow0 $0 0 0 0 $0 0 0 0 01 $0 29,640 $4,920 $0 $7,410 $7,000 $5,046 $285 $2852 $0 29,492 $5,068 $0 $7,373 $6,689 $5,357 $395 $6803 $0 29,345 $5,220 $0 $7,336 $6,359 $5,687 $510 $1,1904 $0 29,198 $5,377 $0 $5,840 $6,008 $6,038 ($830) $3605 $0 29,052 $5,538 $299 $5,810 $5,635 $6,411 ($997) ($637)6 $0 28,907 $5,704 $298 $5,781 $5,240 $6,806 ($858) ($1,495)7 $0 28,762 $5,875 $296 $4,314 $4,820 $7,226 ($2,153) ($3,648)8 $0 28,618 $6,051 $295 $4,293 $4,374 $7,671 ($1,997) ($5,644)9 $0 28,475 $6,233 $293 $4,271 $3,901 $8,145 ($1,835) ($7,479)
10 $0 28,333 $6,420 $292 $2,833 $3,399 $8,647 ($3,085) ($10,564)11 $0 28,191 $6,612 $290 $2,819 $2,866 $9,180 ($2,905) ($13,468)12 $0 28,050 $6,811 $289 $2,805 $2,299 $9,746 ($2,719) ($16,187)13 $0 27,910 $7,015 $287 $1,396 $1,698 $10,348 ($3,923) ($20,110)14 $0 27,771 $7,226 $286 $1,389 $1,060 $10,986 ($3,718) ($23,828)15 $0 27,632 $7,442 $285 $1,382 $383 $11,663 ($3,506) ($27,334)
Totals: 429,377 $91,512 $3,211 $65,052 $61,732 $118,957 ($27,334) ($127,880)Net Present Value (NPV)
Photovoltaic System 100% Financing - 15 year
12.64
($18,473)
Appendix FPage 3 of 3
PVWatts: Monthly PV Performance Data Rooftop ArrayRequested Location: 215 Dodd St., East Orange, NJLocation: NEWARK, NJLat (deg N): 40.7Long (deg W): 74.17Elev (m): 9DC System Size (kW): 25.2Module Type: StandardArray Type: Fixed (roof mount)Array Tilt (deg): 10Array Azimuth (deg): 135System Losses: 14Invert Efficiency: 96DC to AC Size Ratio: 1.1Average Cost of Electricity 0.17Initial Cost No initial cost definedCost of Electricity Generatenot determined
MonthAC System
Output(kWh)
Solar Radiation
(kWh/m^2/day)
Plane of Array Irradiance (W/m^2)
DC array Output (kWh) Value ($)
1 1,500 2.24 69.51 1,581 248.972 1,829 3.04 85.08 1,921 303.663 2,590 3.96 122.89 2,713 429.924 2,909 4.76 142.88 3,048 482.895 3,461 5.66 175.31 3,620 574.496 3,419 5.93 177.84 3,579 567.497 3,366 5.71 177.14 3,524 558.748 3,107 5.32 164.81 3,252 515.819 2,645 4.54 136.26 2,770 439.05
10 2,158 3.48 107.92 2,264 358.1911 1,411 2.26 67.92 1,489 234.1512 1,247 1.90 58.92 1,320 206.94
Total 29,640 48.81 1486.47 31,080 4920.3