EE/CS 481 Spring 2008

104/20/23 05:04 AMUniversity of Portland School of Engineering

Project ChitwoodeNVy

TeamWill Dana

Mike Dillon

John Guptill

AdvisorDr. Van De Grift

Industry RepresentativeMs. Lynnette Nguyen

Page 2: EE/CS 481 Spring 2008 110/28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill

EE/CS 481 Spring 2008

2University of Portland School of Engineering

Overview

• Introduction

• Scorecard

• Additional Accomplishments

• Plans

• Issues/Concerns

• Conclusions

Page 3: EE/CS 481 Spring 2008 110/28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill

EE/CS 481 Spring 2008

3University of Portland School of Engineering

Introduction

• Network Visualization tool to view both network topology and traffic patterns

• Sensors capture data and send to user

Page 4: EE/CS 481 Spring 2008 110/28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill

EE/CS 481 Spring 2008

4University of Portland School of Engineering

Scorecard

• TSP completed and functions on its own• Traffic Generators used for testing this

• TSP able to detect 4 virtual machines

• Tested integration of UIS and TSP back ends

• Able to successfully see traffic passing to a single node from Google

Page 5: EE/CS 481 Spring 2008 110/28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill

EE/CS 481 Spring 2008

5University of Portland School of Engineering

Additional Accomplishments

• Built testing server• 2 NICs and 5 virtual machines

• Good team-instructor meeting

• Network Topology Screen and Traffic Histogram Screen on their way to being completed

Page 6: EE/CS 481 Spring 2008 110/28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill

EE/CS 481 Spring 2008

6University of Portland School of Engineering

Plans

• Start working on integration of the final components

• Finish up the GUI frontends

• Tie GUI to the backend

• Continue testing project

Page 7: EE/CS 481 Spring 2008 110/28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill

EE/CS 481 Spring 2008

7University of Portland School of Engineering

MilestonesNumber Description Target Date Completed Date

11 Theory of Operations Version .9 11/28/2008 11/28/08

12 UIS Back End: Gather/Process Data From Sensors 1/16/09 1/16/09

13 UIS Front End: Traffic Summary 1/16/09 1/16/09

14 Theory of Operations Version .95 1/19/09 1/19/09

15 Testing of Processing Data From Sensors 1/23/2009 1/30/09

16 Theory of Operations Version 1.0 1/30/2009 2/3/09

17 UIS Front End: Traffic Histogram 2/6/09

18 Integrate Traffic Sensor and UIS 2/13/2009 2/12/09

19 UIS Front End: Traffic Topology 2/20/09

20 Traffic Generator 2/20/09 1/30/09

21 Test Entire Application 2/27/2009

22 Bug Fixes 3/13/2009

23 User Tests 3/20/2009

24 Demonstration to Advisors 3/27/2009

25 Founder's Day Presentation Demo 4/3/2009

26 Founder's Day Presentation 4/7/2009

27 Final Report Version .9 4/10/2009

28 Final Report Version .95 4/17/2009

29 Final Report Version 1.0 4/24/2009

Page 8: EE/CS 481 Spring 2008 110/28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill

EE/CS 481 Spring 2008

8University of Portland School of Engineering

Concerns/Issues• GUI

• Java graphics packages are not as flexible as previously hoped

• Resorting to custom coded controls is eating up time

• Both deadlines for both major screens missed

• Integration• Some of it done, still worried about bringing

together the GUI with the rest of functioning system

• Time commitments• Each team member has very loaded schedules

Page 9: EE/CS 481 Spring 2008 110/28/2015 1:18:59 PM University of Portland School of Engineering Project Chitwood eNVy Team Will Dana Mike Dillon John Guptill

EE/CS 481 Spring 2008

9University of Portland School of Engineering

Conclusions• Things are going well

• The heart of eNVy (packet capturing and filtering) done and working

• The soul of eNVy (GUI) still under development, but we have a month of buffer time to get it done

• We will have it done by Founder’s Day

• Design is solid and other than the missed GUI deadlines, we’re on schedule

• Any Questions?