EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011
![Page 2: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/2.jpg)
DECONSTRUCTION OF THENUCLEAR POWER PLANT CAORSO (PC)
• DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS
![Page 3: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/3.jpg)
LOCATION
![Page 4: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/4.jpg)
LOCATION
PO’ RIVER
![Page 5: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/5.jpg)
DECOMMISSIONING OF THE TURBINE BUILDING AND
TURBINE ANNEX
• DECOMMISSIONING OF 6.000 TON OF EQUIPMENT,
STRUCTURES, PIPES, TANKS INSIDE THE TURBINE
BUILDING
• DECONTAMINATION OF 1.200 TON OF RADIOACTIVE
MATERIAL
• RUNNING TIME: 30 MONTHS
![Page 6: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/6.jpg)
LONGITUDINAL TURBINE BUILDING SECTION
![Page 7: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/7.jpg)
CERTAIN AREAS IN DETAIL
![Page 8: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/8.jpg)
DETAILED DESIGN FOR EACH AREA
• Identification of the lines and facilities to preserve
• Identification of the SPOOL
• Dismantling sequenze
• Choice of the cutting techniques
• Procedures for components removal
• Materials handling
![Page 9: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/9.jpg)
EQUIPMENT AND LINES TO PROTECT
![Page 10: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/10.jpg)
TRACEABILITY OF COMPONENTS
“SPOOL IDENTIFICATION”
![Page 11: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/11.jpg)
CUTTING TECHNOLOGY CHOICE
![Page 12: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/12.jpg)
DISMANTLING SEQUENCE
1. Electrical systems (boards, conduits and possibly cable conduits)
2. Electric Motors, servo-motors
3. Carpentry and civil structures
4. Line pipe and components
5. Supports and cushions
![Page 13: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/13.jpg)
Cutting technologies to reduce risks
![Page 14: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/14.jpg)
COMPONENTS REMOVAL
![Page 15: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/15.jpg)
MATERIALS HANDLING
![Page 16: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/16.jpg)
DISMANTING SEQUENCE PROCEDURES
Processing flowchart
AREA PROJECT
(SPOOL, WEIGHTS,ELIMINA
TION
MODE/HANDLING)
SOGIN
APPROVAL
SOGIN VERIFICATION (SPOOL, PLANTS
TO PRESERVE)
DISMANTLING
DECONTAMI-NATION
TBA, TBC, TBE
TBD (NON CONTAMINATED)
CONTROL 100%
CONTROL 10%
ALIENATION
![Page 17: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/17.jpg)
DISMANTLING OF THE AREACOMPONENTS
Results
Effective production lower than expected
![Page 18: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/18.jpg)
PROBLEMS
• RUNNING THE SYSTEM (creating spool,
“physiological” times of the system, understanding the
implementation procedures)
•RESTRICTIONS INTRINSA TO THE SYSTEMIMPROVEMENT OF THE NATURAL HEALTH CONTROL PROCESS
IMPROVEMENT OF THE MATERIAL HANDLING PROCESS
![Page 19: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/19.jpg)
PERFORMING DISMANTLING ACTIVITIESProcessing flowchart
BEFORE THE FIRST CHANGES
PROGETTO DI AREA
(SPOOL, WEIGHT, DISMANTLING
MODES/HANDLING)
SOGIN
APPROVAL
SOGIN VERIFICATION (SPOOL, PLANTS
TO PRESERVE)
DISMANTLING
DECONTAMI-NATION
TBA, TBC, TBE
TBD (NON CONTAMINATED)
CONTROL 100%
CONTROL 10%
ALIENATION
![Page 20: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/20.jpg)
AMENDMENTS TO THE WORKING FLOW
AREA PROJECT
(SPOOL, WEIGHTS,
DISMANTLING MODES/HANDLING
)
SOGIN APPROVAL
SOGIN ( VERIFICATION
SPOOL, PLANTS TO PRESERVE)
DISMANTLING
DECONTAMI-NATION
TBA
TBC
TBD, TBB
CONTROL 100%
CONTROL 10%
ALIENATION
PRE-CONTROL
CONTROL 10%
![Page 21: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/21.jpg)
EFFECTS ON PRODUCTION
![Page 22: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/22.jpg)
WORKING PROGRAMME
![Page 23: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/23.jpg)
RESULTS
![Page 24: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/24.jpg)
LABOUR USED
![Page 25: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/25.jpg)
CONCLUSIONS
1. Extreme design at all stages of intervention
2. Training of employees
3. Creation of new technologies and working procedures not needed until now on traditional field
4. In the order of magnitud the decommissioning and demolition costs are not comparable
5. The decommissioning is not a variant of the demolition work but a real industry that requires expertise and skills.
![Page 26: EDA CONFERENCE – AMSTERDAM – NOVEMBER 2011. DECONSTRUCTION OF THE NUCLEAR POWER PLANT CAORSO (PC) DISMANTLING OF THE TURBINE AND ANNEX BUILDINGS](https://reader031.vdocument.in/reader031/viewer/2022013101/56649f355503460f94c53739/html5/thumbnails/26.jpg)