ehs overview share
TRANSCRIPT
-
7/21/2019 EHS Overview Share
1/214
Clause ISO14001 Clause4.1General Requirements 4.1
4.2Environmental Policy 4.2
4.3 Planning
4.3
4.3.1 Environmental Aspects 4.3.1
4.3.2 Legal and other requirements 4.3.2
4.3.3 Objectives, Targets & Programme(s) 4.3.3
4.4 Implementation And Operation 4.44.4.1 Resources, roles, responsibility and authority 4.4.1
4.4.2 Competence, Training and Awareness 4.4.2
4.4.3 Communication 4.4.3
4.4.3.1
4.4.3.2
4.4.4 Documentation 4.4.4
4.4.5 Control of Documents 4.4.5
4.4.6 Operational control 4.4.6
4.4.7 Emergency preparedness and response 4.4.7
4.5 Checking 4.5
4.5.1 Monitoring and measurement 4.5.1
4.5.2 Evaluation Of Compliance 4.5.24.5.3 Nonconformity, corrective action and preventive
action
4.5.3
4.5.3.1
4.5.3.2
4.5.4 Control of Records 4.5.4
4.5.5 Internal Audit 4.5.5
4.6 Management Review 4.6
-
7/21/2019 EHS Overview Share
2/214
OHSAS18001 ClauseGeneral Requirements 3.1OHS Policy 3.1.1
Planning
3.1.2
Hazard identification, risk assessment and
determining controls
3.2
Legal and other requirements 3.2.1
Objectives and programs 3.2.2
3.2.3
Implementation and operation 3.2.4
Resources, roles,responsibility,accountability
and authority
3.3
3.3.1
3.3.2
Competence, training and awareness 3.3.3
Communication, participation and consultation 3.3.4
Communication 3.4
Participation and consultation
3.4.1
3.4.2
Documentation 3.4.3
Control of documents 3.4.4
Operational Control 3.5Emergency preparedness and response 3.5.1
Checking 3.5.2
Performance measure and monitoring
Evaluation of compliance 3.3.4.3Incident investigation, nonconformity, corrective
action and preventive action
Incident investigation
Nonconformity, corrective action and preventive
action
Control of record
Internal audit
Management Review
-
7/21/2019 EHS Overview Share
3/214
OHSMS 1722
Policy
Occupational safety and health policy
Employee participation
OrganisingResponsibility and accountability
Competence and training
OSH MS documentation
Communication
Planning and implementationInitial review
System planning, development and implementation
OSH objective
Hazard prevention
Evaluation
Performance monitoring and measure
Investigation of work related injuries, disabilities, ill
health, disease and near misses, and their impact on
safety and health performance
Audit
Management review
Action for improvementPreventive and corrective action
Continual improvement
Emergency prevention, preparedness and response
-
7/21/2019 EHS Overview Share
4/214
Eliminate
Substitute
Isolate
Engineering
control
Admin
Control
PPE
Substitute
Eliminate
4 S0 F2
4 S0 F2
Risk Rating Consequence
LikelihoodSTATUS DUE PIC
ontrol Measur
Risk Assessment
Dept: C Prepared by: Date: 06.07.1 Rev: 1
-
7/21/2019 EHS Overview Share
5/214
Isolate
Engineering
control
AdminControl
PPE
Substitute
Isolate
Engineering
control
AdminControl
PPE
Eliminate
4 S0 F2
-
7/21/2019 EHS Overview Share
6/214
Substitute
Isolate
Engineering
control
Admin
Control
PPE
Eliminate
Substitute
Isolate
Engineering
control
Admin
Control
PPE
4 S0 F2
Eliminate
4 S0 F2
-
7/21/2019 EHS Overview Share
7/214
Substitute
Isolate
Engineering
control
AdminControl
PPE
SubstituteIsolate
Engineering
control
Admin
Control
Eliminate
4 S0 F2
F2
Eliminate
4 S0
-
7/21/2019 EHS Overview Share
8/214
PPE
Substitute
Isolate
Engineering
control
Admin
Control
PPE
Eliminate4 S0 F2
-
7/21/2019 EHS Overview Share
9/214
Substitute
Isolate
Engineering
controlAdmin
Control
PPE
Substitute
Isolate
Engineering
control
F2
Eliminate
4 S0
Eliminate4 S0 F2
-
7/21/2019 EHS Overview Share
10/214
Admin
Control
PPE
Substitute
Isolate
Engineering
control
Admin
Control
PPE
Eliminate
4 S0 F2
-
7/21/2019 EHS Overview Share
11/214
Substitute
Isolate
Engineering
control
Admin
Control
PPE
Substitute
Isolate
Engineering
control
Admin
Control
Eliminate
4 S0 F2
Eliminate
4 S0 F2
-
7/21/2019 EHS Overview Share
12/214
PPE
Eliminate
Substitute
IsolateEngineering
control
Admin
Control
PPE
Substitute
Isolate
Engineering
control
Admin
Control
PPE
S0 F2
Eliminate
4 S0 F2
4
-
7/21/2019 EHS Overview Share
13/214
SubstituteIsolate
Engineering
control
Admin
Control
PPE
Substitute
Isolate
Engineering
control
Admin
Control
PPE
Eliminate
4 S0 F2
Eliminate4 S0 F2
-
7/21/2019 EHS Overview Share
14/214
SubstituteIsolate
Engineering
control
Admin
Control
PPE
Substitute
Isolate
Engineering
control
Admin
Control
PPE
Eliminate4 S0 F2
Eliminate 4 S0 F2
-
7/21/2019 EHS Overview Share
15/214
Substitute
Isolate
Engineering
control
Admin
Control
PPE
4 S0 F2
Eliminate
Substitute
Isolate
Engineering
control
Admin
Control
PPE
Substitute
F2
4 S0 F2
Eliminate
4 S0
Eliminate
4 S0 F2
-
7/21/2019 EHS Overview Share
16/214
Isolate
Engineering
control
Admin
ControlPPE
Substitute
Isolate
Engineering
control
Admin
Control
PPE
Eliminate
Eliminate4 S0 F2
-
7/21/2019 EHS Overview Share
17/214
Substitute
Isolate
Engineeringcontrol
Admin
Control
PPE
Substitute
Isolate
Engineeringcontrol
Admin
Control
PPE
Eliminate
Eliminate
4 S0 F2
4 S0 F2
-
7/21/2019 EHS Overview Share
18/214
Substitute
Isolate
Engineeringcontrol
Admin
Control
PPE
4 S0 F2
-
7/21/2019 EHS Overview Share
19/214
Hazard Identification
Station 1
- 26P
Connector
Riveting &
Housing
Assembly
Circuitbreaker
Physical
hazard:
Moving
object .
Station 2
- Main PCB
Clinching
Use 2 hands
safety
operation
switch
Safety
interlock
manual
handling,
repetitive
work (risk:
injurys to
fingers and
hands)
Existingcontrol
Hazard &Potential
Activity/
Product/
Services
HIRADC : Ha
-
7/21/2019 EHS Overview Share
20/214
Circuit
breaker - As
above
Risk: Hand
injury,
repetitive
work,
electricution
Station 3
Safety
interlock
manual
handling,
repetitive
work (risk:
injurys to
fingers and
hands)
-
7/21/2019 EHS Overview Share
21/214
Circuit
breaker - As
above
- Housing
Frame
Screwing
Station 4
Circuit
breaker - As
above
- PCB Visual
Inspection
Station 5
- Flash
Programmin
g
Circuit
breaker
Splicing tool
secure/setup
station
expose to
electrical
energy
(Risk=lelectri
cal
burn/electroc
ution)
Safety
interlock
manual
handling,
repetitive
work (risk:injurys to
fingers and
hands)
-
7/21/2019 EHS Overview Share
22/214
Station 6
Circuit
breaker - As
above
- Finetune
alignment
Station 7
Safety
interlocksharp object
(risk:injury to
fingers and
hands),
physical
injury
Splicing tool
secure/setup
station
expose to
electrical
energy
(Risk=lelectri
cal
burn/electroc
ution)
-
7/21/2019 EHS Overview Share
23/214
- Mechanism
to radio
assembly
Circuitbreaker - As
above
Station 8
Circuit
breaker - Asabove
- Bracket to
MechanismScrewing
Station 9manual
handling,rep
etitive work
(risk: injurys
to fingers
and hands)
manual
handling,
repetitive
work (risk:
injurys to
fingers and
hands)
Safety
interlock
-
7/21/2019 EHS Overview Share
24/214
Circuit
breaker - As
above
- Bottom
Cover
Screwing
Station 10Safety
interlock
sharp object
(risk:injury to
fingers and
hands),
physical
injury
Safety
interlock
-
7/21/2019 EHS Overview Share
25/214
- Mechanism
to radio
assembly
andinspection
Station 11
Circuit
breaker - As
above
- Mechanism
to radio
screwing
Station 12
Safety
interlockrepetitive
work, manual
handling,
electricution
-
7/21/2019 EHS Overview Share
26/214
Circuit
breaker - As
above
- Front Cover
to radio
assembly
Station 13
Safety
interlock
manual
handling
manual
handling,
repetitive
work (risk:
injurys to
fingers and
hands)
Safety
interlock
-
7/21/2019 EHS Overview Share
27/214
- Top Cover
assembly
Station 14
Circuit
breaker - As
above
- Top Cover
screwing
Station 15Splicing tool
secure/setup
station
expose to
electrical
energy
(Risk=lelectri
cal
burn/electroc
ution)
Use 2 handssafety
operation
switch
Using
engineering
board for
setup
manual
handling,
repetative
work,
chemicalsubs material
(glue)
-
7/21/2019 EHS Overview Share
28/214
Circuit
breaker - As
above
- Holding
Spring
screwing
Station 16
Circuit
breaker - As
above
- Finetune
alignment
Station 17Splicing tool
secure/setup
station
expose to
electrical
energy
(Risk=lelectri
cal
burn/electroc
ution)
Splicing tool
secure/setup
station
expose to
electrical
energy
(Risk=lelectri
cal
burn/electroc
ution)
-
7/21/2019 EHS Overview Share
29/214
Circuit
breaker - As
above
- Functional
check
Station 18
Circuit
breaker - As
above
- Functional
check
Station 19
manual
handling
Splicing tool
secure/setup
station
expose to
electrical
energy
(Risk=lelectri
cal
burn/electroc
ution)
-
7/21/2019 EHS Overview Share
30/214
Circuit
breaker - As
above
- Functional
check
Station 20
Safety
interlock
Suspended
Ear plug
expose to
electrical
energy
(Risk=lelectri
calburn/electroc
ution). Noise
Sound Room
Using
engineering
board forsetup
-
7/21/2019 EHS Overview Share
31/214
Circuit
breaker - As
above
- Sticker
Assembly
Station 21
- Visual
check
Station 22
repetitive
Safety
interlock
repetitive
work and
manual
handling,fall
object
-
7/21/2019 EHS Overview Share
32/214
- Default
setting
Station 23
- Frame
assembly
Station 24Physical
hazard:
ImproperConveyor
width setting
. Risk :
damage
board
Safety
interlock
repetitive
work and
manual
handling,fall
manual
handling,fall
interlock
-
7/21/2019 EHS Overview Share
33/214
- Packing
None
-
7/21/2019 EHS Overview Share
34/214
Use of
natural
resouces
(electricity)
Use of raw
material
(plastic
reel/bag)
Use of raw
material
(Glove)
Use of raw
material
(Finger coat)
Use of raw
material
(plastic
reel/bag)
Use of
naturalresouces
(electricity)
Picture
Input Amount/yr
ard Identification Risk Assessment and Determine ControlEnvironmental Aspect Impact Register
-
7/21/2019 EHS Overview Share
35/214
Use of raw
material
(Glove)
Use of raw
material
(Finger coat)
Use of raw
material
(plastic
reel/bag)
Use of raw
material
(Glove)
Use of raw
material
(Finger coat)
Use of
natural
resouces
(electricity)
-
7/21/2019 EHS Overview Share
36/214
Use of rawmaterial
(Glove)
Use of raw
material
(Finger coat)
Use of
natural
resouces
(electricity)
Use of raw
material
(Glove)
Use of rawmaterial
(Finger coat)
Use of
natural
resouces
(electricity)
-
7/21/2019 EHS Overview Share
37/214
Use of raw
material
(Glove)
Use of raw
material
(Finger coat)
Use of raw
material
(plastic
reel/bag)
Use of raw
material
(Glove)
Use of
natural
resouces
(electricity)
Use ofnatural
resouces
(electricity)
-
7/21/2019 EHS Overview Share
38/214
Use of raw
material
(Finger coat)
Use of raw
material
(plastic
reel/bag)
Use of raw
material
(Glove)
Use of raw
material
(Finger coat)
Use of
natural
resouces
(electricity)
-
7/21/2019 EHS Overview Share
39/214
Use of raw
material
(plastic
reel/bag)
Use of raw
material
(Glove)
Use of raw
material
(Finger coat)
Use of raw
material
(Glove)
Use of raw
material
(plastic
reel/bag)
Use of
naturalresouces
(electricity)
-
7/21/2019 EHS Overview Share
40/214
Use of raw
material
(Finger coat)
Use of
natural
resouces
(barcode reel
waste paper)
Use of raw
material
(plasticreel/bag)
Use of raw
material
(Glove)
Use of raw
material
(Finger coat)
Use of
natural
resouces
(electricity)
-
7/21/2019 EHS Overview Share
41/214
Use of raw
material
(plastic
reel/bag)
Use of rawmaterial
(Glove)
Use of raw
material
(Finger coat)
Use of raw
material
(plastic
reel/bag)
Use of raw
material
(Glove)
Use of
natural
resouces
(electricity)
Use of
natural
resouces
(electricity)
-
7/21/2019 EHS Overview Share
42/214
Use of raw
material
(Finger coat)
Use of raw
material(Glove)
Use of raw
material
(Finger coat)
Use of
natural
Resources
(electricity)
Use of
natural
resouces
(electricity)
-
7/21/2019 EHS Overview Share
43/214
Use of raw
material
(Glove)
Use of raw
material
(Finger coat)
Use of raw
material
(Glove)
Use of raw
material
(Finger coat)
Use of
natural
Resources
(electricity)
Use of
natural
Resources
(electricity)
-
7/21/2019 EHS Overview Share
44/214
Use of raw
material
(Glove)
Use of raw
material
(Finger coat)
Use of raw
material(Glove)
Use of raw
material
(Finger coat)
Use of
natural
resouces
(electricity)
-
7/21/2019 EHS Overview Share
45/214
-
7/21/2019 EHS Overview Share
46/214
Use of raw
material
(Finger coat)
Use of raw
material
(Glove)
Use of rawmaterial
(Finger coat)
Use of
natural
resouces
(electricity)
Use of
natural
resouces
(electricity)
-
7/21/2019 EHS Overview Share
47/214
Use of raw
material
(Glove)
Use of raw
material(Finger coat)
Use of
natural
resouces
(paper)
Use of raw
material(Glove)
Use of raw
material
(Finger coat)
Use of
natural
resouces
(electricity)
Use of
natural
resouces
(electricity)
-
7/21/2019 EHS Overview Share
48/214
Use of raw
material
(Glove)
Use of raw
material(Finger coat)
-
7/21/2019 EHS Overview Share
49/214
x x x
x x x
Waste
plasticreel/bag 0 x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
xx x
Normal Abnormal Emergency
Depletion Of
natural
resourcesOutput Amount/yr **Legal
Condition
-
7/21/2019 EHS Overview Share
50/214
Waste
plastic
reel/bag 0 x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
Waste
plastic
reel/bag 0 x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
-
7/21/2019 EHS Overview Share
51/214
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
xx x
-
7/21/2019 EHS Overview Share
52/214
x x x
Waste glove 52 pcs x x
x x x
Wasterubber 7300 pcs x x
x x xWaste
plastic
reel/bag 0 x x
x x x
Waste glove 52 pcs x x
x x x
xx x
-
7/21/2019 EHS Overview Share
53/214
-
7/21/2019 EHS Overview Share
54/214
x x x
Waste
plastic
reel/bag 0 x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
Wasteplastic
reel/bag 0 x x
x x x
Waste glove 52 pcs x x
xx x
x x x
-
7/21/2019 EHS Overview Share
55/214
x x x
Waste
rubber 7300 pcs x x
x x x
Waste paper
? x x
x x
Waste
plastic
reel/bag 0 x x
x x x
Waste glove 52 pcs x x
x x xWaste
rubber 7300 pcs x x
x x x
-
7/21/2019 EHS Overview Share
56/214
x x x
Waste
plastic
reel/bag 0 x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
Waste
plasticreel/bag 0 x x
x
x x x
Waste glove 52 pcs x x
x x x
x x x
-
7/21/2019 EHS Overview Share
57/214
x x x
Waste
rubber 7300 pcs x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
xx x
-
7/21/2019 EHS Overview Share
58/214
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x
x x
x
x
-
7/21/2019 EHS Overview Share
59/214
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
xx x
-
7/21/2019 EHS Overview Share
60/214
x x x
Waste
plastic
reel/bag 0 x x
x
x x x
Waste glove 52 pcs x x
x x x
x x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
x
x x
x x x
-
7/21/2019 EHS Overview Share
61/214
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x x
x x x
-
7/21/2019 EHS Overview Share
62/214
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x x
waste paper
? x x
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
x
x
x x
x x
-
7/21/2019 EHS Overview Share
63/214
x x x
Waste glove 52 pcs x x
x x x
Waste
rubber 7300 pcs x x
-
7/21/2019 EHS Overview Share
64/214
Evaluation
Significant
Yes/No
S0-ADB , F2
= 4 (NO)
S0 , F2 = 4
(NO)
xS0 , F2 = 4(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
Air Pollution
Others (Pls
mention)Soil Pollution
Water
Pollution
Impact to Environment
-
7/21/2019 EHS Overview Share
65/214
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
xS0 , F2 = 4(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
xS0 , F2 = 4(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
66/214
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
67/214
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x S0 , F2 = 4(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
68/214
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
69/214
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
70/214
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
71/214
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)x
-
7/21/2019 EHS Overview Share
72/214
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
73/214
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
74/214
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
75/214
S0 , F2 = 4(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
76/214
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
x
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
S0 , F2 = 4
(NO)
-
7/21/2019 EHS Overview Share
77/214
-
7/21/2019 EHS Overview Share
78/214
-
7/21/2019 EHS Overview Share
79/214
-
7/21/2019 EHS Overview Share
80/214
-
7/21/2019 EHS Overview Share
81/214
-
7/21/2019 EHS Overview Share
82/214
-
7/21/2019 EHS Overview Share
83/214
-
7/21/2019 EHS Overview Share
84/214
-
7/21/2019 EHS Overview Share
85/214
-
7/21/2019 EHS Overview Share
86/214
-
7/21/2019 EHS Overview Share
87/214
-
7/21/2019 EHS Overview Share
88/214
-
7/21/2019 EHS Overview Share
89/214
-
7/21/2019 EHS Overview Share
90/214
-
7/21/2019 EHS Overview Share
91/214
-
7/21/2019 EHS Overview Share
92/214
-
7/21/2019 EHS Overview Share
93/214
LEGAL REQUIREMENT BY AREA
LE
GAL/DEPT
HR
-Training
Clinic
Canteen
MOE
-PgP1
MFG
-PgP2
Maint.B
ay
Se c u r i t
INDEX OF MALAYSIA EHS LEGISLATION : June 20041 Atomic Energy Licensing Act 1984 Act 304 4.4
2
Atomic Energy Licecing (Exemption) (Exemption) (Low Activity Radioactive Material)
Order 2002 PU(A) 182/2002 4.4
3 Environmental Qualit Act 1974 Act 127 1 X X X X X
4
Environmental Quality (Clean Air) (Amendment) Regulations 2000 PU(A) 309/2000
2
5
Environmental Quality (Compounding of Offences) (Amendment) Rules 1999 PU(A)
512/1999 2
6
Environmental Quality (Control of Emission From Diesel Engines)(Amendment)
Regulations 2000 PU(A) 488/2000 2
7 Environmental Qualit Dioxin and Furan Re ulations 2004 PU A 104/2004 2
8 Environmental Qualit Halon Mana ement Re ulation 1999 PU A 452/1999 2
9
Environmental Quality (Delegation of Powers) (Halon Management)Regulation 2000
PU A 490/2000 2
10 Environmental Quality (Licensing) Regulations 1977 PU(A) 198/1977 1
11 Environmental Qualit Motor Vehicle Noise Re ulations 1987 PU A 244/1987 2
12
Environmental Quality (Prescribed Activities) (Environmental Impact Assessment)
Order 1987 PU A 362/1987 6
13
Environmental Quality (Prescribed Premises) (Scheduled Wastes Treatment and
Disposal Facilities) Regulations 1989 PU(A) 141/1989 5 X X
14
Environmental Quality (Prohibition on the Use of Chlorofluorocarbons and other
Gases as Propellants and Blowing Agents) Order 1993 and other Gases as
Propellants and Blowing Agents) Order 1993 2
15
Environmental Quality (Prohibited on the Use of the Controlled Substance in Soap,
Synthetic Detergent and Other Cleaning Agents) Order 1995 PU(A) 115/1995 3 X
16
Environmental Quality (Refrigerant Management) Regulation 1999 PU(A) 451/1999
2 X
17 Environmental Quality (Scheduled Wastes) Regulations 1989 PU(A) 139/1989 5 X
18
Environmental Quality (Sewage and Industrial Effluents) Regulations 2000 PU(A)
398/2000 3
19 Factories and Machinery Act, 1967 Act 139 7.2
20 Factories and Machiner Exem tion No.3 Order 2004 PU A 185/2004 7.2
21 Factories and Machinery (Asbestos Process) Regulations 1986 7.2
22
Factories and Machinery (Building Operations and Works of Engineering
Construction) (Safety) Regulations 1986 PU(A) 5/1970 7.2
23
Factories and Machinery (Fencing of Machinery and Safety) Regulations 1970
PU(A) 10/1970 7.2 X X X
24 Factories and Machiner Lead Re ulations 1984 PU A 60/1984 7.2 X X X X
25 Factories and Machinery (Mineral Dust) Regulations 1989 PU(A) 2/1989 7.2 X X X26 Factories and Machiner Noise Ex osure Re ulations 1989 PU A 1/1989 7.2 X X X X X
Factories and Machinery (Notification, Certificate of Fitness and Inspection)
R l ti 1970 PU(A) 444/1970 7 2
-
7/21/2019 EHS Overview Share
94/214
Environmental Aspect/OHS
Regulations/topic
Environmental/OHS Law
(Act; Section; Regulation; Requirements)
1)Register entry of Generator set DOE.Ref no
:AP/E/3S (P 71/2010)
AP/E/3S (P 72/2010)
EQA1974 Regulations 1978 (Control of Emissions from Diesel
Engines)
2) Sewage discharge EQA 1974 (Sewage) Regulation 2009
Environmental Quality (Refrigerant Management) Regulation 1999
Environmental Quality (Halon Management) Regulation 1999
4) Air emission
DOE.Ref no : AK(CR 140/2007)EQA 1978 (Clean Air)
LEGAL R
3) Halon
5) Disposal of Scheduled Wastes:Environmental Quality
( Scheduled Waste Regulations) 2005
-
7/21/2019 EHS Overview Share
95/214
OSHA 1994 (Dec 2002): Act 514 Part IV, Sec.16 Duty to
Formulate Safety and Health Policy
Occupational Safety and Health (Employers Safety and Health
General Policy Statements) (Exception) Regulations 1995
OSHA 1994 (Dec 2002): Act 514 Part VII, Sec.30 Establishment
of Safety and Health Committee at Place of Work
Occupational Safety and Health (Safety and Health Committee)Regulations 1996
OSHA 1994 (Dec 2002): Act 514 Part VII, Sec.29
Occupational Safety and Health (Safety and Health Officer) Order
19975) Safety and Health Officer
3) Safety and Health Policy
4) Safety and Health Committee
-
7/21/2019 EHS Overview Share
96/214
OSHA 1994 (Dec 2002): USECHH 2000, Regulation 9
OSHA 1997 (Classification, Packaging & Labeling of Hazardous
Chemicals)
OSHA 1994 (Dec 2002): USECHH 2000, Regulation 16
FMA 1967 (June 2003): Act 139 - Factories and Machinery
(Safety, Health and Welfare) Regulations 1970 Regulation 32
6) Chemical Health Risk Assessment
(CHRA)
7) Implementation of PPE
8) Initial Noise MonitoringFMA 1967 (June 2003): Act 139 Factories and Machinery (Noise
Exposure) Regulations 1989, Part III Exposure Monitoring
-
7/21/2019 EHS Overview Share
97/214
FMA 1967(June 2003): Act 139 Factories and Machinery
(Safety, Health & Welfare) Regulations 1970 Regulation 13.
Code of Practice For Safe Working In A Confined Space 2010
OSHA 1994 (Dec 2002): Act 514, Section 15 (1)
FMA 1967 (June 2003): Act 139 - Sec. 25 (1) (c)
Factories and Machinery (Safety, Health and Welfare) Regulations
1970 Regulation 38
12) Certificate of Fitness for Oil Separator,
Air Compressor, Air Receiver, Good Lifts and
Passenger Lifts
Factories and Machinery (Notification, Certificate of Fitness and
Inspection) Regulation 1970 Part II, Certificate of Fitness.
13) Building Operations and Works of
Engineering Construction
Factories and Machinery (Building Operations and Works of
Engineering Constructions) ( Safety) Regulation 1986
11) Occupational Health Clinic / First Aid
Room and First Aid Box
10) Working in Confined Space
9) Lead Exposure MonitoringFMA 1967 (June 2003): Act 139 Factories and Machinery (Lead)
Regulations 1984, Part III Exposure Monitoring.
-
7/21/2019 EHS Overview Share
98/214
14)Environmental Management Systems MS ISO14001: 1997 (ISO/TC 207)
15) Occupational Health and Safety Standard& Requirement
AS/NZS 4801:2001OHSAS 18001:1999
16) Notification of Accident, Dangerous
Occurrence, Occupational Poisoning and
Occupational Disease
Guidelines on Safety and Health ( Notification of Accident,
Dangerous Occurrence, Occupational Poisoning and
Occupational Disease) Regulations 1994
17) Cooling Water Tower Environmental Quality (Sewage and Industrial Effluent)
Regulations 1979 Second Schedule
18) Bomba CertificateFire Act
19) Radiation
Radiation Act 1984
20) Solid and General Wastes (Non-
Scheduled Wastes
Environmental Quality Act 1974
1. Regulation (24) Restriction of pollution of the soil.
2. Regulation (25) Restrictions on pollution of inland waters.
21) Diesel Properties
Environmental Quality ( Control of Petrol and Diesel Properties )
Regulation 2007
Document number Title
N93 A1 N93-Preparation and control
Bosch-Norm | 4497025164 | N93 A | 2011-03-30
-
7/21/2019 EHS Overview Share
99/214
N93 A1.1 Basic requirements for occupational health and safety, fire and
environmental protection
N93 A2 Responsibility for occupational health and safety, fire and
environmental protection
(HSE); Transferring contractor obligations
N93 A3 Representatives for occupational health and safety, fire and
environmental
protection; Tasks and responsibilities
-
7/21/2019 EHS Overview Share
100/214
N93 A4 Legal specifications
N93 A5 Evaluation of environmental aspects
N93 A5.1 Evaluation of environmental aspects; Classification scheme fordefining priorities
N93 A5.2 Evaluation of environmental aspects; Overview of "Environmental
impact"
N93 A6 Audit management and performance assessment of occupational
health and safety,
fire and environmental protection
N93 A8 Employee instruction and training
N93 A8.1 Training and Instruction Matrix; Environmental Protection and
Safety
-
7/21/2019 EHS Overview Share
101/214
N93 A9 Emergency control; Evacuating Buildings
N93 A11 Hazard assessment International version
N93 A11.1 Hazard assessment - RBIN93 A12 Supplier audits
-
7/21/2019 EHS Overview Share
102/214
N93 A13 Waste management
N93 A14 Soil and water conservation
-
7/21/2019 EHS Overview Share
103/214
N93 A18 Chemical working substances
N93 A19 Performing environmental and occupational safety - due diligence
(HSE-Duediligence)
N93 A20 Contractor companies (CC)
-
7/21/2019 EHS Overview Share
104/214
N93 A21 Post-Merger-Integration (HSE-PMI)
N93 A22 Fire protection
N93 A23 Procedure for closing of locations focusing on environmental
issues
N93 B1 Directive; General rules for employees
N93 B1.1 Directive; General rules for employees; Safety identification
N93 B1.2N93 B1.2 Directive; Hazard prevention
N93 B1.3 Directive; Accident notification; Occupational accident notification
schemeN93 B1.4 Directive; Hazardous substance identification; Hazardous
substancesN93 B1.4.1 Directive; Labeling elements acc. to GHS/CLP (Regulation EC
1272/2008
Bosch-Norm | 4497039248 | N93 B | 2011-03-30
Document number Title
-
7/21/2019 EHS Overview Share
105/214
N93 B1.4.2 Directive; Comparison of hazard symbols/pictograms
N93 B1.5 Directive; Skin protection plan; Example
N93 B1.6 Directive; Use of personal protective equipment (PPE); Examples
for de artment /worksho
N93 B10 Directive; Working on electrical machines and equipment (MAE)
N93 B11 Directive; Battery charging installations
N93 B14 Directive; Setting up working equipment (MAE)
N93 B16 Directive; Centrifuges
N93 B17 Directive; EDM machines
N93 B18 Directive; Welding, flame cutting, soldering
N93 B19 Directive; Material-removing processing machines
N93 B20 Directive; Grinder tools
N93 B21 Directive; Electrochemical machining installations (ECM)
N93 B26 Directive; Dust detrimental to health
N93 B28 Directive; Ladders and Steps
N93 B29 Directive; Lifting platforms
N93 B29.1 Directive; Lending and written assignment of hydraulic platforms
to contractor companies; sample
N93 B30 Directive; Handling lifting tools and load carrying devices
N93 B33 Directive; Compressed-gas cylinders
N93 B35 Directive; Powered industrial vehicles
N93 B38 Directive; Working alone
N93 B39 Directive; Circular saws and band saws
N93 B43 Directive; Storing and provision
N93 B44 Directive; Warehouse facilities
N93 B47 Directive; Work on systems using pressurized media
N93 B48 Directive; Kitchen / canteen
-
7/21/2019 EHS Overview Share
106/214
N93 B53 Directive; X-ray systems and equipment with stray radiation effect
N93 B54 Directive; Maintenance / machine cleaning
N93 B59 Directive; Jet stream machines
N93 B65 Directive; Scooters, bicycles and similar vehicles
N93 B69 Directive; Docking stations / loading ramps
N93 B70 Directive; Shears
N93 B71 Directive; Press containers
N93 B72 Directive; Firefighting systems; (Building/room protection systems)
N93 B73 Directive; Workstations with visual display units
N93 B74 Directive; Working in rooms / areas subject to explosion hazard
N93 I1 Safety Marking; Overview
N93 I1.1 General
N93 I1.1.1 Preamble
N93 I1.1.2 Guidelines for safety marking
N93 I1.2 Safety marking at work place
N93 I1.2.1 Prohibition signs; Plasticized PVC film; self-adhesive
N93 I1.2.2 Mandatory signs; Plasticized PVC film; self-adhesive
N93 I1.2.3 Warning signs; Plasticized PVC film; self-adhesive
N93 I1.2.4 Fire safety signs
N93 I1.2.5 Signs for fire brigade services
N93 I1.2.6 Safe condition signs; Plasticized PVC film; self-adhesive
N93 I1.2.7 Marking of dangerous substances; Plasticized PVC film; self-
adhesive
N93 I1.2.9 Inspection stickers
N93 I1.2.10 Minisymbols; Plasticized PVC film; self-adhesiveN93 I1.2.11 Environmental protection signs; Plasticized PVC film; self-
adhesive
N93 I2 Personal protective equipment; Overview
N93 I2.1 Personal protective equipment; General
N93 I2.1.1 Compulsory personal protective equipment
N93 I2.1.2 List of authorized suppliers
N93 I2.2.0 Eye and face protection; General
N93 I2.2.1 Eye and face protection; Mechanical impact
Bosch-Norm | 4497025215 | N93 I | 2011-03-30
Document number Title
-
7/21/2019 EHS Overview Share
107/214
N93 I2.2.2 Eye and face protection; Optical impact
N93 I2.2.3 Eye and face protection; Chemical impact
N93 I2.2.4 Eye and face protection; Thermal impact
N93 I2.2.5 Eye and face protection; Combined impact
N93 I2.3.0 Head protection; General
N93 I2.3.1 Head protection; Mechanical/thermal impact
N93 I2.4.0 Respiratory protection; GeneralN93 I2.4.1 Respiratory protection
N93 I2.5.0 Hand and finger protection; General
N93 I2.5.1 Hand and finger protection; Mechanical impact
N93 I2.5.2 Hand and finger protection; Chemical impact
N93 I2.5.3 Hand and finger protection; Thermal impact
N93 I2.5.4 Hand and finger protection; Electrical impact
N93 I2.5.5 Hand and finger protection; General impacts
N93 I2.6.0 Foot protection; General
N93 I2.6.1 Foot protection; Mechanical impact
N93 I2.6.2 Foot protection; Chemical impact
N93 I2.6.3 Foot protection; Thermal impact
N93 I2.6.4 Foot protection; Mechanical impact and ESD protectionN93 I2.7.0 Body protection; General
N93 I2.7.1 Body protection; Mechanical impact
N93 I2.7.2 Body protection; Chemical impact
N93 I2.7.3 Body protection; Thermal impact
N93 I2.8.0 Hearing protection; General
N93 I2.8.1 Hearing protection
N93 I2.10.1 Skin protection; General
N93 I2.10.2 Example for skin protection plan
N93 I3 Best practice solutions
N93 I3.1 Environmental management system (not yet available
N93 I3.2 Health and safety management system
N93 I3.2.1 Recording and analyzing of occupational accidents
N93 I3.3 Soil and water protection
N93 I3.3.1.1 Machinery and equipment or handling substances hazardous to
water; Sealing of bottom surface
N93 I3.3.1.2 Machinery and equipment or handling substances hazardous to
water; Design of retention systemN93 I3.3.1.3 Machinery and equipment or handling substances hazardous to
water; Example:
Safety program for MAE w. individual feed
N93 I3.3.1.4 Machinery and equipment or handling substances hazardous to
water; Example:
Safety program f. MAE w. central feed
N93 I3.4 Waste (not yet available)
N93 I3.5 Air quality (not yet available)
-
7/21/2019 EHS Overview Share
108/214
N93 I3.6 Hazardous materials and goods (not yet available)
N93 I3.7 Fire protection and emergency control
N93 I3.7.1 Maintenance of fire protection systems
N93 I3.7.1.1 Maintenance of fire protection systems; Maintenance contents and
intervals
N93 I3.8 Inspection intervals for working equipment (MAE)
N93 I3.8.1 Inspection of working equipment (MAE) acc. to Ord. on IndustrialSafety and Health
N93 I3.8.2 Inspection of working equipment (MAE) and installations that
require monitoring;
Recommendations
N93 I3.9 Machinery and equipment safety
N93 I3.9.1 Machinery and equipment safety; Safety standard
N93 I3.9.1.0 Minimum requirements for operating work equipment; Appendix 1
on Ordinance on
Industrial Safety and Health
N93 I3.9.1.1 Machinery and equipment safety; Observance Machine VO
N93 I3.9.1.2 EU-Machine directive/9th ordinance on the Equipment Safety Act;
Procedure withdeviations from CE
N93 I3.9.2 Separating protective installations; Safety standard
N93 I3.9.3 Two-hand operation units; Safety standard
N93 I3.9.4 Key-operated adjuster; Safety standard
N93 I3.9.5 Hydraulic hose assemblies; Safety standard
N93 I3.9.6 Polycarbonate (PC-) inspection windows on machine tools; Safety
standard
N93 I3.9.7 Safety-related planning and inspection of working equipment and
construction
projects; Examples
N93 I3.10 Training and instruction
N93 I3.10.1 Operator training for powered industrial vehicle
N93 I3.10.2 Tips and hints for our employees (leaflet)
N93 I3.11 Safety standards informative
N93 I3.11.2 Presses; Safety standard
N93 I3.11.3 Noise; Safety standard
N93 I3.11.3.1 Acoustic, machine acceptance; Safety standard
N93 I3.11.4 Industrial robots; Safety standard
N93 I3.11.5 Laser installations; Safety standard
N93 I3.11.6 Storing of hazardous substances; Safety standard
N93 I3.11.9 Setting up and operating electroplating shops; Safety standard
N93 I3.11.10 Machines with stock removal using mineral oil as metal workingfluid (KSS); Safety
standard
N93 I3.11.10.1 Checklist; Machinery with stock removal using cooling lubricants
oil; Safety
standard
N93 I3.11.10.2 Switch off matrix; Machinery and equipment MAE using cooling
lubricants oil CL; Safety standard
N93 I3.11.11 Electromagnetic fields; Safety standard
-
7/21/2019 EHS Overview Share
109/214
N93 I3.11.11.1 Electromagnetic fields; Identification of workshops
N93 I3.11.12.1 Traffic and escape routes; Safety standard
N93 I3.11.13 Inspection/assembly installations with combustible liquids; Safety
standard
N93 I3.11.13.1 Inspection and supply rooms with combustible liquids; Safety
standard
N93 I3.11.13.2 Inspection and assembly installations with combustible liquids(minimum
requirements); Safety standard
N93 I3.11.16 Handling biological working materials; Safety standard
N93 I3.11.16.1 Handling biological working materials, hazard assessment; Safety
standard
N93 I3.11.18 Remote maintenance of machine controls; Safety standard
N93 I3.11.18.1 Remote maintenance of machine data; Protocol
N93 I3.11.19 Working alone; Safety standard
N93 I3.11.20 Design and equipment of storage facilities for compressed-gas
cylinders (gascylinder storage)
N93 I3.12 Explosion protection
N93 I3.12.1 Hazardous explosive atmosphere; General
N93 I3.12.1.1 Explosion protection document acc. to Ordin. on Ind. Safety and
health (BetrSichV)
N93 I3.12.1.1.1 Explosion protection document; Assessment of explosion hazard
from gases,
fumes or mist
N93 I3.12.1.1.2 Explosion protection document acc. to Ordin. on Ind. Safety and
health
(BetrSichV); Installations relevant for ex. Protection (samples)
N93 I3.13 HSE-relevant specifications
N93 I3.13.1 Identification, evaluation and documentation of HSE specifications
N93 I3.14 Environment-related product data
N93 I3.14.1 Environment-related product data; Data format and process
-
7/21/2019 EHS Overview Share
110/214
N93 S1 Safety-related planning and inspection of working equipment andconstruction
projects
N93 S14 Machinery and equipment (MAE) for handling substances
hazardous to the
environment
N93 S17 Work subject to prior authorization; Safety standard
N93 S21 Battery installations for electro-powered industrial vehicles; Safetystandards
N93 S22.1 Fire protection - constructional; Safety standards
Bosch-Norm | 4497017384 | N93 S | 2011-03-30
Document number Title
-
7/21/2019 EHS Overview Share
111/214
N93 S22.2 Fire protection - operational; Safety standards
-
7/21/2019 EHS Overview Share
112/214
N93 S22.3 Fire protection - organizational; Safety standards
-
7/21/2019 EHS Overview Share
113/214
Bosch -Norm N93 CN93 C 1 Check Lists for Superiors
N93 C 1.1 Check Duties
N93 C2 Check Lists for Safety Representatives (SHB)
N93 C2.1 Personal Protection Equipment (PPE)/Skin Protection
N93 C2.2 Traffic, Escape and Rescue Routes
N93 C2.3 Hazardous Substances
N93 C2..4 Safety of Machines/Equipment
N93 C2.5 Electrical Installations and Tooling
N93 C2.6 Ladders and Steps
N93 C2.7 Lifting Tools, Loading and Stop Equipment
N93 C2.8 Fire and Explosion Protection
N93 C2.9 Transporting and Storing
N93 C3 Check Lists for Safety specialists and planners
N93 C3.1 Assessing floor/installation plans
-
7/21/2019 EHS Overview Share
114/214
Registration
Number
Bosch
Compliance
Compliance
related
Monitoring or action
required
Area
Responsibility
Yes Refer comment Baseline monitoring: Done Facilities
Yes Refer comment Monthly monitoring: Facilities
Yes
-
Facilities
Yes
Refer comment -
Yes Quarterly
Facilities, Wave
soldering, lacquering
, oven re-flow.
standby generators
EGISTER AND EVALUATION OF COMPLIANCE (Legal and other r
Yes Refer comment
Monthly sent Waste to KA
Monthly Scheduled waste
inventory report to
Department of Environment
Waste Generator
Waste Management
Center
-
7/21/2019 EHS Overview Share
115/214
Yes
To have a safety
policy for a
Penang in both
English and
Bahasa
Policy formulated and
published plant wide.
Revision will be done when
there are changes in process
and activities within the plant.
HSE
Yes - None HSE
Yes
Yes
Yes
Monthly report to MD
Assist Quarterly Audit bySafety Committee
Yes
Yearly Safety training
HSE
Monthly meetingMeeting minute sent to
management for reference.
HSE
-
7/21/2019 EHS Overview Share
116/214
Yes
IH Monitoring
Hygiene TechHSE
Yes
Labeling Maintenance
Yes
PPE HSE
Yes
Yes
Initial noise monitoring &
Additional noise monitoringHSE
Yes
1All operation
processes,standby generators
-
7/21/2019 EHS Overview Share
117/214
HSE
ENG, PUR
Confined Space SOP
Yes
Yes
Yes
Yes PMA/PMT yearly permit Facilities
Yes None Facilities
Nurse
Yes Facilities
Yes
-
7/21/2019 EHS Overview Share
118/214
Yes
Yearly Management Review
Yearly Internal audit
Yearly Surveillance audit
3 yearly Re-assessment audit
HSE-MS Area rep
YesYearly Management Review
Yearly Internal audit
Yearly Surveillance audit
3 yearly Re-assessment audit
HSE-MS Area rep
Yes Yearly Report to DOSH
Headquarter
24 hours notification of any
incident of accident occurred
in the workplace
HSE
Yes Legionella analysis Facilities, sewage
treatment plant
Yes Yearly Renewal Facility
Yearly renewal
RPO
QA
Yes All
Refer comment 6 months Facilities
Yes None HSE-PT,C/PS
-
7/21/2019 EHS Overview Share
119/214
Evaluation
process
In their area of responsibility
executives have to ensure
that there are no deviations
from legal
requirements or from Bosch
requirements that might be
avoided or prevented byadequate monitoring.
EHS-basic requirements
which have to be observed by
all locations are listed in
attachment B
HSE
Yes The subordinate managers
have to provide adequate
operational facilities conform
to HSE requirements, to
check and monitor their
proper functioning and to
allocatefunds tailored to the
requirements for a hazard
minimized, environmental
sound and proper operation .
HSE have to ensure that
associates are appropriately
qualified and trained as well
as prescribed medical
examinations
of associates are provided.
Ensure that legal
requirements and Bosch
regulations on occupational,
health and safety, fire and
environmental protection. are
observed. Ensure,
that company doctors and
first-aid personnel as
required by local law are
appointed
HSE,Subordinate
manager
Yes BOSH-Norm to be implented
within a period of a 6 months.
Deviationsrequire coordination with
C/PS and have to be
documented.
2 Terms
HSE
-
7/21/2019 EHS Overview Share
120/214
Yes Identify clear requirements
for MAE or processes.
Prepare an information sheet
containing the actual
specifications for
the operator and to update as
required.Process and detail in N93 A5
no 4
Facility
operator,HSE
Yes Identify the environmental
aspects related of its
activities, products and
services, that it can control
and influence.
Determine those which have,
or can have significant
impacts on the environment
HSE, All
Yes Establishing environment allobjective HSE
None
Yes With regard to minor and
major non-conformities the
audited area will have to
generate an action plan.
Auditors have to be
knowledgeable and trained in
the relevant techniques and
management systems and
the audit principles of ISO
19011. All the topics
relevant for the location have
to be evaluated.
HSE-Question catalog.
HSE, Auditor, All
Yes Employee instruction and
training shall be organized on
location. Supervisor on site
responsible for conducting
the instruction
Instruction and training to be
carried out are listed in N93
A8.1. Performance ofinstruction and training must
be documented
Document form 1: Example
"List of Signatures"
HSE,PUR
Yes It depend on the group to
conducting the training.
All
-
7/21/2019 EHS Overview Share
121/214
Yes Escape and rescue plans
shall be made and
evacuation drills have to take
place if one of the following
criteria
applies:
Conduct every 2 year
All
Yes For new MAE and building
investments, an overall final
acceptance process at the
plant level has to be set
up, carried out and
documented.
Document form 1: Sample
hazard assessment .
doc
Documentation form 2:
Hazard characteristics .
HSE,All
Yes The questionnaire Supplier
Audits (attachment 1)
provides the minimum
standard. Refer
4.3 the process and detail in
N93 A12 supplier audits
Documentation :
Questionnaire
HSE
-
7/21/2019 EHS Overview Share
122/214
Measures for the protection
of ground and waters for the
case of leakages have to be
taken With dangerous
goods transports the
corresponding national
regulations have to beobserved. Material samples
of pharmaceuticals,
cosmetics, food and
stimulants that manufacturers
and customers make
available for testing have to
be returned to the
manufacturer or disposed of
properly.
All waste disposal contractors
that are to be contracted by
Bosch for the first time haveto undergo a review
Those responsible must have
undergone sufficient training
as required.
Document form
1: Sample info-
questionnaire.
Document form
2: Hazard characteristics.
HSE and FCM
Yes The requirements to the
properties of surfaces and
retention volume for escaping
substances that are
hazardous
to the environment, including
performance examples, are
specified in BoschNorm
N93S14 in 4.2.1 Machinery
and equipment (MAE) and
4.2.2 Wastewater discharge
HSE
-
7/21/2019 EHS Overview Share
123/214
-
7/21/2019 EHS Overview Share
124/214
Yes The implementation of all
Bosch-internal requirements
(GF-guidelines, central
directives, Bosch-Norms)
must have been concluded
18 months after
acquisition.N93 DocumentA21 Form 1 HSE-PMI-check
list (
N93 A21 Form 1 HSE-PMI-
check list
PDF Example:
Implementation Timeline
(RBNA)
Yes Stricter insurers
requirements have to be
assessed by the plant.Requirements from location-
specific regulations (building /
operating permit) have to be
harmonized accordingly
in the fire protection concept
FCN,PUR,HSE,All
Yes Process Scheme GE,HSE
Yes Protective measures/rules of
conduct
HSE and All
Yes None HSE and All
Yes None HSE and All
Yes None HSE, Clinic
Yes None HSE
Yes None HSE
-
7/21/2019 EHS Overview Share
125/214
Yes None HSE
Yes None HSE
Yes None HSE
Yes Protective measure code/behavior HSE
Yes Protective measure code/
behavior
HSE and LOG
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE
Yes Protective measure code/behavior
HSE,FCM
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and LOG/PUR
Yes None
Yes Protective measure code/
behavior
HSE and LOG/PUR
Yes Protective measure code/
behavior
HSE
Yes Protective measure code/
behavior
Yes Protective measure code/
behavior
HSE and All
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE, LOG/PUR
Yes Protective measure code/
behavior
HSE, LOG/PUR
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and FCM
-
7/21/2019 EHS Overview Share
126/214
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE
,FCM,LOG/PUR
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure code/
behavior
HSE and FCM
Yes Protective measure/ code
beviour
HSE and FCM
Yes Protective measure/ code
beviour
HSE and LOG/PUR
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, AllNone ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
-
7/21/2019 EHS Overview Share
127/214
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, AllNone ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, AllNone ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
None ; information HSE, All
National requirements for
responsibilities, deadlines,
content and documentation of
accident causes have to be
observed. There are process
sequence for the record and
analysis of accident in N93
I3.2.1 no 4
HSE
None HSE and FCM
None HSE and FCM
None HSE and FCM
None HSE and FCM
-
7/21/2019 EHS Overview Share
128/214
None HSE
None HSE
None HSE
None HSE, FCM
None HSE
None HSE , FCM
None; information All
None HSE , FCM
None; information HSE
None; information HSE
None; information All
None; information ESH
None; information ESH
fire department emergency
control forces must have
access to working equipment
internal spaces.
ESH,FCM
None;Information All
None;Information All
None;Information All
None;Information ESH
None;Information All
None;Information ESH
None;Information All
Heated baths must have a
protection against
overheating
All
None;Information All
None;Information ESH,FCM
None;Information ESH,FCM
None;Information All
-
7/21/2019 EHS Overview Share
129/214
None;Information ESH,FCM
None;Information All
None HSE
None;Information ESH
None HSE
None HSE and FCM
None HSE and FCM
None: Construction /
equipment / protective
measures
None; Information HSE and FCM
Employers have to identify
and assess their employees
hazards due to explosions
and to decide on the required
protective measures.
The required explosion
protection measures have to
be selected and evaluated
within an explosion protection
concept that is free from
inherent contradictions
HSE and All
None HSE
None HSE
None HSE
None.4 Refer N93 i3.14Process description and
process responsibilities
(overview) for more
information
HSE
None HSE
-
7/21/2019 EHS Overview Share
130/214
Yes Planning instructions targetspecification or Internal target
specification and planning
and procuring of working
equipment and building of
structures. Working
equipment and buildings
have to be acquired or built in
accordance with the safety-
related requirements,
Deviations require
coordination with C/PS and
have to be documented.Working equipment and
structures have to comply
with internal and external
requirements.
HSE and All
Yes None
Yes See Fire Protective " Best
Proactive"
Yes None HSE
Planning and approval
requirements are available at
all times and have to be
adhered to. Facilities on roof
areas (mechanical / technical
equipment) have to be
accessible at least in two
places, opposite ones if
possible. Marked
emergency exits have to
open in escape direction
-
7/21/2019 EHS Overview Share
131/214
Yes Location must have a safe
water supply for firefighting.
Primarily sprinkler systems
have to be provided
according to requirements.
Sprinkler systems have to be
maintained.All areas in Bosch buildings
have to be designed with a
smoke release system.
Sprinkler protected buildings
fire alarm systems have to be
implemented only in selected
areas.
Automatic fire alarm systems
have to be installed in
production plants
FCM, HSE
Fire fighting systems with
gaseous agents have tocomply with the requirements
regarding protection of
persons
and the environment strictly.
Gas detection systems have
to be carried out as required
by law Design and
installation of smoke and
heat release systems with
natural action have to comply
with state-of-the art
technologyA location must have a safe
water supply for firefighting
-
7/21/2019 EHS Overview Share
132/214
Yes Emergency plans have to be
designed and to be
coordinated with the specific
emergency response teams.
Incidents have to be
categorized, assessed and
evaluated (extent ofdamage).
A sufficient number of
employees will have to be
trained in behavior during a
fire and in firefighting with
firefighting equipment
All installations and
equipment for fire protection
needs to be maintained
(including reporting) . Fire
safety audits have to be
conducted at regular intervalsand preferably in combination
with health, safety and
environmental site visits.
Evaluation requirements
have to be at state-of-the-art
level . First response
activities have to be ensured
HSE, ERT Team
Required fire compartments
(e. g. due to legal
requirements) have to be
separated by spatial distance
(minimum
distance from neighboring
building the height of the
higher of the two structures)
or by constructional
measures.
Fire walls must have a
minimum fire resistance of 90
minutes and be continued for
at least 30 cm
above the roof; stability of the
wall must be guaranteed also
with external loads (e. g.
collapsing racks, cranesystems).
New constructions
separations of required
stairways have to be at least
90 minutes fire resistant
-
7/21/2019 EHS Overview Share
133/214
None None
None None
None None
None None
None None
None None
None None
None None
None None
None None
None None
None None
None None
None None
-
7/21/2019 EHS Overview Share
134/214
-
7/21/2019 EHS Overview Share
135/214
HSE Policy in all dept/area
HSE
3 latest SHO report to MD.
Action taken and closed.
SHO Report 8th
July, 8th June and
5th May 2011
CEP Training
HSE
Management
Review minutes of
meeting
Meeting minutes
kept by HSE
3 latest SHC meetingminutes. Corrective action
taken and closed.
SHC minutes ofmeeting
(Q2&Q4)
-
7/21/2019 EHS Overview Share
136/214
HSE
Latest IH monitoring.
Latest CHRA report.
Action taken and closed.
CHRA Report
complete as at
15/4/2011
IH Monitoring for
LEV in progress
New chemicals and
chemical waste
containers
Chemical buy off
procedure. Latest
chemical in the database.
Chemical
Management
Storage Area,
Production Line
and Waste
Management
Area
N/A
Latest chemical register
List of hazardous chemical
Any action taken to reduce
the risk.
Form F under
CHRA reportDept Work Unit
First Aid box. Please verify
the quantity.
First Aid box
inventory updated
by Supervisor
Supervisor
Inventory
Checklist
HSE
Latest noise monitoring
data. Mapping zone done
using in-house
meter/external parties
Noise Monitoring
Report
Record:Biochem
Lab
HSE
List of employee expose to
extreme noise. Latest
Audiomtric test. Evaluationof result.
Audiometric
monitoring
conducted in 2008
-
7/21/2019 EHS Overview Share
137/214
HSE latest lead monitoring data.
Mapping zone area
expose to lead.
Soldering area mapping
Monitoring
conducted 2007
List of employee expose to
leadLatest confined space
activity conducted.
PTW sampling
HSE PMT/PMA certificate.
Latest renew date:
DOSH Log Book
n/a Latest excavation work. Monitor Work
Permit
ClinicFirst Aid box. Please verify
the quantity.
Facilities
SOP & Confined
Space procedure
inprogress
-
7/21/2019 EHS Overview Share
138/214
HSE database Latest Mgt Review. Action
taken & closed.
Latest internal audit.
Action taken & closed
Latest Surveillance Audit.
Action taken & closed
n/a Latest Mgt Review. Actiontaken & closed.
Latest internal audit.
Action taken & closed
Latest Surveillance Audit.
Action taken & closed
Accident report and
investigation
Accident Statistic.
NADOOPOD report to
DOSH. JKKP 8
Last 3 accident report.
Action taken & closed.
Evaluate effectiveness of
the accident CA/PA
JKKP 8
2010 Accident
Case
Facilities Latest Legionella test
result
Certificate Latest Cert:
Film Badge
Entry/exit Medical
check-up
Cert: LPTA/A/1170
Area surveillance:
Personal surveillance:
Schedule Waste
centralized in Waste
Management Center
-
7/21/2019 EHS Overview Share
139/214
A1.1 Checklist
-
7/21/2019 EHS Overview Share
140/214
-
7/21/2019 EHS Overview Share
141/214
-
7/21/2019 EHS Overview Share
142/214
-
7/21/2019 EHS Overview Share
143/214
-
7/21/2019 EHS Overview Share
144/214
-
7/21/2019 EHS Overview Share
145/214
-
7/21/2019 EHS Overview Share
146/214
-
7/21/2019 EHS Overview Share
147/214
-
7/21/2019 EHS Overview Share
148/214
-
7/21/2019 EHS Overview Share
149/214
-
7/21/2019 EHS Overview Share
150/214
-
7/21/2019 EHS Overview Share
151/214
-
7/21/2019 EHS Overview Share
152/214
-
7/21/2019 EHS Overview Share
153/214
-
7/21/2019 EHS Overview Share
154/214
Date : 15/8/2011
Rev : 0
Project / work Routine sample analysis and result,
verification sampling
Every Year, result Gen C B101 result not
comply with Standard B of the regulations
and dust exceeding 0.4g/NM3
Every Month resultmonitoring complied with Standard B of
the regulations
Complied
Every Quarterly
result monitoring complied with Clean Air
regulations
Complied ( 2nd
Schedule registration to DOE in
progress)
-
7/21/2019 EHS Overview Share
155/214
Inspection record
Inspection record
Complied
Complied
Complied
( Last Management Review 31/10/10) No
Changes
-
7/21/2019 EHS Overview Share
156/214
-
7/21/2019 EHS Overview Share
157/214
Complied
Complied
Complied
Complied
Refer to Work Permit System
-
7/21/2019 EHS Overview Share
158/214
Complied
Complied
Complied
Complied
Inprogress
Complied
Complied
-
7/21/2019 EHS Overview Share
159/214
-
7/21/2019 EHS Overview Share
160/214
-
7/21/2019 EHS Overview Share
161/214
-
7/21/2019 EHS Overview Share
162/214
-
7/21/2019 EHS Overview Share
163/214
-
7/21/2019 EHS Overview Share
164/214
-
7/21/2019 EHS Overview Share
165/214
Objective & Target
Aspect Objective Target
Organizational Obj & Target
1. Relative CO2 emission reduction Reduce CO2 emmision to
environment
204 / 198 / 192 year
2011
2. Reduce Accident Rate To reduce accident cases
in RBMA
1. Accident Free 360
days in 2011
2. 3.74 /3.5/3.3 year
2011
3. Comply with Legal and Other
Requirements
Meet all legal and other
requirements
100 % meet all legal
and other
requirements every
year
Departmental Obj & Target1. Awareness Training on ISO14001
implementation
Create awareness on
ISO14001 Management
System
75 % employees are
train and aware 75 /
85 / 95 (2011)
2. Awareness Training on HSE
related issues : such as waste
disposal, use of recycle bin,
hazardous communication (legal),
electrical safety
Create awareness on
HSE requirements
75 % employees are
train and aware 75 /
85 / 95 (2011)
Objective and Target
Organization Objective and Target
Departmental Objective and Target
from Aspect Impact Analysis.
-
7/21/2019 EHS Overview Share
166/214
Program Indicator Operational Control Monitoring & Measure
Go Green
- Shut off light
- LED- Motion Sensor
- PV installation
Relative CO2 emission
data
Policy deployment Telecon: Tracking CO2
reduction program every 2
month
1. Awareness LCD
- Video/ ppt
- Bulletin Board
2. Safety Week
3. HSE
Accident Rate
Number of participation
for each event
Policy deployment Monthly accident report
HSE audit
A.6, C/AU, tiPTop
No of complaint received
by gov or other interested
parties
Yearly Legal evaluation Legal evaluation report
quaterly
HSE Training by
department
No of NCR
No of Feedback (MII)
Follow N93 A.8 2012 Revise quaterly training
attendance and evaluation
HSE Training by
department
No of NCR
No of Feedback (MII)
Follow N93 A.8 2012 Revise quaterly training
attendance and evaluation
-
7/21/2019 EHS Overview Share
167/214
HEALTH SAFETY ENVIRON
Programs Jan Feb Mar Apr
Respiratory Protection Program
ERT
Handling and Storage
of Flammable & Combustible
Logout Tag out
Fire Extinguisher Training Canteen Security FCM HR
Compress Gas Safety
Cafeteria Safety
Chemical Spill
Office Safety
Update on Law & Regulation
Hearing Conservation ProgramContarctor work procedure
C/AU/ HSE Awarenss
CPS
ISO14001 Surveillance Evaluation
Internal
31
EHS Week
Bulletin Board
Monthly Audit/Survey HR-Training Clinic Canteen MOE1
EHS Admin/Finance/ Others EngineeringScheduled Waste
Disposal Area Receiv
Chiller TNB RoomSafety Committee Member Mapis Mapis Mapis Mapis
Azman Azman Azman Azman A
Yahya Yap Bee How
Date 18 8 15 12
Noise Monitoring Addition
Industrial Hygine Monitoring
Air Emission
Send report to
DOE
Sewage Monitoring
Completed Prepare
Plan
Number in the box is the date of a training conducted/plan for the month
Training
HSE -MS
Awareness
EHS / Safety Committee Audit
Monitoring
-
7/21/2019 EHS Overview Share
168/214
EHS ACTIVITIES FOR Y2013
W1 W2 W3 W4
ISO 14001 Internal Audit AAR Yearly Exec
ISO 14001 3rd Party Audit AAR Yearly MGR/ENGDOSH Inspection (Cf) NOY As Requested F&MEHS Committee Meeting NOY Quartely MEMBERSEHS Workplace Audit (Pgp1) AAR Monthly HSE, PICEHS Plant Tour (Pgp2) NOY Bi-Weekly PM, DH & HSE
EHS Workplace Audit (PgP2)NOY/MAS/
HSECWeekly Selected Area PIC
Fire / Emergency Drill NOY Yearly ERT, All
EHS Week / Campaign NOY Yearly ALLEHS Ms Management Review AAR Monthly MGMT
1. Awareness training on System AAR YearlyArea
Representatives
2. Revise HIRARC / EAIA NOY 1/2 Yearly AreaRepresentatives
3. Review prosedure AAR 1/2 YearlyArea
Representatives
4. Review EHS Objective & Target AAR Yearly EHS1. Basic Fire Fighting Bomba 1/2 Yearly ERT2. First Aider Training 1/2 Yearly ERT
3. Handling and Storage of
Flammable & CombustibleMapis Yearly ERT / EMPLOYEE
4. Log Out Tag Out TTT Yearly FCM / TEF / MOE
5. Fire Extinguisher TrainingAAR /
NOYMonthly EMPLOYEES
6. Compressed Gas Safety NOY Yearly MOE7. Cafeteria Safety AAR Yearly Canteen Operators8. Chemical Spill TTT Yearly Chemical Handlers9. Office Safety AAR Yearly Office Occupiers
10. Update on Laws & RegulationNIOSH /
DOSHYearly FCM / MOE / HSE
11. Hearing Conservation Program SOCSO Yearly Associates at noisy
12. Contractor Work ProceduresNIOSH /
DOSHYearly Contractors
13. ERT Refresher Training NOY Monthly ERT
14. EHS Management
Commitment TrainingNOY 1/2 Yearly DHs
1. Accident Data MAS Monthly HSE2. Sewage MAS Monthly HSE, FCM
3. Air Emission MAS Quarterly HSE, FCM
4. Scheduled Waste MAS Monthly HSE, FCM
5. Relative CO2 Emission MAS Monthly HSE, FCM
Legend
EHSPERFORMANCE
MONITORING
MAINEVENTS
ENVMS
EHSAWARNESST
RAINING
DESCRIPTION OF ACTIVITIES PIC FREQTARGET
PARTICIPANTSJAN
-
7/21/2019 EHS Overview Share
169/214
Planned
Delay
On-time
Rescheduled
-
7/21/2019 EHS Overview Share
170/214
W5 W5 W6 W7 W8 W9 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W18 W19 W20 W21
MAYFEB MAR APR
-
7/21/2019 EHS Overview Share
171/214
-
7/21/2019 EHS Overview Share
172/214
W22 W22 W23 W24 W25 W26 W27 W28 W29 W30 W31 W31 W32 W33 W34 W35 W35 W36
JUNE JUL AUG
2013
-
7/21/2019 EHS Overview Share
173/214
-
7/21/2019 EHS Overview Share
174/214
W37 W38 W39 W40 W40 W41 W42 W43 W44 W44 W45 W46 W47 W48 W48 W49 W50 W51
% of Completion Jan -
NOV DECSEPT OCT
-
7/21/2019 EHS Overview Share
175/214
-
7/21/2019 EHS Overview Share
176/214
W52
Dec =
STATUS JAN -
DEC
2013
-
7/21/2019 EHS Overview Share
177/214
RESPONSIBILITY RELATED TO HSE LEGAL & OTHER REQUIREMENTS
Responsibility Requirement Specific Act Retention Penalty (RM) MiscellaneousAR Back-Up
Weekly
DH meeting RBMA N/A 1 year N/A N/A Mapis Azman
Monthly 01/11
SHO Report to MD Legal OHSA (SHO) 10 years5000 or 6
months jail
3 calender
month only w/o
SHO Azman Mapis 4
HSE audit SOP/Legal OHSA (SHO) 10 years NCR N/AMapis Azman 18
HSE Management
System Meeting
SOP N/A 5 years N/A N/A
Mapis Azman 7&8HSE accident CO2 data
to Dr.SchmidtCM HSE report INF N/A N/A
Mapis Azman 15
Sewage Analysis Legal EQA INF10,000 or 2
yearsN/A
Pani Allen 29Sewage Analysis Report
to DOELegal EQA INF
10,000 or 2
yearsN/A
Mapis Azman 26/1Consigment notes to
DOELegal EQA INF
10,000 or 2
yearsN/A
Pani Name 1 29
Quaterly
HSE committee meeting Legal OHSA (SHC) 7 years5000 or 6
months jailN/A
Mapis Name 1
Safety committee Audit Legal OHSA (SHC) 7 years5000 or 6
months jailN/A
Mapis Name 1
HSE Management
ReviewISO/OHSAS SOP 5 years NCR N/A
Mapis Name 1 27
ERT/First Aid Training SOP SOP 3 years NCR N/A Mapis Name 1Scheduled Waste
Inventory to DOELegal EQA INF
10,000 or 2
yearsN/A
Mapis Name 1 10
Air Emission Analysis Legal EQA INF10,000 or 2
yearsN/A
Pani Name 2Air Emission Analysis
Report to DOELegal EQA INF
10,000 or 2
yearsN/A
Mapis Name 1 6
Yearly
ISO14001 Internal Audit ISO/OHSAS SOP 3 years NCR N/A Mapis Name 1ISO14001 Surveillance
AuditISO/OHSAS SOP 3 years NCR N/A
Mapis Name 1
Annual Report Data CMHSE
Database3 years NCR N/A
Mapis Name 1 19
CSR Report Data CMHSE
Database3 years NCR N/A
Mapis Name 1
Fire Drill Legal Fire Act INF 5,000 or 3years
N/AMapis Name 1
Noise Monitoring Legal OHSA INF 1,000 Competency Mapis Azman
Lead Monitoring Legal FMA 30 years 2,000 Competency Mapis Azman
NADOOPOD Report Legal OSHA 5 years10,000 or 1
yearN/A
Mapis Azman 30
IH Monitoring Corp No Corp Req INF NCR IH Certified Lab Lab 2
Duty
To Keep Secrect Legal OHSA N/A20,000 or 2
yearsN/A
Mapis Azman
Chemical Approver
SOP/Legal SOP 3 years
10,000 or 1
year N/A Azman Mapis
Permit to work Legal OSHA INF 1000 Competency Azman Mapis
Impairment (Fire
Supression System) SOP SOP 3 years NCR N/A Azman Mapis
Machine/Tooling Buy-off SOP SOP 3 years NCR N/A Azman Mapis
Scheduled Waste
Shipment Legal EQA INF 2,000 N/A Pani Name 1 29
Training related to HSE
TO
-
7/21/2019 EHS Overview Share
178/214
-
7/21/2019 EHS Overview Share
179/214
Clause ISO14001:2004 Requirements4.1 General Requirements New defination
4.2 Environmental Policy Clearly reflect clause 4.2
4.3 Planning4.3.1 Environmental Aspects
Identify AI
4.3.2 Legal and other requirements AI link to legal
4.3.3 Objectives, Targets &
Programme(s)
Establish,
maintain &
implement.
4.4 Implementation And Operation4.4.1 Resources, roles,
responsibility and Availability of resources
authority
4.4.2 Competence, Training and
Awareness
Competence
4.4.3 Communication To in form or not.
4.4.4 Documentation EMS and their interaction
4.4.5 Control of Documents Approval-review-control
4.4.6 Operational control Associate - Significant Aspect
-
7/21/2019 EHS Overview Share
180/214
4.4.7 Emergency preparedness
and response
Potential emergency, incident
-
7/21/2019 EHS Overview Share
181/214
4.5 Checking4.5.1 Monitoring and measurement Time- equipments-analysis
4.5.2 Evaluation Of Compliance. Evaluate
4.5.3 Nonconformity, corrective
action and
Identify,investigate,evaluate,record,
preventive action. revision.
4.5.4 Control of Records Record demonstrate compliance
4.5.5 Internal Audit Plan ,implement,result -
management
4.6Management Review Ensure continuing suitability,adequacy, effectiveness.
-
7/21/2019 EHS Overview Share
182/214
ABC SdnBHD
Level 0 Level 1RBMA Mgmt System
N93 Manual
Mgmt System Manual
-
7/21/2019 EHS Overview Share
183/214
-
7/21/2019 EHS Overview Share
184/214
-
7/21/2019 EHS Overview Share
185/214
ISO SOP
Level 2 Level 3
I01-01 Organisation Chart
I00-09 Environmental / Aspect / Impact Assessment.
N93-A5 Env.Aspect / Impact Requirements.
I06.-01 Suppliers Assessment
N93-A12 Suppliers Audit.
I00-06 Legal and Other requirements
I00-07 Env. Objectives & Targets
I00-05 OHS & Environment
SMAN-0010 Safety, Health & Env.
committee
I18-01 Training.
N93-A8 Training
SPER-0001 Training needs Analysis
SPER-0003 Training effectiveness and
evaluation.
I00-08 Communication on Environment related issues.
I21-01 Customer Specific Requirements (CSR)
I05-02 Handling of procedures from CM/QMM.
I05-01 Document control.
I06-02 Control of sub-contractor.
-
7/21/2019 EHS Overview Share
186/214
I06-03 Suppliers selection & qualification.
I06-04 Purchasing
I09-07 Maintenance and Servicing.
I09-08 General / Hot work permit.
I13-03 Disposition of Non-conforming products.
I13-05 Waste Management.
N93-A13 Waste Management (guide only)
I15-02 Chemical Handling and storage.
SMAN-0013 Waste water control.
SMAN-0007 Fire loss control.
SMAN-0009 Fire Protection Servicing
procedure.
SMAN-0010 Safety, Health and Env.
committee.SPER-0007 Vendors/Contractors SH&Q
awareness training.
SPUR2-0014 Handling of Chemical
purchase.
SPUR2-0016 Evaluation of Service
suppliers.
SQAS5-0005 Suppliers Audits.
CMAN-002-003 Segregation of waste
at source.
CMAN-002-002 Schedule waste
segregation at source.
CMAN-002-001 Waste Master list.
I00-11 Emergency response procedure.
SMAN-004 Aisles & Exit.
-
7/21/2019 EH