edac-presentation
Post on 03-Dec-2015
218 views
DESCRIPTION
Engineering design & construction presentation for GASCO-Abu DhabiTRANSCRIPT
Presented by
M.Saravana Kumar.Management Trainee
• ERP stands for Enterprise Resource Planning.
• It integrates internal and external management information across an entire organization, embracing Projects, Finance/Accounting, Procurement, sales and service, Purchasing, Inventories, Human Resources, Manufacturing, Quality Management system etc.
Standardize business process Improve information flow Reduce paper work Reduce repeated entry Offers real time monitoring and control Built common vision throughout enterprise. Fasten the creation of reports
Depending on the organization size and needs there are number of ERP software vendors to choose from
ERP Tier I - Revenue more than 500 million USD dollars EX: SAP,Oracle,Microsoft
ERP Tier II - Revenue 25 to 500 million USD dollars EX: IFS,QAD,Epicor,Sage,Lawson
ERP Tier III - Revenue under 25 million USD dollars EX: Syspro,CDC ,Activant solutions
visibility,consona,Exact
Asset Management BD&Estimation Finance&Accounts HR&Admin ISO Department Projects & Overseas operations and maintenance Procurement Secretarial&Legal IT Department
Engagement of Deloitte for the existing process study in EDAC Engineering Limited
Interaction with business process owners in our company and find out the gaps
Site visit & study in tuticorin
Reconfirmation of studied reports to business process owners.
Submission of Final Presentation by Deloitte team to our top management people.
Radio Frequency Identification
Radio-frequency identification (RFID) is the wireless non-contact use of radio-frequency electromagnetic fields to transfer data, for the purposes of automatically identifying and tracking tags attached to objects.
RFID Tag◦ Transponder◦ Located on the object
RFID Reader◦ Transceiver◦ Can read and write data to Tag
Consist of microchip that stores data and antenna
Active transponders have on-tag battery Passive transponders obtain all power from
the interrogation signal of reader Active and passive only communicate when
interrogate by transceiver
Consist of a RF module, a control unit, and a coupling element to interrogate tags via RF communication
Also have secondary interface to communicate with backend systems
It is called as special library because it contains only medical books
They have separated the books like Bound volumes Annex and main journals
Reference books, issue books, book bank
Maintaining manually issuing and returning the books
Enter the data in borrow register Periodically maintain the journal data
through a manual check and manual entry There is no existing automation solution for
the library operations Maintain the data in accession register For issue and return usage of library cards
to students
Library management system ( LMS) Local Area Network ( LAN) Biometric device setup Server arrangements Smart card printing for students
Liberty – Softlink Asia Pvt Ltd, Haryana The library management system consists of
the Circulation , Acquisitions, serials , cataloguing, Borrower, Lending rules etc..
SQL Server Database for Liberty Importing of borrower data and Data
resources available in the library
The library management system server works on the SQL Database
The LMS server IP assigned as 198.168.1.2 The operations are done through the local
host machine
Tagging Process Enabling / writing the accession number on the tag ( Ex: J00000,
J00001) Made the excel data according to the
accession number for the respective books.
Wavex Technologies pvt Ltd – Singapore
RFID Reader with Pad RFID Security gate Thermal slip printer Handheld reader
Used for the Library automation process, OPAC ( Online Public Access Catalogue) and Storage purpose
IBM System x3400 M3 server with 64 bit operating system
Windows server 2008 R2 with OEM License
Setting up the shift timing, leave setup, Shift rotation master, etc.
Enrollment of employee details Attendance entry, OT, etc Standard report viewing Report design in desired format Reader operations
90% Payment released against material delivery and submission of Performance bank guarantee