ed 077 133 ea 005 123 year-round education activities in ... · document resume ed 077 133 ea 005...

79
DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey of State Education Agencies Concerning Activities, Including Legislation, in Year-Round Education is the United States. INSTITUTION New Jersey State Dept. of Education, Trenton. Div. of Research, Planning, and Evaluation: SPONS AGENCY Virginia State, Dept. of Education, Richmond. PUB DAZE Apr 73 NOTE 47p.. EDRS PRICE Iff-$0.65 BC-$3.29 DESCRIPTORS Educational Finance; Educational Planning; Information Dissemination; *State Departments of Education; State Legislation; *State Surveys; *Tables (Data); *Year Round Schools ABSTRACT This survey, 'generated in planning sessions for the 5th National Seminar on 7Zear-"Round Education, puts into usable form needed information importaht to the year-round education movement. The document contains tables with data by State on number of programs, status of the programs, funding sources, grade levels, type of project, purpose of projects, extent of curriculum change, teacher contract effects, and evaluation status..(Author/Mlar)

Upload: others

Post on 29-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

DOCUMENT RESUME

ED 077 133 EA 005 123

TITLE Year-Round Education Activities in the United States.First Annual Survey of State Education AgenciesConcerning Activities, Including Legislation, inYear-Round Education is the United States.

INSTITUTION New Jersey State Dept. of Education, Trenton. Div. ofResearch, Planning, and Evaluation:

SPONS AGENCY Virginia State, Dept. of Education, Richmond.PUB DAZE Apr 73NOTE 47p..

EDRS PRICE Iff-$0.65 BC-$3.29DESCRIPTORS Educational Finance; Educational Planning;

Information Dissemination; *State Departments ofEducation; State Legislation; *State Surveys; *Tables(Data); *Year Round Schools

ABSTRACTThis survey, 'generated in planning sessions for the

5th National Seminar on 7Zear-"Round Education, puts into usable formneeded information importaht to the year-round education movement.The document contains tables with data by State on number ofprograms, status of the programs, funding sources, grade levels, typeof project, purpose of projects, extent of curriculum change, teachercontract effects, and evaluation status..(Author/Mlar)

Page 2: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

U.S. DEPARTMENT OF HEALTH.EDUCATION & WELFAREOFFICE OF EDUCATION

THIS DOCUMENT HAS BEEN REPRO.DUCED EXACTLY AS RECEIVED FROMTHE PERSON OR ORGANIZATION ORIGINATING IT. POINTS OF VIEW OR OPINIONS STATED DO NOT NECESSARILYREPRESENT OFFICIAL OFFICE OF EDUCATION POSITION OR POLICY

YEAR-ROWD ELOCATICI ACTIVITIES t THE WITED STATES

FIRST ANNUAL SURVEY,OF STATE EDUCATION AGENCIES

CONCERNING ACTIVITIES, INCLUDING LEGISLATION,

IN YEAR-ROUND EDUCATION IN:THE UNITED STATES

OFFICE OF PROGRAM DEVELOPMENT,DIVISION OF RESEARCH, _PLANNING AND EVALUATION

NEW JERSEY DEPARTMENT OF EDUCATIONTRENTON, NECARSEY

APRIL IJ/)

FILMED FROM BEST AVAILABLE COPY

Page 3: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

Foreword

The idea of this survey was generated in planning sessionsfor the 5th National Seminar on Year-Round Education sponsored by theVirginia Department of Education. It was apparent that -much informa-tion important to the yea -round education movement was availableonly from widely scattered sources which made collection onerous andled to the further task of organization of the data once they were inhand. The Virginia Department of Education asked and received theassistance of the New Jersey Department of Education in surveyingstate and outlying district education agencies to secure and put intousable form the needed information.

Users of this survey are invited to make comments andsuggestions toward improving the aecondssurvey which will be under-taken early in 1974. Users also are Anvited to reproduce any partor parts of the document, since only a'short preSs run is possibleat this time.

While not as complete as we know this survey can be, it isour hope that it will be of use to thoSe with responsibilities forresearching, planning, developing and operating year-round educationprograms at the state and local levels. We are _pleased to have halthe opportunity to cooperate with the Virginia Tepartment of Educationin this project.

`Bruce Campbell, Tirector'

Extended Schobl Year -ProgramsNew Jersey Department of EdueationTrenton, New JerseyApril 1973

Page 4: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

Year-Round Education Activities in the United States

Summary Data

1. Total number of programs in feasibility, planning, operation - 100.

. See Tables I and II.

2. Total number of states with programs - feasibility, planning,operation - 34. See Tables I and II,

3. Total number of states with operatior'l programs - 18. See Table I.

AZ, CA, CO. FL, GA, IL, KY, MI, MN, E), NV, NH, Ph, TX, UT, VT,

VI, WA.

4. Number of states with pending legislation - 3. See Table I.

AK, AR, IL.

Number of states that did not return survey - 8. See Table I.

AL, CZ, KS, MA, NC, ND, PR, WA.

6. Number of programs per state - Table II.

7. Funding sources - Table III.

8. Type of plan - Table IV.

9. Type of project by beginning date - Table V.

10. Grade levels - Table VI.-

11. Total number of students in identified programs - Table VII.

12. Purpose of projects - Table VIII.

13. Extent curriculum change - Table IX.

14. Teacher contract effects - Table, X.

15. Evaluation status - Table XI.

Page 5: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

Table I

Composite Data

States and Outlying Districts in Survey*

AL nrAK LAS nrAZ op #5

AR LCA op #17

.

CZ nrCO op #4

CT no programsDE no programsFL op #6

GA op #2 (1)

GU Incomplete dataHI #1ID no programsIL L op #1

IN no programsIA #1

KS

KYLAME

nr

op #1no programsno programs

ND

OH

OK

OR

nr#1#1#1

MD no programs PA op #12

MA nr PR nr

MI op #2 RI #3

MN op #1 SC #1

MS no programs SD no programs

MO op #1 TN #2

MT #1 TX op #1 (2)

NB #1 UT op #1

NV op #1 VT op #1

NH op #2 VA op #8

NJ #9 VI #1

NM #1 WA op #1

NY #1 WV no programs

NC nr WI #7WY #1

*Key - nr - no return, L- legislation, op - operational,# - number of programs in state.

(1) There are other programs; data incomplete(2) Statewide

Page 6: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

Table II

Programs Per State

AZ - 5 OR - 1CA - 17 MI - 2CO - 4 MN- 1FL- 6 MO-

GA- 2 (1) MT- 1HI- 1 NB- 1IL - 1 PA - 12

IA - 1 RI - 3

KY - 1 SC - 1NV - 1 TN - 2NH - 2 TX - 1 (2)

NJ- 9 UT - 1

NM - 1 VT - 1NY- 1 VA- 8OH - 1 VI - 1OK - 1 WA - 1

WI - 7WY - 1

(1) Incomplete data Total 100(2) Statewide programs

Table III

Funding Sources

Self-financed 39Title I 2

Title III 12

Special Federal 1

State grant 33Not indicated 21

Page 7: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

Table IV

Type of flan

Total OperationalStudy/Planning

1. Voluntary 4-quarter 16 9 7

2. 4-quarter 50-15 1 1

3. 45-15 39 22 17

4. 45-15 block 1 1

5. Staggered attendance 5 / 5

6. Flexible 3 2 1

7. Qunimester 6 3 3

8. Trimester 2 0 (1)

9. Extended summer session 2 1 1

10. 6-term plus summer 1 1

11. Continuous progress 3 2 1

12. 4-1-4-1 2 1 1

13. Not yet determined/under study 6. 6

14. Not indicated 15 15

(1) Operational but recently abandoned (Florida)

Page 8: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

Table V

Type of Project by Beginning Date

Date Feasibility PlanningPre-

Implementation Operation AbandonedNot

Indicated

1964 1

1968-9 3

1969-70 1 1

1970-71 3

1971-2 4 9 1 (1)

1972-3 15 5 2 (2) 25 1

1973-4 4 '7 2 2 1

1974-5 4 1

Date notindicated 17 1

(1) Operational since 1964, recently abandoned(2) Includes 30 pilot schools,in Texas

Page 9: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

Table VI

Grade Levels

P-5 (1) 2 6,7 and 8 2

P-6 13 7-12 3

P -7 1 8-12 2

P-8 13 9-12 13

P-9 1 10-12 1

P-12 28 College- fresh.

and soph. 1

5 & 6 1

Not indicated 16

(1) P indicates pre-first grade inclUding nursery,

kindergarten-and others.

Page 10: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

Table VII

Number of Students in Identified Programs

AK

AZ

AR

0

8,500

0

GU

HI

ID

0

1,859

0

MD

MI

MN

0

471

1, 000

NJ

NM

NY

(b) 24,215

1,500

5, 200

SD

TN

TX

Not indicated

56, 000

CA (1) 8,881 IL ,2,600 MS 0 off. Not indicated UT 477

CO (2) 2,099 IN 0 MO 2,700 OK 10,709 VT 1,000

CT 0 IA Not indicated MT Not indicated OR 4,500 VA 30,479

DE 0 KY 95,682 NB 4,800 PA (7) 330 VI Undetermined

FL (3) 130 LA 0 NV 7 oo RI 6,785 WA 4, 200

GA (4) 44,000 ME 0 NH (5) 1, 287 SC 20: 000 WV

WI (8) 19, 90i

WY 14, 0

Number.of programs which -did not indicated student numbers - 42Total number of students - 374,004

1. Plus 25 schools2. Plus 3 programs undetermined

3. Plus 5 not indicated

4. Incomplete5. Plus 1 not indicated6. Plus 1 not indicated7. Plus 10 not indicated8. Plus 3 not indicated

Page 11: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

Table VIII

Purpose of Projects

Space utilization 58

Curriculum improvement . 68

Reduction' -in capital outlay 4

Staff utilization and productivity 2

Not indicated 15

Table IX

Extent Curriculum Change

Under Study 4

Little or no change 5

Moderate change 4

Major change 49

Not indicated 49

Tab

Teacher Con

Under study

Minimal or no ef

Optional - volun

Extensive

Nct determined

Not indicated

Tab

Evaluat

Under study

Being designed

In process

Completed

Evaluation cont

Not indicated

Page 12: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

k

58

68

4

2

15

4

5

4

49

49

Table X

Teacher Contract Effects

Under study 6

Minimal or no effect 9

Optional - voluntary 22

ExtensiveT.,

Not determined 7

Not indicated 56

Table XI

Evaluation Status

Under study 2

Being designed 33

In process 4

Completed 19

Evaluation contract 1

Not indicated 44

4.-

ix

Page 13: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

1

State

1.1

ProjectTitle

1.2

Name of District

of SchoolDistrict-wide *

1 . 3

Name ofSuperintendent

1 . 1.1-

1% :

Mailing Address

1 . 5

Name ofProjectDirector

1 . 6

MailingAddress

AL Did not return survey

AK 1. Nd programs in operation2. Enabling legislation has been introduced

AS Did not return survey

AZ Extended Yuma Union HighSchool School DistrictYear

W. A. Canode 3150 Avenue AYuma, AZ 85364

Not yet

appointed1.4

AZ Project Apache JundtionUtiliza- Public Schooltion ofSchool En-vironment

Dr. ThomasReno

PO Box879Apache Junction, AZ 85220

.

.

1.3 1.11.

AZ Year Phoenix Union HighRound High SchoolSchools

Dr. GeraldDe Grow

.

2526 W. OsbornPhoenix, AZ 85017

Dr. TerryTerril

1.4

AZ The Twelve Roosevelt SchoolMonth District #66SchoolYear

Dr. Russell A.Jackson

6000 S-7th StreetPhoenix, AZ 85040

MargaretSmith

1.11.

AZ Not Scottsdaleindicated District #48

.

Dr, GabrielReuben

3811 North 44th StreetPhoenix, AZ 85018

.

.

Mr. SteveSimon

4320 North,ScottsdaleRd.,Scotts-41e, AZ85251

AR 1. No pro rams in operation2. An ass mbly bill has been Prepared but not yet introduced to authoriz- Extended Scho?1 Year prog

CA Not La Mesa-Springindicated Valley Elementary

School District

James 'Runge 4150 Date AvenueLatMesa, CA 92041

Not indicated 1.4

CA Not Old Adobe Unionindicated Elementary School

District

Dean Bagowan 1660 Albin WayPetaluma, CA 94952

Not indicated 1.4

,

Page 14: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

k

t

1.4i:

Mailing Address

1.5

Name ofProjectDirector

1.6

MailingAddress

2.1

Type ofProject

2.2

FundingSource

2.3

Type Plan

3150 Avenue AYuma, AZ 85364

Not yet

.appointed1.4 Not

indicatedSelf-financed Voluntary 4-

quarter

PO Box879Apache Junction, AZ 85220

..

1.3 1.4 Feasibilitystudy

Self-financed Under study

.

2526 W. OsbornPhoenix, AZ 85017

Dr. TerryTerril

1.4 FeasibilityPlanningOperational

Title III 4-quarter

6000 S-7th StreetPhoenix, AZ 85040

MargaretSmith

1.4 Planning Self-financed

45-15

.

3811 North 44th StreetPhoenix, AZ 85018

Mr. SteveSimon

4320 NorthScottsdaleRd.,Scotts-(*le, AZ85251

Feasibilitystudy

Not.

indicated

.

4-quarter and45-15 inelementaryschool

t yet introduced to authorize Extended Scho 1 Year programs

4750 Date AvenueLa Mesa, CA 92041

Not indicated 1.4 Operational Not indicated 45-15 staggered

1600 Albin WayPetaluma, CA 94952

Not indicated 1.4 operational Not indicated 45-15staggered

Page 15: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

Table VIII

Purpose of Projects

Space utilization 58

Curriculum improvement 68

Reduction in capital outlay 4

Staff utilization and productivity 2

Not indicated 15

Table IX

Extent Curriculum Change

Under Study 4

Little or no change 5

Moderate change

Major change 49

Not indicated 49

Teaci

Under stu

Minimal o

Optional

Extensive

Not deter

Not indic

Under stu

Being des

In proces

Completed

Evaluati

Not indi

Page 16: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

58

68

4

2

15

4

5

4

49

49

Table X

Teacher Contract Effects

Under study 6

Minimal or no effect 9

Optional - voluntary 22

Extensive 3

Not determined 7

Not indicated 56

Table XI

Evaluation_ Status

Under study 2

Being designed 33

In process -4

Completed 19

Evaluation contract 1

Not indicated 44

1

Page 17: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

Beginning_ Date

2.5

GradeLevels

2.6

Number ofPupils

3.1

Purpose

3L2

Extent Curriculum-Change

3.3

Teacher Contrac'Effects

June 1973 9-12 1,000 Space utilizationProgram improvement

Under study Under study.

July 1972 K-12 1,500 Space- utilizationProgram imprdvement

..

Under studyTeachers! optionteach 12 months o3 quarters understudy

July 1972 9=12 2,000 Curriculum revisionReduction in capitaloutlay

Total curriculumrevision

Under study

Fall 1973 K-8 To bedetermined

Space utilization Not indicated Still in preliminstages

Sept.1974

K-12 4,000 Space utilization-Program improvement

Not indicated WA indicated

.

4 1971-1972 K=8 3 elem. &3. midd3e

school

Spade utilizationProgram improvement

Not indicated I-

1972-1973 _K,6 2 Elem.

schoolsSpace utilization-

.

- Not indicated

Page 18: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

,se

3L2

Extent Curriculum-Change-

3.3

Teacher ContractEffects '

3.4

Evaluation Status

2

Other Comments

.

zationrovement

Under study Under study Being designed

zationrovement Under study

Teachers' option toteach 12 months or3 quarters understudy

Being designed

revisionn capital

Total curriculumrevision

Under study Information basedevaluation strategy

zation Not indicated Still in preliminarystages

Being designed

zationrovement

Not indicated Not indicated Under study

zationrovement

Not indicated

.

zation- Not indicated

..

..,_____,

Page 19: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

.

3

:>.

State

1.1

ProjectTitle

_.

1.2

Name of District

of SchoolDistrict-wide * _Superintendent

1.3

Name of

1.4i:

Mailing Address

1.5

Name ofProjectDirector

1.6

MillingAddress

CA

,

Not

indicatedOcean View Elemen-tary School Distr.

James CarVell 7972 Warner Avenue .

Huntington Beach CA 92647Not indicated 1.4

CA Notindicated

.

Pajaro Valley JointUnified School Dist

John Duncan 165 Blackburn Street

PO Box 630Watsonville, CA 95076

Not indicated 1.4

CA Not

indicatedSan Diego CityUnified School Dist

ThomasGoodman

4100 Normal StreetSan Diego, CA 92103

Not indicated 1.4

. .

CA Notindicated

Elk Grove UnifiedSchool District

Glenn Houde =Elk Grove, CA 92624 Not indicated 1.4

CA Notindicated

Escondido CityElem. School Dist.

James Slezak Fifth & Maple StreetsEscondido, CA 92025

.

Not indicated 1.4

CA Not

indicatedHayward UnifiedSchool District

RaymondArveson

1099 "E" StreetPO Box 5000Hayward, CA 94541

Not indicated.

1.4

CA Notindicated.

Hesperia Elem.School District

HowardCarmichael

16079 Main StreetHesperia, CA 92345

Not indicated 1.4

.

CA Notindicated

Lakeside Union*Elem. School Dist.

Robert MuScio. 12335 Woodside AvenuePO Box 578Lakeside, CA 92040

1.3 1.4

CA Noneindicated

ABC Unified SchoolDistrict

.

Charle's

Hutcbison17 923 South Pioneer Blvd.

Artesia, CA 907 01

Not indicated 1.4

.

,

Page 20: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

1.4.0.

ailing Address

1.5

Name ofProjectDirector

1.6

MailingAddress

2.1

Type ofProject

2.2

FundingSource

2.3

Type Plan

arner Avenueton Beach CA 92647

Not indicated 1.4 Operational Not indicated 45-15staggered

ackburn Street630ville, CA 95076

Not indicated 1.4 Operational Not indicated 45-15staggered

oral Street_go, CA 92103

Not indicated 1.4 Operational Not indicated 45-15staggered

ave, CA 92624 Not indicated' 1.4 Preimple-mentationplanning

Not indicated 45-15staggered.

Maple Streetsido, CA 92025

Not indicated 1.4 Operational Not indicated 45-15staggered

'.7" Street

(5000, CA 94541

Not indicated 1.4 Operational Not indicated,..

50-154 quarter plan

4ain Streeta, CA 92345

Not indicated 1.4 Operational Not indicated 45-15staggered'

doodside Avenue

578$e, CA 92040

1.3 1.4 Operational Self, financed- 45-15

,

staggered

South Pioneer Blvd.

:, CA 907 01

Not indicated 1.4 Operational Not indicated- Flexible

Page 21: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginningDate

2.5

GradeLevels

2.6

Number ofPupils

3.1

Purpose

3u2

Extent Curriculum'

Change

.

3.3

Teacher ContractEffects

1972-1973 K -8 2 Element.

ary School.)

Not indicated

1972-1973 K-8 4 Elem. &1 middleschools

Not indicated Not indicated

1972-1973 K-6 6 Elem.

schools

Save space allocatipnmoney

Not indicated

'973-1974 High-school

Not

indicated1 school

Program improvement Very extensive Not indicated

1972-1973 K-6 Not indica-ted

3 schools.

Space utilization andProgram improvement

Not indicated

1968 & 1972 K-6 2 schools Not indicated .

_

1972-1973 K-6 2 schools Not indicated

.

1972 -1973 K-8 3,898

entiredistrict

Not indicated

.

1971-1972 Elei. Not ,

indicated1 school

Program improvement Not indicated.

.

.

Page 22: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

3.2

Extent Curriculum'Change

3.3

Teacher ContractEffects

3.4

Evaluation Status

4

Other Comments

Neither school overcrowded.Full time equivalent staff-ing concept and criterionreferenced continuum ofskills characterize theplan. Distrfct desires totest the plan.

Not indicated

-

_the

Intensive community involve-ment and study characterize

plan

Not indicated

- Very extensive Not indicated

Not indicated

___ First evaluation pre-sented in 197 0 very

favorable

District attendance isdecreasing.

.... --Classes will be ,providedfor students electing thetraditional school yearwithin existing schools

....

-.... Not indicated. . The California data is

based on.a summary sheetfrom the California StateDepartment. More completeinformation will have to beobtained from the schooldistricts themselves.

.

-___

.

Page 23: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

5

,tate

1.1

ProjectTitle

1.2

Name of Districtof School

District-wide *

1.3

Name ofSuperintendent

1.1+.

Mailing Address

1.5

Name ofProjectDirector

1 . 6 .

MailingAddress

CA Notindicated

Bear ValleyUnified SchoolDistrict

Ralph Bell 41220 Park AvenueP.O.Box 1509Big Bear Lake, CA 92315

Not indicated 1.4 01

az

of

CA Not

indicatedBerryessa UnionSchool District

F. GregoryBetts

935 Piedmont RoadSan Jose, CA .95132

Not indicated 1.4 Ot

CA Notindicated

Chula Vista CitySchool District

Burton C.Tiffany

84 East 5th StreetChula Vista, CA 92012

Not indicated 1.4 O

CA Notindicated

Corona NorcoUnified SchoolDistrict

Charles Terrell 300 Buena Vista AvenueCorona, CA 91720

Not indicated 1.4 o/

CA Notindicated

San JoaquinElementary SchoolDistrict

Ralph Gates 14600 Sand Canyon DriveEast Irvine,, CA 92650

.

Not indicated 1.4

CA Notindicated

Santee ElementarySchool District

CharlesSkidmore t

9625 Cuyamaca StreetP.O. Box 220

Santee, CA 92071

Not indicated

.

3..4 o/

CZ Did not return survey

. .

CO Notindicated

Jefferson CountySchool District_R-1

Dr. Alton W.

Cowan

Box 15128Denver, CO 80215

Mr. WilliamMitchell,

Bear CreekArea AdMinistrator

3115 S.

Kipling,

Morrison,

CO 80465

CO Not

indicated

Boulder ValleySchool DistrictRE-25

Dr. Barnard

Ryan'F.O.Box 11

Boulder, CO 80302

'Not indicated 1.4 Fd

sl

e.

sd

.

.

Page 24: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

>1.

'

. .

'ddress

1.5

Name OfProjectDirector

1.6

Mailing

Address

2.1

Type of_Project

2.2

FundingSource

2.3

Type Plan

enue

, CA 92315

Not indicated 1.4

joperational

Operationaland planned

Not indicated 45-15 .

staggered

Road

95132Not indicated 1.4 Operational Self-financed 45-15

staggered

treetCA '2012

Not indicated 1.4 Operational Not indicated 45-15

sta::ere

ta 'Avenue

1720

Not indicated 1.4 Operational Not indicated 45-15

.yon Drive Not indicatedA 92650

1.4 Operational Not indicated 45-15 '

staggered

Street Not indicated--] ca

071

1.4 Operational Not indicated 45-15block

Mr. William1215 Mitchell,

Bear CreekArea Adminis-trator

3115 S.Kipling,

Morrison,CO 80465

Preimple-

mentationSelf-financed 45-15

Not indicated'0302

1.4 Feasibilitystudy forelementaryschools

Seeking state

legislationfor funding.Currentlyself-financed

45-15

.

Page 25: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

Beginning

Date

2.5

Grade

Levels

2.6

Number ofPupils

3.1

Purpose

3.2

Extent CurriculumChange

3.3

Teacher ContractEffects .

1972-1973 5 and 61 school

1,483 Ease overcrowding Not indicated

July 1972 K -6 1,0001 school

Ease overcrowding Not indicated

July 1971 K-6 4 schools Ease overcrowding Not indicated

1972-1973 E3.em. &

Jr: High,

4 schools1,600approx,

Eva.Laate educationalprogress of studentswho volunteered foryear round school

Not indicated t

1972-1973 K-8 1 school900

Space!esaving

Educational improvementNot indicated

1972-1973 school Not indicated

.

Summer1973

K-12 Not

indicatedSpace utilization Extensive Not indicated

Fall 1973 K-6 Notindicated

Space utilization Not indicated

.

) a

Page 26: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

3.2

Extent CurriculumChange

3.3

Teacher ContractEffects

3.4

Evaluation Status

6

Other Comments

Not indicated

Not indicated Evaluation contract

Not indicated

Not indicated

t

Not indicated 6

Extensive Nct indicated

Not indicated

..........

.

.

)

Page 27: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

7

State

1.1

ProjectTitle,

1.2

Name of Districtof School

District -wide *

1.3

Name ofSuperintendent

1.4 .-

Mailing Address

1.5

Name pfProjectDirector

1.6

,

MailingAddress

CO Year RoundEduc. Pro-gram at.

CunninghamElementary

Cherry Creek SchoolDistrict, Cunning-ham Elem. School

Dr. RichardKoeppe

-

4700 South YosemiteEnglewood, CO 80110

Mr. VernShelley, -

Principal

9659 E.-Mississippi,

Denver,CO 80231

CO Notindicated

Colorado SpringsDistrict #11

Dr. TomDoherty

.

1115 N. El PasoColorado Springs,CO 80903

Not indicated 1.4

CT No programs

DE No programs -

FL FloridaState Lab.School

Trimester.

Laboratory SchoolFL State Univ.Tallahassee, FL

Not indicated 1.2.

Ralph L.Witherspoon,

Director

1.2

,

FL Bradford

Countypedtegg

Session

Bradford CountySchools

Starke, FL

Thomas L.Casey

1.2 C.M. Clark,Asst. Super -

intendent

1.2

FL S. BryanJenningsContinuousProk_ess

S. Bryan JenningsElem. SchoolOrange ParkClay County, FL

Not indicated 1.2 Dr, MaryZellner,

Principal

1.2

--'

.

I'l

Page 28: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

1.4 .

.

ling Address

.

1.5

Name pfProjectDirector

1.6

MailingAddress

2.1

Type ofProject

--

Funding_Source.

2.3

Type Plan

th Yosemite,, d, CO 80110.

Mr. VernShelley-,

Prindipal

9659 E.

-Mississippi,

Denver,CO 80231

Operational Self- financed,

45-15

EiSpPrIng's,

3

i

Not indicated ,. 1.4 Planning Self-financed-

Pwo 16 weeksessions dividesby two 8 week-vacations

1.2

.

Ralph L.Witherspoon,Director

1.2

-

Operationalbut recentlyabandoned

.

Not indicated Trimester

_

1.2 C.M. Clark,Asst. Super-intendent

1.2 Operationalfor 2 yearsabandoned

Title I and ExtendedLeg. grant summer session

1.2

.

Dr; Mary-

Zellner,

Principal

1.2 Operational FL Department -Continuousof Education progress

.

____..

Page 29: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginningDate

2.5

GradeLevels

2.6

Number ofPupils

3.1

Purpose

7..,

,,,.A

Extent Curriculum.Change

3.3

Teacher Contract_Effects

Sept. 1972 K-6 1,000 Space utilization Not indicated Minimal

July 1973 RUssel JrHigh &PenroseK-6

1,099

Elem. unde-termined

Space utilization

.

.

Not indicated .

.

.

Fall 1964 K-12. Not

indicatedFuller facilitiesutilization:Flexible pupil move-ment

Ungraded flexiblemovement

Mandatory attendancfor 22 trimesters

Summer 197Summer 1971

K-12 Notindicated

Remedial, enrichment,acceleration

Add -on curriOlum Voluntary

July 1970 K-5 Not

indidatedUse of facilities Extended school year

40 days

- -

Voluntary staff forextra time

,

,

.

,

. i

Page 30: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

t

32

. Extent Curriculum-Change

3.3

Teacher ContractEffects

3.4

Evaluation Status

8

Other Comments

Not indicated Minimal In designing stagesSpring 1973

Not indicated

.

.

ancs

Ungraded flexiblemovement

Mandatory attendancefor 22 trimesters

Not indicatedPlan has been abandoned.1)Unpopular with parents,teachers and students.2)Students tended toachieve less well and possess more adjustment prob-lems in this ESY program

than children in the regu-lar school year.

Add-orreurriculum Voluntary.t

Not indicated

for Extended school year40 days

Voluntary staff for-extra time

Not indicated

Ole .

11

Page 31: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

9

State

1.1

ProjectTitle

1.2

Name of Districtof School

District-wide *

1.3

Name ofSuperintendent

1.4

-

Mailing Address

1.5

Name ofProject

Director

1.6 .

MailingAddress

FL Cocoa High45-15

Cocoa-High Schoollrevard County, FL

Not indicated 1.2 Robertmlubaugh,

Principal

1.2 e

FL DadeCountyQuinmester

Dade County School,

Dist. Miami, FLDr. E.L.Whigham

Dade County School District4 inmester Program

I iami, FL

-Martin

Rubinstein,

Project Mgr.

1410 N.E.

2nd Avenue,

Miami, FL33132

.

FL NoVa ESY Nova SchoolsPlan 200 Fort LauderdaleDay Contin Broward County, FLuous 'Pro- 33314gress

NOt indicated 1.2 Warren C.

Smith,

Director.

1.2 4

GA Atlanta Atlanta Public4-Quarter Schools.

Isar RoundProgram

John Letson 'e930 Forrest Hill Dr., SW'tlanta, GA 30315

Not indicated

CA Fulton CountyPublic Schools

Ed Bakerr

786 Cleveland Ave., SWAtlanta, GA 30315

Not indicatedrt 0

GA There are several other prograns and studies Georgia which, however, we e not reported.

GU Incomplete data. .

..._

.

.

.

Page 32: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

.4

Address

1.5

Name ofProjectDirector

1.6 .

MailingAddress-

2.1

Type ofProject

2.2

FundingSource

2.3

Type Plan,

.2 RobertBlubaugh,

Principal

1.2 Operational

.

School. Dist. 45-15

.

School Districtogram

.Martin

Rubinstein,

Project Mgr.

1410 N.E.

2nd Avenue,

Miami, FL33132

Operational Local andstate funds

Quinmester

. Warren C.

Smith,

Director

1.2 Operational School dis-trict

200 day continuous progress

Hill Dr., SW30315

Not indicated Operational. Self-financi 4-quarter

d Ave., SW30315

Not indicated Operational "Self-financed 4-quarter.

ich, however, were not reported.

Page 33: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginningDate

2.5

GradeLevels

2.6

Number ofPupils

3.1

.

Purpose

3.2

Extent CurriculumChange

3.3

Teacher ConEffect

July 1972 9-12 130 1)Make comparison be-tween 45-15 and tradi-tional.

2)Relieve overcrowding.3)See if students willbe more motivated byshorter-time in school.4)Determine if teachersare more productive ifgiven vacation time atend of each nine weekperiod.

Unchanged Volunteers

June 1971 7 -12 Thousands,but.numbernot indica-ted

Use of facilities, ex-tensive curriculumrevision, 1,300 coursesoffered.

Extensive Some teachers

other teacher!month.

197 -1 K-12 Notindicated

Encourage innovation,provide continuous pro-gress learning

Extensive Teachers serveuntary basis

Sept.1968 -',2 32,000 Program improvement Complete recasting,substantial desequen-tialization

3 quarters mail

4th optional

Sept. 1968 8 -12 12,000 Program improvement Complete recasting,substantial desequen-tialization

3 quarters mar

4th optional

Page 34: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

3 3.1

on

!et Purpose

...

3.2-

Extent CurriculumChange

3.3

Teacher ContractEffects

3.4

Evaluation Status

lo

Other Comments

comparison be-45-15 and tradi-

eve overcrowding.if students willmotivated by

r time in school.rmine if teachersre productive ifvacation time ateach nine week

Unchanged Volunteers.

..

Not indicated

.

130 si,udents on 45-15;

rest of school on txadal school year.

q.s f facilities, ex-

ler curriculumn, 1,300 courses

Extensive Some teachers on 10 mo.,Notother teachers on 111month,

indlcated Florida infomation isextracted from a paper -

done by the College ofEduc., 7niv. of Florid:

ry ge innovation,Ls continuous pro-

earning

Extensive Teachers serve on vol.,_.

untary basisNot indicated

.

ma improvementit

Complete recasting,substantial desequen-tialization

3 quarters mandatory,4th optional

On-going

.

,

ma improvement11

Complete recasting,

substantial desequen-tialization

3 quarters mandatory;4th optional

.

On-going Students pay tuitionfor fourth quarter.

_____.

.

.

Page 35: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

11)-

;tate

1.1

ProjectTitle

1 . 2

Name of District

of SchoolDistrict -wide *

1.3

Name of

Superintendent

1.4

.

Mailing Address

1.5

Name pfProject-Director

1.6

MailingAddress

HI Kona 4-

QuarterProgram

Konawaena Elem.School, Intermedi-ate & H.S. HawaiiSchool District

Mr. Harry C.Chuck

Hawaii District Office

P.0- Box 1922HilojilI -96720

Hawaii Ed. State Dept.P.O. Box 2360Honolulu, HI 96804

Dr. Toshio & 1.4SteeringCommittee

Ff

ID No prograv-

of Educationduring the 1972-73 school

is offeringyear.

state funding for feasibility studies regarding the 12

I

meIL The State ,)epartment

available

.IL Valley View Dist.#365 U*

Kenneth

Hermansen104 McKool AvenueRomeoville, IL 60441

Not indicated

IN 1. Three school2. Funds have

3. No programs

districts havebeen allocated batare planned or

subr'tted applicationsnot released.

in operation at

for feasibility studies.

this time.

IA 1. All

Year SchoolCommunityStudy2. TheExtendedSchoolYear

1, Urbandale

SchoolDistrict2. Polk CountyBoard of Education

1. Dr. Lyle

W. Kehm

2. K. W.

Miller

1. 7101 Airline AvenueUrbandale, IA 50322

2. 112-116 Eleventh St.Des Moines, IA 50309

.

.

Joseph 1.4Millard

Fe

st

st

1

KS Did not re7urn. .

survey

KY ElectiveQuarterProgram

Jefferson CountyScnool District*

Dr: RichardVan Hoose

3332 Newburg Road'P.O. Box 18125Louisville, KY 140218

Gene 1.4McFadden

Ox

LA Has no programs

ME Has no programs

MD Has no pr6 Pams

.. ,

Page 36: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

1 . 4

g Address

1 . 5

Name pfProject

Pireetor

1.6 .

MailingAddress

2.1

Type ofProject

2.2

.

FundingSource

2.3

Type Plan

F, rict Office

2

720

State Dept.6o1 96804

Dr. Toshio & 1.4SteeringCommittee

Feasibility State 4-quarter

ng for feasibility studies regarding the 12 month school year. The money will be

.01 Avenue, IL 6°441

Not indicated Operational Now local 45-15

feasibility studies.

F: rline Avenues, le, IA 50322

s

1, Eleventh St.les, IA 50309

Joseph 1.4Millard

Feasibilitystudy;

survey ofliterature

Not indicated-

.

.

`:125KY 40218

III

Road Gene 1.4McFadden

Operational Title III &Self-financed

Voluntary 4-quarter

, .......

Irl .

i

Page 37: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginniDate

Sept. 1969

1970 (K-f!/

1972 (9-12

2.5 2.6

Grade Number ofLevels Pupils

K-12 1,859

K-12

3.1

Purpose

Economic & educationalbenefits

3.3

Extent Curriculum. Teacher ContracChange Effects

Reordering of course No problem yetcontent to fit quarte

2,600

Ally, 1972

Adequately house pupils Elem: open classroom Range of options-Prevent program erosion Second: quarter ableSave construction costs courses

1-12 95,682 Program improvementSpace utilization

Complete rewrite and Not indicatedreorganization of thecurriculum

Page 38: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

3%.2

Extent Curriculum.

Change

3.3

Teacher ContractEffects

3.4

Evaluation Status

12

Qther Comments

.onal Reordering of coursecontent to fit quarter

No problem yet Evaluation completed it1971. Decision reachedto discontinue project.

aip.ils

.osioncosts

Elem: open classroomSecond: quarter

courses

Range of options avail-

able

Elem: completed

Second:'in progress

,

1 t Complete rewrite andreorganization of thecurriculum

Not indicated Being designed

1

Page 39: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

13

tate

1.1

ProjectTitle

1.2

Name of District

of School

District-wide *

1.3

Name of

Superintendent

,

1.4

.

Mailing Address

1.5

Name ofProjectDirector

1 . 6

MailingAddress

MA Did not re,urn survey

MI 45-15 ESY Northville PublicSchools

Raymond E.

SpearWest Main StreetNorthville, MI 48167

.

Miss FlorencePanattoni

_

1.4

'ti

Ex

pa

vo

MI Tri-Distr.ExtendedSchoolYear

'East Lansing,

Haslett, OkemosDr. MalcolmKatz

East Lansing Public Schools509 Burcham DriveEast Lansing, MI 48823

Mr. HerbertGibbs

1.4 0

MN More ElementarySchool

Pius J. Lacher Mora, MN 55051 1.3

_

1.4 Op

MS No Prograns

MO Francis Francis HowellHowell Elem. SchoolYear Rt. 2Round St. Charles, MOSchool 63301Program

r

Dr. M. GeneHenderson

.

Francis Howell SchoolDistrictRt. 2

St. Charles, MO 63301

.

Alan M.O'Dell

.

1.4 Op(

MT 1. Missoula CountyH.S. .

2. Columbia FallsH.S.

1. George

Zellick2. Robert

Souhrada

15 South Avenue, WestMissoula, MT 59801Columbia Falls, MT 59912

1.4 Nc

NB'

Twelve Papillion PublicMonth Con- Schoolstinuous Papillion - LaVistSchool NB 68o46Program

Paul D. Basler Paul D. Basler130 West First StreetPapillion, NB 68046

i..

,

Dr, Stanley

.cox130 W. 1st

Street

Papillion,NB 68046

Fe

st

Page 40: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

1.4

ng Address

1.5

Name ofProjectDirector

Mailing Type ofAddress Project

2.2

FundingSource

2.3

Type Plan

Streete, MI 48167

Miss FlorencePanattlni

1.4 Experimenta

participa-tion

voluntary

Title III 45-15

ing Public Schoolsam Driveing, MI 48823

Mr. HerbertGibbs

1.4 Operationa Title III Quinmester

55051 1.3 1.4 Operational Self-financed 45-15

well School

, MO 63301

Alan M.OtDell 1.4 Operational Self-financed

Avenue, WestMT 59801lls, MT 59912

1.4 Not indicated

45,a5

sler

irst StreetNB 68046

D. StanleyWilcox

130 W. 1st

Street -

Papillion,NB 68046

Feasibilitystudy

Title III &LEA

45 -i5

Page 41: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginningDate

2.5

GradeLevels

2.6

Number ofPupils

3.1

Purpose

3.2

Extent CurriculumChange

3.3

Teacher ContractEffects

July, 1972 K-5 171 . Improve program; demon-strate potential spa3esavings

More flexible, moreindividualized

Participation voltat this time

June, 1972 9-12 300 To find out how manystudents and staff willtake advantage of

opportunity.

Not indicated None,

July, 1971 K-6 1,000 Space and programimprovement

Flexible program Eager

July, 1969 1-6 2,700 Space and staffutilization

.

Redesigned into nineweek units

Extensive

L.,

.

Juiy,'1973

-

K-12 4,800 Program improvement andspace utilization

Extensive:

1. Continuous progress

skill'subjects2. Three week curricu-

lum units3. No Sequential pro-

_grams

.

Per diem pay forteachers (planningstages)

.

-:

Page 42: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

of

.3.2'

Extent CurriculumChange

3.3

Teacher ContractEffects

3.4

Evaluation Status

14

.

Other Comments

emon-

.paceMore flexible, moreindividualized

Participation vc'untaryat this time i

Interim evaluationcompleted

nywill

Not indicated None Preliminary completedFebruary, 1973 -

.

Flexible program Eager In process preliminary.

'evaluation completed....-

E

Redesigned into nineweek units

Extensive

.

Completed in past yearby Danforth Foundation

.

1. Teachers may teach oneor more 45 day periods.

2. Teachers may teach samegroup for four periods.3. Teachers may teach twoor more groups for nine-month period.

4. Teachers may teach five45 day periods.

,

Copies of the evalua.titin

can be obtained by limitingDr. Henderson.

Extensive:

1. Continuous progress

skill'Subjects2. Three week curricu-

lum units3. NO Sequential pro-

grams

-

Per diem pay forteachers (planningstages_) ,

.

--!

Being designed

.

. ...

.

and

ni

Page 43: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

15

,tate

1.1

ProjectTitle

1.2

Name of Districtof School

Distric.t-wide *

1.3

Name ofSuperintendent

1 . 4

Mailing Address

1.5

Name ofProjectDirector

1.6

MailingAddress

NV Sun Valley Elem.School ,

Dr. MarvinPicollo

5490 Leon DriveSparks, NV 89431

Charles E.

Coyle,

Principal

1.4

NH AlvirneQuarterlyPlan

Hudson SchoolDistrict

Peter G.

DolloffHudson Memorial SchoolThornine, Road

Hudson, NH 03051

PrincipalAlvirne H.S.

1.1

NH Project

ESYKeene SchoolDistrict

John Day 1 Elm StreetKeene, Nil 03431

Edward White 1.4 FE

s

NJ Monroe Twp. PublicSchools

Clyde Stauffer Maple Grove SchoolAcademy StreetWilliamstown, NJ 08094

JayTregellas

1.4 FE

s

NJ Lcing Branch

Public SchoolsWilliamMeskill

6 West End CourtP.O. Box 1Long Branch, N 07740

Charles Lewis SchoolDavistown & Erial RoadsBlackwood, NJ 08012

ThomasMaggio

.

JamesThompson

1.4

1.4

F

st

F

st

NJ Gloucester Twp.Public Schools*

James Lilley

NJ Mt. Laurel Twp.Public Schools*

Thomas

HarringtonHattie Britt SchoolMt. Laurel RoadMoorestown, NJ 08057

Not indicated 1.4 F

st

NJ Tenafly PublicSchools

JohnGeissinger

27 W. Clinton AvenueTenafly, NJ. 07670

FlorenceWallace

1.4 Fe

s

NJ Notindicated

Delran.PublicSchools*

JosephChinnici

Chester Avenue SchoolDairen, NJ 08075

James TowsonJoseph '

ChinnicA

RobertRhoads

1.4

Warren HillsFeJr. HighCarlton Ave.Washington,NJ 07882

Fe

st

s

NJ Not

indicatedWarren Hills

Reg. H.S. DistrictEric Errickson P.O. Box 169

Washington, NJ 07882

Page 44: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

1.4

Mailing Address

1.5 1.6 .

Name ofProject MailingDirector Address

2.1

Type ofProject

2.2

FundingSource

2.3

Type Plan

0 Leon Drive

ks, NV 89431Charles E. 1.4Coyle,

Principal

Operationa. Self-financed 4-quarter

son Memorial Schoolmine Roadon, NH 03051

Principal 1.4.

Alvirne H.S.Operational Self-financed,

,NH Dept. ofEd. State Aid

For BuildingFunds

4-quarter

lm Streete, NH 03431

Edward White 1.4 Feasibilitystudy

Title III1965

Voluntary 4-quarter

le Grove Schoolemy Streetiamstown, NJ 08094

Jay

Tregellas1.4 Feasibility

studyState grant Staggered*

attendance

st End CourtBox 1

Branch, N 07740

ThomasMaggio

1.4 Feasibilitystudy

State grant Quinmester

les Lewis Schoolstown & Erial Roadskwood, NJ 08012

James

ThompsonLit Feasibility

studyState grant Staggered

attendance

e Britt School. urel Roadstown, NJ 08057

Not indicated 1.4 Feasibilitystudy

State grant Staggeredattendance

Clinton Avenuely, NJ 07670

FlorenceWallace

1.4 Feasibilitystudy

State grant

ter Avenue Schooln, NJ 08075

James TowsonJosephChinnici.

Box 169

ington, NJ 07882Robert

Rhoads

1.4

Warren Hill;

Jr. HighCarlton Ave.Washington,NJ 07882

Feasibilitystudy

Feasibilitystudy

State grant

state grant

Not yet

determined

Staggeredattendance

Not determined

Page 45: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginningDate

2.5

GradeLevels

2.6

Number ofPupils

3.1

Purpose

3.2

Extent CurriculumChange

3.3

Teacher ContracEffects

Sept. 1972 K=6 700 Space use

.

Minor

,

No problem yet

Sept. 1972s

9-12 1,287 Program improvement In process Npt indicated

lo informa-tion now

Not indicated . ,

lot

leterminedK-12 3,800 Better space utilization. Not indicated

Notdetermined

10-12 1,275 Program improvement. .

Extensive recast in45 day modules

Not determined

Notdetermined

K -8 5,238 Space utilization Not indicated

Notdetermined

K-8 2,700 Space utilization Minimal i Not determined

Notdetermined

9-12 1,250 Program improvement Mini Courses coopera-tive with eveningadult .school

Not determined

Notdetermined

K-12 2,452 Space utilization' _Minimal Not determined.

Notdetermined

K-12 4,300 Space utilizationProgram_ improvement

Not indidav;ed

.

.

Page 46: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

3.2

Extent CurriculumChange

3.3

Teacher ContractEffects

3.4

Evaluation Status

16

Other Comments

Minor No problem yet Formative evaluationin process

ovementI.In process Npt indicated Being designed

Atilizatior. Not indicated - Preliminary designed

yement Extensive recast in45 day modules

Not determined Preliminary designed

ation Not indicated - Preliminary designed'

ation Minimal Not determined Preliminary designed

ovement Mini Courses coopera-tive with eveningadult .school

Not determined- Preliminary designed

tion Minimal Not determined Preliminary designed

tionvement

yNot indicated

-

Preliminary designed

Page 47: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

,

.

17

state

1.1

ProjectTitle

1.2

Name of Districtf School

District-wide *

1.3

Name ofSuperintendent

1.4,

.

Mailing Address

1.5

Name ofProjectDirector

1 . 6 .

MailingAddress

NJ Not

indicatedWashington Twp.Public Schools*

Willard

CangreveBunker Hill SchoolRFD #3

Sewell, NJ 08080

JohnCaggiano,

TonyFulgiriti

1.4

NJ NorthernValleyESY

Northern ValleyReg. H.S. District

Donald Watts Administrative OfficesCloster PlazaCloster, NJ 07624

MathewGlowski

1.4

NM Extended Roswell Indepen-School dent School'Dist.YearStudy

Roger Luginbill Roswell Independent School' Robert Wilso200 West ChisumRo'Swell, NM 88201

1.4

NY Feasibility Fashion InstituteStudy For of TechnologyContinuousLearningYear atFashion

Instituteof Technol-ogy

Marvin Feldman,President

Fashion Institute of GeorgeTechnology . ThomasW. 27th StreetNew York, NY .

.

Bureau ofOccupation-al EducationResearchState Ed.Dept. Rm.468Albany, NY12224'

NC Did not return survey

ND Did not return survey

OH Butler CountySchools

Third & Ludlow Streets Donald C.Hamilton, OH 45011 Morris

1.4 1

1

OK Extended Healdton PublicSchool Schools*Year 'Moore Pub.Schools*

James Harrod

Jer Doyle

Healdton, OK 73438 Charles Head

Moore, OK ,

P.O.Box 400Healdton, OK

OR

_..

Molalla School Dist.#35.Gresham SchoolDist. #4

Wm.Jordan

Gordon Russel.

P.O.Box 107 NoneMolalla, OR 970381400 S.E. 5thGresham, OR 97030

None

Page 48: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

1.4

ailing Address

1 . 5

Name ofProjectDirector

1.6 .

.

MailingAddress

2.1

Type ofProject

2.2

FundingSource

2.3

Type Plan

Hill School

t, NJ 08080

JohnCaggiano,

TonyFulgiriti

1.4 Feasibility State grantstudy,

Staggeredattendance

strative Offices-r Plaza-r, NJ 07624

MathewGlowski

1.4 Planning Title III Not determined.

11 Independent School.lest Chisum-11, NM 88201

Robert Wilson 1.4 Feasibility Title IIIstudy

Not determined

.n Institute of

.logy

h Streetirk, NY -

GeorgeThomas

.

.

Bureau ofOccupation-al EducationResearchState Ed.Dept. Rm.468Albany, NY12224'

Feasibility Vocational Ed.study ESEA I

,Continuous

learning yearfivestreamprogram

& Ludlow Streetson, OH 45011

-Donald C.Morris

1.4 Curriculum Title IIIdevelopment

Not indicated

on, OK 73438

OK

Charles Head

,

P.O. Box 400

Healdtan,OKPlanning Title III No specified

plan yet

x 107a, OR 97038..E. 5th -

:m, OR 97030

None None

1:

Feasibility Self-financed'studies (3)

Planning -

projects(l0)

4quarter45-15

Page 49: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginningDate

2.5

GradeLevels

2.6

Number ofPupils

3.1

Purpose

3.2l 3.3

Extent Curriculum Teacher ContraChange Effects

Not

determinedNot'indicated Space saving Not indicated

July, 1974 9-12 3, 200 Program improvement & Extensive Not indicatedspace economy

July, 1972 9-12. 1,500 Program improvement Develop 9 week curric Extended contracular modules in all basisdisciplines

Nov. 1972 CommunityCollegeFreshman&_Sophomore

5,200 Space utilization, Extensive 8 weekMore effective pr'ogram learning periods

Exploring multipteacher contractib ilities

Sept. 1972 K-;12 10,709 To meet student needs Not determined

July, 1971

July, 1972

1-8 4,500 Space utilization Very little Flexible 92 monthtact & 12 -month

Page 50: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

ac

3.2

Extent CurriculumChange

3.3

Teacher ContractEffects-

3.418

Other CommentsEvaluation Status

Not indicated - - Preliminary designed

ement & Extensive Not indicated

,

Being designed Mini courses &fewersequential courses &learning activitypackets

rement Develop 9 week curric-ular modules in alldisciplines

Extended contractbaSis

.

In procesS of

completion

.

ion,

pi;Ogram

Extensive 8 weeklearning periods'

Exploring multipleteacher contract poss-ibilities

Being designed

.

t needs Not determined ..-

.

Being deSigned

ion Very little Flexible 91 month con-tract & 12 month

,

Being designed

ip:

et

a*

it

Page 51: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

19

State

1.1

ProjectTitle

1.2

None of Districtof School

District-wide *

1.3

Name ofSuperintendent

1 . 4

.,

Mailing Address

1 . 5

Name ofProjectDirector

1.6

MailingAddress

PA Year RoundSchool

Clarion StateCollege

Dr. John

McOldinClarion Research LearningCenter .Mr......ponald

Clarion State CollegeClarion, .PA 16214

1.3 &

Means

1.4

PA Year RoundSchool

Rochester AreaSchool District*

Mr. MatthewHosie

540 Reno StreetRochester, PA 15074

Mr. Thomas

Skinner1.4

PA Year RoundSchool

Butler AreaSchool District*

Dr. SamuelDe Simone

167 New Castle RoadButler, PA 16001

1.3 1.4

PA Year RoundSchool

Wissahickon School Dr.WilliamDistrict Stautenburgh

Hauston RoadAmbler, PA 19002

1.3 1.4

PA Year RoundSchool

Fairview School Dr. CharlesDistrict Shultz

Fairview, PA 16415 Dr. FrankJohnston

1.4

PA Year RoundSchool

Gateway "School Dr. J. E.District' Shafley

Administrative OfficeMonroeville, PA 15146

1.3 1.4

PA Year RoundSchool

Pennsbury SchoolDistrict

Mr. WilliamIngraham

Dr. RonaldHuber

Yardley AvenueFallsington, PA 19054

315 W. State StreetDo lestown, PA 18001

'

1.3%.

1.3

1.4

1.4. PA Year Round

SchoolCentral Bucks AreaSchool District

PA Year RoundSchool

Neshaminy School Dr. JosephDistrict Ferderbar

2061 Old Lincoln Hwy.

Langhorne, PM 19047

131 W. Nittany AvenueState College, PA 16801

1.3

1.3

1.4

1.4PA Year Round

SchoolState College Area Dr. Robert C.School District Campbell

PA Year RoundSchool

Manheim Twp. Mr. Raymond'School District Dunlap

Millersville Dr. RobertState College 1 Labriola

School Rd. Box 5134Lancaster, PA 17601

Millersville, PA 17551

1.3

1.3

1.4 .

1.4 ,

PA Year Round.School

_ _.

Page 52: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

. 1.11.

Mailing Address

1 . 5

Name ofProject

Director

1 . 6

MailingAddres-

2.1

Type ofProject

2.2

FundingSource

2.3

Type Plan

'larion Research Learning'enterenter

.

'larion State College,larion, PA 16214

1.3 &

r....Dpnald.

eans

1.4 Planning State grant Flexible all -

year school

Reno Street

1 'ochester PA 1 0 4Mr. Thomas

Skinner

140 .4 Operational State grant Voluntary 4-uarter

67 New Castle Roadtier PA 16001

1.3 1.4 Operational State grant Voluntary 4-uarter

uston Roadh

1 mbler PA 1.0021.3 1.4 Feasibility State grant Not Indicated

irview, PA 16415 Dr. Frank

Johnston1.4 Feasibility State grant Not indicated

il

. .

dministrative Officeonroeville, PA 1 146

ardley Avenueallsin ton PA 1.0 4

1.3 1.4 Feasibility State grant Not indicated

,

1.3 1.4.

Feasibilitystud

Title III Not indicated

15 W. State Streetoylestown, PA 18901

..

1.3 1.4 Feasibilitystudy

State° grant Not indicated

061 Old Lincoln Hwy.nr" 04 1.3 1.4 Feasibilitystud

State grant Not indicated

31 W. Nittany Avenuetate College, PA 16801

. 1.3 1.4 Feasibilitystud

State grant Not indicated

Ili chool Rd. Box 5134.ncaster, PA 17601

1.3 1.4 Feasibilitystudy

State grant Not indicated

1illersville, PA 17551 1.3 1.4 Planning State grant -Not indicated

Page 53: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginningDate

2.5

GradeLevels

2.6

Number ofPupils

3.1

Purpose

3.2

Extent CurriculumChange

3.3

Teacher ContractEffects-

.1972-73 Nursery-12th

300 Program improvement New curriculum Not indicated--- -

1972-73Sch. ear

K-12 Notindicated

Space utilizationProram imorovement

New curriculum Not indicated

1972-73 7-12 Notindicated

Program improvement New curriculumwritten

Not indicated

1972-73 Not indicated Program improvementSpace utilization

Not indicated

1972-73 Not indicated Program improvementSpace utilization

Not indicated

1972-73 Not indicated Program improvementSpace utilization

Not indicated

1972-73 Not indicated Space utilizationProgram improvement

Not indicated

1972-73

Sch. yearNot indicated Program improvement

Space utilizationNot indicated

1972-73 Not indicated

1972-73 Not indicated

1972-73 K-12 Notindicated

1973* Middle Sch. 25-30iModel Sch.

Frbgram improvement-

New curriculum.

Not indicated

..

Page 54: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

I

r

se

3.2

Extent CurriculumChange

New curriculum

3.3

Teacher ContractEfft..Its

Not indicated

3.4

Evaluation Status

20

Other Comments

rovement

zation' ovement

New curriculum Not indicated 4.

rovement New curriculumwritten

Not indi1cated.

2rovementlzation

Not indicated,,,

rovementzation

Not indicated 4.

,

)rovementzation

Not Indicated

zzl.tior,-

:;:v."-,-<

^t indicated.

.... .

)roc indicated.zatiork

,,

.

.4

,

,rovement New curriculum.

Not indicated . ,

.

.

.

Page 55: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

21

tate

1.1

ProjectTitle

1.2

Name of District

of SchoolDistrict-wide *

1.3

Name ofSuperintendent

1.4

Mailing Address

1.5

Name ofProjectDirector

1.6

MailingAddress

...

PR Did not return survey

Narraganset SchoolDept.

Mr. JohnO'Brien

29 Fifth AvenueNarraganset, RI 02882

Mr. David 1.4Hayes,

Principal

FE

0RI

RI Foster-Glocester Mr. Curtis

Reg. School Dist. Bumpus

_

RFD #2 North Scituate, RI02857

G. Tetreault, John R.Principal Fogerty Sch.

TheodoreFoster Dr.

Foster, RI02825

FE

E

RI FifthQuarterPlan

Cranstoh School Dr. Joseph

Dept. Picano

845 Park AvenueCranston, II 02910

1. 522 East Main StreetRock Hill, SC 29730-

2. Dupre Drive.Spartanburg; SC 29301

Dr.Guy DiBiasi?,

of Curriculum;3ambo, Dir.ofMr. Arnold Flgers,of Project Paue.Setter

1.. Mr. Chas.

Hall2. Dr. John

Tillotson

Dir.

Mr. CarloGrant Pro.;

Dir.

SC Nonereported

1. Rock Hill School 1. B.J.Savage

District #32. Spartanburg Sch. 2 Dr.J.G.

District #7 McCracken

1.4

1.4

CI

IN

dE

it

SD No prograns

TN Memphis

SchoolCalendar

Study

Memphis City John FreeManSchools*

2597 Avery AvenueMemphis, TN 38112

,Dr. Shelby 1.4'Counce

TN Knox County Schools* Miss Mildred'Doyle

400 W. Hill AvenueKnoxville, .TN 37902

Mr. Sam 1.4

Bretton

Mr. Ira, E. 1.4Huchingson,

Coordinator

Nst

3

s

7.

a.

TX Quarter .Mandatory

System

_

fr,r entire All publicstate in 1973-74 schools in TX

_

Texas Educational Agency11th & Brazos Streets

, ,

Austin,, TX 78746 %

Page 56: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

1.4

Mailing Address

1.5

Name ofProjectDirector

MailingAddress

Fifth Avenuerraganset, RI 02882

Mr. DavidHayes,

Principal

D #2 North Scituate, RI

857

G. Tetreault,

Principal

John E.Fogerty Sch.

Theodore-Foster Dr.

Foster, RI02825

5 Park Avenueanston, RI 02910

522 East Main Stre&,.

Rock Hill, SC 29730

Dupre DriveSpartahburg, SC 29301

Dr. Guy DiBiasip, Dir.

of Curriculum; Mr. Carlo3ambo, Dir, of Grant Pro.;

Mr. Arnold. Rogers, Dir.

of Project Pacp.Setter

. Mr. Chas.

HallDr. JohnTillotson

1.4

1.4

97 Avery Avenue

mphis, TN 38112

Dr. ShelbyCounce

1.4

0 W. Hill Avenueoxv lle, TN 37902

Mr. SamBratton

1.4

exas Educational Agencyth & Brazos Streetsstin, TX 78746

Mr. Ira, E.

Huchingson,

Coordinator

1.4

2.1

Type ofProject

2.2

FundingSource

2.3

Type Plan

Feasibilitystudy

State reim-bursed funds

45-15

Fea- )ilitysty,

State reim-bursed funds

45-15

Planning Title III Quinmester

Curriculumrevision &development,

implementa-tion

Title III,

State,

Local

Quinmester

Study Not indicated

Feasibilitystudy

39 pilot

schools in2-73 &gency taskforce

Self-financed-QuinmesterVoluntary 45-15Volun.4-cuarter

Quartersystem

ilot schools,local fundingagency groups.

regular bud-get

Page 57: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginningDate

2.5

Grade

LeVels

2.6

Number ofPupils

3.1

Purpose

3.2

Extent CurriculumChange

3.3

Teacher ContEffects

1971 -72 K-6 880 Space utilization Not indicated 180 day & 240contracts-

Not

reportedK-12 or5-12

1,300 Space utilization Not indicated 180 day & 240 i

contracts

Summer 73 K-12 4,605 Program improvement Complete curriculumchange

Not indicated

Fall 1973 7-12 1.Rock Hill7,000

2. Spartan-

burg13;000

Program improvement Complete 45 day contrac,

225 day contra*

..

Not beforeJuly, 1974

K-12 Not

indicatedProgram improvement;Better space utilizatio

Not indicated

72-73' K-12 56,000Pilot

'Educational improvementFinanciil purposes also.considered

$. .1

Complete Not indicated

Page 58: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

G.1

rose

3.2

Extent CurriculumCha !e

3.3

Teacher ContractEffects

3.4

Evaluation Status

22

Other Comments

lization Not indicated 180 day & 240 daycontracts

Not indicated.

ization Not indicated 180 day & 240 daycontracts

Not indicated

'provement Complete curriculumchange

Not indicated Being.designed,

provement Complete 45 day contracts to225 day contracts

Preliminary evaluation Joint project

Isrovement;

e utilizationNot indicated Being designed

1 improvement.urposes :also

.

Complete Not indicated In progress to be com-pleted March 13

.

Legislation pending,

to.postpone enactmentuntil 1975:

Page 59: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

23

State

1.1

ProjectTitle

1.2

Name of Districtof'School

District -wide *

1.3

-

Name ofSuperintendent

1.4

.

Mailing' Address

1.5

Name ofProject

Director

1.6

.

MailingAddress

UT Grant Elem. SchoolNebo School Dist.

Dr. Joe A.

Reidhead

50 South MainSpanish Fork, UT 8466o

Waldo Jacob-son, Principa

SpringvilleUT 84663

VT Notindicated

Champlain ValleyUnion High School,Hinesburg, VT 05461Chittenden SouthSupervisory District_

Mr. TheodoreWhalen

Office of Supt.-

Shelburne, VT

Mr. IohnOlsen,Princ.Mr. Paul RiceAsst.

1.2

. VA Prince Wm. Garfield SeniorCounty High SchoolYear RoundSchool

Mr. HerbertSaunders

Prince'Wm.County SchoolBoard Office,Mariassas,VA 22110

.

Dr. WilliamVolk

1.4

VA Bel Air, Dale City,

Minnieville andNeabsco Elem. Schs:Prince WilliamCounty

.

Mr. HerbertSaunders(Interim Supt.)

.

Prince Wm. County School

Board'Office, Manassas,VA 22110

Dr. WilliamVolk

1.4

VA Mills E. GodwinMiddle School

Mr. HerbertSaunders

(Interim Supt.)

14800 Darbydale AvenueWoodbridge, VA 22191

Mr. R. DeanKilby

1.4 D

VA

::

Planning All Schools*Project to 7 Elementary

study year 3 Intermediateround oper-.2 High Schoolsation ofschools in

.

York County

George Pope,York CountyPublic Schools

-

.O. Box 451,Yorktown, VA 23490

.

'John Baldino

.

1.4 F

s

pI_

b

b

Page 60: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

-"Mr

1.4

4I1^'

Mailing Address

l.5

Name PfProjectDirector

1.6

MailingAddress

2.1 2.2

Type of Funding

Project Source

2.3

Type Plan

0 South Mainpanish Fork, UT 84660

Waldo Jacob- Springville

son, Principa UT 84663Operational Local district Flexible sched.

child mustattend 180 daysout of 225

Office of Supt.

Shelburne, VT

Mr. aohnOlsen, Princ.

Mr. Paul RiceAsst.

1.2 Operational Self-financed Multiple access'curripulum &calendar, 119-week overlapping. quarters,

volunta

Prince Wm.County SchoolBoard Office, .Manassas,

VA 22110

Dr. WilliamVolk

R & D State grant Multiple entry45-15 and

conventionalrear.

Prince Wm.County SchoolBoard Office, Manassas,VA 22110

Dr. WilliamVolk

1.4 Operational Self-financed 45-15

14800 Darbydale Avenue

Woodbridge, VA 22191

Mr. R. DeanKilby

1.4 bperational Self-financed 45-15

T.O. Box 451,Yorktown, VA 23490

John Baldino 1,4 Feasibility State grant

study andplanning leaL-Lng to opera-tion on atrial basis

-Pentamester

Page 61: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.14 2.5

Beginning GradeDate Levels

2.6

Number ofPupils

3.1

Purpose

3.2

Extent' CurriculumChange

3 . 3

Teacher ContractEffects

Aug, 1972 5 477 Program improvement Continuous progress Optional

Sept, 1972 9-12 1,000 Program benefits,Space utilization

Continuous progress9-week courses (Duo)a work study programindependent study, etc.

ti

Regular 185 day contract, additional don a per diem basis

July, 1973 9-12 3,000 Provide students withvarious time frames tomeet educational objec-tives and support qual-ity education standards

Change from tradition-al.year to 9-weekprograms, student sel-ection of interest re-lated classes & studentchoice 'of sch.calendar.

240 day contracts

220 day contracts

June, 1971 1-5 3,400 Program improvement,

Better space utiliza-tion

Curriculumreorganization

240 day contracts230 day contracts180 day contracts150 day contracts60 day contracts

June, 1971 6,7,8 1,550 Program improvement,Better space utiliza-tion

Planning K-12June 72-73Poss.opera-tion .

June 1973

8,200 Program improvement

Curriculumreorganization

Curridulumreorganization

240 day contracts230 day contracts180 day contracts150 day contracts60 day contracts

Not yet determined

Page 62: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

3.2

Extent CurriculumChange

3.3

Teacher ContractEffects

3.4

Evaluation Status

24

Other Comments

vement Continuous progress Optional Preliminary evaluationAug. 28, 1972 annual

fits,

ationContinuous progress9-week courses (Duo)a work study program,independent study, etc.

Regular 185 day con-

tract, additional dayson a per diem basis

Preliminary in process

nts withframes tonal objec-port qual-standards

Change from tradition-al, year to 9-week

programs, student sel-ection of interest re-;

lated classes & studentchoice of sch.calendar.

240 day contracts220 day contracts

Being designed inconjunction with R & D,

ement,

tiliza-Curriculumreorganization

240 day contracts230 day contracts180 day contracts150 day-contracts

Go day contacts

Evaluation completed

vement, Curriculumutiliza- reorganization

240 day contracts230 day contracts180 day contracts150 day contracts60 day contracts

Evaluation completed

vement Curriculumreorganization

Not yet determined Preliminary, evaluation Secondary courses rede-signed into 9-week non-sequentials with, putllperformance requirements(PPR)s

Elementary courses - con-tinuous progress individ-ualized instruction with(PPR)s

Page 63: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

25

tate

1.1

ProjectTitle

1.2

Name of Districtof School

District-wide *

1.3

Name ofSuperintendent

1.4

Mailing Address

1.5

Name ofProjectDirector

1.6 .

MailingAddress

VA Year_ Round

EducationProject807

1. Thos.HenderSon

Middle School2. Mary Scott,

Elem. School

Dr. ThomasLittle

4011 Moss Side AvenueRichmond, VA 23222

.

1.C.Fred_Bateman2.James Robin-son George

1.4 F

s

VA VirginiaBeach 45-15 cycledattendancePlan

City of Virginia

Beach PublicSchools

E. E. Brickell City of Virginia BeachPublic Schools, P.O.Box6038, Princess Anne StaiiioVirginia Beach, VA 23456

.

Dr. James

MoonieDir.of "Re-

search Planing & Devel-

opment,P.O.Box 6038,Annex IV,

VirginiaBeach, VA23456*

VA K-12

Year RoundPrograms

Roanoke CountySchools

4 Elementary1 Intermediate1 High School

Arnold Burton 526 College AvenueSalem, VA 24153

Alan Farley;

Director.1.4

VA Loudoun County

Guilford, Sterling& Sully Elem.School.;

:I- Sterling MiddleSchool

Mr. Robert Butt 20 Union StreetLeesburg, VA 22075

Dr. ArthurWelch

30 W. North

St., Lees-burg, VA22075

VI Virgin IslandsDept. of Education

St.Thomas, St.John,St. Croix

Dr. Harold

Haizlip, Comm.of Education

13.0, Box 630

Dept. of EducationCharlotte AmalieSt. Thomas, IT 00801

Mr. Don Smith

.

Notindicated

1.4.

1.4 i

WANot

indicatedFranklin PierceDistrict 402 Dr. Edw. Hill

315 South 129th St.Tacomaz WA 98444

WV No prograns in operation

Page 64: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

1.4

Mailing Address

1.5

Name ofProjectDirector

1.6

MailingAddress

2.1

Type of

Project

2.2

FundingSource

2.3

Type Plan

1 Moss Side Avenuehmond, VA 23222.

1.C.Fred. Bateman2.James Robin-

son George.

1.4 Feasibilitystudy

State grant-

Random individ-ual vacationoptions withJune to Augustextension

y of Virginia Beach

tic Schools, P.O. Box

8, Princess Anne Stationginia Beach, VA 23456

.

Dr. JamesMoonie

Dir.of Re-

search Plan-ing & Devel-opment,P.O.Box 6038,Annex IV,

VirginiaBeach, VA23456

Planning &preparationphase

State grant &Self-financed

45-15cycledattendanceplan

College Avenueem, VA 24153

Alan Farley,

Director1.4 R & D State gr'ant :3-year phase in

beginning with7 6-week terms7th term volun-

aEY

45-15'Union Street-sburg, VA 22075

Dr. ArthurWelch

30 W.NorthSt., Lees-burg, VA22075

R & D State grant &Self-financed

Box 630. of Education

Ilotte AmalieThomas, VI 00801

Mr. Don Smith

,

1.4 Feasibilitystudy

Not indinted

South 129th St.'a, WA 98444

Not ,

indicated 1.4 OperationalJ.S.O.E.Exp.Sc .

Prqs. & Local -4-1-4-1-1

Page 65: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginningDate

2.5

GradeLevels

2.6

Number ofPupils

3.1

Pur ose

3.2

Extent CurriculumCha e

3.3

Teacher ContractEffects

Notindicated

1-8 1,679 Program improvement

_Total continuousprogress with articul-ation hcross levels(Elementary Middle)

92 mo. contract

12 mo. contract

I

OperationalJune, 1973

1-7 5,000 Space utilization

.

Extensive

b

,

180 day contract240 day contract

.

Sept. 1973 K-12 4,000

b

Program improvement Complete change topackaged continuousprogress, behavioralobjective based

Not indicated

July, 1973 1-8 3,650

.

Program improvementSpace utilization

.

Reorganize curriculumfor 45-15 schedule;3-week units will bedeveloped for eachsubject area

195 day contract228 day contract

1974 Not determined

. .

Better spaceutilization

Not indicated --.

,

.

Sept. 1971 .K-12 4,200Program ImprovementSpace utilization Extensive . Little

-.

Page 66: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

3.2

Extent CurriculumChange

3.3

Teacher ContractEffects

3.4

Evaluation Status

26

Other Comments

Nement Total continuousprogress with articulation across levels'(Elementary Middle)

92 mo. contract12 mo. contract

Being designed

tion Extensive

.

180 day contract240 day contract

Plailning phase in pro-

gresse operationalphase designed

'sequential

Modification for: greaterflexibility of instructionand curriculum for multi-age classes; minimize re-petition through recordkeeping; provide for

skill and con-cept developient; allowfor continuous progress ofstudents,

..

ement Complete change to

packaged continuousprogress, hehavioralobjective based

Not indicated Being designed

ovementation

Reorganize curriculumfor 45-15 schedule;3-week units will bedeveloped for eachsubject area

195 day contract228 day contract.

Being designedt

Not indicated In planning stage

vementtion Extensive Little In process

Page 67: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

27

State

1.1

ProjectTitle

1.2

Name of District

of SchoolDistrict -wide *

1.3

Name ofSuperintendent

.

1.4

Mailing Address

1.5

Name pfProj,_ct

Director

1.6

MailingAddress

WI Milwaukee PublicSchool District

Dr. RichardGousha

P.O.Drawer 10KMilwaukee WI 3201

Dr. JosephCollins

'

1.4

WI Year RoundSchoolStudy

Racine UnifiedSchool District

C. RichardNelson

2230 Northwestern AvenueRacine, WI 53404

Sam Castagna 1.4WmiGrindeland

111/

WI Union Grove Dist.Union High School

James

Highly ad

Box 36

Hwy. 45Union Grove WI 3182

1.4

WI League ofWomen Vote,'.

Feasibilitof Yr.Rouro

School,Wausau

Wausau School

District

Dr.. T.

NicholsonMrs. Richard Turk, Pres.League of Women Voters634 South-5th AvenueWausau, WI 54401

.

.Mrs.JohnCook 1.727 Bertha'Street

Wausau, WI54401

.Mrs.Robert 2.725 S. 6thQuinn . Avenue

Wausau, WI4401

I.

r

WI Joint District #3City of OconomowocEt. A1.

Wm. Paton 521 Westover StreetOconomowoc, WI 53066

Donald Kremer 641 ForestDir.See.Ed. Street

WI Burlington ALeaSchool" District

P. R.

ReinfeldtBox C

Burli ton, WI 31621.3 1.4

WI Hamilton JointSchool Dist. 16

N. H. Fries W220 N6151 Town Line RoadSussex, WI 53.089

Kieth Wunrow, Marcy SchoolDir.of Instr. W180 N4851

Marcy Road,Menomonee

WY ExtendedSchool Yr.

.

Laramie County(School Dist. #1Cheyenne, WY82001

Dr. JoeLutjeharms

.

,

1.2

.

Mr. Leo . 1.2Breeden,, Asst.

Superintendent

Page 68: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

1.4

Mailing Address

1.5

Name pfProjectDirector

Drawer 10Kaukee, WI 53201

Northwestern Avenuene, WI 53404

Dr. JoSephCollins

Sam CastagnaWm.Grindeland

1 . 6 .

MailingAddress

1.4

2.1

Type ofProject

Feasibility-stud

2 . 2

FundingSource

Self-financed

2.3

`Type PltIn

Not indicated

easibility Self-financedtudy &rogram

lanning

45-15

36

45

n Grove, WI 53182

Richard Turk, Pres.ue of Women Votersouth 5th Avenueu, WI 54401

[.Mrs.JohnCook

.Mrs.RobertQuinn

1.4 Feasibility Self-financedstudy

45-15

1.727 BerthaStreet

Wausau, WI544012.725 S,6th. Avenue

Wausau, WI54401

.League of' Not indicatedomen Votersocal Study

rogram.Feasibilitstudy

destover Streetmowoc, WI 53066

Donald Kremer,

Dir.Sec,Ed.

641 Forest

StreetFeasibility Self-financedstudy

457.15

1.3ngton, WI 53105

1.4 Feasibility Self-financedstudy

45-15

N6151 Town Line Roadx, WI 53089

Kieth Wunrow,Dir.of Instr.

Marcy SchoolW180 N4851Marcy RoadMenomonee

Feasibility Self-financedstudy

45-15

1. 2 Mr. Leo

Breeden, Asst.Superintendent

1.2 Feasibilitystudy

Self-financed Voluntary4-quarter

Page 69: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

2.4

BeginningDate

2.5

GradeLevels

2.6

Number ofPupils

3.1

Purpose

3.2

Extent CurriculumChange

3.3

Teacher ContraEffects

Sept. 1971 Not'indic ated

Not

determined9-12 9,600 Program improvement

Space savingNot indicated

Not

_determined9-12 900 Space utilization'' 0,1Not indicated

1972-73 Not indi sated Program improvement Not indicated

Not

determined

K-12 '5,600 Space utilizationProgram improvement

Not indicated

To be

determinedIC-12 3,800 Space utilization Nine week units

Study com-

pleted July

1971

K-12 Not

indicated'Program improvement.Space utilization

Not indicated

Fall 1974 K-12 14,000 Enrichment,

lcceleration,Space utiliZation

- Extensive

Page 70: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

ra

3.2

Extent CurridulumChange

3.3

Teacher ContractEffects

3.4

Evaluation Status

28

Other Comments

ovement Not indicated Evaluation of feaibil-ity study completedFeb. 1971. No furtherstudy planned.

ation Not indicated

_

Planwas studied.No plans to implement.

-

ovement Not indicated

.

Preliminary stages

.

tion

vementNot indidated - Elementary- school

feasibility studycomplete

tion Nine week units . Preliminary

vementtion

Not indicated - No work lies been doneto implement following

the study..

--;

ion

.

Extensive

r

_ J _

Being_designed to gointo effect Spring1975

,

Curriculum to be revisedto fit 60-day quartersystem, Each subjectarea is asked to revisecurricultim to relatebetter to world of workconcepts.

Page 71: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

LEGISLATIVE ACTIVITIES AFFECTING

YEAR-ROUND EDUCATION IN THE UNITED STATES

as reported by SEAs in conjunction

with the first annual survey of

year-round education activities

Prepared "by

Henry J. Pruitt, Project Associate

Extended School Year Programs

Office of Program Development

Division of Research, Planning and Evaluation

New Jersey Department of Education

Trenton, New Jersey

April 1973

Page 72: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

ARIZONA

An Act, Chapter 115, House Bill 2019, was approved by theGovernor of Arizona on May 8, 1972. This act is in reference toExtended School Year programs in the state of Arizona.

AN ACT RELATING TO EDUCATION: Authorizing the operation of certainschools on an extended year basis; authorizing financial aid to bepaid on the basis of the equivalent of one hundred seventy-five

days attendance; requiring certain school districts to employseparate budgets for schools on extended school operation; amendingsections 15-301, 15-321, 15-442 and 15-1212, Arizona revisedstatutes; amending title 15, chapter 11, Arizona revised statutes,by adding article 2.2, and making an appropriation.

Sec. 7 Appropriation; purpose

The sum of one hundred ten thousand dollars is appropriatedto the state department of education, for the fiscal year beginningJuly 1, 1972, for the purpose of financing the cost of additionalstaff positions needed for the department to provide the supervisionand assistance necessary to school districts which qualify and areauthorized to participate in a program of twelve month. schooloperation-pursuant to section 3 of this act.

I. Legislative Intent

The Legislature intends by this act to authorize schooldistricts to evaluate, plan and-employ the use of extended schoolprograms.

II. Requirements for Qualifications of School Districts

A. To qualify, a school. must be a public common or highschool of the State of Arizona.

B. Very small schools will not be approved.

C. A need.for an Extended School Year-program must bedemonStrated showing a more economical .utilizationof facilities and personnel, or-curriculum improvement.

D. There must be evidence,of-program planning involving

students, faculty, parentS and community.

E. Objectives must be clearly defined.

F. Implementatior procedure must carry out a full cycle ofoperation for all students.

III. Evaluation Criteria

A. There are to be phase-in checkpoints for progressevaluation (formulative evaluation) for each step ofimplementation.

Page 73: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

- 2-

B. There is to be an outcome evaluation (summativeevaluation) for ascertaining objective accomplishment.

IV. State Superintendent of Public Instruction's dutieswill include:

A. Providing departmental staff and guidelines forassisting and supervising districts who wish to operateand/or plan ESY programs. Thete guidelines are available

ARKANSAS

Arkansas has the first draft of a bill dated November 27, 1972that may or may not be introduced into the legislature.

A BILL FOR AN ACT TO BE ENTITLED:

AN ACT authorizing school districts,in this state to operate on aquarterly rather than a semester basis; authorizing districts tooperate all or some of their schools for all four quarters with statefunding for three quarters of attendance for any one student;authorizing the state board of education to establish appropriaterules and regulations for the operation of elementary and secondaryschools on a quarterly basis, and to assure that no school districtbe penalized in the loss of minimum foundation program aid, trans-portation aid, or other forms of state aid to local school districtsin the operation of schodls on a quarterly-rather than a semesterbasis; and for other purposes."'

I. legislative Intent

The Legislature intends by this act to authorize school districtsto operate on a quarterly rather than a semester basis-. This changewould be optional.

II. Requirements_ for Qualifidation of Sdhool Districts

A. Districts may, upon the approval of a majority of thequalified voters at an annual sch661 board election,elect to operate one or more of the .schools of saidschool district on a quarterly rather than a semesterbasis.

B. The revised curriculum shall be so structured that thematerial covered during the :present school year of twosemesters is covered in three; three-month quarters.

Page 74: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

C. Any school district may return to the semester system

3

D.

upon a-majority vote of the members of the school

board on or before July 1 prededing the tcrm at_whichthe school district is to return to the semester system.

assistance either under the quarter system or the semesterprograms to assure school districts equivalent stateThe State Board will make adjustments in formulas and

system.

Emergency

It has been determined that a number of school districts areexperiencing unusual adjustments in the number of pupilsservedand the immediate passage of this act is necessary to make maximum

and efficient use of existing buildings, facilities and staff.

It is not known, at this time, if this bill has been introduced.

CALIFORNIA

I. Legislation Passed, 1971

SB-673 - Authorizes public school districts, with the approvalof the Superintendent of Public Instruction, toestablish and operate in one or more schools of thedistrict, the 45-15 plan. District-to receive thesame financial support, but not more financial supportthan it would have received if the school had beenoperating under the provisions of law relating to thei-egular schOol year, including -summer school. (Ed. C.

Sections 32100 - 32133)

AB 1002 - Identical to SB 673 except the- proyisions of thischapter (Chapter 7. Continuous School Programs) donot bedome operative until July 1, 1.973. Also, therequired approval of the State Superintendent of PublicInstruction is removed.

AB 331 ProVidea- for the establishment during the 1972-73school year of five-year experimental programs in two

been received during the regular school year, includingsummer school based on average daily attendance.

or more school districts selected by' the Superintendent

of Public Instruction. Focuses upon the "academic

quarter" plan. NO funding beyond"that which would have

Page 75: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

4

AB 1924 - Provides a financial incentive for State aideddistricts to consider implementation of the yearround utilization of facilities.

II, Requirements -of School for the Feasibility .StudyReport under SB-673 or AB-331

A. Needs and Status Information

1. Background data and information concerning theschool district: size, growth, facilities, uniquecircumstances and any history of prior studiesundertaken by the school district.

2. Clear-cut statements of goals and objectives.

3. Summary of existing district instructional program,specific programs in schools under consideration.

4. Awareness of specific problems involved in thedesign and implementation of the year round schoolingplan selected by the district.

5. Tentative conclusions concerning selection andimplementation of a year round school program.

B. Implementation Plan

1. Evidence of thoroughness in planning; evidence ofbroad community, staff and board involvement.

2. Development or modification of a plan includingstaffing, scheduling, use of facilities, etc.

3. Development of teaching strategies, curriculum materials,professional growth opportunities.

4. Specific school organization--establishment ofattendance areas, (as- in the 45-15 plan), establishmentof specific family/student assignments, alternativesfor families not desiring year round schooling.

5. Consideration of a simulation model to work out "bugs"before actual implementation:

Resolution to the totality bf problemS,endountered:Legal atpect of the law--state testing, .EMR teacher/student ratios, ethnic surveys, youthemployment,community recreation programs, student transfers,district maintenance program, relationship to summersessions, student transportation, professional growth,vacation patterns, increased secretarial assistance,use of school facilities, juvenile delinquency, balanced

enrollments, instructional articulation, PL 874, cafeteriaoperations, teacher . '.,,ent monies, single salaryschedule, etc.

Page 76: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

-5

III. Evaluation Dec.gn

A. Plans should drawn for:

1. Instructional program

2. Finances

3. Facilities

B. Subdivision of each of the items should be based on:

1. An immediate or short term basis (1-2 years)

2. A long term basis.

ILLINOIS

AN .ACT to add sections 10-19.2 and 34-21.3 to The School Code"approved March 18, 1961 as amended. Signed by the GovernorAugust 2, 1972.

I. Additions to the School Code

A. Any school district may by- resolution of its boardfile an application with the office of the Superintendentof Public Instruction and, if approved, receive fundsfor the purpose of conducting a study of the feasibilityof operating one or more schools within the district ona full year school plan.

B. The board shall subn4t a final report to the StateSuperintendent of Public Initruction within one yearafter receipt of funds or upon completion of the study,whichever occurs first.

C. If, based upon the results of a full year feasibilitystudy, the board decides to operate one or more schoolsin the district, the Superintendent of Public Instructionmay, depending upon certain guidelines, reimburse theboard for expenditures;resulting:from making such atransition, provided that no expenditures will bereimbursed which would have been incurred,,by the boardin the absence of a changeover. to a full year program.

Page 77: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

6

MICHIGAN

Enrolled. Senate Bill No. 1140

AN ACT to make appropriations for the department of educationand certain other purposes relating to education for the fiscalyear ending June 30, 1973; to provide for the expenditure of suchappropriations; and to provide for the disposition of fees andother income received by various state agencies.

The People of the State of Michigan enact:

Sec. 1. There is appropriated for the department of education andcertain state purposes related to education herein set forth, fromthe general fund of the state, for the fiscal year ending June 30,1973, the sum of $36,936,450.00.

Sec. 19 line 3 to line 6:

Apportionments of state school aid for school districtsmaintaining school for the entire 12 month year shall be made bythe Department of Education on or before May 15 of each fiscal yearas required by law.

Sec. 27

Beginning in 1973-1974 there shall be appropriated notto exceed 150,000.00 to be used by districts conducting =attendedSchool Year programs approved by the department. The State Boardshall promulgate rules to implement*this section.

NEW JERSEY

By rule of the State Board of Education dated June 28, 1972,a new system of credit assignment and graduation requirements becameeffective for the class of 1976, i.e., the entering ninth grade,and all subsequent classes. All courses meeting for the same lengthof time shall be of equal weight; the designations "major" and "minor"no longer applicable. One credit shall equal 1440 minutes' per-academic year. The former forty-minute class, period minimum isabolished. making poSsible more flexible scheduling.

Programs may also be planned for individuals based uponspecified, measurable instructional objectives for a .particularcourse. The school shall certify completion-of a course for thepupil based upon the original specified objectives. The schoolshall not be obligated to assign credit(s) una, r this plan. Ifcredits are not assigned, the school shall determine and establisha set number of courses for promotion and graduation purposes.

Page 78: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

-7

PENNSYLVANIA

ACT 80

The Governor on July 30, 1969, signed into law Act 80,

which amends Section 1504 of the Public School Code of 1949,

as amended. Act 80 further defines and adds flexibility to the

length of the school day and school term.

Upon request of a board of school directors for an

exception to the aforesaid daily schedule, the Superintendent

of Public Instruction may, when in his opinion a meritorious

educatidnal program warrants, approve a school week containing

a minimum of twenty seven and one-half hours of instruction

as the equivalent of five (5) school days, or a school year

containing a minimum of nine hundred ninety hours of instruction

as the equivalent of one hundred eighty (180) school days.

I. Legislative Intent

The intent of this act is to provide a board of school

directors greater flexibility in the development of its school

calendar, and to provide opportunities for more creative and

flexible programs for children and adults within the school districts.

II. Provisions

A. The vital consideration is that the 900 actual hours ofinstruction time for elementary and 990 hours of instruc-

tion time for secondary schools be preserved.

B. All school programs which would require fewer than 5-1/2

hours of instructional time in secondary and 5 hours ofinstructional time in elementary schools per day shall besubmitted to the Secretary of Education for approval.

C. .Any school program containing a school week of fewer than27-1/2 hours of instruction time in secondary and 25 hoursof instruction time in elementary shall be submitted tothe Secretary of Education for approval'.

D. A school board may extend its instructional school yearbeyond the minimum of 180 days without approval.

E. This act does not permit a reduction in the legalrequirement for at least 180 days-of instruction for pupils.

Page 79: ED 077 133 EA 005 123 Year-Round Education Activities in ... · DOCUMENT RESUME ED 077 133 EA 005 123 TITLE Year-Round Education Activities in the United States. First Annual Survey

TEXAS

General Statutory Directives

The general directives of Chapter 16, subchapter G-1, of theTexas Education Code (House Bill 1078, enacted by the Sixty-secondLegislature, 1971) are as follows:

The Texas Education Agency is directed to prepare anddistribute restructured curriculum to districts so that the materialwhich is now covered in two semesters will be covered in three,three-month (60-day) quarters.

Beginning with the 1972-73 school year, districts may operateon the basis of a quarter system. Beginning with the 1973-74 schoolyear, all districts in the State must operate on the basis of aquarter system; however, districts are not required to operatea fourth quarter.

School distric must operate at least three quarters,providing 180 days of instruction and 10 days of inservice educationfor teachers.

Each district may operate all or some of its schools for allfour qua:-,ters and shall decide which students attend each quarter.Schedules must be arranged so that members of the same family,attending school in the same district, will be able to attend thesame three quarters.

A district may require neither a teacher to teach all fourquarters nor a student to attend more than three quarters.

Pupils may be counted for attendance under the FoundationSchool Program for three quarters. Attendance in the fourth quarteris optional and must be financed by either local funds or tuition.

The State Board of Education, in response to a strong state-wide reaction both pro and con to the above program, has announcedits intention to ask the 1973 Legislature to postpone mandatoryenactment until 1975. This session will meet in the Spring of 1973.