ecq plots - scis design guidelines - (v0.5.0)
TRANSCRIPT
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
1/22
Energy City Extremely Confidential & Limited Disclosure Document
The contents of this document are exclusively owned by of Energy City Qatar. Due to the high sensitive information enclosed,
the content of this document must not be disclosed to any individual or third party other than the addressed parties, without
written approval from Energy City Qatar.
Smart City Integrated Solutions Project
Energy City-Qatar
Systems Design Guideline
Office Plots & Buildings
Version 0.5.0
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
2/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (2/22) ECQ Confidential All Rights Reserved
Table of Contents
Overview .................................................................................................................................................................... 3
Instructions to Developers ...................................................................................................................................... 5
City Command & Control Center (C3) ................................................................................................................. 6
Smart City Requirements ........................................................................................................................................ 7
Section (1): Local Operations Room (LOR) ..................................................................................................... 10
Section (2): Technical Systems .......................................................................................................................... 11
Security Systems ............................................................................................................................................ 11
1. CCTV Surveillance System ................................................................................................................. 11
2. Access Control System (ACS) ............................................................................................................ 12
3. Intrusion Detection System (IDS) ...................................................................................................... 14
Safety Systems ................................................................................................................................................ 16
1. Fire Alarm System (FAS) .................................................................................................................... 16
2. Gas Detection System (GDS) .............................................................................................................. 16
Building Management & Control Systems................................................................................................. 17
1. Lighting Control System (LCS) .......................................................................................................... 17
2. Building Management System (BMS) ............................................................................................... 18
3. Office Automation ............................................................................................................................... 19
Audio Visual Systems ................................................................................................................................... 20
1. Public Address System (PAS) ............................................................................................................ 20
2. Digital Signage ..................................................................................................................................... 20
Section (3): Appliances ....................................................................................................................................... 22
1. LED Lighting. ....................................................................................................................................... 22
2. Electrical Fire Containment. ............................................................................................................... 22
3. Glass Anti-Shattering. ......................................................................................................................... 22
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
3/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (3/22) ECQ Confidential All Rights Reserved
Overview
Energy City Qatar project (ECQ) is defined to build a complete integrated smart city, equipped with fully
integrated, state-of-the-art intelligent and interactive technical solutions, to automate most of the manual processesand services running inside the different city operation cycles.
These solutions were defined to fulfill the city requirements to set unique city identity, and support the different
running operation and maintenance services.
The Smart City Integrated Solutions (SCIS) are defined and deployed to satisfy the city and city elements technical
needs with respect to the following services:
1. Security & Protection.2. Health, Safety, & Environment.3. Urban Traffic Management & Control.4. Building Management and Control.5. Energy Management.6. Audio Visual.7. Entertainment.8. Communication & Telecommunications.
The smart city concept to be implemented by ECQ is fully defined and developed by Integrated Smart City
Company of Doha Qatar (ISC). This concept will assure the citys compliance with the five main requirements of
ISC Smart City Model, which are listed as follows:
1. Secured CityECQ shall be equipped with all countermeasures to ensure the overall security of the city and city
elements. These measures should enable city operators to gain complete video surveillance, access control
of people and vehicles, and protection against illegal intrusion to the different city elements.
2. Safe CityECQ shall be equipped with all systems and solutions to satisfy all the city requirements for human health
and safety, and environment.
3. Connected CityECQ different elements shall be digitally connected through a well-defined multi-layered high-bandwidth
communication platform. This connectivity will enable any city element to exchange data, audio and video
information with any other element, and most-of-all with the city Command & Control Center (CCC).
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
4/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (4/22) ECQ Confidential All Rights Reserved
4. Intelligent CityECQ shall deploy the latest state-of the-art technologies in all the city technical systems and solutions. The
hardware and software components of these systems shall be provided by the most referenced and field-
tested vendors in the related field worldwide.
5. Green CityECQ is defined to be Silver LEED Green Building certified city. All systems and solutions should be
designed, configured, and programmed to satisfy the different green city certificate requirements, such as
energy saving, consumption monitoring, etc.
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
5/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (5/22) ECQ Confidential All Rights Reserved
Instructions to Developers
1. This document is addressing the technical systems design consultants of all ECQ plot developers.2. The purpose of this document is to set the minimum requirements of technical systems and solutions design,
with respect to the quality, quantity of components, local plot-wide integration, and central city-wide
integration, in order to fully comply with the ECQ Integrated Smart City model and systems.
3. At DC2 design stage, each plot developer shall submit the detailed design package of each designated system,for review and full compliance approval by ECQ in accordance with the enclosed design guidelines. The
design package should include but not limited to all design layouts, single line diagrams, bill of quantities, and
technical specifications, of all plot buildings and elements.
4. The ECQ plot developer shall conform to the specified vendors list for each system, as an essential technicalcondition to achieve the complete and consistent operation with the ECQ Smart City centralized integration
platform.
5. At construction stage, all system components shall be submitted for compliance approval by ECQ inaccordance with the enclosed technical specifications and integration requirements.
6. For all plot systems, connected with the ECQ Command & Control Center, the Complete Integrationcondition, between the Plot system and the respective Central Management System at ECQ Command &
Control Center, should be valid upon fulfilling the following requirements:
a.
All functions of the Local Plot System should be operated by the respective Central ManagementSystem at ECQ Command & Control Center.
b. The Central Management System should be able to operate any future upgrades of the Local PlotSystem.
c. The Local Plot System should support and operate with any future upgrades of the respective CentralManagement System.
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
6/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (6/22) ECQ Confidential All Rights Reserved
City Command & Control Center (C3)
ECQ has one centralized City Command and Control Center (C3), which is located at H01 plot building #3.
All city-wide systems are managed and controlled centrally by C3. All plot-wide systems, located in the buildings
LORs are connected and integrated with the central management platform at C3, to achieve central monitoring and
control features of all elements in all ECQ plots.
The main purposes of C3 are:
1. Provide complete city monitoring, control and management, and data gathering services, to the ECQoperators, and facility managers.
2. Provide a complete incident management and recovery services for city-level and multi-plot incidents.3. Provide on-demand facility operations support services to city plots in case of plot incidents.4. Act as a secondary and stand-by LOR for all the connected LORs throughout the city.
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
7/22
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
8/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (8/22) ECQ Confidential All Rights Reserved
3. AppliancesThe following appliances shall be deployed by the plot developer as per the following deployment
guidelines:
1. LED Lighting2. Electrical Fire Containment3. Glass Anti-Shattering
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
9/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (9/22) ECQ Confidential All Rights Reserved
Design Guidelines
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
10/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (10/22) ECQ Confidential All Rights Reserved
Section (1): Local Operations Room (LOR)
To Be Defined in Release 1.0
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
11/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (11/22) ECQ Confidential All Rights Reserved
Section (2): Technical Systems
The following guidelines shall be considered when designing the systems for ECQ office plot elements:
Security Systems
1. CCTV Surveillance System1.1.The following table shows the standard office plot elements, to be covered by the CCTV
surveillance cameras, along with location-specific coverage requirements:
Element PTZ/Fixed Coverage
Office Building Outdoor Area
Gate PTZ Full at preset
Road PTZ Full at preset with 5mm lines
Intersection PTZ Full with 100m radius circles
Public Area PTZ Full at preset
Perimeter PTZ View 1m object from 100m at full screen
Office Building
Entrance Fixed Full Indoor
Emergency Exit Fixed Full Indoor
Car Parking PTZ Entrances, Driving lanes, ElevatorPublic Elevator Fixed Full Indoor
Service Elevator Fixed Full Indoor
Elevator Shaft PTZ Full at preset
Elevator Lobby Fixed Full Indoor
Stairs Area Fixed Full Indoor
Corridor Fixed Full with 30m radius circle
Loading Dock PTZ Full at preset
Workshop Not Applicable Not Applicable
Trash Room PTZ Full at presetStorage Room Fixed Full Indoor
Rest Room Not Applicable Not Applicable
Communication Room Not Applicable Not Applicable
Switchgear Room Not Applicable Not Applicable
UPS Room Not Applicable Not Applicable
Transformer Room Not Applicable Not Applicable
Electrical Room PTZ Full at preset
Mechanical Room PTZ Full at preset
Local Operations Room Fixed Full at presetRoof PTZ Full with 100m radius circles
Office Not Applicable Not Applicable
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
12/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (12/22) ECQ Confidential All Rights Reserved
1.2.The CCTV management system is connected to ECQ C3 through the city TCP/IP backbonenetwork.
1.3.Continues 24hr/7dy recording of each camera, through IP Network Video Recorders (NVRs), withminimum 4 weeks playback storage.
1.4.All CCTV Control & Management System components such as decoders/encoders, NVRs, clientand server software must support direct and complete integration ability with the ECQ City
Security Management System at C3.
1.5.The Approved venders for CCTV Surveillance System and its components such asdecoders/encoders, NVRs, client and server software are:
Siemens. Any other vendor that supports direct and complete integration with C3 integration platform.
2. Access Control System (ACS)2.1 The following table shows the standard office plot elements, to be covered by the CCTV
surveillance cameras, along with location-specific coverage requirements:
Element Coverage
Office Building
Emergency Exit Access Door
Car Parking Access Door
Public Elevator Elevator Door
Service Elevator Elevator Door
Elevator Shaft Not Applicable
Elevator Lobby Access Door
Stairs Area Access Door
Corridor Not Applicable
Loading Dock Access Door
Workshop Access Door
Trash Room Not ApplicableStorage Room Access Door
Rest Room Access Door
Communication Room Access Door
Switchgear Room Access Door
UPS Room Access Door
Transformer Room Access Door
Electrical Room Access Door
Mechanical Room Access Door
Local Operations Room Access DoorRoof Access Door
Office Access Door
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
13/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (13/22) ECQ Confidential All Rights Reserved
2.1.The ACS Management System is connected to ECQ C3 through TCP/IP backbone network.2.2.All ACS Control & Management System components such as central controller, interface modules,
client and server software must support direct and complete integration ability with the ECQ City
Security Management System at C3.
2.3.The Approved venders for the ACS Control & Management System components such as centralcontroller, interface modules, client and server software are:
Siemens. Any other vendor that supports direct and complete integration with C3 integration platform.
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
14/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (14/22) ECQ Confidential All Rights Reserved
3. Intrusion Detection System (IDS)3.1.The following table lists the office plot elements to be protected by the IDS, along with respective
target intrusion area to be monitored:
Elements Target Intrusion Area
Office Building Outdoor Area
Gate Not Applicable
Road Not Applicable
Intersection Not Applicable
Public Area Not Applicable
Perimeter Perimeter Ground
Office Building
Entrance Doors
Emergency Exit Doors
Car Parking Not Applicable
Service Elevator Not Applicable
Public Elevator Not Applicable
Elevator Lobby Not Applicable
Elevator Shaft Not Applicable
Stairs Area Windows
Corridor Windows
Loading Dock Windows
Workshop Windows
Trash Room Windows
Storage Room Windows
Rest Room Windows
Communication Room Windows
Switchgear Room Windows
UPS Room Windows
Transformer Room Windows
Electrical Room Windows
Mechanical Room Windows
Local Operations Room Windows
Roof Doors
Office Windows
3.2.The IDS Management System shall be connected to ECQ C3 through city TCP/IP backbonenetwork.
3.3.All ACS Control & Management System components must support direct and completeintegration ability with the ECQ City Security Management System at C3.
3.4.The Approved venders for the IDS Control & Management System components such as centralcontroller, interface modules, client and server software are:
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
15/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (15/22) ECQ Confidential All Rights Reserved
Siemens. Any other vendor that supports direct and complete integration with C3 integration platform.
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
16/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (16/22) ECQ Confidential All Rights Reserved
Safety Systems
1. Fire Alarm System (FAS)1.1.The FAS design should meet all requirements and specifications of Qatar Civil Defense
Department and other governmental agencies.
1.2.All FAS Control & Management System components must support direct and complete integrationability with the ECQ City Integrated Safety Management System at C3.
1.3.The Approved venders for the FAS components such as central controller, interface modules, clientand server software are:
Siemens. Any other vendor that supports direct and complete integration with C3 integration platform.
2. Gas Detection System (GDS)2.1.The installation of a gas detection system in underground car parks allows an audible and visual
alarm to indicate any area where the build up of carbon monoxide (CO) from vehicle emissions
reaches dangerous levels.
2.2. The system shall be connected to the BMS for alarm monitoring.2.3. Approved vendor is Siemens or any other equivalent.
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
17/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (17/22) ECQ Confidential All Rights Reserved
Building Management & Control Systems
1. Lighting Control System (LCS)1.1.The LCS shall be applied to all lighting located at the following office plot elements, along with
their respective control functionality:
Elements Control Functionality
Office Building Outdoor Area
Gate On/Off
Road On/Off
Intersection On/Off
Public Area On/Off + Dimming
Perimeter On/Off + Dimming
Office Building
Entrance On/Off + Dimming
Emergency Exit On/Off + Dimming
Car Parking On/Off + Dimming
Service Elevator On/Off + Dimming
Public Elevator On/Off + Dimming
Elevator Lobby On/Off + Dimming
Elevator Shaft Not Applicable
Stairs Area On/Off + Dimming
Corridor On/Off + Dimming
Loading Dock On/Off
Workshop On/Off
Trash Room On/Off
Storage Room Not Applicable
Rest Room On/Off
Communication Room On/Off
Switchgear Room On/Off
UPS Room On/Off
Transformer Room On/OffElectrical Room On/Off
Mechanical Room On/Off
Local Operations Room On/Off + Dimming
Roof On/Off
Office Included within the office automation
1.2.The dimming function for building public areas should be controlled by motion or presencedetection sensors.
1.3.The Approved vender is Siemens or any other equivalent.
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
18/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (18/22) ECQ Confidential All Rights Reserved
2. Building Management System (BMS)2.1.The equipment like (Air Cooled Units, Package Units A/c Units and chillers) are connected to DDC
controllers through hard wire integration.
2.2.The BMS I/O Points Schedule and BMS Equipment List for monitoring and controlling buildingMEP equipment and systems should be engineered based on the provided Standard I/O Points
Schedule and BMS Equipment List enclosed with these guidelines.
2.3.The DDC Controllers shall utilize standard protocols, BACnet over IP /LON.2.4.The Management Level shall support the model of a distributed network of multiple Operator
Workstations.
2.5.The function of the Operator Workstation is to provide a user-friendly operator interface and toprovide data archiving facilities. For system reliability, the workstations shall not be requiring to
perform any of the control features.
2.6.The Local Building Management Station (LBMS) shall be capable of the following Display of graphical representations of the plant overlaid with live data Monitor and operate / influence process devices Receiving of alarm messages from the process level and directing them to the appropriate
reporting device e.g. printer, pager, fax, e-mail, SMS
Monitor process devices for communication problems and other device faults. Adjusting time strategies in the process level. Long term storage of logged data from the process devices Archiving / retrieve data to/from long term data storage Display graphically the logged data Custom application programming
2.7.The BMS shall allow supplier independent integration of third-party subsystems.2.8.The BMS must support direct and complete integration ability with the City Facility Management
System (CFMS) at ECQ C3. This integration should enable the CFMS operator to communicate with
the BMS through BACnet/IP protocol, and to perform remotely complete monitoring, and control
operations to the designated building, exactly at the same level can be performed by the BMS.
2.9.The Approved venders for the LCS System components are: Siemens. Any other vendor that supports direct and complete integration with C3 integration platform.
2.10. The BMS equipment list and I/O data points should be in full conformance with the enclosedStandard BMS Equipment Schedule.
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
19/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (19/22) ECQ Confidential All Rights Reserved
3. Office Automation3.1.Light Control.3.2.HVAC Control.3.3.Curtain (Blind) Control.
To Be Defined in Release 1.0
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
20/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (20/22) ECQ Confidential All Rights Reserved
Audio Visual Systems
1. Public Address System (PAS)1.1.The public address system shall be deployed in the public areas to provide public address
announcement and emergency evacuation messages.
1.2.Each Office building shall be equipped with stand-alone PA systems, and then all the PA officebuilding systems to be connected through IP to a central PA command system at ECQ C3.
1.3.The approved vendor for PAS system component are: ATEIS. Any other vendor that supports direct and complete integration with C3 integration platform.
2. Digital Signage2.1. Digital Signage shall provide the following:
Visual public address Evacuation Guidelines Event information Schedules Advertisement.
2.2. The following table lists the elements of the plots buildings and surrounding outdoor areas, to becovered with Digital Signage, along with location:
ECQ Office Plots Indoor/Outdoor
Office Building Outdoor Area
Gate Not Applicable
Road Not Applicable
Intersection Not Applicable
Public Area Outdoor
Perimeter Not Applicable
Office BuildingEntrance Indoor & Outdoor
Emergency Exit Not Applicable
Service Elevator Not Applicable
Car Parking Not Applicable
Public Elevator Not Applicable
Elevator Lobby Not Applicable
Elevator Shaft Not Applicable
Stairs Area Indoor & Outdoor
Corridor Not Applicable
Loading Dock Not Applicable
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
21/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Page (21/22) ECQ Confidential All Rights Reserved
Workshop Not Applicable
Trash Room Not Applicable
Storage Room Not Applicable
Rest Room Not Applicable
Communication Room Not Applicable
Switchgear Room Not Applicable
UPS Room Not Applicable
Transformer Room Not Applicable
Electrical Room Not Applicable
Mechanical Room Not Applicable
Local Operations Room Indoor & Outdoor
Roof Not Applicable
Office Not Applicable
-
7/28/2019 ECQ Plots - SCIS Design Guidelines - (v0.5.0)
22/22
Version 0.5.0Systems Design Guidelines - ECQ Office Plots
Section (3): Appliances
1. LED Lighting.To Be Defined in Release 1.0
2. Electrical Fire Containment.To Be Defined in Release 1.0
3. Glass Anti-Shattering.To Be Defined in Release 1.0