ecosmart™ concrete project ecosmart™ a concrete contribution to the environment ·...

8
1 ECOSMART™ CONCRETE Project a concrete contribution to the environment Michel de Spot, P.Eng. President & CEO, ECOSMART Foundation Sustainability and Concrete Westmar , January 3, 2008 EcoSmart™ Foundation Non-Profit Organization Created in 1999. Supported by the Government of Canada. Effective industry-government partnership. Introduce technology innovations that reduce GHG signature of concrete. 2 Million Tonne CO 2 One tonne Clinker, one tonne CO 2 50% Process 40% Fuel 10% Electricity, Transportation EcoSmart Concrete Objectives To minimize GHG “signature” of concrete by optimizing replacement of Portland cement with Supplementary Cementing Materials such as fly ash while improving or maintaining • Cost • Performance • Constructability ? X SCM: Zero (or low) GHG Fly ash Metakaolin Slag Natural pozzolan

Upload: others

Post on 11-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ECOSMART™ CONCRETE Project EcoSmart™ a concrete contribution to the environment · 2012-02-12 · 1 ECOSMART™ CONCRETE Project a concrete contribution to the environment Michel

1

ECOSMART™ CONCRETE Projecta concrete contribution to the environment

Michel de Spot, P.Eng. President & CEO, ECOSMART Foundation

Sustainability and ConcreteWestmar , January 3, 2008

EcoSmart™ Foundation

Non-Profit OrganizationCreated in 1999. Supported by the Government of Canada.Effective industry-government partnership. Introduce technology innovations that reduce GHG

signature of concrete.

2 Million Tonne CO2

One tonne Clinker, one tonne CO2

50% Process40% Fuel10% Electricity,

Transportation

EcoSmart Concrete ObjectivesTo minimize GHG “signature” of concrete by optimizing replacement of Portland cement with Supplementary Cementing Materials such as fly ash while improving or maintaining • Cost• Performance• Constructability

? X

SCM: Zero (or low) GHGFly ash

Metakaolin

SlagNatural pozzolan

Page 2: ECOSMART™ CONCRETE Project EcoSmart™ a concrete contribution to the environment · 2012-02-12 · 1 ECOSMART™ CONCRETE Project a concrete contribution to the environment Michel

2

Coal Fired Power Plant

Coal Mine & Power Plant

Demonstration Project

How much SCM replacement can be achieved, how does it affect: Cost – Performance – Constructability in the Emirates context

With: Suppliers

Cement manufacturers, ready-mixed concrete producers, SCM producers / suppliers

DesignersDevelopers & owners, architects, structural engineers, material

engineers & test labs, code officialsBuilders

Contractors, sub-trades (concrete placers, finishers, form installers)

Learning by doing

50% FA

York University Building

50% Fly Ash

Underground Garage

50% Fly Ash

Page 3: ECOSMART™ CONCRETE Project EcoSmart™ a concrete contribution to the environment · 2012-02-12 · 1 ECOSMART™ CONCRETE Project a concrete contribution to the environment Michel

3

Little MountainWater Reservoir Vancouver

50% Fly Ash

Water Reservoir

50% Fly AshSprayedConcrete

Apartment Building

50% Fly Ash

Seymour Water Filtration Plant

Seymour Water Filtration Plant Bayview High Rise Building

Page 4: ECOSMART™ CONCRETE Project EcoSmart™ a concrete contribution to the environment · 2012-02-12 · 1 ECOSMART™ CONCRETE Project a concrete contribution to the environment Michel

4

Brentwood Skytrain Station

30% fly ash in pre-cast

Replacement levels in Canada

Case Studies50%

Optimum: SOS

New ‘Standard’

90’s Baseline5%

25% 1.7 Mt

1.35 Mt CO2 saved

?

Durability DurabilityDurability

Treat Island tests

Emirates Dubai

Page 5: ECOSMART™ CONCRETE Project EcoSmart™ a concrete contribution to the environment · 2012-02-12 · 1 ECOSMART™ CONCRETE Project a concrete contribution to the environment Michel

5

‘a very dynamic construction market” EcoSmart Emirates

Introduction of the technology in the Emirates by • Demonstration Projects• Showcasing feasibility, benefits and cost-effectiveness• Addressing technical issues and risks • Developing innovative solutions• Linking Canadian companies to local clients g p

Demonstration Projects

• DP World Tanker Jetty• YAS Island (Ferrari F1 Circuit)• Dubai World Trade Centre• Burgh Dubai Tower• UNIBETON Project

Ferrari experience

Yas Island

Key Strategic Elements in the UAE

Cost• Supply source• 100 Mt /a in India (free ?)• Reduce cost in the EmiratesStrength• Tests comparing performance with traditional concreteDurability• Tests and studies comparing durability with “durable” concrete• Tests and studies comparing durability with durable concrete Ease of construction• Pumpability• Less water and admixtures• Heat of hydration (cracking, ice)GHG Saving• LEED• GHG credits• Publicity

Heat of Hydration tests on various binders(350kg, 425kg and 500kg)Heat of Hydration

100% OPC GGBFS 65%

Page 6: ECOSMART™ CONCRETE Project EcoSmart™ a concrete contribution to the environment · 2012-02-12 · 1 ECOSMART™ CONCRETE Project a concrete contribution to the environment Michel

6

Heat of Hydration tests on various binders(350kg, 425kg and 500kg)Heat of Hydration

100% OPC Fly Ash 25%

Heat of Hydration tests on various binders(350kg, 425kg and 500kg)Heat of Hydration

100% OPC Fly Ash 40%

Heat of Hydration tests on various binders(350kg, 425kg and 500kg)Heat of Hydration

100% OPC Fly Ash 55%

Heat of Hydration tests on various binders(350kg, 425kg and 500kg)Heat of Hydration

GGBFS 65%Fly Ash 40%

Compressive Strength Development7-d MC; Air Dried at 38°C

40

50

60

reng

th, M

Pa

Control30% FA 0 43 W/CM

0

10

20

30

0 10 20 30

Age, days

Com

pres

sive

Str 30% FA, 0.43 W/CM

45% FA, 0.43 W/CM45% FA, 0.40 W/CM

RCP Test Results at 28 Days

3000

4000

5000

6000

oulo

mbs

Control30% FA: 0.43 W/CM

0

1000

2000

3000

MC 1/38 3/38 7/38 LD Cycles

Conditions

RC

P, C

o

45% FA: 0.43 W/CM45% FA: 0.40 W/CM

Page 7: ECOSMART™ CONCRETE Project EcoSmart™ a concrete contribution to the environment · 2012-02-12 · 1 ECOSMART™ CONCRETE Project a concrete contribution to the environment Michel

7

Fly Ash Supply

Sundance

1,000 km

What’s next

…---…SOS

ParametersMaterial

Type of SCM: FA, GGBFS, SF, otherCost, availability, distance

TechnicalType of element: slab, walls, footings, ..Strength: Stripping, 28d, 56dDurability, resistance to scaling and chemical attacksCuring, carbonationH t f h d tiHeat of hydrationStandards, liability

ConstructionPlacing, finishing, forms, curing Setting time: Stripping and finishing

EnvironmentGHG SignatureWaste reductionExpected lifespan

Industry decision-makers

Supply• Cement Manufacturers• Ready-Mixed Concrete Producers• SCM producers / suppliersDesign• Developerse e ope s• Architects• Structural Engineers• Material engineers & test labs• Code officialsBuild• Contractors• Sub-trades: Concrete placers

Material• Type of SCM: FA, GGBFS, SF• Cost, Availability, distance

Technical• Type of element: slab, walls,

footings• Strength: Stripping, 28d, 56d• Durability, scaling, exposure• Curing, carbonation• Standards, liability

Construction

Supply• Cement Manufacturers• Ready-Mixed Concrete Producers• SCM producers / suppliersDesign• Developers• Architects• Structural Engineers• Material engineers & test labs• Code officialsBuild

Parameters Interests

CollaborativeInteractive

Decision-supportingConstruction• Placing, finishing, forms, curing • Setting time: Stripping and

finishing• Architectural: Color, texture,

finishEnvironment

• GHG Signature• Waste reduction• Expected lifespan

Build• Contractors• Sub-trades: Concrete placers

tool SOSMaterialTechnicalConstruction

SupplyDesign input results

Algorithmengine

feed learning

SOS ConstructionEnvironment

gBuild

input results

databases

learning

Page 8: ECOSMART™ CONCRETE Project EcoSmart™ a concrete contribution to the environment · 2012-02-12 · 1 ECOSMART™ CONCRETE Project a concrete contribution to the environment Michel

8

Consortium• Universities• Material Engineers• Structural Engineers• Cement producers• Contractor• Architect• Developerp• Government

Budget: 3,800,000 CAD$ 50% Government / 50% private

Benefits of SCM Concrete1. SCMs cost less to produce than cement2. Stronger at long term3. Easier to place, pump and finish4. Lower heat of Hydration5. More durable and resistant to salt and

sulfates 6 GHG d ti d dit 1T f SCM6. GHG reduction and credits: 1T of SCM

reduce GHG emission by up to 1T.7. Address cement shortage

Risks of SCM Concrete

1. Slower setting time particularly in cold climate

2. QA/QC is particularly important3. “Fly ash makes good concrete better

….and bad concrete worse”

Thank You