Page 1: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Mechanical Energy Workshop

Efficiency Offerings to Apply for

Page 2: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Thank You

2

Our Hosting Partners: National Grid and Atlas Copco

Gold Sponsor

APA HVAC Technologies - Manufacturer Rep for ABB Variable Speed

Drives

Rhode Island Commerce Corporation

Page 3: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Safety Moment

3

Spring is around the corner. Don’t gamble with your safety – if you’re a professional excavator or homeowner, smart digging always requires a call to 811.

Page 4: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Presenters

Jeffrey Boutwell – Atlas Copco

Sales Engineer

[email protected]

Jeffrey Dunham – National Grid

Commercial Sales Representative (RI)

[email protected]

Keith Miller – National Grid

Channel Sales Representative (MA, RI – Mechanical)

[email protected]

Jeffrey Hall – Delta Electro Power

Energy Efficiency Group

[email protected]

4

Page 5: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

5

Serving You Sustainably

Close, long-term customer

relationships

Better solutions to reduce

operational cost and increase

up-time

Responsive support anywhere

and anytime

Reduce wasted air usage

Atlas Copco helps customers increase productivity and

stay ahead of competition by providing:

Page 6: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Atlas Copco Is Committed

Partners in Sustainable Productivity

6

Page 7: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Experience Counts

7

Supporting a wide variety of industries

Page 8: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Why Do a Leak Survey and

Flow Study?

Eliminate air leaks

Reduce wasted air usage

Set the foundation for sizing your compressed air

system correctly

Reduce energy usage

Secure incentives from National Grid

Low overall operating cost

Provides a supply-side audit

8

Page 9: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Performance Comparison

9

Performance ComparisonTotal KW Input -vs- Capacity

0

10

20

30

40

50

60

70

80

90

100

0 10 20 30 40 50 60 70 80 90 100

A) Modulation Control

B) Active Rotor Length Adj.

C) Full Load / No Load

D) VSD

A

B

C

D

Page 10: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Part Load Performance

10

Part Load Performance of Various Regulation Types

Modulation Rotor Length Full Load / VSD

Control Adjustment No Load

% Capacity % Bhp % Bhp % Bhp % Input kW

100 100 100 100 100

90 97 93 92.5 90

80 94 85 85 80

70 91 78 77.5 70

60 88 72 70 61

50 85 67 62.5 53

40 82 64 55 43.5

30 79 55 47.5 35

20 76 45 40 26

10 73 35 32.5 --

0 70 25 25 --

Page 11: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

They are currently spending $121,665 / year to generate

compressed air

We identified 72 leaks with an estimated demand of 216 cfm (a

50hp running to handle leaks only)

11

When a world class jewelry manufacturer wanted to

reduce cost and improve compressed efficiency, they did

an audit.

Case Study

Reduced Cost from Fixing Leaks:$22,531

Reduced Cost from Replacing

Modulating Compressor with a New VSD$35,100

Page 12: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Process in Action:

Success with Bradford Soap, RI

12

Application:

• Drying product

Existing Equipment:

• (1) Quincy QSVI-50 (50hp)

• (1) Old backup pump

Process Information:

• 24-27”HgV operation

• Intermittent batch process

• Pump operates 24/7

Atlas Copco Solution:

• V-box to initiate savings discussion

• Purchased (1) 40hp GHS1600VSD+

• Set-point Control at 22”HgV

Estimated Savings:nearly $20K/year

Utility Incentive:$21K – 45% of project

Page 13: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Break

Questions & Answers

Page 14: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

What is an Energy Efficiency Program?

National Grid offers financial incentives to customers who purchase

and install qualified energy efficiency equipment that meets

established program requirements for high efficient energy saving

equipment.

Eligible customers must be located in a National Grid service

territory in Massachusetts, New York or Rhode Island. Customers

who receive a National Grid electric or gas bill are qualified to

participate in a variety of programs.

Participants receive a financial incentive that assists the customer

in recovering the higher incremental cost for purchasing more

efficient products.

All customers contribute to this Energy Efficiency fund through a

surcharge on their utility bill.

14

Page 15: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Energy Incentives to Apply For

Lighting

Compressed Air

Custom – Electric and/or Gas

15

Page 16: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

National Grid Service Territory

Electricity: 3.3 million customers (MA, RI, NY)

Natural gas: 3.4 million customers (MA, RI, NY)16

Page 17: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Electric Program Categories

New Construction/Major Renovation and Replacing

Failed Equipment

Large Commercial Retrofit Program

Multi Family Buildings Program (MA - 5 or more

dwelling units)

17

Page 18: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

New Construction/ Major Renovation

and Replacing Failed Equipment

18

Lighting

Lighting Controls

Variable Speed Drives

(VSD/VFDs)

Engineering Services

Chillers

Custom Applications

Variable Speed Air

Compressors

Zero-Loss Condensate

Drains

Low Pressure Drip Filters

Engineered Air Nozzles

Air Storage Incentives

Refrigerated Dryers

Electric Incentives Compressed Air Measures

Page 19: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Large Commercial Retrofit Program

19

Pay for Performance Retro Commissioning

Energy Management Systems

Engineering Services

Variable Speed Drives and Motors

Lighting Systems and Controls

Vending Misers

Custom Applications

Electric Incentives

Page 20: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

National Grid Gas Program

Opportunities: New Construction/Retrofit

20

Automatic Boiler Controls

Wi-Fi Thermostats

Condensing Water Heater

Condensing Boilers/ High-Efficiency Boiler Heads

Insulation

Infrared Heaters

Steam Traps

Furnaces

Heating/ Water Heating

Page 21: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Why Do Energy Efficiency?

Increases value of your property

Improve manufacturing efficiencies

Lowers energy bills

Reduces maintenance costs

Creates a better work environment for employees

Enhances a building or company image

Increased reliability of equipment

21

Page 22: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Qualifying a Large

Commercial / Industrial Client

Is the customer a National Grid commercial/industrial account?

Is the product being installed new?

Only new products qualify.

Does the product meet all qualifying conditions?

Delta Electro Power (Delta) will coordinate with your National Grid

account representative to determine if products qualify, and to

make sure proper application is completed.

Delta will assist to complete application in its entirety and submit all

relevant documentation as listed on the application.

Upon application approval, National Grid will provide a commitment

letter for the amount of incentive and any qualifying conditions that

need to be met to be qualified.

22

Page 23: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Variable Speed Drives Audit & Review

Variable Speed Drives eliminate the losses and costs of throttling

devices, allowing for reduced power consumption and improved

energy factor.

Audit/Application Process:

Delta performs site review to assess Variable Speed Drive applications

that do not currently exist

National Grid reviews audit and verifies that motor or replacement motor

and drives meet program requirements

Hours of operation meet minimum requirements (>2000 hours)

National Grid calculates performance and savings (before offering

customer commitment)

23

Page 24: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Case Study

VFD – Large Condo Complex

Installed VFDs and Controls at a large condo complex with two 75 HP

primary loop pumps.

Supplied and installed new VFDs with bypass.

Tied in differential pressure controls to the new VFD to allow the VFD to

control the differential pressure in the system that is now regulated with a

bypass valve

24

$29,016 installation cost of VFDs and controls on both pumps

$18,000 National Grid Incentive

$14,859 Annual Energy Savings

$ 11,016 / $ $14,859 = 0.74 Year Payback

$222,885 reduction in operating costs

over the expected lifetime of the equipment

Page 25: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

25

Case Study

Lighting – Manufacturing Facility and Offices

Total Project Cost

$331,588

Estimated National

Grid Incentive

$149,215

Net Cost to Customer

$182,373

Annual Fixture

Maintenance Savings

$1,653

Annual Electric Cost

Savings

$92,162

Simple Payback in

Years

1.94

Page 26: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Compressed Air Leak Survey /

Supply-Side Audit

An air leak survey will establish the size of a leak and the amount of

benefit which can be realized by repairing the leak. Repairing leaks

will allow customers to achieve lower operating costs. Costs will be

shared for the repair.

Audit/Air Leak Survey Requirements and steps for authorization:

Delta/Atlas Copco submits a proposal for air leak study to National Grid

Delta details scope of work and type of metering equipment to perform

evaluation.

Delta provides a written report identifying system leaks and benefits that

can be realized by repairing leaks.

26

Page 27: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Air Leak Process & Responsibility

27

Provide a complete leak survey and system

technical review at no charge.

Offer financial assistance in installing

permanent metering of compressed air

system energy consumption.

Recommend for low cost O&M

improvements.

Cover up to 45% of all costs for leak repair

or other low cost O&M improvements.

Assist with other items, e.g. a follow-up

system assessment, staff training,

permanent metering or purchase of leak

detection equipment for customer use.

Pays 100% of the survey fee as long as

80% of the leaks are identified in the report.

National Grid will… The participating customer will…

Issue initial Purchase Order for leak survey

and metering costs. NGRID will reimburse

customer following leak repairs.

Pay up to 55% of costs of costs for leak

repair or other O&M improvements.

Repair identified compressed air leaks

within 90 days of system survey.

Provide periodic air system operating data

to National Grid or designated service

providers.

Implement an on-going leak detection and

repair program within the facility.

Page 28: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Case Study

A manufacturing facility needed a energy-efficient replacement for

their compressed air system.

Reviewed air system performance.

Installed high efficiency air compressor with VSD motor and dryer.

28

$197,348 total project cost

$78,878 Utility Incentive

273,974 kWh Annual Electric Savings

$33,808 Annual Cost Savings

2,215 Tons of Carbon Reduction

3.5 year payback with incentive included

Page 29: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Custom Study

National Grid can provide a technical consultant to assist vendors in

the review and estimation of energy savings that can be achieved by

installing efficient products when requested. Qualifying studies have a

50/50 copay between the customer and National Grid.

Examples of custom studies:

Energy Recovery Ventilation

Complex lighting projects

Custom ventilation projects (lab or complex DCV systems)

Applications not covered by Prescriptive Applications

A National Grid sales person can assist with establishing any costs

that may be incurred from consulting services.

29

Page 30: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Case Study

Optimized energy efficiency using Energy Recovery Ventilation (ERV),

high efficiency HVAC rooftop units, increased insulation, and optimal

lighting

30

A manufacturing warehouse expansion required design

enhancements to optimize energy efficiency.

38 tons of air-conditioning load reduction

1.2 million BTU/hour of heating load reduction

1.8 year payback on Energy Recovery

Page 31: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Useful Links

Massachusetts Electric Incentive Applications www.masssave.com/en/business/business-forms-documents

Rhode Island Electric Incentive Applications and Gas

Rebate Applicationswww.ngrid.com/ribus-ee

Massachusetts Gas Rebate Applicationswww.gasnetworks.com

31

Page 32: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

Break

Questions & Answers

Page 33: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

33

ATC – Automatic Temperature Controls ECI – Energy Conservation Inc.

True Strategic Partners – working closely together daily for many years.

Three privately owned small businesses with a combined staff of 75

professionals with more than 100 years combined corporate experience.

Thousands of energy efficiency measures installed.

Every National-Grid-incentivized measure of any size or scope can be

evaluated, audited, designed, engineered, supplied, and installed by our

team.

Perform all energy engineering and savings calculations as well as

application submittal to National Grid.

One point of contact, one bill (if desired).

One Team – Every Solution

Page 34: Efficiency Offerings to Apply for€¦ · • (1) Quincy QSVI-50 (50hp) • (1) Old backup pump Process Information: • 24-27”HgV operation • Intermittent batch process • Pump

34

Thank You!