EGSE CENTRIC PLAN FOR TWO TOWER TESTS

IN ACCORDANCE WITH MEETING HELD 02 MAR 2005

REVISED 22 MAR 2005

Page 2: EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005

MEETING HELD 02-MAR-2005

• ATTENDEES– SYSTEM ENGINEERING REPRESENTATIVE P. HASCALL– ELX REPRENTATIVE M. HUFFER– MECH SYS REPRESETATIVE M. NORDBY– I&T REPRESENTATIVES

• E. Bloom• K. Fouts• B. Grist• E. do Couto• G. Godfrey• L. Wai• R. Claus• B. Horwitz

Page 3: EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005

TEST AS YOU FLY

• ALL CABLES INSIDE LAT TO BE FLIGHT LENGTH AND MATERIALS– USE OF FLIGHT CABLES TBD BY DEL. SCHED.– INSTALL PER FLIGHT ROUTING WITHOUT CABLE TRAYS

• CABLES PASSING OUT OF LAT WILL GO THROUGH FLIGHT INTERFACE AT LAT SHIELD– LAT SHIELD WILL BE SIMULATED BY METAL PANELS,

ATTACHED LIKE FLIGHT PANELS (or as close as we can)– CABLES WILL ROUTE ALONG GPR, TO A CABLE WRAP AT

DRIVE SHAFT/SUPPORT– CABLES OUTSIDE LAT WILL BE LONGER THAN FLIGHT,

MAYBE SIMILAR IN LENGTH TO ANOTHER TEST CASE

Page 4: EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005

DESIRED FEATURES

• INSTALL INTO AN ODD AND AN EVEN BAY– M. HUFFER HAS TILL 8 MAR TO REQUEST THIS– OTHERWISE, INSTALL INTO BAY 0,4 IAW PLAN (676)

• TEST EQUIPMENT LOCATED ON TEST STAND– THERE ARE OPEN SPACES IN STAND– SPACES WILL BE FILLED WITH STAND ELECTRONICS

• If these electronics are not installed, then test EGSE can be located there

• Access to motor shafts would be blocked by test EGSE

Page 5: EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005

TWO TOWER BLOCK DIAGRAM

BPULAT-DS-02104

19” RACK

LAT SHIELD INTERFACE

-X 115 V 30A

TWR-A

TWR-B

PDUGASU

LAT

-DS

-02106

LAT

-DS

-02106

LAT

-DS

-02095

LAT

-DS

-02095

JS1

JS1

J1

J1

LAT-DS-02103

LAT-DS-02103 LAT-DS-02096 Flt Length

Dip Switch Board

Sim. To LAT-DS-02105Length = short stub

JL7

JL8

JL3

JL41

JL40

JL50 - JL65JL13-JL28

JL5

J6

JL49

P

S

P

P P

P

P

P

P

P

S

S

S

S

S

SS

S

S

S

S

P

P

P

P

S

S

S

P

P

PS

Length 51” max

Length 20” max

Length 34” max

JL4S

P

JL-153

LAT SHIELD INTERFACE

+X

LAT-DS-02863Flight Length

Manual SWPri to Red

JL69

JL39

GASU Test BoxPS for GTB

PS for marginCLOCK for margin

Test CrateVSC

LAT-DS-02882Flight Length

PS

PS

UPS

UPS

19” RACK

115 V 15A

Page 6: EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005

WHAT WE ALREADY HAVE

• I&T HAS THE FOLLOWING– THREE LAT PS (AGILENT 6032)– CABLES

• 2103, 2 ea. GIVEN TO ELX

• 2105, 2 ea. (not required now)• 2106, 2 ea. (max length, may not be correct for our bays) GIVEN TO ELX

• 2095, 2 ea. (max length, may not be correct for our bays) GIVEN TO ELX

• 2104, 54” long (may not match the flight cable)• 100 pin connectors for 2 more 2104 cables

– I think they can be used for 2863 cables

• Connectors\backshells for 16 cable savers for 2095 (in case cables are flight)– In assembly

• Connectors\backshells for 16 cable savers for 2106 (in case cables are flight)– Conns. due 3/16, Backshells 4/7

• BPU ALMOST COMPLETE IN ELX LAB– NEED IT’S SCHEMATIC AND THE LIST OF INPUTS AND OUTPUTS– KILL SWITCH IMPLENTATION IS VIA THE AGILENT POWER SUPPLY

• I&T to implement on rack and in RM 102

Page 7: EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005

SHORTAGES / RESPONSIBILITY• CABLES

– 2096, 2 ea. – BPU to LAT, 2 ea.– 2105 / Dip Switch Panel– 2882– Test box to JL-39– 2863– Test crate to JL-69 (sim. To 2104)

• UPS, 2 EA. ($80 EA. TO MOD. EXISTING UNITS, $2,000 EA. NEW)

• 30 A SERVICE, POWER CABLES• 19” RACK, 2 EA. ($300 EA.)• RACK MOUNTED VME CRATE, 2 EA.• CONNECTOR MOUNTING PANELS• GASU AND PDU MOUNTS• CABLES WITHIN VSC TEST RACK

• ELX

• DONE I&T

• DONE I&T• DONE I&T• ELX• SEE PG 9• SEE PG 9• ELX

Page 8: EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005

MISC ITEMS FOR I&T TO PROVIDE

• CABLE FASTENING TO GPR– USE TIE DOWN POINTS THAT ARE FLIGHT APPROVED

• Is this a special order?– DETERMINE CABLE LENGTHS OUTSIDE LAT SHIELD

• Include cable wrap• Contacted Steve Score today, will follow up.

• REMOTE CONTROL OF LAT PS (2)– WITH OUR MOVE INTO RM 102, THE PS MUST BE REMOTELY

CONTROLLED• Parts cost of $2,000• Purchased hardware. I think that basic controls will be done via

command line. It would be better to have someone write some command scripts so we can control usage.

• CABLES WITHIN BPU/PS RACK– Need ELX schematic for BPU. Think just wires and lugs, not certain,

have to check with Jim MacDonald. This should be provided as part of the BPU design (ICD).

Page 9: EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005

EGSE MOUNTING / HARDWARE

• CONNECTOR MOUNTING PANELS – design and drawings done by Mechanical systems (ready now); fabrication and fit up is responsibility of I&T (Eliazar)

• GASU AND PDU MOUNTS– design and drawings done by Mechanical systems (ready now); fabrication and fit up is responsibility of I&T (Eliazar)

Page 10: EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005

SUPPLIED BY ELX GROUP

BPU

28 VdcPOWER SUPPLY

AGILENT 6032

28 VdcPOWER SUPPLY

AGILENT 6032

GPIB TO E-NET CONVERTER

UPS & BATTERY

UPS & BATTERY

AC

AC

110 V @ 30 A

110 V @ 30 A

LAT POWER RACK BLOCK DIAGRAM

DAQ PRIMARY

SIU /HEATER

WORKSTATION W/TERA TERM

Page 11: EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005

TEST RACK (EVENTUALLY VSC RACK)

• GASU TEST BOX (GTB)– PERMITS EXT / INT CLOCK SELECTION

• Provides input for external clock (clock is doubled ie: 44 MHz input for 22 MHz system operation)

– PERMITS VOLTAGE MONITORING FOR GASU• Provides connection for margining supply

– PERMITS EXT TRIGGER SOURCES• Should be able to route multiple sources via this capability

– Muon Telescope– Pulse generator

– HAS OTHER FEATURES WE MAY USE IN FUTURE– DOCUMENTATION TO BE DELIVERED BY GREGG THAYER

• Interface cabling to be furnished by Gregg and I

• POWER SUPPLY FOR GTB USE BK’s• POWER SUPPLY FOR MARGINING USE BK’s• CLOCK SOURCE FOR CLOCK MARGIN TESTS USE AGLNT

– ONLY HAVE ONE, MUST ORDER MORE