    151fRiseAs i at efa leg ENGINEERSIN I NA L IM ITED/A nul na. Lnden., , STANDARD SPECIFICATIONFOR POSITIVE MATERIALIDENTIFICATION (PMI) ATSUPPLIER'S WORKSSTANDARD SPECIFICATION No

    6 81 0001 Rev. 2Page I of 8

    c Tc o v in g i i 4f l c o m o ic t T I P T t hf g i t t a v r

    STANDARD SPECIFICATIONFOR

    POSITIVE MATERIALIDENTIFICATION

    (PMI)AT SUPPLIER'S WORKS

    4 , 52 20.10.11 REVISED AND RE-ISSUED AK C DM 15.07.08 REVISED AND RE-ISSUED NK R SSL SKP VC0 07.12.00 ISSUED AS STANDARD SPECIFICATION AK C AK B AKB M I

    Standards StandardsRev.No Date Purpose Preparedby C h e c k e dby

    Commi t teeConvenor B u r e a uChai rmanA pp r o v e d b y

    Formal No. 8-00-0001-F1 Rev. 0 Copyright EIL All rights reservedPage 1642 of 2542

  • 8/12/2019 Eil Spec for Pmi

    2/8

    151Mae le E N G I N E E R Simegver I N D I A L I M I T E D n eRaWanJelwill Govl of India Undertakno STANDARD SPECIF ICATIONFOR POS ITIVE M ATERIALIDENTIFICATION (PM I) ATSUPPLIER S WORKS ST A NDA R D SP E C I F IC A T I O N No .6-81 -000 1 Rev. 2Page 2 o f 8Abbreviations

    API American Petroleum InstituteAS Alloy SteelLSTK Lump Sum Turn KeyPM I Positive Material IdentificationSc h ScheduleSS Stainless SteelTPI or TPIA Third Party Inspection AgencyInspection Standards CommitteeConvenor: Mr.AK ChaudharyMembers: Mr. SS LotayMr. SC GuptaMr. RK SinghMr. Rajeev KumarMr. Anoop GoelMr. G SureshMr. G Poornachandra Rao

    Mr. MP Jain (Projects)

    Forma t N o. 8 -00-0001-F1 Rev . 0 Copyr ight EIL Al l r ights reservedPage 1643 of 2542

  • 8/12/2019 Eil Spec for Pmi

    3/8

    STANDARD SPECIF ICATIONFOR POS ITIVE MATE RIALIDENTIFICATION (PMI) ATSUPP LIER S WORKS151M4-? te E N G I N E E R SOgrir tfigtegW INDIA LIMITEDGo r l o f I nd ia u nd e r ta k ing }

    STAND ARD SPECIF ICAT ION No .6-81 -000 1 Rev. 2

    Page 3 of 8

    ONT NTS0SCOPE 42.0 REFERENCE DOCUMENTS 43.0 DEFINITIONS 44.0 PMI EXAMINATION 5.0 ACCEPTABLE METHODS FOR PMI 6.0 EXTENT OF PMI EXAMINATION 67.0 RECORDING AND DOCUMENTATION 78.0 MARKING 7

    Copy right EIL All rights reservedFormat No. 8-00-00 01-F1 Rev. 0Page 1644 of 2542

  • 8/12/2019 Eil Spec for Pmi

    4/8

    STANDARD SPECIF ICATIONFOR PO SITIVE MATERIALIDENTIFICATION (PMT) ATSUPPLIER S WORKS t ENCJNEERSb rea eg-60 I N D I A L I M I T E D STAND ARD SPECIF ICAT ION No .6-81 -000 1 Rev. 2Page 4 of 81.0 SCOPE1 1 This specification applies to the requirements for Positive Material Identification (PMI) to beperformed at the Supplier's works on Metallic Materials procured either directly by the

    Owner/EIL/ LSTK contractor or indirectly through the sub-Suppliers.1.2 Any post order deviation from this specification must be approved by Owner/EIL in theDeviation/ Waiver Permit format (No. 5-0000-0180-F1) enclosed with Material Requisition.1.3 This specification covers the procedures and methodology to be adopted to assure that thechemical composition of the material is consistent with the material specifications as specifiedin purchase documents using 'Alloy Analyzer' at the time of final inspection before dispatch.1.4 The scope of this specification shall include but shall not be limited to Positive MaterialIdentification (PMI) to be performed on Materials listed below:1.4.1 For alloy Steel materials as below:

    Alloy Steel Pipes including Clad PipesAlloy Steel Flanges & ForgingsAlloy Steel Fittings including Clad FittingsAlloy Steel FastenersAlloy Cast & Forged steel valvesAlloy Steel Instrumentation Items (Control Valves, Safety Valves etc.)Longitudinal Pipe & Fittings Welds.Gaskets (for Ring Type Joints)

    1.4.2 For Carbon Steel materials as below:All Carbon Steel Piping items under NACE or HIC or H2Carbon Steel flanges and valves (Rating 900# and above)Carbon Steel Pipes & fittings for following thicknesses:Size 1 - 2 NB : Sch 160 & aboveSize 3 NB : Sch XS & aboveSize 4 - 12 NB : Sch 120 & aboveFollowing items shall be excluded from scope of PMI examination.Gaskets other than for Ring Type JointsInternal Components of Valves

    1.5 All grades of material supplies including Stainless Steels shall be liable for PMI test at site. Incase of any defective materials being found at site, the Supplier shall be responsible to effectreplacement of such defective materials at project site without any delays to the satisfaction ofEIL site RCM (Resident Construction Manager).

    2.0 REFERENCE DOCUMENTS2.1 API Recommended Practice 578 (First Edition, May 1999) - Material Verification Program forNew and Existing Alloy Piping Systems.3.0 DEFINITIONS3.1 Supplier Any Supplier or Manufacturer on whom an order is placed for the supply of referreditems. This definition shall also include any sub-Supplier or manufacturer on whom a sub-order

    is placed by the Supplier.

    Copy right EIL All rights reservedFormat No. 8-00-00 01-F1 Rev. 0Page 1645 of 2542

  • 8/12/2019 Eil Spec for Pmi

    5/8

    S T A N D A R D S P E C I F I C A T I O NF O R P O S I T IV E M A T E R I A LIDENTIFICATION (PM I) ATSUPPLIER'S W ORKSSaIRCIELM ; ENGINEERSPar taiReZ VW INDIA LIMITED

    STAND ARD SPECIF ICAT ION No .6-81-0001 Rev. 2

    Page 5 of 82Inspection Lot: A group of items offered for inspection covered under same size, Heat andHeat treatment lot.3.3 Alloy Material: Any metallic material (including welding filler materials) that containsalloying elements such as chromium , nickel, molybdenum or vanadium, which are intentionallyadded to enhance mechanical or physical properties and/or corrosion resistance.4.0 P M I E X A M I N A T IO N1The Supplier shall submit a procedure of PMI to comply with the requirements of thisSpecification App roval of PMI Procedure shall be obtained from Own er/EIL/TPIA p rior tocomm encing manufacture/ inspection of product.4.2 PMI examination of materials is independent of any certification, markings or colour codingthat may exist and is aimed at verifying that the alloy used are as per specified grades.4.3 The Supp lier shall identify all incoming alloy materials and m aintain full traceability of all alloymaterials including all off-cuts. Transfer of identification marks shall be undertaken prior tocutting to ensure m aintenance of identification on off-cuts.4. 4 The Supplier shall ensure that all alloy materials are segregated and stored in separatelyidentified locations to p revent the m ix up of m aterials of different alloy specifications or alloymaterial with carbon steel. Non ferro-magnetic materials shall be segregated at all times fromferro-magnetic materials.4 .5 PMI examination is subject to surveillance inspection by Owner/EIL/ TPIA.5.0 A C C E P T A BL E M E T H O D S F O R P M I5.1 The method used for PMI examination shall provide a quantitative determination of the alloyingelements like chromium, nickel, molybdenum or vanadium in Alloy Steel items.5 .2 Instruments or methods used for PMI examination shall be able to provide quantitative,recordable, elemental composition results for positive identification of alloying elementspresent.5.3 The acceptable instrum ents for alloy analyzer shall be either Portable X-Ray fluorescence or Optical Emission type each capable of verifying the percentage of alloy elements withinspecified range.5 .4 Chemical spot testing, magnets, alloy sorters and other methods using eddy current ortriboelectric testing methods are not acceptable for PMI examination.5 .5 The PMI instrument used shall have the sensitivity to detect the alloying elements in thespecified range.5 .6 All PMI instruments shall have been serviced within a 6 month period of the time of use toverify the suitab ility of batteries, sources etc., and the dat a of the last service shall be stated onthe PMI Report Form (Sample enclosed).5.7 Each analyzer must be calibrated according to the m anufacturer's specification at the beginningand end of each shift. Instrument m ust be checked against known standard for each alloy typeto be inspected during the shift.

    Copy right EIL All rights reservedFormat No. 8-00-00 01-F1 Rev. 0Page 1646 of 2542

  • 8/12/2019 Eil Spec for Pmi

    6/8

    STANDARD SPECIF ICATIONFOR POS ITIVE MATE RIALIDENTIFICATION (PMI) A TSUPPLIER S WORKSISil laZreq e E N G IN E E R S

    s Ige eW I N D I A U M I T E DGovt a Inaa UndenakingiSTAND ARD SPECIF ICAT ION No .

    6-81 -000 1 Rev. 2Page 6 of 88Certified samples, with full traceability, of a known alloy materials shall be available for use asa random spot check on the instrument calibration.

    5.9 The surfaces to be examined shall be prepared by light grinding or abrasive paper and solventcleaner. Evidence of Arc burn resulting from examination shall be removed by light grinding orabrasive paper. No permanent marks, which are injurious to the usage of product in service, areacceptable.

    5 10 Alloy Steel ring type joint Gaskets shall be inspected by using portable X-Ray fluorescenceinstrument.5.11 Testing shall be done as per the procedures outlined by the manufactures of alloy analyzerbeing used. Modification of these procedures if any must be approved by Owner/EIL.5.12 The persons performing PMI shall demonstrate their capabilities to the satisfaction ofOwner/EIL/TPIA visiting engineer. If the Supplier has qualified operator on their rolls, he may

    perform the examination. Otherwise PMI examination shall be sub-contracted to an independenttesting agency approved by EIL.

    5.13 Whenever material is identified as not meeting requirements by the visiting engineer a rejectionnote shall be issued.6 0 EXTENT OF PMI EXAMINATIONFollowing sampling plans shall be applicable for PMI examination of various items.Flanges, Fittings 100Valves, RTJ GasketsPipes 100 (for pipes procured from traders).2 random samples drawn from eachSize/Heat/Lot (for pipes procured directly from mills)C. FastenersLot Size Sample SizeUpto 100 2 (Min 2)101 to 500 1 (Min 3)501 and above 0.5 (Min 5)

    Note:For Welded Pipes and Fittings, PMI shall be performed on Base Metal as well asweldments.Whenever any sample drawn to PMI test on the basis of percentage selection in B & Cabove, fails to meet specification requirements, 100% of items of lot shall be tested forPMI.

    Copy right EIL All rights reservedFormat No. 8-00-00 01-F1 Rev. 0Page 1647 of 2542

  • 8/12/2019 Eil Spec for Pmi

    7/8

    S T A N D A R D S P E C I F I C A T I O NF O R P O S IT I V E M A T E R I A LI D E N T I F I C A T I O N P M I ) ATSUPPLIER S WORKS

    i . 3 1 1 a e l t i . ENGINEERSogr i r E iRteg IND IA LIMITEDIA Go a t Ind ia Undertaking ST A NDA R D SP E C I F IC A T I O N No .6-81-0001 Rev. 2Page 7 o f 87.0 RECORDING AND DOCUMENTATIONThe results of PMI examination shall be recorded in a Report Format as enclosed with thisspecification.8.0 MARKING8.1 All alloy materials tested by PMI shall be identified using either of the following methods byindicating PMI OKBar Code/Hologram StickerA low stress stamp marking

    Copyr ight EIL Al l r ights reservedForma t N o. 8 -00-0001-F1 Rev . 0Page 1648 of 2542

  • 8/12/2019 Eil Spec for Pmi

    8/8

    STANDARD SPECIF ICATIONFOR POS ITIVE MATE RIALIDENTIFICATION (PMI) A TSUPP LIER S WORKS 2 elie ENGINEERSst ar &Reg W INDIALIMTED

    GOA Of India undertakng)

    ST A NDA R D SP E C I F IC A T I O N No .6-81 -000 1 Rev. 2

    Page 8 o f 8

    POSITIVE MATERIAL IDENTIFICATION REPORTBULK MATERIALS

    Page ofProject: Client Job N o.PMI Report No. Supplier/Sub-SupplierPurchase Order No. Testing AgencyPurchaseRequisition No:

    PMI Location

    Bulk Item Type (as per Requisition)Material Specification/GradeNumber of items in LotRequisition Item No./ Description Major content, Weight Percent RemarksAccept/RejectElement Cr Mo N i VSpecified RangeActual observations

    Instrument Type / ID

    Last Service Date Inspection Agency Witnessed By

    Copyr ight EIL Al l r ights reservedForma t N o. 8 -00-0001-F1 Rev . 0Page 1649 of 2542