Comfort and Energy Improvements at Powdered Beverage Manufacturing Site

TRANSCRIPT

Page 1: EECO2 Case Study - Comfort and Energy Improvements at Powdered Beverage Manufacturing Site

EECO2 Case Study

Comfort and EnergyImprovements at PowderedBeverage Manufacturing Site

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

Page 2: EECO2 Case Study - Comfort and Energy Improvements at Powdered Beverage Manufacturing Site

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

Client: Global Consumer Beverage Manufacturer

Location: India

Sector: Food and Beverage

Page 3: EECO2 Case Study - Comfort and Energy Improvements at Powdered Beverage Manufacturing Site

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

About the Project:

Sector:

Food & Beverage

Brief:

Reduce dehumidification energy demand without compromising operator working conditions and product quality.

Page 4: EECO2 Case Study - Comfort and Energy Improvements at Powdered Beverage Manufacturing Site

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

Project Challenge:

Client was experiencing high HVAC energy demand driven by original design in order to meet Product critical relative humidity conditions during summer months.

Solution:EECO2 worked with the site team as part of an EnergyIntervention event to understand the issues in detail.This approach led to key recommendations to improveworkplace conditions in addition to energy reductionopportunities, as highlighted below;

1. Achieve dehumidification with chilled water coil asopposed to desiccant wheel with steam recharge,avoiding significant replacement capital costs

2. Rebalance HVAC system and reduce air change ratesin spreading, scraping and grinding areas

3 Reconfigure airflow and pressurisation regime, usingexisting plant, to reducing working temperatures inrack cooling areas

4 Improved filtration strategy to reduce pressure dropand fan energy consumption

Page 5: EECO2 Case Study - Comfort and Energy Improvements at Powdered Beverage Manufacturing Site

Benefits:

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

The client immediately saw the benefit of the proposed solutions because the site team were engaged in the process, alongside the EECO2 engineering team, they felt confident enough to begin project implementationimmediately, scheduled for completion in 2015.

Conclusion:

Page 6: EECO2 Case Study - Comfort and Energy Improvements at Powdered Beverage Manufacturing Site

Contact Details:

General Enquiries & SalesTel: +44 (0) 1625 660 717Email: [email protected]

Technical SupportTel: +44 (0) 1625 660 717Email: [email protected] EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JN

Connect with us:

Follow us on Linkedin

Like us on Facebook

Follow us on Twitter

Add us on Google Plus