EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project John Bally CAWCR

Upload: jun

Post on 05-Feb-2016

41 views

Category:

Documents


0 download

DESCRIPTION

EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project. John Bally CAWCR. Beijing ‘08. WMO >> WWRP >> FDP Implement nowcasting science and systems for the Olympics Provide an enhanced weather service Technology transfer and training Quantify the benefits. Olympics. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

EGOWS 2008

The Beijing 2008 Nowcasting Forecast Demonstration Project

John BallyCAWCR

Page 2: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08

• WMO >> WWRP >> FDP

• Implement nowcasting science and systems for the Olympics

• Provide an enhanced weather service

• Technology transfer and training

• Quantify the benefits

Page 3: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Daily probability of rainfall in Beijing from August 1 to September 30

Olympics Paralympics

Page 4: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Vulnerabilities

Page 5: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Enhanced data collection.....

Page 6: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Many systems will be in Beijing...

BJANC (BMB&NCAR)

CARDS (MSC)

GRAPES-SWIFT (CMA)

MAPLE (McGill & WDT),

NIWOT (NCAR)

STEPS (CAWCR)

SWIRLS (HKO)

TIFS (CAWCR)

Real Time Verification (CAWCR)

Socio Economic Impacts Assessment

(BMB)

Page 7: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Many Systems will be in Beijing.....

Page 8: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 How will we use so many systems?

Page 9: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08Which system is best ?

Real Time Forecast Verification

every 6 minutes

Page 10: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Web Page display for forecasters

Page 11: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Concentrate on some big risks….

High Impact Weather

Observed Frequency

Precipitation 35 %

Thunderstorm 25 %

Heavy Rain 6.5 %

Page 12: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08To make probability of flash floods

start with the rain already on the ground...

Page 13: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Look at the STEPS forecast...

Page 14: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 And any other good forecasts you can get ... this one’s from the Hong Kong “SWIRLS” system

Page 15: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 And do the stats on the ensemble to get the probability of hitting a threshold, given the obs rain..

..... Export the threat polygons to VIPS..

Page 16: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Rainstorm Warning Products issued by Chinese forecasters using realtime FDP information

Page 17: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Start with the TIFS interface…. single radar, single track-set TS Warning generation.....

Page 18: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Thunderstorm strike probability

Histogram of storm detections wrt forecast (normalizedspeed and direction). after Dance, Ebert, Scurrah

Page 19: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Mathematics

where (x, θ is a point in polar coordinates, t is forecast time, V is speed, σv is speed standard deviation, σ θ direction standard deviation. after Dance, Ebert, Scurrah

=

PDF that thunderstorm centre is over a point, based on Gaussian distribution in polar coordinates.

Page 20: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Strike probability field (with contours) for storm over 1 hour (black = 1, white = 0)

Page 21: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Ensemble strike probability calculated in TIFS... Automated and Manual versions.....

..... Export the threat polygons to VIPS..

Page 22: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 But not before the expert forecaster adjusts the nowcast....

Page 23: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 During the adjustment ....

Page 24: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 After adjustment ....

Page 25: EGOWS 2008 The Beijing 2008 Nowcasting Forecast Demonstration Project

Beijing ‘08 Thunderstorm and lightning threat products issued by Chinese forecasters using realtime FDP information