eco-logical-fox's faq: disaster relief sustainable asset house
DESCRIPTION
Due to the overwhelming interest in the PreMODS bamboo plyboard International Building Standard certified disaster relief house, we have issued this media FAQ regarding its current deployment as a SUSTAINABLE social infrastructure and disaster relief asset. Contact [email protected] for more information or inquiries.TRANSCRIPT
Prefabricated Modular Sustainable (PreMODS)- Disaster Relief Asset
FAQ:
PreMODS units delivered as a DRA: 425
PreMODS total DRA square feet in use: 270,450 sq ft
PreMODS first field use: 2004
Most recent relief installation: Leh, 2010
PreMODS use as an international disaster asset: Tsunami, Sri Lanka, Tsunami, Andaman Islands, Flood, Cloud Burst, Leh, Quake/ Landslide, Jammu KashmirSocial Dev't, Kashmir; Bihar; Tezpur
In-Field PreMODS (re Appropriate Constr. Tech): Dry Hot PlainsHot Humid JungleHigh Altitude- Snow to 1meter roof loadHigh-low Alt-Cold Wet: IS insulated coreHurricane Prone: rated to <150kmphEarthquake Prone: Tensile-Twist x2 wood
Total In-Field PreMODS DRA, Social and Conventional: 2,000+ units
PreMODS locations on India sub-continent:
Andhra Khammam/Hyderabad, Assam, Guwhati, Tezpur, Dinjam, Bodoland, Tripura, Agartala, Maharashtra Mumbai, Wardha, Uttaranchal Haldwani, Joshimath Yol Cantt, Delhi , Arunachal Ruksin, Pasighat, Remi Village, Lumla, Tawang, Nagaland Kisama, Dimapur, Andamans Port Balir, Carnicobar, Tamilnadu Thanjavur, Chennai, Uttar Pradesh Amethi, J&K Uri, Leh, Kargil, Srinagar, Rajasthan, Jaipur, Bikaner, West Bengal, Kalimpong, Dinhata, Manipur, Tamilong Distt, Bihar, Patna, Madhya Pradesh Jabalpur
Bhopal.
EXAMPLE FLOORPLANS
Did you Know? Only 50-75% of a felled tree can be used for plywood and takes 60 years to renew. 100% of
every bamboo pole is used for plyboard and takes only 6 months to renew. I.S. rated Bamboo plyboard has over double the tensile and rupture performance of conventional timber plywood.
INSTALLATIONS: as DISASTER RELIEF ASSET:
Medical Station, Kargil
Flood/Landslide Relief, LEH
High Altitude Relief Asset Deployment to post-Landslide Tent Village
INSTALLATIONS: as SOCIAL INFRASTRUCTURE ASSET:
Primary Schoolhouse , Arunachal Pradesh
Tech School J&K