THE EL TORNO GOLD PROJECT ARGENTINA Dr. Kevan Ashworth Dr. Fabio Montanari JUNE 2009 Safe Harbor Statement: Certain statements contained herein are "forward-looking" statements (as such term is defined in the Private Securities Reform Act of 1995). Because such statements include risks and uncertainties, actual results may differ materially from those expressed or implied by such forward-looking statements. Information or opinions in this document are presented solely for informative purposes and are not intended nor should be construed as investment advice. We encourage you to carefully review the Company with your investment advisor and verify any information that is important to your investment decision.

Upload: carlton-parfitt

Post on 25-Jun-2015

279 views

Category:

Business


2 download

DESCRIPTION

El Torno contains a large gold-rich quartz vein system that extends north-south for 14 km and is up to 20 metres wide. The central parts of the system have been worked since the Incas, resulting in about 1 km of underground galleries that are now flooded. The vein system was investigated by Puma Minerals in 1997 who carried out over 2,100 m of drilling. They were followed in 1999 by Peñoles (discoverer of the world’s largest silver mine and Mexico’s largest and richest gold mines) who undertook trenching, grab sampling, and geological surveying as well as a geophysical IP survey. The drilling showed that gold is concentrated in a 2 metre-wide zone on the western side of the main vein. Puma estimated that a 1.3 km length of the vein could have the potential for over 500,000 ounces of gold to a depth of 100 metres or 2 million ounces to a depth of 400 metres at an assumed grade of 10 g/t gold (not NI-43-101 compliant)

TRANSCRIPT

Page 1: El Torno Gold Project Report 2009

THE

EL TORNO GOLD PROJECT

ARGENTINA

Dr. Kevan Ashworth Dr. Fabio Montanari JUNE 2009 Safe Harbor Statement: Certain statements contained herein are "forward-looking" statements (as such term is defined in the Private Securities Reform Act of 1995). Because such statements include risks and uncertainties, actual results may differ materially from those expressed or implied by such forward-looking statements. Information or opinions in this document are presented solely for informative purposes and are not intended nor should be construed as investment advice. We encourage you to carefully review the Company with your investment advisor and verify any information that is important to your investment decision.

Page 2: El Torno Gold Project Report 2009

The El Torno Project The El Torno Project, in the extreme north of Argentina, is an area of 78 km2 that contains a very large gold-bearing quartz vein system that extends intermittently north-south for 14 km with veins up to 20 metres wide. The central parts of the system have been worked since the Incas, resulting in about 1 km of underground galleries, and more recent drilling has shown that gold is concentrated in a 2 m wide zone on the western side of the main vein. Previous workers estimated that a 1.3 km length of the vein could have the potential for over 500,000 ounces of gold to a depth of 100 metres or 2 million ounces to a depth of 400 metres at an assumed grade of 10 g/t gold (non-NI 43-101 compliant). Soltera has carried out two stream sediment geochemical sampling programmes and a detailed structural survey. The results show that:

• The main vein system appears mineralized along its full length of 14 kilometres. • The vein system is folded into an anticlinal form and the tested mineralization in

the west wing could extend across into the east wing which is totally untested. • There are broad and strong stream sediment geochemical gold anomalies over

wide areas of the country rocks up to 2 km from the main vein that are centered on suites of small veins and stockworks that could be major open-pit targets.

• The exploration area has been reduced effectively from 80 km2 to 10 km2 and within this precisely defined area there is potential for several million ounces of both underground and open-pit gold.

The next step is to carry out a two-pronged exploration programme on both the geo- chemical anomalies and the main vein system. Mapping, surface sampling and small, specifically targeted, geophysical programmes will be used to define drill targets. Soltera is currently in the process of raising funding to carry out these programmes. Introduction The El Torno Gold Project is located in the province of Jujuy, in the Andean Cordillera of northwest Argentina near the border with Bolivia (Figure 1). It covers an area of approximately 78 km2 of grassland at a height of 4,000 metres above sea level. The climate is semi-arid, with temperatures ranging from -5oC on winter nights to 25oC on summer days. There is only rain, no snow, in winter, but the cold wet conditions make operating difficult during a three month period from late May to late August. The light vegetation is mainly “alfa” type grass and a little bush. The area is accessible by road all year round from the village of Santa Catalina located 20 km to the east. Santa Catalina is 335 km by road from the city of San Salvador de Jujuy which has direct flights to Buenos Aires. Title Soltera holds options over 7,800 hectares (Figure 2) by agreements with five title owners. In essence, Soltera pays a rent that increases annually and is $100,000 for

2

Page 3: El Torno Gold Project Report 2009

Fig. 1: Soltera Project Locations June 2009 to June 2010, and has work obligations that require $1 million expenditure by 30th December 2010. The 2009 to 2010 rental has already been paid. Full details of the option agreements are shown in Appendix 1. Geology This region is dominated by mildly metamorphosed sandstones and shales of Ordovician age (Acoite Formation, Figure 2) which were folded along north-south axial planes during the Jurassic. The folds vary from open to near-isoclinal and the axes are dislocated in places by cross-faults. The whole folded sequence is cut by a series of long inverse faults that strike north-south, dip gently west and thrust to the east causing repeated stacking and repetition of the sedimentary units. In the El Torno area the sedimentary sequence consists of two main units; a lower one of coarse sandstones, and an upper unit of interlayered finer-grained sandstones and shales. The lower, coarse sandstone, unit is more permeable and rigid versus the less permeable, more flexible upper layer. This is an important control on the mineralization, as described below.

Eureka Cu + Au El Torno Au

Argentina Project Locations

3

Page 4: El Torno Gold Project Report 2009
Page 5: El Torno Gold Project Report 2009

Mineralization The belt of Acoite Formation sandstones and shales extends at least 200 km north-south within northern Argentina and contains numerous deposits of vein gold, vein lead-zinc-silver and a limited number of sedimentary style copper deposits. This mineralized belt continues northward into Bolivia. At El Torno, the sandstones and shales are cut by a set of very large gold-bearing quartz veins that extend intermittently for at least 14 kilometres north-south. The veins vary in thickness from a few centimetres to over 20 metres and are concentrated along the axis of a major north-south fold. They appear to be interlayered with the sedimentary strata and dip gently in the main. In places, they are dislocated by cross faults. Gold mineralization, as shown by old workings and drilling in the central part of the vein system, is concentrated in a 2 metre-wide zone on the western side of the main vein. The gold is associated with pyrite, often limonitised, but the gold itself appears to be mainly free. Assays of drill core suggest an average around 10 g/t gold for the portion that was drilled with values up to 37 g/t gold. The main vein system is accompanied in places by broad stockworks of small quartz and pyrite veins that can extend up to 300 metres outwards from the main vein and in some cases occur up to 2 kilometres away and appear unrelated to the main vein system. Old records show values as high as 112 g/t gold from surface samples of these stockwork systems. The mineralized systems, both the main veins and the stockworks, were possibly emplaced during the Jurassic folding when the sedimentary sequence was penetrated by gold-bearing hydrothermal fluids. The fluids migrated relatively easily through the relatively permeable sandstones of the lower Acoite Formation and became concentrated in zones of high permeability of low pressure. They were stopped, however, by the relatively impermeable pelitic layers of the upper Acoite Formation unit and so became concentrated as veins and stockworks in the lower unit. We believe that this has considerable implications for exploration. Past Activity El Torno has been a producing gold mine for centuries. It was originally worked by the Incas, then the Spaniards, and this resulted in over 1,000 metres of underground galleries. More modern exploration, including geophysics and drilling, has been carried out since 1997 with an estimated expenditure around $1.35 million. In 1997 Puma Minerals Corp. (“Puma”) carried out geological mapping and drilled sixteen holes totaling 2,015 metres using reverse circulation air hammer to a maximum depth of 180 metres (Figure 3). The drilling, over a 1 kilometre length of the vein, gave impressive results. Gold values for the main vein were between 5 g/t and 37 g/t gold and stockwork samples showed up to 23 g/t gold accompanied by silver in a 1:1 ratio (Table 1). It is interesting to note that samples of country rock intersected by the drill holes commonly show 1-2 g/t gold. The drill assay values could well be low, because reverse circulation air blast percussion drilling can easily lose gold.

5

Page 6: El Torno Gold Project Report 2009

6

Page 7: El Torno Gold Project Report 2009

Prospection Regional

Minera Penoles Argentina S. A. / Puma Minerals

PROYECTO "EL TORNO"

Well Deep Azimuth Inclination Interval Thickness Sample Au

N° (m) (m) (m) N° g/t Thick x g/t

ET -1 102 65 -55 12 a 14 2 1004 2.98 5,96

24-26 2 1010 1.49 2,98

40-42 2 10lB 1,83 3,66

5H4 12 1025-1030 1,42 17,04

70-72 2 1034 0,77 1.54

74-76 2 1036 0,45 0,90

78-80 2 1038 2,5 5,00

100 - 102 2 1050 4,9 9.80

ET·2 180 -90 122-124 2 1114 0,87 1,74

ET-3 104 -90 12 - 14 2 1161 1.34 2,68

28 - 30 2 11511 0,83 1.66

40 - 44 4 1165-1168 0,86 3,44

58 - 60 2 1174 5.44 10,88

96 – 98 2 1193 0.34 0,68

102-104 2 1196 0,47 0,94

ET-4 154 65 -55 12.14 2 1202 2,4 4,80

7 - 6 12 1134·1239 1,06 12,72

90 -108 18 1242-1251 0,65 11,70

112 -116 4 1254·1255 1,08 4,32

120-124 4 1259-1280 1,14 4,56

146 - 154 8 1273-1276 0,24 1,92

ET-5 106 35 -55 16 - 18 2 1285 1,05 2.10

38 - 40 2 \296 1,85 3,70

48 - 54 6 1301·1303 6,22 37,32

58 - 76 18 1307-1316 0.76 13,50

82 - 84 2 1319 14,36 28,72

88 - 92 4 1322·1323 0,68 2.72

96 - 98 2 1326 2,57 5,l(

102 · 106 4 1329-1330 1,22 4,88

ET-6 150 -90 108 - 110 2 1381 1,96 3,92

146 - 148 2 1407 0,96 1.96

ET-7 104 ·90 36 - 38 2 1427 0,68 1,36

78 - 80 2 1449 0,32 0,64

ET-8 114 ·90 42 - 44 2 1483 0,65 1.30

54 - 56 2 ·1490 0,3 0,80

60 - 62 2 1493 0,34 0,68

88 - 96 8 1507-1511 0,61 4,88

106 -108 2 1517 13,06 26,10

7

Page 8: El Torno Gold Project Report 2009

Well Deep Azimuth Inclination Interval Thickness Sample Au

N° (m) (m) (m) N° g/t Thick x g/t

ET-9 100 -90 2 - 4 2 1522 0,31 0,62

14 -16 2 1528 1.07 2,14

26 - 28 2 1535 1.02 2,04

44 - 48 4 1544-1545 0,24 0,96

76 - 78 2 1561 3.01 6,02

80 - 82 2 1563 0,35 0,7

84 - 86 2 1565 1.9 3.80

ET-10 150 90 -55 24 - 26 2 1586 0,3 0,60

56 - 58 2 1603 2,76 5,52

60 - 62 2 1605 0,64 1,28

86 - 88 2 1618-1619 1.09 2,18

96 - 100 4 1824-162!> 2,19 8,76

114 - 116 2 1633 0,33 0,66

126 - 128 2 1639 0,97 1,94

ET-11 150 90 -55 26 - 30 4 1664·1685 0,8 3,20

56 - 62 6 lW>-IBa2 1,14 6.84

62 - 64 2 1683 11,56 23.12

78 - 80 2 16111 0.42 0,84

132 - 134 2 1119 2,06 4,12

136 - 140 4 1722·1724 0.28 1.12

ET-12 102 90 -55 50 - 52 2 1755 0,3 0.60

54 - 56 2 1751 0,85 1.70

58 – 66 8 17~1782 0,52 4.18

98 -100 2 1780 1,35 2,70

ET-13 149 18 -55 33 – 44 10 1799-1803 0,77 1.70

122-124 2 1845 0,48 0,96

ET-14 100 290 -60 3 - 40 2 1879 0,69 1.36

ET-15 100 290 -60 56 - 58 2 1941 0,95 1,90

ET-16 150 90 -55

ET 1-16 2015 c/0,17 232 1,8 1,49

Table 1: El Torno Drill Holes (May 1997) Sectors with Gold Anomalous Values. In 1999, Industrias Peñoles, SA de CV (“Peñoles”) undertook additional exploration including trenching, grab sampling and geological surveying as well as a geophysical Induced Polarization survey. The three IP geophysical profiles conducted by Peñoles suggest the presence of a flanking structure adjacent to the main vein with moderate to high chargeability that is located at depth between 50 and 125 metres. This structure has never been tested. Based on Puma’s historical drilling, and their own work, Peñoles estimated that a 1.3 kilometre length of the vein would have the potential for over 500,000 ounces of gold to a depth of 100 metres and that the same length to a depth of

8

Page 9: El Torno Gold Project Report 2009

9

Page 10: El Torno Gold Project Report 2009

400 metres could have the potential for over 2 million ounces of gold at an assumed grade of 10 g/t gold (non-tNI 43-101 compliant). A private individual recently mined parts of the upper 2 to 3 metres of the main vein and an alluvial deposit nearby. Gold was recovered as particles and micro-nuggets, confirming that at least part of the vein gold is free rather than locked in pyrite grains. The exploitation consisted of washing and gravity concentration with a trommel and sluice system and produced about 300 grams of gold per day. The gravity concentration plant is still at the site and in good condition, and Soltera is examining the feasibility of restarting production which, although small-scale, would fund exploration on the main targets. Exploration by Soltera Soltera has concentrated to date on several stream sediment geochemical surveys and a detailed structural survey. To date, the company has spent around $150,000 on this exploration. The first stream sediment geochemical survey, in late 2007, was strategic and covered about 100 km2, including the whole El Torno property. It was intended as a first check to establish whether only the central part of the vein system is gold-rich. The country is rolling highland dissected by streams, so is well suited for this type of survey. A total of 596 samples were collected at selected locations on stream courses and the -80 mesh fractions analysed in Canada. The results show a series of distinct, very strong anomalies extending the full 14 km length of the vein system, indicating that the gold mineralization is present along almost its whole length (Figure 4). Even more interesting, was the presence of very strong and broad gold anomalies up to 2 km away from the main system, which appear to be centred over large areas of vein suites and stockworks in the country rocks. One of these anomalies alone is 2 km long by 1.5 km wide. These broad but strong anomalies gave the first indication that gold mineralization is far more extensive than previously thought and, furthermore, they offer the distinct possibility that wide mineralized areas of country rock may be previously unrecognised large-scale open-pit targets. The structural study, completed in April 2008, focused on the main vein system, concentrating on parts of the system exposed at the surface and in the old mine workings. The results suggest that the quartz veins are broadly parallel to the sedimentary layering, rather than steeply dipping as previously thought, and they thicken in the anticlinal axis (Figs. 5 and 6). This is reminiscent of the Bendigo and Ballarat gold fields in Australia and suggests the possibility of stacked mineralized vein systems along the anticlinal axis at depth. Furthermore, the vein gold identified to date has all been on the western side of the main vein in the western limb of the anticline, and there could well be unidentified gold-quartz mineralization in the unexplored eastern limb. The second stream sediment geochemical survey, in mid-2008, was tactical and focused on the anomalies identified by the first survey. It consisted of just over 1,000 samples covering an area of about 15 km2. The results were excellent and confirmed the presence of a major gold anomalous zone about 5 km north-south and up to almost 2

10

Page 11: El Torno Gold Project Report 2009

11

Page 12: El Torno Gold Project Report 2009

12

Page 13: El Torno Gold Project Report 2009

km wide centered on the vein system but extending well beyond the vein into the country rocks on either side (Figure 7). There is also a separate anomalous area of about one square kilometer located about 1 km east of the main vein in the south. The remote anomalies appear to be centered on large areas of vein suites and stockworks that are concentrated the sandstone-rich lower unit of the sedimentary sequence. This fits with the interpretation that the mineralizing hydrothermal fluids could penetrate the lower, sandstone rich unit easily, but their movement was blocked by the overlying pelitic upper unit. Erosion along the anticlinal axis has exposed the lower unit and the outcrops coincide almost precisely with the geochemical gold anomaly that extends 5 km north-south and 2 km east-west. Potential The vein system, apparently mineralized over most of its 14 km length, is a prime target for future test work. If the vein gold extends into the eastern limb of the anticline or if mineralization along the axis of the anticline is repeated at depth, then the potential mineralized system could be much more extensive than previously thought. In that case, the earlier (non NI-43-101 compliant) Peñoles estimate of more than 500,000 ounces of gold to 100 metres depth could be increased by magnitudes. This is a target that warrants diamond drilling. Separately, the well-structured and strong geochemical gold anomalies throughout the country rocks well beyond the vein system form precise and important exploration targets for possible open-pit mineralization. In this respect, they differ from the vein mineralization where the target is gold-rich quartz veins that would require underground mining. Both underground and open-pit targets are large-scale and are each large enough to contain several million ounces of gold. The main vein system will require extensive diamond drilling, but the open-pit targets are relatively easy to test by a combination of surface sampling, percussion drilling and diamond drilling. It is interesting to note that there are some similarities between El Torno and AngloGold Ashanti Limited’s Cerro Vanguardia Mine in the south of Argentina. In particular, the El Torno vein system with its attendant suites of small veins in the country rocks appears similar, at least superficially, to Cerro Vanguardia where the gold mineralization occurs in a series of narrow hydrothermal quartz veins that occupy specific structures. Total gold production in 2007 was 220,000 ounces of gold at cash costs of $261 per ounce of gold. This is a rich open-pit mine system with total resources of approximately 3.5 million ounces at just over 3 grams of gold per tonne and reserves of 1.9 million ounces of gold at a grade of 6.52 grams of gold per tonne. Soltera looks to the Cerro Vanguardia Mine as a potential exploration and production model for El Torno.

13

Page 14: El Torno Gold Project Report 2009

14

Page 15: El Torno Gold Project Report 2009

Conclusions The net result of Soltera’s exploration programme is:

• The main vein system appears mineralized along its full length of 14 kilometres. • The vein system is folded into an anticlinal form and the tested mineralization in

the west wing could extend across into the east wing which is totally untested. • There are broad and strong stream sediment geochemical gold anomalies over

wide areas of the country rocks up to 2 km from the main vein that are centered on suites of small veins and stockworks that could be major open-pit targets.

• The exploration area has been reduced effectively from 80 km2 to 10 km2 and within this precisely defined area there is potential for several million ounces of both underground and open-pit gold.

• There are similarities between El Torno and AngloGold Ashanti’s Cerro Vanguardia mine in the south of Argentina where gold is mined in relatively small open-pits centered upon a series of narrow hydrothermal quartz veins that occupy specific structures.

The next step is to carry out a two-pronged exploration programme on both the geo- chemical anomalies and the main vein system. The geochemical anomalies will be tested by a limited geophysical survey, surface sampling, trenching, and shallow drilling. The vein system will be tested also by a geophysical programme, followed by mapping of the old gold workings and a limited programme of diamond drilling. Soltera is currently in the process of raising funding to carry out these programmes. Cost Estimates Units Price per Unit Geophysical survey 60 Km $2,000 $120,000 Trenching & sampling 15 Km $1,000 $15,000 Drilling HQ full core wire line, including analysis and all related expenses 1,300 m $280 $364,000 Tot $499,000

15

Page 16: El Torno Gold Project Report 2009

APPENDIX 1

SUMMARY OF EL TORNO OPTION AGREEMENT The original option agreement covering El Torno,dated July 6, 2007, is between Incas Mineral, SA and a private individual: Manuel Bernal Mateo. Under this option agreement, Incas has exclusive rights to explore the El Torno Project with an option to acquire a 100% interest in El Torno, upon fulfilling certain conditions. Incas Mineral, S.A. is an Argentinean company that was incorporated on July 6, 2007. On July 24 2007, Soltera acquired all the shares of Incas from Fabio Montanari, the sole shareholder, for $1,500 which represents the costs for incorporating and organizing Incas in Argentina. Under the Option to Purchase agreement, Soltera has an obligation to spend $1 million on exploration by Dec 30, 2010 (renegotiated extension to original deadline) of which Soltera has spent approximately $500,000 to date. Soltera must also make payments including a total of $350,000 by June 30, 2010, according to the schedule detailed below. Soltera has an option to acquire the mineral titles. The payment schedule for El Torno is detailed below: 1. Issue $180,000 as a loan to the private individual for mining and exploration purposes on the Property on July 30, 2007 (issued) 2. $50,000 (paid) on or before June 30, 2008 3. $100,000 (paid) on or before June 30, 2009 4. $200,000 on or before June 30, 2010 5. $150,000 on or before June 30, 2011 6. $150,000 on or before December 31, 2011 7. $150,000 on or before June 30, 2012 8. $2,700,000 on or before December 31, 2012 or $500,000 each 6 months until a total of $2,970,000 is paid. During the life of any mine on the El Torno Claims, the registered owners will be entitled to receive a 1% net return royalty, which may be bought out by the Company at any time for $1,000,000. The option is currently in good standing.

16

Page 17: El Torno Gold Project Report 2009

APPENDIX 2: Some Photo of the El Torno Project

The El Torno Camp17

Page 18: El Torno Gold Project Report 2009

The Historic Jesuit Camp close to the Quartz Vein Field18

Page 19: El Torno Gold Project Report 2009

The Emerging of One of the Large Quartz Vein 19

Page 20: El Torno Gold Project Report 2009

The Quartz Vein Field20

Page 21: El Torno Gold Project Report 2009

Historic Goldmine Shaft21

Page 22: El Torno Gold Project Report 2009

Dr. Montanari standing in Peñoles Trench22

Page 23: El Torno Gold Project Report 2009

Current Operation on an Eluvium & Colluvium Zone of the Quartz Vein Field 23

Page 24: El Torno Gold Project Report 2009

The Old Plant – The Shaking Table

24

Page 25: El Torno Gold Project Report 2009

The New Plant – The 80 m3 / hour Trommel25

Page 26: El Torno Gold Project Report 2009

The Exploration Operations – Stream Sediment Samples Drying

26

Page 27: El Torno Gold Project Report 2009

The Exploration Operations – The Stream Sediments Samples Archive27