Exemplifying achievement in the following areas:
47%Energy Savings
32%Water Savings
Less EmbodiedEnergy in Materials
39%
107.20 tCO₂/year
95.04 tCO₂/year
Operational CO₂ Emissions
Operational CO₂ Savings
THIS CERTIFIES THAT Administrative Building Offices
HAS ACHIEVED AN EDGE CERTIFICATE
CERTIFICATE NUMBER LP7-GHA-19011010057126
DEVELOPED BY MPS
CERTIFIED BY thinkstep-SGS
Thomas Saunders, EDGE Program Director DATE OF ISSUE: 28-JUN-2019
ENERGY MEASURESReduced Window to Wall RatioReflective Paint/Tiles for RoofInsulation of RoofVariable Speed Drives PumpsEnergy-Saving Light Bulbs - Internal SpacesEnergy-Saving Light Bulbs - External SpacesLighting Controls for Corridors and StaircasesOccupancy Sensors in Open Offices
WATER MEASURESLow-Flow Faucets in BathroomsDual Flush for Water Closets in BathroomsWater-Efficient Urinals in all Bathrooms
MATERIALSFloor Slabs - In-Situ Reinforced Concrete SlabRoof Construction - Steel (Zinc or Galvanised Iron) Sheets on Steel RaftersExternal Walls - Solid Dense Concrete BlocksInternal Walls - Solid Dense Concrete Blocks
THIS CERTIFIES THATAdministrative Building OfficesTema Port Project P.O. Box TT240Tema,
28-JUN-2019DATE OF ISSUE
thinkstep-SGSCERTIFIED BY
EDGE Software Version: v2.1.5Paul OcranWAS AUDITED BY
LP7-GHA-19011010057126CERTIFICATE NUMBER
EDGE CERTIFICATEHAS ACHIEVED AN
MPSDEVELOPED BY
Ghana
Thomas Saunders, EDGE Program Director
www.edgebuildings.comEDGE is a registered trademark of IFC. ©IFC 2019The EDGE standard requires 20% efficiencies in energy, water and materials compared to a local benchmark. Predicted efficiencies are not a guarantee of future operational performance. Energy savings may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Virtual energy does not contribute savings to utility bills.
This certificate is issued by the Certifier based on information provided by the client and the audit by the Auditor, and is subject to the terms and conditions of the Certifier. Contact [email protected] if the above measures are not consistent with your observation on the project.