Eastchester Union Free School DistrictBoard of Education Work Session2022 Capital Project Planning
26 October, 2021
2
Agenda
• Assessments and Findings
• Goals
• Scope and Value of Work
• Project Cost
• Timeline
• Discussion and Next Steps
3
Assessments & Findings
4
Assessments & Findings * Buildings lack mechanical ventilation and filtration. Opening
windows is not best practice for providing clean, fresh air to
classrooms.
▪ 2018 - 2019 Safety & Security Bond Planning
▪ 2020 State Education Department (SED) Building Conditions Survey, Unsatisfactory, Non-functioning and Critical Failing Items that need to be corrected 2021
▪ District-Wide Facilities Survey & Assessment –extensive analysis of buildings conditions beyond SED requirements, corrective measures, best practice, and bringing buildings up to an acceptable standard.
Process & Assessments01
* Scope of the 2020 BCS and 2021 Facilities Survey & Assessment excludes instructional and/or program related improvements.
Most systems met code at the time of installation, but do not meet current code - Buildings lack accessibility, like non-accessible toilet facilities
Aging infrastructure: Original Mechanical, Electrical, and Plumbing systems, deteriorating floors and ceilings. Existing HVAC systems were somewhat adequate pre-pandemic but don’t address current concerns related to health & wellness and safety & security.
General needs include site and athletic field stormwater improvements, site security, parking and paving.
Findings02Buildings lack basic school safety components and layering of safety measures
All buildings deemed Unsatisfactory by SED Standards.
5
Goals
Health & Wellness and Safety & Security of
students, faculty and staff through corrected and
improved infrastructure
6
Building Age
Square footage of buildings older than 1970 or 50+ years is 346,877 sq ft.
01
* 66% of district school buildings are 50+ years or older.
Goal: Existing Building Infrastructure
District Capital Investments
Over the last 25 years, most funds were spent on building additions to address enrollment.
02
Since 1996, $63.6M of $73.3M, or 87% of capital fundswas spent on building additions/new construction.
Of the remaining 13%, none was spent on modernizing building infrastructure and systems other than critical-failing items, like boiler and roof replacements.
7
Scope & Value of WorkExisting building infrastructure is failing and will
continue to fail unless an investment is made on
District’s assets. A maintenance plan does not work
unless building infrastructure is fixed.
8
Scope of WorkSafety & Security
Layering Approach - Secure entrance vestibules,
exterior door replacement, interior door
replacements with intruder locksets, exterior
lighting and security devices.
01
Health & Wellness
Ventilation, clean filtered air, better lighting
quality, cleaner drinking water, healthy building
materials, and equity.
02
Accessibility
Toilet rooms, interior and exterior stairs and
ramps, ADA parking spaces
03
Infrastructure & Building Maintenance
Steam conversion to hot water, mechanical
equipment, domestic water piping, electrical
panels, electric service upgrades, backflow
preventors, expanded fire alarm systems,
asbestos abatement, ceilings and lighting,
classroom casework and flooring
04
Site Improvements & Storm Drainage
Stormwater improvements, select re-paving, HS
baseball & softball field improvements, HS bus
loop improvements
05
Systems are mostly original to the buildings
Includes basic components related to clean air and thermal comfort,
and a key strategy for maintaining healthy environments to learn, while minimizing the spread of
airborne particles
9
Scope of WorkSafety & Security
Secure entrance vestibules, interior door replacements
with intruder locksets, exterior door replacement, exterior
lighting and security devices
01 Layering Approach - Secure entrance vestibules,
exterior door replacements, interior door
replacements with intruder locksets, exterior
lighting and security devices
E n t r yS e c u r e V e s t ib u le
S e c u r i t y O f f i c e
S e c u r e E n t r y
1 Locked exterior doors
Check-in with security officer
Locked interior vestibule door. Release activated by security officer2 3
2
31
3
3
1
2
Middle/High School
ADA Accessible
Lobby
Lobby
Anne Hutchinson
1
Lobby
2
3
Security Office
Secure Vestibule
Security Office
Greenvale
1
2
3Lobby
Secure Vestibule
1
2
3
Secure Vestibule
Waverly
Lobby
Security Office
11
Scope of WorkHealth & Wellness
02 Ventilation, clean filtered air, better lighting
quality, cleaner drinking water, healthy building
materials, and equity.
12
Scope of WorkAccessibility
03 Toilet rooms, interior and exterior stairs and
ramps, ADA parking spaces
13
On-going infrastructure and systems
replacements, upgrades and repair.Scope of WorkInfrastructure & Building Maintenance
04
14
Stormwater improvements, select re-paving, HS
baseball & softball field improvements, HS bus
loop improvementsScope of WorkSite Improvements & Storm Drainage
05
15
Eastchester High School
Third FloorSecond Floor
Proposed secure entrance addition Safety & Security Planning
First FloorBasement Floor
Secure vestibule addition
Boiler Room repairs
Electrical Room egress alterations
Toilet Room renovations
New unit ventilators / casework replacement
Classroom ceiling and lighting replacement for hot water piping installation
Corridor renovations for hot water piping installation
Area of 2019 addition & alterations – no work
Masonry opening for new until ventilator
Interior door replacement
Heating & Ventilation Replacement
16
Eastchester Middle School
Second FloorFirst Floor
Locker Room renovations
Toilet Room renovations
New unit ventilators / casework replacement
Classroom ceiling and lighting replacement for hot water piping installation
Corridor renovations for hot water piping installation
Area of 2019 addition & alterations – no work
Masonry opening for new until ventilator
Interior door replacement
Classroom 211
17
Anne Hutchinson Elementary School
Secure vestibule renovations
Auditorium renovations; ceilings & lighting
Electrical Room renovations
Toilet Room renovations Masonry opening for new ventilation fans
First Floor
Cafeteria wall tile replacement
Exterior door replacement
Masonry opening for new until ventilator
Ground Floor
New unit ventilators / casework replacement
Classroom ceiling and lighting replacement for hot water piping installation
Corridor renovations for hot water piping installation
Heating & Ventilation Replacement
tr
tr
18
Greenvale Elementary School
First Floor
Second Floor
Secure vestibule renovations
Trenching for electrical service/room
Electrical Room renovations
New unit ventilators / casework replacementClassroom ceiling and lighting replacement for hot water piping installation
Corridor renovations for hot water piping installation
Masonry opening for new until ventilator
Window replacementExterior stair repair / reconstruction
Interior system replacement
Toilet Room renovations
Third Floor
Fourth Floor
19
Second FloorFirst Floor
Waverly Elementary School
Secure vestibule renovations & addition
Toilet Room renovations
New unit ventilators / casework replacement
Classroom ceiling soffit renovations for hot water piping installation
Masonry opening for new until ventilator
Interior system replacement
20
Project Cost Summary
21
Timeline
23
Timeline
24
Discussion & Next Steps