ed 077 133 ea 005 123 year-round education activities in ... · document resume ed 077 133 ea 005...
TRANSCRIPT
DOCUMENT RESUME
ED 077 133 EA 005 123
TITLE Year-Round Education Activities in the United States.First Annual Survey of State Education AgenciesConcerning Activities, Including Legislation, inYear-Round Education is the United States.
INSTITUTION New Jersey State Dept. of Education, Trenton. Div. ofResearch, Planning, and Evaluation:
SPONS AGENCY Virginia State, Dept. of Education, Richmond.PUB DAZE Apr 73NOTE 47p..
EDRS PRICE Iff-$0.65 BC-$3.29DESCRIPTORS Educational Finance; Educational Planning;
Information Dissemination; *State Departments ofEducation; State Legislation; *State Surveys; *Tables(Data); *Year Round Schools
ABSTRACTThis survey, 'generated in planning sessions for the
5th National Seminar on 7Zear-"Round Education, puts into usable formneeded information importaht to the year-round education movement.The document contains tables with data by State on number ofprograms, status of the programs, funding sources, grade levels, typeof project, purpose of projects, extent of curriculum change, teachercontract effects, and evaluation status..(Author/Mlar)
U.S. DEPARTMENT OF HEALTH.EDUCATION & WELFAREOFFICE OF EDUCATION
THIS DOCUMENT HAS BEEN REPRO.DUCED EXACTLY AS RECEIVED FROMTHE PERSON OR ORGANIZATION ORIGINATING IT. POINTS OF VIEW OR OPINIONS STATED DO NOT NECESSARILYREPRESENT OFFICIAL OFFICE OF EDUCATION POSITION OR POLICY
YEAR-ROWD ELOCATICI ACTIVITIES t THE WITED STATES
FIRST ANNUAL SURVEY,OF STATE EDUCATION AGENCIES
CONCERNING ACTIVITIES, INCLUDING LEGISLATION,
IN YEAR-ROUND EDUCATION IN:THE UNITED STATES
OFFICE OF PROGRAM DEVELOPMENT,DIVISION OF RESEARCH, _PLANNING AND EVALUATION
NEW JERSEY DEPARTMENT OF EDUCATIONTRENTON, NECARSEY
APRIL IJ/)
FILMED FROM BEST AVAILABLE COPY
Foreword
The idea of this survey was generated in planning sessionsfor the 5th National Seminar on Year-Round Education sponsored by theVirginia Department of Education. It was apparent that -much informa-tion important to the yea -round education movement was availableonly from widely scattered sources which made collection onerous andled to the further task of organization of the data once they were inhand. The Virginia Department of Education asked and received theassistance of the New Jersey Department of Education in surveyingstate and outlying district education agencies to secure and put intousable form the needed information.
Users of this survey are invited to make comments andsuggestions toward improving the aecondssurvey which will be under-taken early in 1974. Users also are Anvited to reproduce any partor parts of the document, since only a'short preSs run is possibleat this time.
While not as complete as we know this survey can be, it isour hope that it will be of use to thoSe with responsibilities forresearching, planning, developing and operating year-round educationprograms at the state and local levels. We are _pleased to have halthe opportunity to cooperate with the Virginia Tepartment of Educationin this project.
`Bruce Campbell, Tirector'
Extended Schobl Year -ProgramsNew Jersey Department of EdueationTrenton, New JerseyApril 1973
Year-Round Education Activities in the United States
Summary Data
1. Total number of programs in feasibility, planning, operation - 100.
. See Tables I and II.
2. Total number of states with programs - feasibility, planning,operation - 34. See Tables I and II,
3. Total number of states with operatior'l programs - 18. See Table I.
AZ, CA, CO. FL, GA, IL, KY, MI, MN, E), NV, NH, Ph, TX, UT, VT,
VI, WA.
4. Number of states with pending legislation - 3. See Table I.
AK, AR, IL.
Number of states that did not return survey - 8. See Table I.
AL, CZ, KS, MA, NC, ND, PR, WA.
6. Number of programs per state - Table II.
7. Funding sources - Table III.
8. Type of plan - Table IV.
9. Type of project by beginning date - Table V.
10. Grade levels - Table VI.-
11. Total number of students in identified programs - Table VII.
12. Purpose of projects - Table VIII.
13. Extent curriculum change - Table IX.
14. Teacher contract effects - Table, X.
15. Evaluation status - Table XI.
Table I
Composite Data
States and Outlying Districts in Survey*
AL nrAK LAS nrAZ op #5
AR LCA op #17
.
CZ nrCO op #4
CT no programsDE no programsFL op #6
GA op #2 (1)
GU Incomplete dataHI #1ID no programsIL L op #1
IN no programsIA #1
KS
KYLAME
nr
op #1no programsno programs
ND
OH
OK
OR
nr#1#1#1
MD no programs PA op #12
MA nr PR nr
MI op #2 RI #3
MN op #1 SC #1
MS no programs SD no programs
MO op #1 TN #2
MT #1 TX op #1 (2)
NB #1 UT op #1
NV op #1 VT op #1
NH op #2 VA op #8
NJ #9 VI #1
NM #1 WA op #1
NY #1 WV no programs
NC nr WI #7WY #1
*Key - nr - no return, L- legislation, op - operational,# - number of programs in state.
(1) There are other programs; data incomplete(2) Statewide
Table II
Programs Per State
AZ - 5 OR - 1CA - 17 MI - 2CO - 4 MN- 1FL- 6 MO-
GA- 2 (1) MT- 1HI- 1 NB- 1IL - 1 PA - 12
IA - 1 RI - 3
KY - 1 SC - 1NV - 1 TN - 2NH - 2 TX - 1 (2)
NJ- 9 UT - 1
NM - 1 VT - 1NY- 1 VA- 8OH - 1 VI - 1OK - 1 WA - 1
WI - 7WY - 1
(1) Incomplete data Total 100(2) Statewide programs
Table III
Funding Sources
Self-financed 39Title I 2
Title III 12
Special Federal 1
State grant 33Not indicated 21
Table IV
Type of flan
Total OperationalStudy/Planning
1. Voluntary 4-quarter 16 9 7
2. 4-quarter 50-15 1 1
3. 45-15 39 22 17
4. 45-15 block 1 1
5. Staggered attendance 5 / 5
6. Flexible 3 2 1
7. Qunimester 6 3 3
8. Trimester 2 0 (1)
9. Extended summer session 2 1 1
10. 6-term plus summer 1 1
11. Continuous progress 3 2 1
12. 4-1-4-1 2 1 1
13. Not yet determined/under study 6. 6
14. Not indicated 15 15
(1) Operational but recently abandoned (Florida)
Table V
Type of Project by Beginning Date
Date Feasibility PlanningPre-
Implementation Operation AbandonedNot
Indicated
1964 1
1968-9 3
1969-70 1 1
1970-71 3
1971-2 4 9 1 (1)
1972-3 15 5 2 (2) 25 1
1973-4 4 '7 2 2 1
1974-5 4 1
Date notindicated 17 1
(1) Operational since 1964, recently abandoned(2) Includes 30 pilot schools,in Texas
Table VI
Grade Levels
P-5 (1) 2 6,7 and 8 2
P-6 13 7-12 3
P -7 1 8-12 2
P-8 13 9-12 13
P-9 1 10-12 1
P-12 28 College- fresh.
and soph. 1
5 & 6 1
Not indicated 16
(1) P indicates pre-first grade inclUding nursery,
kindergarten-and others.
Table VII
Number of Students in Identified Programs
AK
AZ
AR
0
8,500
0
GU
HI
ID
0
1,859
0
MD
MI
MN
0
471
1, 000
NJ
NM
NY
(b) 24,215
1,500
5, 200
SD
TN
TX
Not indicated
56, 000
CA (1) 8,881 IL ,2,600 MS 0 off. Not indicated UT 477
CO (2) 2,099 IN 0 MO 2,700 OK 10,709 VT 1,000
CT 0 IA Not indicated MT Not indicated OR 4,500 VA 30,479
DE 0 KY 95,682 NB 4,800 PA (7) 330 VI Undetermined
FL (3) 130 LA 0 NV 7 oo RI 6,785 WA 4, 200
GA (4) 44,000 ME 0 NH (5) 1, 287 SC 20: 000 WV
WI (8) 19, 90i
WY 14, 0
Number.of programs which -did not indicated student numbers - 42Total number of students - 374,004
1. Plus 25 schools2. Plus 3 programs undetermined
3. Plus 5 not indicated
4. Incomplete5. Plus 1 not indicated6. Plus 1 not indicated7. Plus 10 not indicated8. Plus 3 not indicated
Table VIII
Purpose of Projects
Space utilization 58
Curriculum improvement . 68
Reduction' -in capital outlay 4
Staff utilization and productivity 2
Not indicated 15
Table IX
Extent Curriculum Change
Under Study 4
Little or no change 5
Moderate change 4
Major change 49
Not indicated 49
Tab
Teacher Con
Under study
Minimal or no ef
Optional - volun
Extensive
Nct determined
Not indicated
Tab
Evaluat
Under study
Being designed
In process
Completed
Evaluation cont
Not indicated
k
58
68
4
2
15
4
5
4
49
49
Table X
Teacher Contract Effects
Under study 6
Minimal or no effect 9
Optional - voluntary 22
ExtensiveT.,
Not determined 7
Not indicated 56
Table XI
Evaluation Status
Under study 2
Being designed 33
In process 4
Completed 19
Evaluation contract 1
Not indicated 44
4.-
ix
1
State
1.1
ProjectTitle
1.2
Name of District
of SchoolDistrict-wide *
1 . 3
Name ofSuperintendent
1 . 1.1-
1% :
Mailing Address
1 . 5
Name ofProjectDirector
1 . 6
MailingAddress
AL Did not return survey
AK 1. Nd programs in operation2. Enabling legislation has been introduced
AS Did not return survey
AZ Extended Yuma Union HighSchool School DistrictYear
W. A. Canode 3150 Avenue AYuma, AZ 85364
Not yet
appointed1.4
AZ Project Apache JundtionUtiliza- Public Schooltion ofSchool En-vironment
Dr. ThomasReno
PO Box879Apache Junction, AZ 85220
.
.
1.3 1.11.
AZ Year Phoenix Union HighRound High SchoolSchools
Dr. GeraldDe Grow
.
2526 W. OsbornPhoenix, AZ 85017
Dr. TerryTerril
1.4
AZ The Twelve Roosevelt SchoolMonth District #66SchoolYear
Dr. Russell A.Jackson
6000 S-7th StreetPhoenix, AZ 85040
MargaretSmith
1.11.
AZ Not Scottsdaleindicated District #48
.
Dr, GabrielReuben
3811 North 44th StreetPhoenix, AZ 85018
.
.
Mr. SteveSimon
4320 North,ScottsdaleRd.,Scotts-41e, AZ85251
AR 1. No pro rams in operation2. An ass mbly bill has been Prepared but not yet introduced to authoriz- Extended Scho?1 Year prog
CA Not La Mesa-Springindicated Valley Elementary
School District
James 'Runge 4150 Date AvenueLatMesa, CA 92041
Not indicated 1.4
CA Not Old Adobe Unionindicated Elementary School
District
Dean Bagowan 1660 Albin WayPetaluma, CA 94952
Not indicated 1.4
,
k
t
1.4i:
Mailing Address
1.5
Name ofProjectDirector
1.6
MailingAddress
2.1
Type ofProject
2.2
FundingSource
2.3
Type Plan
3150 Avenue AYuma, AZ 85364
Not yet
.appointed1.4 Not
indicatedSelf-financed Voluntary 4-
quarter
PO Box879Apache Junction, AZ 85220
..
1.3 1.4 Feasibilitystudy
Self-financed Under study
.
2526 W. OsbornPhoenix, AZ 85017
Dr. TerryTerril
1.4 FeasibilityPlanningOperational
Title III 4-quarter
6000 S-7th StreetPhoenix, AZ 85040
MargaretSmith
1.4 Planning Self-financed
45-15
.
3811 North 44th StreetPhoenix, AZ 85018
Mr. SteveSimon
4320 NorthScottsdaleRd.,Scotts-(*le, AZ85251
Feasibilitystudy
Not.
indicated
.
4-quarter and45-15 inelementaryschool
t yet introduced to authorize Extended Scho 1 Year programs
4750 Date AvenueLa Mesa, CA 92041
Not indicated 1.4 Operational Not indicated 45-15 staggered
1600 Albin WayPetaluma, CA 94952
Not indicated 1.4 operational Not indicated 45-15staggered
Table VIII
Purpose of Projects
Space utilization 58
Curriculum improvement 68
Reduction in capital outlay 4
Staff utilization and productivity 2
Not indicated 15
Table IX
Extent Curriculum Change
Under Study 4
Little or no change 5
Moderate change
Major change 49
Not indicated 49
Teaci
Under stu
Minimal o
Optional
Extensive
Not deter
Not indic
Under stu
Being des
In proces
Completed
Evaluati
Not indi
58
68
4
2
15
4
5
4
49
49
Table X
Teacher Contract Effects
Under study 6
Minimal or no effect 9
Optional - voluntary 22
Extensive 3
Not determined 7
Not indicated 56
Table XI
Evaluation_ Status
Under study 2
Being designed 33
In process -4
Completed 19
Evaluation contract 1
Not indicated 44
1
2.4
Beginning_ Date
2.5
GradeLevels
2.6
Number ofPupils
3.1
Purpose
3L2
Extent Curriculum-Change
3.3
Teacher Contrac'Effects
June 1973 9-12 1,000 Space utilizationProgram improvement
Under study Under study.
July 1972 K-12 1,500 Space- utilizationProgram imprdvement
..
Under studyTeachers! optionteach 12 months o3 quarters understudy
July 1972 9=12 2,000 Curriculum revisionReduction in capitaloutlay
Total curriculumrevision
Under study
Fall 1973 K-8 To bedetermined
Space utilization Not indicated Still in preliminstages
Sept.1974
K-12 4,000 Space utilization-Program improvement
Not indicated WA indicated
.
4 1971-1972 K=8 3 elem. &3. midd3e
school
Spade utilizationProgram improvement
Not indicated I-
1972-1973 _K,6 2 Elem.
schoolsSpace utilization-
.
- Not indicated
,se
3L2
Extent Curriculum-Change-
3.3
Teacher ContractEffects '
3.4
Evaluation Status
2
Other Comments
.
zationrovement
Under study Under study Being designed
zationrovement Under study
Teachers' option toteach 12 months or3 quarters understudy
Being designed
revisionn capital
Total curriculumrevision
Under study Information basedevaluation strategy
zation Not indicated Still in preliminarystages
Being designed
zationrovement
Not indicated Not indicated Under study
zationrovement
Not indicated
.
zation- Not indicated
..
..,_____,
.
3
:>.
State
1.1
ProjectTitle
_.
1.2
Name of District
of SchoolDistrict-wide * _Superintendent
1.3
Name of
1.4i:
Mailing Address
1.5
Name ofProjectDirector
1.6
MillingAddress
CA
,
Not
indicatedOcean View Elemen-tary School Distr.
James CarVell 7972 Warner Avenue .
Huntington Beach CA 92647Not indicated 1.4
CA Notindicated
.
Pajaro Valley JointUnified School Dist
John Duncan 165 Blackburn Street
PO Box 630Watsonville, CA 95076
Not indicated 1.4
CA Not
indicatedSan Diego CityUnified School Dist
ThomasGoodman
4100 Normal StreetSan Diego, CA 92103
Not indicated 1.4
. .
CA Notindicated
Elk Grove UnifiedSchool District
Glenn Houde =Elk Grove, CA 92624 Not indicated 1.4
CA Notindicated
Escondido CityElem. School Dist.
James Slezak Fifth & Maple StreetsEscondido, CA 92025
.
Not indicated 1.4
CA Not
indicatedHayward UnifiedSchool District
RaymondArveson
1099 "E" StreetPO Box 5000Hayward, CA 94541
Not indicated.
1.4
CA Notindicated.
Hesperia Elem.School District
HowardCarmichael
16079 Main StreetHesperia, CA 92345
Not indicated 1.4
.
CA Notindicated
Lakeside Union*Elem. School Dist.
Robert MuScio. 12335 Woodside AvenuePO Box 578Lakeside, CA 92040
1.3 1.4
CA Noneindicated
ABC Unified SchoolDistrict
.
Charle's
Hutcbison17 923 South Pioneer Blvd.
Artesia, CA 907 01
Not indicated 1.4
.
,
1.4.0.
ailing Address
1.5
Name ofProjectDirector
1.6
MailingAddress
2.1
Type ofProject
2.2
FundingSource
2.3
Type Plan
arner Avenueton Beach CA 92647
Not indicated 1.4 Operational Not indicated 45-15staggered
ackburn Street630ville, CA 95076
Not indicated 1.4 Operational Not indicated 45-15staggered
oral Street_go, CA 92103
Not indicated 1.4 Operational Not indicated 45-15staggered
ave, CA 92624 Not indicated' 1.4 Preimple-mentationplanning
Not indicated 45-15staggered.
Maple Streetsido, CA 92025
Not indicated 1.4 Operational Not indicated 45-15staggered
'.7" Street
(5000, CA 94541
Not indicated 1.4 Operational Not indicated,..
50-154 quarter plan
4ain Streeta, CA 92345
Not indicated 1.4 Operational Not indicated 45-15staggered'
doodside Avenue
578$e, CA 92040
1.3 1.4 Operational Self, financed- 45-15
,
staggered
South Pioneer Blvd.
:, CA 907 01
Not indicated 1.4 Operational Not indicated- Flexible
2.4
BeginningDate
2.5
GradeLevels
2.6
Number ofPupils
3.1
Purpose
3u2
Extent Curriculum'
Change
.
3.3
Teacher ContractEffects
1972-1973 K -8 2 Element.
ary School.)
Not indicated
1972-1973 K-8 4 Elem. &1 middleschools
Not indicated Not indicated
1972-1973 K-6 6 Elem.
schools
Save space allocatipnmoney
Not indicated
'973-1974 High-school
Not
indicated1 school
Program improvement Very extensive Not indicated
1972-1973 K-6 Not indica-ted
3 schools.
Space utilization andProgram improvement
Not indicated
1968 & 1972 K-6 2 schools Not indicated .
_
1972-1973 K-6 2 schools Not indicated
.
1972 -1973 K-8 3,898
entiredistrict
Not indicated
.
1971-1972 Elei. Not ,
indicated1 school
Program improvement Not indicated.
.
.
3.2
Extent Curriculum'Change
3.3
Teacher ContractEffects
3.4
Evaluation Status
4
Other Comments
Neither school overcrowded.Full time equivalent staff-ing concept and criterionreferenced continuum ofskills characterize theplan. Distrfct desires totest the plan.
Not indicated
-
_the
Intensive community involve-ment and study characterize
plan
Not indicated
- Very extensive Not indicated
Not indicated
___ First evaluation pre-sented in 197 0 very
favorable
District attendance isdecreasing.
.... --Classes will be ,providedfor students electing thetraditional school yearwithin existing schools
....
-.... Not indicated. . The California data is
based on.a summary sheetfrom the California StateDepartment. More completeinformation will have to beobtained from the schooldistricts themselves.
.
-___
.
5
,tate
1.1
ProjectTitle
1.2
Name of Districtof School
District-wide *
1.3
Name ofSuperintendent
1.1+.
Mailing Address
1.5
Name ofProjectDirector
1 . 6 .
MailingAddress
CA Notindicated
Bear ValleyUnified SchoolDistrict
Ralph Bell 41220 Park AvenueP.O.Box 1509Big Bear Lake, CA 92315
Not indicated 1.4 01
az
of
CA Not
indicatedBerryessa UnionSchool District
F. GregoryBetts
935 Piedmont RoadSan Jose, CA .95132
Not indicated 1.4 Ot
CA Notindicated
Chula Vista CitySchool District
Burton C.Tiffany
84 East 5th StreetChula Vista, CA 92012
Not indicated 1.4 O
CA Notindicated
Corona NorcoUnified SchoolDistrict
Charles Terrell 300 Buena Vista AvenueCorona, CA 91720
Not indicated 1.4 o/
CA Notindicated
San JoaquinElementary SchoolDistrict
Ralph Gates 14600 Sand Canyon DriveEast Irvine,, CA 92650
.
Not indicated 1.4
CA Notindicated
Santee ElementarySchool District
CharlesSkidmore t
9625 Cuyamaca StreetP.O. Box 220
Santee, CA 92071
Not indicated
.
3..4 o/
CZ Did not return survey
. .
CO Notindicated
Jefferson CountySchool District_R-1
Dr. Alton W.
Cowan
Box 15128Denver, CO 80215
Mr. WilliamMitchell,
Bear CreekArea AdMinistrator
3115 S.
Kipling,
Morrison,
CO 80465
CO Not
indicated
Boulder ValleySchool DistrictRE-25
Dr. Barnard
Ryan'F.O.Box 11
Boulder, CO 80302
'Not indicated 1.4 Fd
sl
e.
sd
.
.
>1.
'
. .
'ddress
1.5
Name OfProjectDirector
1.6
Mailing
Address
2.1
Type of_Project
2.2
FundingSource
2.3
Type Plan
enue
, CA 92315
Not indicated 1.4
joperational
Operationaland planned
Not indicated 45-15 .
staggered
Road
95132Not indicated 1.4 Operational Self-financed 45-15
staggered
treetCA '2012
Not indicated 1.4 Operational Not indicated 45-15
sta::ere
ta 'Avenue
1720
Not indicated 1.4 Operational Not indicated 45-15
.yon Drive Not indicatedA 92650
1.4 Operational Not indicated 45-15 '
staggered
Street Not indicated--] ca
071
1.4 Operational Not indicated 45-15block
Mr. William1215 Mitchell,
Bear CreekArea Adminis-trator
3115 S.Kipling,
Morrison,CO 80465
Preimple-
mentationSelf-financed 45-15
Not indicated'0302
1.4 Feasibilitystudy forelementaryschools
Seeking state
legislationfor funding.Currentlyself-financed
45-15
.
2.4
Beginning
Date
2.5
Grade
Levels
2.6
Number ofPupils
3.1
Purpose
3.2
Extent CurriculumChange
3.3
Teacher ContractEffects .
1972-1973 5 and 61 school
1,483 Ease overcrowding Not indicated
July 1972 K -6 1,0001 school
Ease overcrowding Not indicated
July 1971 K-6 4 schools Ease overcrowding Not indicated
1972-1973 E3.em. &
Jr: High,
4 schools1,600approx,
Eva.Laate educationalprogress of studentswho volunteered foryear round school
Not indicated t
1972-1973 K-8 1 school900
Space!esaving
Educational improvementNot indicated
1972-1973 school Not indicated
.
Summer1973
K-12 Not
indicatedSpace utilization Extensive Not indicated
Fall 1973 K-6 Notindicated
Space utilization Not indicated
.
) a
3.2
Extent CurriculumChange
3.3
Teacher ContractEffects
3.4
Evaluation Status
6
Other Comments
Not indicated
Not indicated Evaluation contract
Not indicated
Not indicated
t
Not indicated 6
Extensive Nct indicated
Not indicated
..........
.
.
)
7
State
1.1
ProjectTitle,
1.2
Name of Districtof School
District -wide *
1.3
Name ofSuperintendent
1.4 .-
Mailing Address
1.5
Name pfProjectDirector
1.6
,
MailingAddress
CO Year RoundEduc. Pro-gram at.
CunninghamElementary
Cherry Creek SchoolDistrict, Cunning-ham Elem. School
Dr. RichardKoeppe
-
4700 South YosemiteEnglewood, CO 80110
Mr. VernShelley, -
Principal
9659 E.-Mississippi,
Denver,CO 80231
CO Notindicated
Colorado SpringsDistrict #11
Dr. TomDoherty
.
1115 N. El PasoColorado Springs,CO 80903
Not indicated 1.4
CT No programs
DE No programs -
FL FloridaState Lab.School
Trimester.
Laboratory SchoolFL State Univ.Tallahassee, FL
Not indicated 1.2.
Ralph L.Witherspoon,
Director
1.2
,
FL Bradford
Countypedtegg
Session
Bradford CountySchools
Starke, FL
Thomas L.Casey
1.2 C.M. Clark,Asst. Super -
intendent
1.2
FL S. BryanJenningsContinuousProk_ess
S. Bryan JenningsElem. SchoolOrange ParkClay County, FL
Not indicated 1.2 Dr, MaryZellner,
Principal
1.2
--'
.
I'l
1.4 .
.
ling Address
.
1.5
Name pfProjectDirector
1.6
MailingAddress
2.1
Type ofProject
--
Funding_Source.
2.3
Type Plan
th Yosemite,, d, CO 80110.
Mr. VernShelley-,
Prindipal
9659 E.
-Mississippi,
Denver,CO 80231
Operational Self- financed,
45-15
EiSpPrIng's,
3
i
Not indicated ,. 1.4 Planning Self-financed-
Pwo 16 weeksessions dividesby two 8 week-vacations
1.2
.
Ralph L.Witherspoon,Director
1.2
-
Operationalbut recentlyabandoned
.
Not indicated Trimester
_
1.2 C.M. Clark,Asst. Super-intendent
1.2 Operationalfor 2 yearsabandoned
Title I and ExtendedLeg. grant summer session
1.2
.
Dr; Mary-
Zellner,
Principal
1.2 Operational FL Department -Continuousof Education progress
.
____..
2.4
BeginningDate
2.5
GradeLevels
2.6
Number ofPupils
3.1
Purpose
7..,
,,,.A
Extent Curriculum.Change
3.3
Teacher Contract_Effects
Sept. 1972 K-6 1,000 Space utilization Not indicated Minimal
July 1973 RUssel JrHigh &PenroseK-6
1,099
Elem. unde-termined
Space utilization
.
.
Not indicated .
.
.
Fall 1964 K-12. Not
indicatedFuller facilitiesutilization:Flexible pupil move-ment
Ungraded flexiblemovement
Mandatory attendancfor 22 trimesters
Summer 197Summer 1971
K-12 Notindicated
Remedial, enrichment,acceleration
Add -on curriOlum Voluntary
July 1970 K-5 Not
indidatedUse of facilities Extended school year
40 days
- -
Voluntary staff forextra time
,
,
.
,
. i
t
32
. Extent Curriculum-Change
3.3
Teacher ContractEffects
3.4
Evaluation Status
8
Other Comments
Not indicated Minimal In designing stagesSpring 1973
Not indicated
.
.
ancs
Ungraded flexiblemovement
Mandatory attendancefor 22 trimesters
Not indicatedPlan has been abandoned.1)Unpopular with parents,teachers and students.2)Students tended toachieve less well and possess more adjustment prob-lems in this ESY program
than children in the regu-lar school year.
Add-orreurriculum Voluntary.t
Not indicated
for Extended school year40 days
Voluntary staff for-extra time
Not indicated
Ole .
11
9
State
1.1
ProjectTitle
1.2
Name of Districtof School
District-wide *
1.3
Name ofSuperintendent
1.4
-
Mailing Address
1.5
Name ofProject
Director
1.6 .
MailingAddress
FL Cocoa High45-15
Cocoa-High Schoollrevard County, FL
Not indicated 1.2 Robertmlubaugh,
Principal
1.2 e
FL DadeCountyQuinmester
Dade County School,
Dist. Miami, FLDr. E.L.Whigham
Dade County School District4 inmester Program
I iami, FL
-Martin
Rubinstein,
Project Mgr.
1410 N.E.
2nd Avenue,
Miami, FL33132
.
FL NoVa ESY Nova SchoolsPlan 200 Fort LauderdaleDay Contin Broward County, FLuous 'Pro- 33314gress
NOt indicated 1.2 Warren C.
Smith,
Director.
1.2 4
GA Atlanta Atlanta Public4-Quarter Schools.
Isar RoundProgram
John Letson 'e930 Forrest Hill Dr., SW'tlanta, GA 30315
Not indicated
CA Fulton CountyPublic Schools
Ed Bakerr
786 Cleveland Ave., SWAtlanta, GA 30315
Not indicatedrt 0
GA There are several other prograns and studies Georgia which, however, we e not reported.
GU Incomplete data. .
..._
.
.
.
.4
Address
1.5
Name ofProjectDirector
1.6 .
MailingAddress-
2.1
Type ofProject
2.2
FundingSource
2.3
Type Plan,
.2 RobertBlubaugh,
Principal
1.2 Operational
.
School. Dist. 45-15
.
School Districtogram
.Martin
Rubinstein,
Project Mgr.
1410 N.E.
2nd Avenue,
Miami, FL33132
Operational Local andstate funds
Quinmester
. Warren C.
Smith,
Director
1.2 Operational School dis-trict
200 day continuous progress
Hill Dr., SW30315
Not indicated Operational. Self-financi 4-quarter
d Ave., SW30315
Not indicated Operational "Self-financed 4-quarter.
ich, however, were not reported.
2.4
BeginningDate
2.5
GradeLevels
2.6
Number ofPupils
3.1
.
Purpose
3.2
Extent CurriculumChange
3.3
Teacher ConEffect
July 1972 9-12 130 1)Make comparison be-tween 45-15 and tradi-tional.
2)Relieve overcrowding.3)See if students willbe more motivated byshorter-time in school.4)Determine if teachersare more productive ifgiven vacation time atend of each nine weekperiod.
Unchanged Volunteers
June 1971 7 -12 Thousands,but.numbernot indica-ted
Use of facilities, ex-tensive curriculumrevision, 1,300 coursesoffered.
Extensive Some teachers
other teacher!month.
197 -1 K-12 Notindicated
Encourage innovation,provide continuous pro-gress learning
Extensive Teachers serveuntary basis
Sept.1968 -',2 32,000 Program improvement Complete recasting,substantial desequen-tialization
3 quarters mail
4th optional
Sept. 1968 8 -12 12,000 Program improvement Complete recasting,substantial desequen-tialization
3 quarters mar
4th optional
3 3.1
on
!et Purpose
...
3.2-
Extent CurriculumChange
3.3
Teacher ContractEffects
3.4
Evaluation Status
lo
Other Comments
comparison be-45-15 and tradi-
eve overcrowding.if students willmotivated by
r time in school.rmine if teachersre productive ifvacation time ateach nine week
Unchanged Volunteers.
..
Not indicated
.
130 si,udents on 45-15;
rest of school on txadal school year.
q.s f facilities, ex-
ler curriculumn, 1,300 courses
Extensive Some teachers on 10 mo.,Notother teachers on 111month,
indlcated Florida infomation isextracted from a paper -
done by the College ofEduc., 7niv. of Florid:
ry ge innovation,Ls continuous pro-
earning
Extensive Teachers serve on vol.,_.
untary basisNot indicated
.
ma improvementit
Complete recasting,substantial desequen-tialization
3 quarters mandatory,4th optional
On-going
.
,
ma improvement11
Complete recasting,
substantial desequen-tialization
3 quarters mandatory;4th optional
.
On-going Students pay tuitionfor fourth quarter.
_____.
.
.
11)-
;tate
1.1
ProjectTitle
1 . 2
Name of District
of SchoolDistrict -wide *
1.3
Name of
Superintendent
1.4
.
Mailing Address
1.5
Name pfProject-Director
1.6
MailingAddress
HI Kona 4-
QuarterProgram
Konawaena Elem.School, Intermedi-ate & H.S. HawaiiSchool District
Mr. Harry C.Chuck
Hawaii District Office
P.0- Box 1922HilojilI -96720
Hawaii Ed. State Dept.P.O. Box 2360Honolulu, HI 96804
Dr. Toshio & 1.4SteeringCommittee
Ff
ID No prograv-
of Educationduring the 1972-73 school
is offeringyear.
state funding for feasibility studies regarding the 12
I
meIL The State ,)epartment
available
.IL Valley View Dist.#365 U*
Kenneth
Hermansen104 McKool AvenueRomeoville, IL 60441
Not indicated
IN 1. Three school2. Funds have
3. No programs
districts havebeen allocated batare planned or
subr'tted applicationsnot released.
in operation at
for feasibility studies.
this time.
IA 1. All
Year SchoolCommunityStudy2. TheExtendedSchoolYear
1, Urbandale
SchoolDistrict2. Polk CountyBoard of Education
1. Dr. Lyle
W. Kehm
2. K. W.
Miller
1. 7101 Airline AvenueUrbandale, IA 50322
2. 112-116 Eleventh St.Des Moines, IA 50309
.
.
Joseph 1.4Millard
Fe
st
st
1
KS Did not re7urn. .
survey
KY ElectiveQuarterProgram
Jefferson CountyScnool District*
Dr: RichardVan Hoose
3332 Newburg Road'P.O. Box 18125Louisville, KY 140218
Gene 1.4McFadden
Ox
LA Has no programs
ME Has no programs
MD Has no pr6 Pams
.. ,
1 . 4
g Address
1 . 5
Name pfProject
Pireetor
1.6 .
MailingAddress
2.1
Type ofProject
2.2
.
FundingSource
2.3
Type Plan
F, rict Office
2
720
State Dept.6o1 96804
Dr. Toshio & 1.4SteeringCommittee
Feasibility State 4-quarter
ng for feasibility studies regarding the 12 month school year. The money will be
.01 Avenue, IL 6°441
Not indicated Operational Now local 45-15
feasibility studies.
F: rline Avenues, le, IA 50322
s
1, Eleventh St.les, IA 50309
Joseph 1.4Millard
Feasibilitystudy;
survey ofliterature
Not indicated-
.
.
`:125KY 40218
III
Road Gene 1.4McFadden
Operational Title III &Self-financed
Voluntary 4-quarter
, .......
Irl .
i
2.4
BeginniDate
Sept. 1969
1970 (K-f!/
1972 (9-12
2.5 2.6
Grade Number ofLevels Pupils
K-12 1,859
K-12
3.1
Purpose
Economic & educationalbenefits
3.3
Extent Curriculum. Teacher ContracChange Effects
Reordering of course No problem yetcontent to fit quarte
2,600
Ally, 1972
Adequately house pupils Elem: open classroom Range of options-Prevent program erosion Second: quarter ableSave construction costs courses
1-12 95,682 Program improvementSpace utilization
Complete rewrite and Not indicatedreorganization of thecurriculum
3%.2
Extent Curriculum.
Change
3.3
Teacher ContractEffects
3.4
Evaluation Status
12
Qther Comments
.onal Reordering of coursecontent to fit quarter
No problem yet Evaluation completed it1971. Decision reachedto discontinue project.
aip.ils
.osioncosts
Elem: open classroomSecond: quarter
courses
Range of options avail-
able
Elem: completed
Second:'in progress
,
1 t Complete rewrite andreorganization of thecurriculum
Not indicated Being designed
1
13
tate
1.1
ProjectTitle
1.2
Name of District
of School
District-wide *
1.3
Name of
Superintendent
,
1.4
.
Mailing Address
1.5
Name ofProjectDirector
1 . 6
MailingAddress
MA Did not re,urn survey
MI 45-15 ESY Northville PublicSchools
Raymond E.
SpearWest Main StreetNorthville, MI 48167
.
Miss FlorencePanattoni
_
1.4
'ti
Ex
pa
vo
MI Tri-Distr.ExtendedSchoolYear
'East Lansing,
Haslett, OkemosDr. MalcolmKatz
East Lansing Public Schools509 Burcham DriveEast Lansing, MI 48823
Mr. HerbertGibbs
1.4 0
MN More ElementarySchool
Pius J. Lacher Mora, MN 55051 1.3
_
1.4 Op
MS No Prograns
MO Francis Francis HowellHowell Elem. SchoolYear Rt. 2Round St. Charles, MOSchool 63301Program
r
Dr. M. GeneHenderson
.
Francis Howell SchoolDistrictRt. 2
St. Charles, MO 63301
.
Alan M.O'Dell
.
1.4 Op(
MT 1. Missoula CountyH.S. .
2. Columbia FallsH.S.
1. George
Zellick2. Robert
Souhrada
15 South Avenue, WestMissoula, MT 59801Columbia Falls, MT 59912
1.4 Nc
NB'
Twelve Papillion PublicMonth Con- Schoolstinuous Papillion - LaVistSchool NB 68o46Program
Paul D. Basler Paul D. Basler130 West First StreetPapillion, NB 68046
i..
,
Dr, Stanley
.cox130 W. 1st
Street
Papillion,NB 68046
Fe
st
1.4
ng Address
1.5
Name ofProjectDirector
Mailing Type ofAddress Project
2.2
FundingSource
2.3
Type Plan
Streete, MI 48167
Miss FlorencePanattlni
1.4 Experimenta
participa-tion
voluntary
Title III 45-15
ing Public Schoolsam Driveing, MI 48823
Mr. HerbertGibbs
1.4 Operationa Title III Quinmester
55051 1.3 1.4 Operational Self-financed 45-15
well School
, MO 63301
Alan M.OtDell 1.4 Operational Self-financed
Avenue, WestMT 59801lls, MT 59912
1.4 Not indicated
45,a5
sler
irst StreetNB 68046
D. StanleyWilcox
130 W. 1st
Street -
Papillion,NB 68046
Feasibilitystudy
Title III &LEA
45 -i5
2.4
BeginningDate
2.5
GradeLevels
2.6
Number ofPupils
3.1
Purpose
3.2
Extent CurriculumChange
3.3
Teacher ContractEffects
July, 1972 K-5 171 . Improve program; demon-strate potential spa3esavings
More flexible, moreindividualized
Participation voltat this time
June, 1972 9-12 300 To find out how manystudents and staff willtake advantage of
opportunity.
Not indicated None,
July, 1971 K-6 1,000 Space and programimprovement
Flexible program Eager
July, 1969 1-6 2,700 Space and staffutilization
.
Redesigned into nineweek units
Extensive
L.,
.
Juiy,'1973
-
K-12 4,800 Program improvement andspace utilization
Extensive:
1. Continuous progress
skill'subjects2. Three week curricu-
lum units3. No Sequential pro-
_grams
.
Per diem pay forteachers (planningstages)
.
-:
of
.3.2'
Extent CurriculumChange
3.3
Teacher ContractEffects
3.4
Evaluation Status
14
.
Other Comments
emon-
.paceMore flexible, moreindividualized
Participation vc'untaryat this time i
Interim evaluationcompleted
nywill
Not indicated None Preliminary completedFebruary, 1973 -
.
Flexible program Eager In process preliminary.
'evaluation completed....-
E
Redesigned into nineweek units
Extensive
.
Completed in past yearby Danforth Foundation
.
1. Teachers may teach oneor more 45 day periods.
2. Teachers may teach samegroup for four periods.3. Teachers may teach twoor more groups for nine-month period.
4. Teachers may teach five45 day periods.
,
Copies of the evalua.titin
can be obtained by limitingDr. Henderson.
Extensive:
1. Continuous progress
skill'Subjects2. Three week curricu-
lum units3. NO Sequential pro-
grams
-
Per diem pay forteachers (planningstages_) ,
.
--!
Being designed
.
. ...
.
and
ni
15
,tate
1.1
ProjectTitle
1.2
Name of Districtof School
Distric.t-wide *
1.3
Name ofSuperintendent
1 . 4
Mailing Address
1.5
Name ofProjectDirector
1.6
MailingAddress
NV Sun Valley Elem.School ,
Dr. MarvinPicollo
5490 Leon DriveSparks, NV 89431
Charles E.
Coyle,
Principal
1.4
NH AlvirneQuarterlyPlan
Hudson SchoolDistrict
Peter G.
DolloffHudson Memorial SchoolThornine, Road
Hudson, NH 03051
PrincipalAlvirne H.S.
1.1
NH Project
ESYKeene SchoolDistrict
John Day 1 Elm StreetKeene, Nil 03431
Edward White 1.4 FE
s
NJ Monroe Twp. PublicSchools
Clyde Stauffer Maple Grove SchoolAcademy StreetWilliamstown, NJ 08094
JayTregellas
1.4 FE
s
NJ Lcing Branch
Public SchoolsWilliamMeskill
6 West End CourtP.O. Box 1Long Branch, N 07740
Charles Lewis SchoolDavistown & Erial RoadsBlackwood, NJ 08012
ThomasMaggio
.
JamesThompson
1.4
1.4
F
st
F
st
NJ Gloucester Twp.Public Schools*
James Lilley
NJ Mt. Laurel Twp.Public Schools*
Thomas
HarringtonHattie Britt SchoolMt. Laurel RoadMoorestown, NJ 08057
Not indicated 1.4 F
st
NJ Tenafly PublicSchools
JohnGeissinger
27 W. Clinton AvenueTenafly, NJ. 07670
FlorenceWallace
1.4 Fe
s
NJ Notindicated
Delran.PublicSchools*
JosephChinnici
Chester Avenue SchoolDairen, NJ 08075
James TowsonJoseph '
ChinnicA
RobertRhoads
1.4
Warren HillsFeJr. HighCarlton Ave.Washington,NJ 07882
Fe
st
s
NJ Not
indicatedWarren Hills
Reg. H.S. DistrictEric Errickson P.O. Box 169
Washington, NJ 07882
1.4
Mailing Address
1.5 1.6 .
Name ofProject MailingDirector Address
2.1
Type ofProject
2.2
FundingSource
2.3
Type Plan
0 Leon Drive
ks, NV 89431Charles E. 1.4Coyle,
Principal
Operationa. Self-financed 4-quarter
son Memorial Schoolmine Roadon, NH 03051
Principal 1.4.
Alvirne H.S.Operational Self-financed,
,NH Dept. ofEd. State Aid
For BuildingFunds
4-quarter
lm Streete, NH 03431
Edward White 1.4 Feasibilitystudy
Title III1965
Voluntary 4-quarter
le Grove Schoolemy Streetiamstown, NJ 08094
Jay
Tregellas1.4 Feasibility
studyState grant Staggered*
attendance
st End CourtBox 1
Branch, N 07740
ThomasMaggio
1.4 Feasibilitystudy
State grant Quinmester
les Lewis Schoolstown & Erial Roadskwood, NJ 08012
James
ThompsonLit Feasibility
studyState grant Staggered
attendance
e Britt School. urel Roadstown, NJ 08057
Not indicated 1.4 Feasibilitystudy
State grant Staggeredattendance
Clinton Avenuely, NJ 07670
FlorenceWallace
1.4 Feasibilitystudy
State grant
ter Avenue Schooln, NJ 08075
James TowsonJosephChinnici.
Box 169
ington, NJ 07882Robert
Rhoads
1.4
Warren Hill;
Jr. HighCarlton Ave.Washington,NJ 07882
Feasibilitystudy
Feasibilitystudy
State grant
state grant
Not yet
determined
Staggeredattendance
Not determined
2.4
BeginningDate
2.5
GradeLevels
2.6
Number ofPupils
3.1
Purpose
3.2
Extent CurriculumChange
3.3
Teacher ContracEffects
Sept. 1972 K=6 700 Space use
.
Minor
,
No problem yet
Sept. 1972s
9-12 1,287 Program improvement In process Npt indicated
lo informa-tion now
Not indicated . ,
lot
leterminedK-12 3,800 Better space utilization. Not indicated
Notdetermined
10-12 1,275 Program improvement. .
Extensive recast in45 day modules
Not determined
Notdetermined
K -8 5,238 Space utilization Not indicated
Notdetermined
K-8 2,700 Space utilization Minimal i Not determined
Notdetermined
9-12 1,250 Program improvement Mini Courses coopera-tive with eveningadult .school
Not determined
Notdetermined
K-12 2,452 Space utilization' _Minimal Not determined.
Notdetermined
K-12 4,300 Space utilizationProgram_ improvement
Not indidav;ed
.
.
3.2
Extent CurriculumChange
3.3
Teacher ContractEffects
3.4
Evaluation Status
16
Other Comments
Minor No problem yet Formative evaluationin process
ovementI.In process Npt indicated Being designed
Atilizatior. Not indicated - Preliminary designed
yement Extensive recast in45 day modules
Not determined Preliminary designed
ation Not indicated - Preliminary designed'
ation Minimal Not determined Preliminary designed
ovement Mini Courses coopera-tive with eveningadult .school
Not determined- Preliminary designed
tion Minimal Not determined Preliminary designed
tionvement
yNot indicated
-
Preliminary designed
,
.
17
state
1.1
ProjectTitle
1.2
Name of Districtf School
District-wide *
1.3
Name ofSuperintendent
1.4,
.
Mailing Address
1.5
Name ofProjectDirector
1 . 6 .
MailingAddress
NJ Not
indicatedWashington Twp.Public Schools*
Willard
CangreveBunker Hill SchoolRFD #3
Sewell, NJ 08080
JohnCaggiano,
TonyFulgiriti
1.4
NJ NorthernValleyESY
Northern ValleyReg. H.S. District
Donald Watts Administrative OfficesCloster PlazaCloster, NJ 07624
MathewGlowski
1.4
NM Extended Roswell Indepen-School dent School'Dist.YearStudy
Roger Luginbill Roswell Independent School' Robert Wilso200 West ChisumRo'Swell, NM 88201
1.4
NY Feasibility Fashion InstituteStudy For of TechnologyContinuousLearningYear atFashion
Instituteof Technol-ogy
Marvin Feldman,President
Fashion Institute of GeorgeTechnology . ThomasW. 27th StreetNew York, NY .
.
Bureau ofOccupation-al EducationResearchState Ed.Dept. Rm.468Albany, NY12224'
NC Did not return survey
ND Did not return survey
OH Butler CountySchools
Third & Ludlow Streets Donald C.Hamilton, OH 45011 Morris
1.4 1
1
OK Extended Healdton PublicSchool Schools*Year 'Moore Pub.Schools*
James Harrod
Jer Doyle
Healdton, OK 73438 Charles Head
Moore, OK ,
P.O.Box 400Healdton, OK
OR
_..
Molalla School Dist.#35.Gresham SchoolDist. #4
Wm.Jordan
Gordon Russel.
P.O.Box 107 NoneMolalla, OR 970381400 S.E. 5thGresham, OR 97030
None
1.4
ailing Address
1 . 5
Name ofProjectDirector
1.6 .
.
MailingAddress
2.1
Type ofProject
2.2
FundingSource
2.3
Type Plan
Hill School
t, NJ 08080
JohnCaggiano,
TonyFulgiriti
1.4 Feasibility State grantstudy,
Staggeredattendance
strative Offices-r Plaza-r, NJ 07624
MathewGlowski
1.4 Planning Title III Not determined.
11 Independent School.lest Chisum-11, NM 88201
Robert Wilson 1.4 Feasibility Title IIIstudy
Not determined
.n Institute of
.logy
h Streetirk, NY -
GeorgeThomas
.
.
Bureau ofOccupation-al EducationResearchState Ed.Dept. Rm.468Albany, NY12224'
Feasibility Vocational Ed.study ESEA I
,Continuous
learning yearfivestreamprogram
& Ludlow Streetson, OH 45011
-Donald C.Morris
1.4 Curriculum Title IIIdevelopment
Not indicated
on, OK 73438
OK
Charles Head
,
P.O. Box 400
Healdtan,OKPlanning Title III No specified
plan yet
x 107a, OR 97038..E. 5th -
:m, OR 97030
None None
1:
Feasibility Self-financed'studies (3)
Planning -
projects(l0)
4quarter45-15
2.4
BeginningDate
2.5
GradeLevels
2.6
Number ofPupils
3.1
Purpose
3.2l 3.3
Extent Curriculum Teacher ContraChange Effects
Not
determinedNot'indicated Space saving Not indicated
July, 1974 9-12 3, 200 Program improvement & Extensive Not indicatedspace economy
July, 1972 9-12. 1,500 Program improvement Develop 9 week curric Extended contracular modules in all basisdisciplines
Nov. 1972 CommunityCollegeFreshman&_Sophomore
5,200 Space utilization, Extensive 8 weekMore effective pr'ogram learning periods
Exploring multipteacher contractib ilities
Sept. 1972 K-;12 10,709 To meet student needs Not determined
July, 1971
July, 1972
1-8 4,500 Space utilization Very little Flexible 92 monthtact & 12 -month
ac
3.2
Extent CurriculumChange
3.3
Teacher ContractEffects-
3.418
Other CommentsEvaluation Status
Not indicated - - Preliminary designed
ement & Extensive Not indicated
,
Being designed Mini courses &fewersequential courses &learning activitypackets
rement Develop 9 week curric-ular modules in alldisciplines
Extended contractbaSis
.
In procesS of
completion
.
ion,
pi;Ogram
Extensive 8 weeklearning periods'
Exploring multipleteacher contract poss-ibilities
Being designed
.
t needs Not determined ..-
.
Being deSigned
ion Very little Flexible 91 month con-tract & 12 month
,
Being designed
ip:
et
a*
it
19
State
1.1
ProjectTitle
1.2
None of Districtof School
District-wide *
1.3
Name ofSuperintendent
1 . 4
.,
Mailing Address
1 . 5
Name ofProjectDirector
1.6
MailingAddress
PA Year RoundSchool
Clarion StateCollege
Dr. John
McOldinClarion Research LearningCenter .Mr......ponald
Clarion State CollegeClarion, .PA 16214
1.3 &
Means
1.4
PA Year RoundSchool
Rochester AreaSchool District*
Mr. MatthewHosie
540 Reno StreetRochester, PA 15074
Mr. Thomas
Skinner1.4
PA Year RoundSchool
Butler AreaSchool District*
Dr. SamuelDe Simone
167 New Castle RoadButler, PA 16001
1.3 1.4
PA Year RoundSchool
Wissahickon School Dr.WilliamDistrict Stautenburgh
Hauston RoadAmbler, PA 19002
1.3 1.4
PA Year RoundSchool
Fairview School Dr. CharlesDistrict Shultz
Fairview, PA 16415 Dr. FrankJohnston
1.4
PA Year RoundSchool
Gateway "School Dr. J. E.District' Shafley
Administrative OfficeMonroeville, PA 15146
1.3 1.4
PA Year RoundSchool
Pennsbury SchoolDistrict
Mr. WilliamIngraham
Dr. RonaldHuber
Yardley AvenueFallsington, PA 19054
315 W. State StreetDo lestown, PA 18001
'
1.3%.
1.3
1.4
1.4. PA Year Round
SchoolCentral Bucks AreaSchool District
PA Year RoundSchool
Neshaminy School Dr. JosephDistrict Ferderbar
2061 Old Lincoln Hwy.
Langhorne, PM 19047
131 W. Nittany AvenueState College, PA 16801
1.3
1.3
1.4
1.4PA Year Round
SchoolState College Area Dr. Robert C.School District Campbell
PA Year RoundSchool
Manheim Twp. Mr. Raymond'School District Dunlap
Millersville Dr. RobertState College 1 Labriola
School Rd. Box 5134Lancaster, PA 17601
Millersville, PA 17551
1.3
1.3
1.4 .
1.4 ,
PA Year Round.School
_ _.
. 1.11.
Mailing Address
1 . 5
Name ofProject
Director
1 . 6
MailingAddres-
2.1
Type ofProject
2.2
FundingSource
2.3
Type Plan
'larion Research Learning'enterenter
.
'larion State College,larion, PA 16214
1.3 &
r....Dpnald.
eans
1.4 Planning State grant Flexible all -
year school
Reno Street
1 'ochester PA 1 0 4Mr. Thomas
Skinner
140 .4 Operational State grant Voluntary 4-uarter
67 New Castle Roadtier PA 16001
1.3 1.4 Operational State grant Voluntary 4-uarter
uston Roadh
1 mbler PA 1.0021.3 1.4 Feasibility State grant Not Indicated
irview, PA 16415 Dr. Frank
Johnston1.4 Feasibility State grant Not indicated
il
. .
dministrative Officeonroeville, PA 1 146
ardley Avenueallsin ton PA 1.0 4
1.3 1.4 Feasibility State grant Not indicated
,
1.3 1.4.
Feasibilitystud
Title III Not indicated
15 W. State Streetoylestown, PA 18901
..
1.3 1.4 Feasibilitystudy
State° grant Not indicated
061 Old Lincoln Hwy.nr" 04 1.3 1.4 Feasibilitystud
State grant Not indicated
31 W. Nittany Avenuetate College, PA 16801
. 1.3 1.4 Feasibilitystud
State grant Not indicated
Ili chool Rd. Box 5134.ncaster, PA 17601
1.3 1.4 Feasibilitystudy
State grant Not indicated
1illersville, PA 17551 1.3 1.4 Planning State grant -Not indicated
2.4
BeginningDate
2.5
GradeLevels
2.6
Number ofPupils
3.1
Purpose
3.2
Extent CurriculumChange
3.3
Teacher ContractEffects-
.1972-73 Nursery-12th
300 Program improvement New curriculum Not indicated--- -
1972-73Sch. ear
K-12 Notindicated
Space utilizationProram imorovement
New curriculum Not indicated
1972-73 7-12 Notindicated
Program improvement New curriculumwritten
Not indicated
1972-73 Not indicated Program improvementSpace utilization
Not indicated
1972-73 Not indicated Program improvementSpace utilization
Not indicated
1972-73 Not indicated Program improvementSpace utilization
Not indicated
1972-73 Not indicated Space utilizationProgram improvement
Not indicated
1972-73
Sch. yearNot indicated Program improvement
Space utilizationNot indicated
1972-73 Not indicated
1972-73 Not indicated
1972-73 K-12 Notindicated
1973* Middle Sch. 25-30iModel Sch.
Frbgram improvement-
New curriculum.
Not indicated
..
I
r
se
3.2
Extent CurriculumChange
New curriculum
3.3
Teacher ContractEfft..Its
Not indicated
3.4
Evaluation Status
20
Other Comments
rovement
zation' ovement
New curriculum Not indicated 4.
rovement New curriculumwritten
Not indi1cated.
2rovementlzation
Not indicated,,,
rovementzation
Not indicated 4.
,
)rovementzation
Not Indicated
zzl.tior,-
:;:v."-,-<
^t indicated.
.... .
)roc indicated.zatiork
,,
.
.4
,
,rovement New curriculum.
Not indicated . ,
.
.
.
21
tate
1.1
ProjectTitle
1.2
Name of District
of SchoolDistrict-wide *
1.3
Name ofSuperintendent
1.4
Mailing Address
1.5
Name ofProjectDirector
1.6
MailingAddress
...
PR Did not return survey
Narraganset SchoolDept.
Mr. JohnO'Brien
29 Fifth AvenueNarraganset, RI 02882
Mr. David 1.4Hayes,
Principal
FE
0RI
RI Foster-Glocester Mr. Curtis
Reg. School Dist. Bumpus
_
RFD #2 North Scituate, RI02857
G. Tetreault, John R.Principal Fogerty Sch.
TheodoreFoster Dr.
Foster, RI02825
FE
E
RI FifthQuarterPlan
Cranstoh School Dr. Joseph
Dept. Picano
845 Park AvenueCranston, II 02910
1. 522 East Main StreetRock Hill, SC 29730-
2. Dupre Drive.Spartanburg; SC 29301
Dr.Guy DiBiasi?,
of Curriculum;3ambo, Dir.ofMr. Arnold Flgers,of Project Paue.Setter
1.. Mr. Chas.
Hall2. Dr. John
Tillotson
Dir.
Mr. CarloGrant Pro.;
Dir.
SC Nonereported
1. Rock Hill School 1. B.J.Savage
District #32. Spartanburg Sch. 2 Dr.J.G.
District #7 McCracken
1.4
1.4
CI
IN
dE
it
SD No prograns
TN Memphis
SchoolCalendar
Study
Memphis City John FreeManSchools*
2597 Avery AvenueMemphis, TN 38112
,Dr. Shelby 1.4'Counce
TN Knox County Schools* Miss Mildred'Doyle
400 W. Hill AvenueKnoxville, .TN 37902
Mr. Sam 1.4
Bretton
Mr. Ira, E. 1.4Huchingson,
Coordinator
Nst
3
s
7.
a.
TX Quarter .Mandatory
System
_
fr,r entire All publicstate in 1973-74 schools in TX
_
Texas Educational Agency11th & Brazos Streets
, ,
Austin,, TX 78746 %
1.4
Mailing Address
1.5
Name ofProjectDirector
MailingAddress
Fifth Avenuerraganset, RI 02882
Mr. DavidHayes,
Principal
D #2 North Scituate, RI
857
G. Tetreault,
Principal
John E.Fogerty Sch.
Theodore-Foster Dr.
Foster, RI02825
5 Park Avenueanston, RI 02910
522 East Main Stre&,.
Rock Hill, SC 29730
Dupre DriveSpartahburg, SC 29301
Dr. Guy DiBiasip, Dir.
of Curriculum; Mr. Carlo3ambo, Dir, of Grant Pro.;
Mr. Arnold. Rogers, Dir.
of Project Pacp.Setter
. Mr. Chas.
HallDr. JohnTillotson
1.4
1.4
97 Avery Avenue
mphis, TN 38112
Dr. ShelbyCounce
1.4
0 W. Hill Avenueoxv lle, TN 37902
Mr. SamBratton
1.4
exas Educational Agencyth & Brazos Streetsstin, TX 78746
Mr. Ira, E.
Huchingson,
Coordinator
1.4
2.1
Type ofProject
2.2
FundingSource
2.3
Type Plan
Feasibilitystudy
State reim-bursed funds
45-15
Fea- )ilitysty,
State reim-bursed funds
45-15
Planning Title III Quinmester
Curriculumrevision &development,
implementa-tion
Title III,
State,
Local
Quinmester
Study Not indicated
Feasibilitystudy
39 pilot
schools in2-73 &gency taskforce
Self-financed-QuinmesterVoluntary 45-15Volun.4-cuarter
Quartersystem
ilot schools,local fundingagency groups.
regular bud-get
2.4
BeginningDate
2.5
Grade
LeVels
2.6
Number ofPupils
3.1
Purpose
3.2
Extent CurriculumChange
3.3
Teacher ContEffects
1971 -72 K-6 880 Space utilization Not indicated 180 day & 240contracts-
Not
reportedK-12 or5-12
1,300 Space utilization Not indicated 180 day & 240 i
contracts
Summer 73 K-12 4,605 Program improvement Complete curriculumchange
Not indicated
Fall 1973 7-12 1.Rock Hill7,000
2. Spartan-
burg13;000
Program improvement Complete 45 day contrac,
225 day contra*
..
Not beforeJuly, 1974
K-12 Not
indicatedProgram improvement;Better space utilizatio
Not indicated
72-73' K-12 56,000Pilot
'Educational improvementFinanciil purposes also.considered
$. .1
Complete Not indicated
G.1
rose
3.2
Extent CurriculumCha !e
3.3
Teacher ContractEffects
3.4
Evaluation Status
22
Other Comments
lization Not indicated 180 day & 240 daycontracts
Not indicated.
ization Not indicated 180 day & 240 daycontracts
Not indicated
'provement Complete curriculumchange
Not indicated Being.designed,
provement Complete 45 day contracts to225 day contracts
Preliminary evaluation Joint project
Isrovement;
e utilizationNot indicated Being designed
1 improvement.urposes :also
.
Complete Not indicated In progress to be com-pleted March 13
.
Legislation pending,
to.postpone enactmentuntil 1975:
23
State
1.1
ProjectTitle
1.2
Name of Districtof'School
District -wide *
1.3
-
Name ofSuperintendent
1.4
.
Mailing' Address
1.5
Name ofProject
Director
1.6
.
MailingAddress
UT Grant Elem. SchoolNebo School Dist.
Dr. Joe A.
Reidhead
50 South MainSpanish Fork, UT 8466o
Waldo Jacob-son, Principa
SpringvilleUT 84663
VT Notindicated
Champlain ValleyUnion High School,Hinesburg, VT 05461Chittenden SouthSupervisory District_
Mr. TheodoreWhalen
Office of Supt.-
Shelburne, VT
Mr. IohnOlsen,Princ.Mr. Paul RiceAsst.
1.2
. VA Prince Wm. Garfield SeniorCounty High SchoolYear RoundSchool
Mr. HerbertSaunders
Prince'Wm.County SchoolBoard Office,Mariassas,VA 22110
.
Dr. WilliamVolk
1.4
VA Bel Air, Dale City,
Minnieville andNeabsco Elem. Schs:Prince WilliamCounty
.
Mr. HerbertSaunders(Interim Supt.)
.
Prince Wm. County School
Board'Office, Manassas,VA 22110
Dr. WilliamVolk
1.4
VA Mills E. GodwinMiddle School
Mr. HerbertSaunders
(Interim Supt.)
14800 Darbydale AvenueWoodbridge, VA 22191
Mr. R. DeanKilby
1.4 D
VA
::
Planning All Schools*Project to 7 Elementary
study year 3 Intermediateround oper-.2 High Schoolsation ofschools in
.
York County
George Pope,York CountyPublic Schools
-
.O. Box 451,Yorktown, VA 23490
.
'John Baldino
.
1.4 F
s
pI_
b
b
-"Mr
1.4
4I1^'
Mailing Address
l.5
Name PfProjectDirector
1.6
MailingAddress
2.1 2.2
Type of Funding
Project Source
2.3
Type Plan
0 South Mainpanish Fork, UT 84660
Waldo Jacob- Springville
son, Principa UT 84663Operational Local district Flexible sched.
child mustattend 180 daysout of 225
Office of Supt.
Shelburne, VT
Mr. aohnOlsen, Princ.
Mr. Paul RiceAsst.
1.2 Operational Self-financed Multiple access'curripulum &calendar, 119-week overlapping. quarters,
volunta
Prince Wm.County SchoolBoard Office, .Manassas,
VA 22110
Dr. WilliamVolk
R & D State grant Multiple entry45-15 and
conventionalrear.
Prince Wm.County SchoolBoard Office, Manassas,VA 22110
Dr. WilliamVolk
1.4 Operational Self-financed 45-15
14800 Darbydale Avenue
Woodbridge, VA 22191
Mr. R. DeanKilby
1.4 bperational Self-financed 45-15
T.O. Box 451,Yorktown, VA 23490
John Baldino 1,4 Feasibility State grant
study andplanning leaL-Lng to opera-tion on atrial basis
-Pentamester
2.14 2.5
Beginning GradeDate Levels
2.6
Number ofPupils
3.1
Purpose
3.2
Extent' CurriculumChange
3 . 3
Teacher ContractEffects
Aug, 1972 5 477 Program improvement Continuous progress Optional
Sept, 1972 9-12 1,000 Program benefits,Space utilization
Continuous progress9-week courses (Duo)a work study programindependent study, etc.
ti
Regular 185 day contract, additional don a per diem basis
July, 1973 9-12 3,000 Provide students withvarious time frames tomeet educational objec-tives and support qual-ity education standards
Change from tradition-al.year to 9-weekprograms, student sel-ection of interest re-lated classes & studentchoice 'of sch.calendar.
240 day contracts
220 day contracts
June, 1971 1-5 3,400 Program improvement,
Better space utiliza-tion
Curriculumreorganization
240 day contracts230 day contracts180 day contracts150 day contracts60 day contracts
June, 1971 6,7,8 1,550 Program improvement,Better space utiliza-tion
Planning K-12June 72-73Poss.opera-tion .
June 1973
8,200 Program improvement
Curriculumreorganization
Curridulumreorganization
240 day contracts230 day contracts180 day contracts150 day contracts60 day contracts
Not yet determined
3.2
Extent CurriculumChange
3.3
Teacher ContractEffects
3.4
Evaluation Status
24
Other Comments
vement Continuous progress Optional Preliminary evaluationAug. 28, 1972 annual
fits,
ationContinuous progress9-week courses (Duo)a work study program,independent study, etc.
Regular 185 day con-
tract, additional dayson a per diem basis
Preliminary in process
nts withframes tonal objec-port qual-standards
Change from tradition-al, year to 9-week
programs, student sel-ection of interest re-;
lated classes & studentchoice of sch.calendar.
240 day contracts220 day contracts
Being designed inconjunction with R & D,
ement,
tiliza-Curriculumreorganization
240 day contracts230 day contracts180 day contracts150 day-contracts
Go day contacts
Evaluation completed
vement, Curriculumutiliza- reorganization
240 day contracts230 day contracts180 day contracts150 day contracts60 day contracts
Evaluation completed
vement Curriculumreorganization
Not yet determined Preliminary, evaluation Secondary courses rede-signed into 9-week non-sequentials with, putllperformance requirements(PPR)s
Elementary courses - con-tinuous progress individ-ualized instruction with(PPR)s
25
tate
1.1
ProjectTitle
1.2
Name of Districtof School
District-wide *
1.3
Name ofSuperintendent
1.4
Mailing Address
1.5
Name ofProjectDirector
1.6 .
MailingAddress
VA Year_ Round
EducationProject807
1. Thos.HenderSon
Middle School2. Mary Scott,
Elem. School
Dr. ThomasLittle
4011 Moss Side AvenueRichmond, VA 23222
.
1.C.Fred_Bateman2.James Robin-son George
1.4 F
s
VA VirginiaBeach 45-15 cycledattendancePlan
City of Virginia
Beach PublicSchools
E. E. Brickell City of Virginia BeachPublic Schools, P.O.Box6038, Princess Anne StaiiioVirginia Beach, VA 23456
.
Dr. James
MoonieDir.of "Re-
search Planing & Devel-
opment,P.O.Box 6038,Annex IV,
VirginiaBeach, VA23456*
VA K-12
Year RoundPrograms
Roanoke CountySchools
4 Elementary1 Intermediate1 High School
Arnold Burton 526 College AvenueSalem, VA 24153
Alan Farley;
Director.1.4
VA Loudoun County
Guilford, Sterling& Sully Elem.School.;
:I- Sterling MiddleSchool
Mr. Robert Butt 20 Union StreetLeesburg, VA 22075
Dr. ArthurWelch
30 W. North
St., Lees-burg, VA22075
VI Virgin IslandsDept. of Education
St.Thomas, St.John,St. Croix
Dr. Harold
Haizlip, Comm.of Education
13.0, Box 630
Dept. of EducationCharlotte AmalieSt. Thomas, IT 00801
Mr. Don Smith
.
Notindicated
1.4.
1.4 i
WANot
indicatedFranklin PierceDistrict 402 Dr. Edw. Hill
315 South 129th St.Tacomaz WA 98444
WV No prograns in operation
1.4
Mailing Address
1.5
Name ofProjectDirector
1.6
MailingAddress
2.1
Type of
Project
2.2
FundingSource
2.3
Type Plan
1 Moss Side Avenuehmond, VA 23222.
1.C.Fred. Bateman2.James Robin-
son George.
1.4 Feasibilitystudy
State grant-
Random individ-ual vacationoptions withJune to Augustextension
y of Virginia Beach
tic Schools, P.O. Box
8, Princess Anne Stationginia Beach, VA 23456
.
Dr. JamesMoonie
Dir.of Re-
search Plan-ing & Devel-opment,P.O.Box 6038,Annex IV,
VirginiaBeach, VA23456
Planning &preparationphase
State grant &Self-financed
45-15cycledattendanceplan
College Avenueem, VA 24153
Alan Farley,
Director1.4 R & D State gr'ant :3-year phase in
beginning with7 6-week terms7th term volun-
aEY
45-15'Union Street-sburg, VA 22075
Dr. ArthurWelch
30 W.NorthSt., Lees-burg, VA22075
R & D State grant &Self-financed
Box 630. of Education
Ilotte AmalieThomas, VI 00801
Mr. Don Smith
,
1.4 Feasibilitystudy
Not indinted
South 129th St.'a, WA 98444
Not ,
indicated 1.4 OperationalJ.S.O.E.Exp.Sc .
Prqs. & Local -4-1-4-1-1
2.4
BeginningDate
2.5
GradeLevels
2.6
Number ofPupils
3.1
Pur ose
3.2
Extent CurriculumCha e
3.3
Teacher ContractEffects
Notindicated
1-8 1,679 Program improvement
_Total continuousprogress with articul-ation hcross levels(Elementary Middle)
92 mo. contract
12 mo. contract
I
OperationalJune, 1973
1-7 5,000 Space utilization
.
Extensive
b
,
180 day contract240 day contract
.
Sept. 1973 K-12 4,000
b
Program improvement Complete change topackaged continuousprogress, behavioralobjective based
Not indicated
July, 1973 1-8 3,650
.
Program improvementSpace utilization
.
Reorganize curriculumfor 45-15 schedule;3-week units will bedeveloped for eachsubject area
195 day contract228 day contract
1974 Not determined
. .
Better spaceutilization
Not indicated --.
,
.
Sept. 1971 .K-12 4,200Program ImprovementSpace utilization Extensive . Little
-.
3.2
Extent CurriculumChange
3.3
Teacher ContractEffects
3.4
Evaluation Status
26
Other Comments
Nement Total continuousprogress with articulation across levels'(Elementary Middle)
92 mo. contract12 mo. contract
Being designed
tion Extensive
.
180 day contract240 day contract
Plailning phase in pro-
gresse operationalphase designed
'sequential
Modification for: greaterflexibility of instructionand curriculum for multi-age classes; minimize re-petition through recordkeeping; provide for
skill and con-cept developient; allowfor continuous progress ofstudents,
..
ement Complete change to
packaged continuousprogress, hehavioralobjective based
Not indicated Being designed
ovementation
Reorganize curriculumfor 45-15 schedule;3-week units will bedeveloped for eachsubject area
195 day contract228 day contract.
Being designedt
Not indicated In planning stage
vementtion Extensive Little In process
27
State
1.1
ProjectTitle
1.2
Name of District
of SchoolDistrict -wide *
1.3
Name ofSuperintendent
.
1.4
Mailing Address
1.5
Name pfProj,_ct
Director
1.6
MailingAddress
WI Milwaukee PublicSchool District
Dr. RichardGousha
P.O.Drawer 10KMilwaukee WI 3201
Dr. JosephCollins
'
1.4
WI Year RoundSchoolStudy
Racine UnifiedSchool District
C. RichardNelson
2230 Northwestern AvenueRacine, WI 53404
Sam Castagna 1.4WmiGrindeland
111/
WI Union Grove Dist.Union High School
James
Highly ad
Box 36
Hwy. 45Union Grove WI 3182
1.4
WI League ofWomen Vote,'.
Feasibilitof Yr.Rouro
School,Wausau
Wausau School
District
Dr.. T.
NicholsonMrs. Richard Turk, Pres.League of Women Voters634 South-5th AvenueWausau, WI 54401
.
.Mrs.JohnCook 1.727 Bertha'Street
Wausau, WI54401
.Mrs.Robert 2.725 S. 6thQuinn . Avenue
Wausau, WI4401
I.
r
WI Joint District #3City of OconomowocEt. A1.
Wm. Paton 521 Westover StreetOconomowoc, WI 53066
Donald Kremer 641 ForestDir.See.Ed. Street
WI Burlington ALeaSchool" District
P. R.
ReinfeldtBox C
Burli ton, WI 31621.3 1.4
WI Hamilton JointSchool Dist. 16
N. H. Fries W220 N6151 Town Line RoadSussex, WI 53.089
Kieth Wunrow, Marcy SchoolDir.of Instr. W180 N4851
Marcy Road,Menomonee
WY ExtendedSchool Yr.
.
Laramie County(School Dist. #1Cheyenne, WY82001
Dr. JoeLutjeharms
.
,
1.2
.
Mr. Leo . 1.2Breeden,, Asst.
Superintendent
1.4
Mailing Address
1.5
Name pfProjectDirector
Drawer 10Kaukee, WI 53201
Northwestern Avenuene, WI 53404
Dr. JoSephCollins
Sam CastagnaWm.Grindeland
1 . 6 .
MailingAddress
1.4
2.1
Type ofProject
Feasibility-stud
2 . 2
FundingSource
Self-financed
2.3
`Type PltIn
Not indicated
easibility Self-financedtudy &rogram
lanning
45-15
36
45
n Grove, WI 53182
Richard Turk, Pres.ue of Women Votersouth 5th Avenueu, WI 54401
[.Mrs.JohnCook
.Mrs.RobertQuinn
1.4 Feasibility Self-financedstudy
45-15
1.727 BerthaStreet
Wausau, WI544012.725 S,6th. Avenue
Wausau, WI54401
.League of' Not indicatedomen Votersocal Study
rogram.Feasibilitstudy
destover Streetmowoc, WI 53066
Donald Kremer,
Dir.Sec,Ed.
641 Forest
StreetFeasibility Self-financedstudy
457.15
1.3ngton, WI 53105
1.4 Feasibility Self-financedstudy
45-15
N6151 Town Line Roadx, WI 53089
Kieth Wunrow,Dir.of Instr.
Marcy SchoolW180 N4851Marcy RoadMenomonee
Feasibility Self-financedstudy
45-15
1. 2 Mr. Leo
Breeden, Asst.Superintendent
1.2 Feasibilitystudy
Self-financed Voluntary4-quarter
2.4
BeginningDate
2.5
GradeLevels
2.6
Number ofPupils
3.1
Purpose
3.2
Extent CurriculumChange
3.3
Teacher ContraEffects
Sept. 1971 Not'indic ated
Not
determined9-12 9,600 Program improvement
Space savingNot indicated
Not
_determined9-12 900 Space utilization'' 0,1Not indicated
1972-73 Not indi sated Program improvement Not indicated
Not
determined
K-12 '5,600 Space utilizationProgram improvement
Not indicated
To be
determinedIC-12 3,800 Space utilization Nine week units
Study com-
pleted July
1971
K-12 Not
indicated'Program improvement.Space utilization
Not indicated
Fall 1974 K-12 14,000 Enrichment,
lcceleration,Space utiliZation
- Extensive
ra
3.2
Extent CurridulumChange
3.3
Teacher ContractEffects
3.4
Evaluation Status
28
Other Comments
ovement Not indicated Evaluation of feaibil-ity study completedFeb. 1971. No furtherstudy planned.
ation Not indicated
_
Planwas studied.No plans to implement.
-
ovement Not indicated
.
Preliminary stages
.
tion
vementNot indidated - Elementary- school
feasibility studycomplete
tion Nine week units . Preliminary
vementtion
Not indicated - No work lies been doneto implement following
the study..
--;
ion
.
Extensive
r
_ J _
Being_designed to gointo effect Spring1975
,
Curriculum to be revisedto fit 60-day quartersystem, Each subjectarea is asked to revisecurricultim to relatebetter to world of workconcepts.
LEGISLATIVE ACTIVITIES AFFECTING
YEAR-ROUND EDUCATION IN THE UNITED STATES
as reported by SEAs in conjunction
with the first annual survey of
year-round education activities
Prepared "by
Henry J. Pruitt, Project Associate
Extended School Year Programs
Office of Program Development
Division of Research, Planning and Evaluation
New Jersey Department of Education
Trenton, New Jersey
April 1973
ARIZONA
An Act, Chapter 115, House Bill 2019, was approved by theGovernor of Arizona on May 8, 1972. This act is in reference toExtended School Year programs in the state of Arizona.
AN ACT RELATING TO EDUCATION: Authorizing the operation of certainschools on an extended year basis; authorizing financial aid to bepaid on the basis of the equivalent of one hundred seventy-five
days attendance; requiring certain school districts to employseparate budgets for schools on extended school operation; amendingsections 15-301, 15-321, 15-442 and 15-1212, Arizona revisedstatutes; amending title 15, chapter 11, Arizona revised statutes,by adding article 2.2, and making an appropriation.
Sec. 7 Appropriation; purpose
The sum of one hundred ten thousand dollars is appropriatedto the state department of education, for the fiscal year beginningJuly 1, 1972, for the purpose of financing the cost of additionalstaff positions needed for the department to provide the supervisionand assistance necessary to school districts which qualify and areauthorized to participate in a program of twelve month. schooloperation-pursuant to section 3 of this act.
I. Legislative Intent
The Legislature intends by this act to authorize schooldistricts to evaluate, plan and-employ the use of extended schoolprograms.
II. Requirements for Qualifications of School Districts
A. To qualify, a school. must be a public common or highschool of the State of Arizona.
B. Very small schools will not be approved.
C. A need.for an Extended School Year-program must bedemonStrated showing a more economical .utilizationof facilities and personnel, or-curriculum improvement.
D. There must be evidence,of-program planning involving
students, faculty, parentS and community.
E. Objectives must be clearly defined.
F. Implementatior procedure must carry out a full cycle ofoperation for all students.
III. Evaluation Criteria
A. There are to be phase-in checkpoints for progressevaluation (formulative evaluation) for each step ofimplementation.
- 2-
B. There is to be an outcome evaluation (summativeevaluation) for ascertaining objective accomplishment.
IV. State Superintendent of Public Instruction's dutieswill include:
A. Providing departmental staff and guidelines forassisting and supervising districts who wish to operateand/or plan ESY programs. Thete guidelines are available
ARKANSAS
Arkansas has the first draft of a bill dated November 27, 1972that may or may not be introduced into the legislature.
A BILL FOR AN ACT TO BE ENTITLED:
AN ACT authorizing school districts,in this state to operate on aquarterly rather than a semester basis; authorizing districts tooperate all or some of their schools for all four quarters with statefunding for three quarters of attendance for any one student;authorizing the state board of education to establish appropriaterules and regulations for the operation of elementary and secondaryschools on a quarterly basis, and to assure that no school districtbe penalized in the loss of minimum foundation program aid, trans-portation aid, or other forms of state aid to local school districtsin the operation of schodls on a quarterly-rather than a semesterbasis; and for other purposes."'
I. legislative Intent
The Legislature intends by this act to authorize school districtsto operate on a quarterly rather than a semester basis-. This changewould be optional.
II. Requirements_ for Qualifidation of Sdhool Districts
A. Districts may, upon the approval of a majority of thequalified voters at an annual sch661 board election,elect to operate one or more of the .schools of saidschool district on a quarterly rather than a semesterbasis.
B. The revised curriculum shall be so structured that thematerial covered during the :present school year of twosemesters is covered in three; three-month quarters.
C. Any school district may return to the semester system
3
D.
upon a-majority vote of the members of the school
board on or before July 1 prededing the tcrm at_whichthe school district is to return to the semester system.
assistance either under the quarter system or the semesterprograms to assure school districts equivalent stateThe State Board will make adjustments in formulas and
system.
Emergency
It has been determined that a number of school districts areexperiencing unusual adjustments in the number of pupilsservedand the immediate passage of this act is necessary to make maximum
and efficient use of existing buildings, facilities and staff.
It is not known, at this time, if this bill has been introduced.
CALIFORNIA
I. Legislation Passed, 1971
SB-673 - Authorizes public school districts, with the approvalof the Superintendent of Public Instruction, toestablish and operate in one or more schools of thedistrict, the 45-15 plan. District-to receive thesame financial support, but not more financial supportthan it would have received if the school had beenoperating under the provisions of law relating to thei-egular schOol year, including -summer school. (Ed. C.
Sections 32100 - 32133)
AB 1002 - Identical to SB 673 except the- proyisions of thischapter (Chapter 7. Continuous School Programs) donot bedome operative until July 1, 1.973. Also, therequired approval of the State Superintendent of PublicInstruction is removed.
AB 331 ProVidea- for the establishment during the 1972-73school year of five-year experimental programs in two
been received during the regular school year, includingsummer school based on average daily attendance.
or more school districts selected by' the Superintendent
of Public Instruction. Focuses upon the "academic
quarter" plan. NO funding beyond"that which would have
4
AB 1924 - Provides a financial incentive for State aideddistricts to consider implementation of the yearround utilization of facilities.
II, Requirements -of School for the Feasibility .StudyReport under SB-673 or AB-331
A. Needs and Status Information
1. Background data and information concerning theschool district: size, growth, facilities, uniquecircumstances and any history of prior studiesundertaken by the school district.
2. Clear-cut statements of goals and objectives.
3. Summary of existing district instructional program,specific programs in schools under consideration.
4. Awareness of specific problems involved in thedesign and implementation of the year round schoolingplan selected by the district.
5. Tentative conclusions concerning selection andimplementation of a year round school program.
B. Implementation Plan
1. Evidence of thoroughness in planning; evidence ofbroad community, staff and board involvement.
2. Development or modification of a plan includingstaffing, scheduling, use of facilities, etc.
3. Development of teaching strategies, curriculum materials,professional growth opportunities.
4. Specific school organization--establishment ofattendance areas, (as- in the 45-15 plan), establishmentof specific family/student assignments, alternativesfor families not desiring year round schooling.
5. Consideration of a simulation model to work out "bugs"before actual implementation:
Resolution to the totality bf problemS,endountered:Legal atpect of the law--state testing, .EMR teacher/student ratios, ethnic surveys, youthemployment,community recreation programs, student transfers,district maintenance program, relationship to summersessions, student transportation, professional growth,vacation patterns, increased secretarial assistance,use of school facilities, juvenile delinquency, balanced
enrollments, instructional articulation, PL 874, cafeteriaoperations, teacher . '.,,ent monies, single salaryschedule, etc.
-5
III. Evaluation Dec.gn
A. Plans should drawn for:
1. Instructional program
2. Finances
3. Facilities
B. Subdivision of each of the items should be based on:
1. An immediate or short term basis (1-2 years)
2. A long term basis.
ILLINOIS
AN .ACT to add sections 10-19.2 and 34-21.3 to The School Code"approved March 18, 1961 as amended. Signed by the GovernorAugust 2, 1972.
I. Additions to the School Code
A. Any school district may by- resolution of its boardfile an application with the office of the Superintendentof Public Instruction and, if approved, receive fundsfor the purpose of conducting a study of the feasibilityof operating one or more schools within the district ona full year school plan.
B. The board shall subn4t a final report to the StateSuperintendent of Public Initruction within one yearafter receipt of funds or upon completion of the study,whichever occurs first.
C. If, based upon the results of a full year feasibilitystudy, the board decides to operate one or more schoolsin the district, the Superintendent of Public Instructionmay, depending upon certain guidelines, reimburse theboard for expenditures;resulting:from making such atransition, provided that no expenditures will bereimbursed which would have been incurred,,by the boardin the absence of a changeover. to a full year program.
6
MICHIGAN
Enrolled. Senate Bill No. 1140
AN ACT to make appropriations for the department of educationand certain other purposes relating to education for the fiscalyear ending June 30, 1973; to provide for the expenditure of suchappropriations; and to provide for the disposition of fees andother income received by various state agencies.
The People of the State of Michigan enact:
Sec. 1. There is appropriated for the department of education andcertain state purposes related to education herein set forth, fromthe general fund of the state, for the fiscal year ending June 30,1973, the sum of $36,936,450.00.
Sec. 19 line 3 to line 6:
Apportionments of state school aid for school districtsmaintaining school for the entire 12 month year shall be made bythe Department of Education on or before May 15 of each fiscal yearas required by law.
Sec. 27
Beginning in 1973-1974 there shall be appropriated notto exceed 150,000.00 to be used by districts conducting =attendedSchool Year programs approved by the department. The State Boardshall promulgate rules to implement*this section.
NEW JERSEY
By rule of the State Board of Education dated June 28, 1972,a new system of credit assignment and graduation requirements becameeffective for the class of 1976, i.e., the entering ninth grade,and all subsequent classes. All courses meeting for the same lengthof time shall be of equal weight; the designations "major" and "minor"no longer applicable. One credit shall equal 1440 minutes' per-academic year. The former forty-minute class, period minimum isabolished. making poSsible more flexible scheduling.
Programs may also be planned for individuals based uponspecified, measurable instructional objectives for a .particularcourse. The school shall certify completion-of a course for thepupil based upon the original specified objectives. The schoolshall not be obligated to assign credit(s) una, r this plan. Ifcredits are not assigned, the school shall determine and establisha set number of courses for promotion and graduation purposes.
-7
PENNSYLVANIA
ACT 80
The Governor on July 30, 1969, signed into law Act 80,
which amends Section 1504 of the Public School Code of 1949,
as amended. Act 80 further defines and adds flexibility to the
length of the school day and school term.
Upon request of a board of school directors for an
exception to the aforesaid daily schedule, the Superintendent
of Public Instruction may, when in his opinion a meritorious
educatidnal program warrants, approve a school week containing
a minimum of twenty seven and one-half hours of instruction
as the equivalent of five (5) school days, or a school year
containing a minimum of nine hundred ninety hours of instruction
as the equivalent of one hundred eighty (180) school days.
I. Legislative Intent
The intent of this act is to provide a board of school
directors greater flexibility in the development of its school
calendar, and to provide opportunities for more creative and
flexible programs for children and adults within the school districts.
II. Provisions
A. The vital consideration is that the 900 actual hours ofinstruction time for elementary and 990 hours of instruc-
tion time for secondary schools be preserved.
B. All school programs which would require fewer than 5-1/2
hours of instructional time in secondary and 5 hours ofinstructional time in elementary schools per day shall besubmitted to the Secretary of Education for approval.
C. .Any school program containing a school week of fewer than27-1/2 hours of instruction time in secondary and 25 hoursof instruction time in elementary shall be submitted tothe Secretary of Education for approval'.
D. A school board may extend its instructional school yearbeyond the minimum of 180 days without approval.
E. This act does not permit a reduction in the legalrequirement for at least 180 days-of instruction for pupils.
TEXAS
General Statutory Directives
The general directives of Chapter 16, subchapter G-1, of theTexas Education Code (House Bill 1078, enacted by the Sixty-secondLegislature, 1971) are as follows:
The Texas Education Agency is directed to prepare anddistribute restructured curriculum to districts so that the materialwhich is now covered in two semesters will be covered in three,three-month (60-day) quarters.
Beginning with the 1972-73 school year, districts may operateon the basis of a quarter system. Beginning with the 1973-74 schoolyear, all districts in the State must operate on the basis of aquarter system; however, districts are not required to operatea fourth quarter.
School distric must operate at least three quarters,providing 180 days of instruction and 10 days of inservice educationfor teachers.
Each district may operate all or some of its schools for allfour qua:-,ters and shall decide which students attend each quarter.Schedules must be arranged so that members of the same family,attending school in the same district, will be able to attend thesame three quarters.
A district may require neither a teacher to teach all fourquarters nor a student to attend more than three quarters.
Pupils may be counted for attendance under the FoundationSchool Program for three quarters. Attendance in the fourth quarteris optional and must be financed by either local funds or tuition.
The State Board of Education, in response to a strong state-wide reaction both pro and con to the above program, has announcedits intention to ask the 1973 Legislature to postpone mandatoryenactment until 1975. This session will meet in the Spring of 1973.