Eland 1 Solar Project – NOP
bm 7/12/2018
I:\Planning\WORKGRPS\WP\LABELS\
Eland1SolarProject.nop.docx
City of Arvin
P.O. Box 548
Arvin, CA 93203
Bakersfield City Planning Dept
1715 Chester Avenue
Bakersfield, CA 93301
Bakersfield City Public Works Dept
1501 Truxtun Avenue
Bakersfield, CA 93301
California City Planning Dept
21000 Hacienda Blvd.
California City, CA 93515
Delano City Planning Dept
P.O. Box 3010
Delano, CA 93216
City of Maricopa
P.O. Box 548
Maricopa, CA 93252
City of McFarland
401 West Kern Avenue
McFarland, CA 93250
City of Ridgecrest
100 West California Avenue
Ridgecrest, CA 93555
City of Shafter
336 Pacific Avenue
Shafter, CA 93263
City of Taft
Planning & Building
209 East Kern Street
Taft, CA 93268
City of Tehachapi
Attn: John Schlosser
115 South Robinson Street
Tehachapi, CA 93561-1722
City of Wasco
764 E Street
Wasco, CA 93280
Inyo County Planning Dept
P.O. Drawer "L"
Independence, CA 93526
Kings County Planning Agency
1400 West Lacey Blvd, Bldg 6
Hanford, CA 93230
Los Angeles Co Reg Planning Dept
320 West Temple Street
Los Angeles, CA 90012
San Bernardino Co Planning Dept
385 North Arrowhead Avenue, 1st Floor
San Bernardino, CA 92415-0182
San Luis Obispo Co Planning Dept
Planning and Building
976 Osos Street
San Luis Obispo, CA 93408
Santa Barbara Co Resource Mgt Dept
123 East Anapamu Street
Santa Barbara, CA 93101
Tulare County Planning & Dev Dept
5961 South Mooney Boulevard
Visalia, CA 93291
Ventura County RMA Planning Div
800 South Victoria Avenue, L1740
Ventura, CA 93009-1740
U.S. Bureau of Land Management
Ridgecrest Field Office
300 South Richmond Road
Ridgecrest, CA 93555
China Lake Naval Weapons Center
Tim Fox, RLA - Comm Plans & Liaison
429 E Bowen, Building 981
Mail Stop 4001
China Lake, CA 93555-6108
Edwards AFB, Sustainability Office
412 TW/XPO, Bldg 2750, Rm 204-38
195 East Popson Avenue
Edwards AFB, CA 93524
U.S. Fish & Wildlife Service
777 East Tahquitz Canyon Way, Suite 208
Palm Springs, CA 92262
Environmental Protection Agency
Region IX Office
75 Hawthorn Street
San Francisco, CA 94105
U.S. Dept of Agriculture/NRCS
5000 California Avenue, Ste 100
Bakersfield, CA 93309-0711
U.S. Army Corps of Engineers
Regulatory Division
1325 "J" Street, #1350
Sacramento, CA 95814-2920
U.S. Postal Service
Address Management Systems
28201 Franklin Parkway
Santa Clarita, CA 91383-9321
State Air Resources Board
Stationary Resource Division
P.O. Box 2815
Sacramento, CA 95812
Caltrans/Dist 6
Planning/Land Bank Bldg.
P.O. Box 12616
Fresno, CA 93778
Caltrans/Dist 9
Planning Department
500 South Main Street
Bishop, CA 93514
State Clearinghouse
Office of Planning and Research
1400 - 10th Street, Room 222
Sacramento, CA 95814
State Dept of Conservation
Director's Office
801 "K" Street, MS 24-01
Sacramento, CA 95814-3528
State Dept of Conservation
Division of Oil & Gas
4800 Stockdale Highway, Ste 417
Bakersfield, CA 93309
State Dept of Conservation
Division of Oil & Gas
801 "K" Street, MS 18-01
Sacramento, CA 95814-3530
California State University
Bakersfield - Library
9001 Stockdale Highway
Bakersfield, CA 93309
California Energy Commission
James W. Reed, Jr.
1516 Ninth Street
Mail Stop 17
Sacramento, CA 95814
State Dept of Fish & Wildlife
1234 East Shaw Avenue
Fresno, CA 93710
California Highway Patrol
Planning & Analysis Division
P.O. Box 942898
Sacramento, CA 94298-0001
Integrated Waste Management
P.O. Box 4025, MS #15
Sacramento, CA 95812-4025
State Water Resources Control Board
Division of Drinking Water
Attn: Jesse Dhaliwal, Sr. Sanitary Eng
4925 Commerce Drive, Suite 120
Bakersfield, CA 93309
Public Utilities Comm Energy Div
505 Van Ness Avenue
San Francisco, CA 94102
California Regional Water Quality
Control Board/Lahontan Region
15095 Amargosa Road - Bld 2, Suite 210
Victorville, CA 92392
State Lands Commission
100 Howe Avenue, Ste 100-South
Sacramento, CA 95825-8202
State Dept of Toxic Substance Control
Environmental Protection Agency
1515 Tollhouse Road
Clovis, CA 93612
State Dept of Water Resources
San Joaquin Dist.
3374 East Shields Avenue, Room A-7
Fresno, CA 93726
CalRecycle
Dept of Resources, Recycling, and
Recovery
1001 "I" Street
Sacramento, CA 95812
Kern County
Agriculture Department Kern County Administrative Officer
Kern County Public Works Department/
Building & Development/Floodplain
Kern County Public Works Department/
Building & Development/Survey
Kern County
Env Health Services Department
Kern County Fire Dept
Cary WrightNick D, Fire Marshall
Kern County Library/Beale
Local History Room
Kern County Library/Beale
Andie Apple Kern County Parks & Recreation
Kern County Sheriff's Dept
Administration
Kern County Public Works Department/
Building & Development/Development
Review
Kern County Public Works
Department/Operations &
Maintenance/Regulatory Monitoring &
Reporting
Mojave Town Council
Bill Deaver, President
P.O. Box 1113
Mojave, CA 93502-1113
Kern County Superintendent of Schools
Attention Mary Baker
1300 17th Street
Bakersfield, CA 93301
KernCOG
1401 19th Street - Suite 300
Bakersfield, CA 93301
Kern County Water Agency
P.O. Box 58
Bakersfield, CA 93302-0058
East Kern Air Pollution
Control District
Adams, Broadwell, Joseph & Cardozo
Attention: Janet M. Laurain
601 Gateway Boulevard, Suite 1000
South San Francisco, CA 94080
U.S. Air Force
Attn: David Bell/AFCEC CZPW
Western Regional/Leg Branch
510 Hickam Avenue, Bld 250-A
Travis AFD, CA 94535-2729
U.S. Army
Attn: Philip Crosbie, Chief
Strategic Plans, S3, NTC
P.O. Box 10172
Fort Irwin, CA 92310
U.S. Army
Attn: Tim Kilgannon, Region 9
Coordinator
Office of Strategic Integration
721 - 19th Street, Room 427
Denver, CO 80202
U.S. Navy
Attn: Steve Chung
Regional Community Plans & Liaison
Officer
1220 Pacific Highway, Bldg 127
San Diego, CA 92132-5190
U.S. Marine Corps
Commanding General
MCIWEST-MCB CamPen
Attn: A/CS, G7
Box 555010
Camp Pendleton, CA 92055-5246
AT&T California
OSP Engineering/Right-of-Way
4540 California Avenue, 4th Floor
Bakersfield, CA 93309
Kern Audubon Society
Attn: Harry Love, President
13500 Powder River Avenue
Bakersfield, CA 93314
Los Angeles Audubon
926 Citrus Avenue
Los Angeles, CA 90036-4929
Center on Race, Poverty
& the Environment
Attn: Marissa Alexander
1999 Harrison Street – Suite 650
San Francisco, CA 94612
Center on Race, Poverty
& the Environmental/
CA Rural Legal Assistance Foundation
1012 Jefferson Street
Delano, CA 93215
Defenders of Wildlife/
Kim Delfino, California Dir
980 - 9th Street, Suite 1730
Sacramento, CA 95814
Desert Tortoise Preserve Committee
4067 Mission Inn Avenue
Riverside, CA 92501
California Farm Bureau
2300 River Plaza Drive, NRED
Sacramento, CA 95833
Mojave Chamber of Commerce
P.O. Box 999
Mojave, CA 93502
Native American Heritage Council
of Kern County
Attn: Gene Albitre
3401 Aslin Street
Bakersfield, CA 93312
Sierra Club/Kern Kaweah Chapter
P.O. Box 3357
Bakersfield, CA 93385
Southern California Edison
P.O. Box 410
Long Beach, CA 90801
Southern California Edison
2244 Walnut Grove, Ave, GO-1 Quad 2C
Rosemead, CA 91770
Southern California Edison
Planning Dept.
510 S. China Lake Blvd.
Ridgecrest, CA 93555
Southern California Edison
2244 Walnut Grove, Ave, GO-1 Quad 2C
Rosemead, CA 91770 Verizon California, Inc.
Attention Engineering Department
520 South China Lake Boulevard
Ridgecrest, CA 93555
Chumash Council of Bakersfield
2421 "O" Street
O.O. Box 902
Bakersfield, CA 93301-2441
David Laughing Horse Robinson
P.O. Box 20849
Bakersfield, CA 93390
Kern Valley Indian Council
Attn: Robert Robinson, Chairperson
P.O. Box 401
Weldon, CA 93283
Kern Valley Indian Council
Historic Preservation Office
P.O. Box 401
Weldon, CA 93283
Santa Rosa Rancheria
Clarence Atwell, Chairperson
P.O. Box 8
Lemoore, CA 93245
Tejon Indian Tribe
Kathy Morgan, Chairperson
1731 Hasti-acres Drive, Suite 108
Bakersfield, CA 93309
Kitanemuk & Yowlumne Tejon Indians
Chairperson
115 Radio Street
Bakersfield, CA 93305
Tubatulabals of Kern County
Attn: Robert Gomez, Chairperson
P.O. Box 226
Lake Isabella, CA 93240
Tule River Indian Tribe
Neal Peyron, Chairperson
P.O. Box 589
Porterville, CA 93258
San Fernando Band of Mission Indians
Attn: John Valenzuela, Chairperson
P.O. Box 221838
Newhall, CA 91322
Terra-Gen Power, LLC
Steve Yatsko
11512 El Camino Real, Suite 370
San Diego, CA 92130-3025
Renewal Resources Group
Holding Company
Rupal Patel
113 South La Brea Avenue, 3rd Floor
Los Angeles, CA 90036
Sempra Generation
Marilyn Burke
101 Ash Street HQ-14A
San Diego, CA 92101^
David Walsh
22941 Banducci Road
Tehachapi, CA 93561
Congentrix Sunshine, LLC
Rick Neff
9405 Arrowpoint Blvd
Charlotte, NC 28273
Fotowatio Renewable Ventures
Sean Kiernan
44 Montgomery Street, Suite 2200
San Francisco, CA 94104
EDP Renewables Company
North America, LLC
53 SW Yamhill Street
Portland, OR 97204
T.T. Case
P.O. Box 2416
Tehachapi, CA 93581^
Structure Cast
Larry Turpin, Precast Sales Manager
8261 McCutchen Road
Bakersfield, CA 93311
Marcus V. da Cunha
Vice President of Development
EcoPlexus, Inc.
650 Townsend Street, Suite 310
San Francisco, CA 94103
Wind Stream, LLC
Albert Davies
1275 - 4th Street, No. 107
Santa Rosa, CA 95404
Darren Kelly
Sr. Business Manager
Terra-Gen Power, LLC
1095 Ave of the Americas – FL 25, Ste A
New York, NY 10036-6797
Bill Barnes
Dir of Asset Mgmt
AES Midwest Wind Gen
P.O. Box 2190
Palm Springs, CA 92263-2190
Sarah K. Friedman
Beyond Coal Campaign/Sierra Club
1417 Calumet Avenue
Los Angeles, CA 90026
Robert Burgett
9261 - 60th Street, West
Mojave, CA 93501
Lozeau Drury LLP
410 – 12th Street, Suite 250
Oakland, CA 94607
PG&E
Steven Ng, Manager
Renewal Dev, T&D Intercon
77 Beal Street, Room 5361
San Francisco, CA 94105
Wayne Mayes
Iberdrola Renewables
Dir Tech Serv
1125 NW Couch St, Ste 700, 7th Fl
Portland, OR 97209
Michael Strickler
Iberdrola Renewables, Sr Proj Mgr
1125 NW Couch St, Ste 700, 7th Fl
Portland, OR 97209
Recurrent Energy
Seth Israel
300 California Street, 8th Floor
San Francisco, CA 92109
Kelly Group
Kate Kelly
P.O. Box 868
Winters, CA 95694
Carol Lawhon
Association Executive, IOM
Tehachapi Area Assoc of Realtors
803 Tucker Road
Tehachapi, CA 93561
Matthew Gorman
The Gorman Law Firm
1346 E. Walnut Street, Suite 220
Pasadena, CA 91106
Janice Armstrong
24121 Rand Court
Tehachapi, CA 93561
Joyce LoBasso
P.O. Box 6003
Bakersfield, CA 93386
LIUNA
Attn: Danny Zaragoza
2201 "H" Street
Bakersfield, CA 93301
Mojave Foundation
Attn: Todd Quelet
16922 Airport Boulevard
Mojave, CA 93501
Northcutt and Associates
4220 Poplar Street
Lake Isabella, CA 93240-9536
Tehachapi Resource Cons Dist
321 West "C" Street
Tehachapi, CA 93561-2011
Nature Conservancy West Reg Office
201 Mission Street, 4th Floor
San Francisco, CA 94105
Vestas
1417 NW Everett Street
Portland, OR 97209
California City Community Dist
21000 Hacienda Blvd.
California City, CA 93505
Antelope Valley-East Kern
Water Agency
6500 West Avenue N
Palmdale, CA 93551
Mojave Unified School Dist
3500 Douglas
Mojave, CA 93501
Darren Kelly
Sr. Business Manager
Terra-Gen Power, LLC
1095 Ave of the Americas – FL 25, Ste A
New York, NY 10036-6797
Lozeau Drury LLP
410 – 12th Street, Suite 250
Oakland, CA 94607
So. San Joaquin Valley Arch Info Ctr
California State University of Bkfd
9001 Stockdale Highway
Bakersfield, CA 93311
Division of Occupational
Safety and Health
2550 Mariposa Mall, Ste. 4000
Fresno, CA 93721-2219
Edwards Air Force Base
AFFTC/XRX Bldg 0001, Room 110
#1 South Rosamond Blvd.
Edwards AFB, CA 93524-1936
Federal Communications Comm
18000 Studebaker Road, #550
Cerritos, CA 90701
U.S. Fish & Wildlife Service
2493 Portola Road, Suite B
Ventura, CA 93003
Eastern Kern Resource Cons Dist
300 South Richmond Road
Ridgecrest, CA 93555-4436
U.S. Army Corps of Engineers
P.O. Box 997
Lake Isabella, CA 93240
State Clearinghouse
Office of Planning and Research
P.O. Box 3044
Sacramento, CA 95812-3044
CERTIFIED MAIL
State Dept of Water Resources
Div. Land & Right-of-Way
P.O. Box 942836
Sacramento, CA 94236
Kern County Engineering, Surveying,
& Permit Svs/Floodplain
Kern County Engineering, Surveying,
& Permit Svs/Survey
Kern County Fire Dept
Nick Dunn, Fire Chief
Kern County Fire Dept
Brian Marshall
Kern County Fire Dept
Dave Goodell
Kern County Library/Beale
Diane Duquette
Kern County Library
California City Branch
9507 California City Boulevard
California City, CA 93505
Kern County Library
Mojave Branch
16916 1/2 Highway 14, Space D2
Mojave, CA 93501
Kern County Roads Department Kern County
Waste Management Department
Local Agency Formation Comm/LAFCO
5300 Lennox Avenue, Suite 303
Bakersfield, CA 93309
California City Airport
22636 Airport Way, #8
California City, CA 93505
Mojave Airport
1434 Flightline
Mojave, CA 93501
East Kern Airport Dist
Attention Stuart Witt
1434 Flightline
Mojave, CA 93501
East Kern Airport Dist Engineer
3900 Ridgemoor Avenue
Bakersfield, CA 93306
U.S. Air Force
Western Regional Environmental Officer
50 Fremont Street, Suite 2450
San Francisco, CA 94105-2230
U.S. Army
Dir of Public Works/Master Plan Div
P.O. Box 105097
Fort Irwin, CA 92310-5097
U.S. Army
Peter Rubin
B790 5th Street
Parks RFTA
Dublin, CA 94568
U.S. Marine Corps
Patrick Christman
Building 1164/Box 555246
Camp Pendleton, CA 92055
AT&T
5555 E. Olive Avenue, Cubicle 450F
Fresno, CA 93727
Kern Audubon Society
P.O. Box 3581
Bakersfield, CA 93385
Center on Race, Poverty
& the Environmental
47 Kearny Street, Suite 804
San Francisco, CA 94108-5528
Defenders of Wildlife/
Cynthia Wilkerson, M.S.
California Representative
1303 "J" Street, Suite 270
Sacramento, CA 95814
Beth Boyst
Pacific Crest Trail Program Manager
1323 Club Drive
Vallejo, CA 94592
Native American Heritage Council
of Kern County/Fay Van Horn
P.O. Box 1507
Bakersfield, CA 93302
Anitra Kass
Pacific Crest Trail Association
P.O. Box 3398
Idyllwild, CA 92549
Sierra Club/Kern Kaweah Chapter
Arthur Unger
***PUT IN BUCKET***
Southern California Gas Co
1510 North Chester Avenue
Bakersfield, CA 93308
Southern California Gas Co
Transportation Dept
9400 Oakdale Avenue
Chatsworth, CA 91313-6511
David Laughing Horse Robinson
P.O. Box 1547
Kernville, CA 93238
Kern Valley Indian Council
Attn: Bob Robinson
P.O. Box 1010
Lake Isabella, CA 93240
Tejon Indian Tribe
Kathy Morgan, Chairperson
2234 4th Street
Wasco, CA 93280
Kitanemuk & Yowlumne Tejon Indians
Chairperson
981 North Virginia
Corvina CA 91722
Renewal Resources Group
Holding Company
Rupal Patel
5700 Wilshire Blvd, Suite 330
Los Angeles, CA 90036
Element Power Solar Dev, LLC
John Gaglioti
864 Portola Drive
Monterey, CA 93940
Jon VanDerZee
EDP Renewables Company
North America, LLC
53 SW Yamhill Street
Portland, OR 97204
Nautilus Solar
Paul Steinway
P.O. Box 188
Fort Lupton, CO 80621
First Solar
Rick Williams
18300 Von Karman Ave, Ste 930
Irvine, CA 92612
Gary Izing
enXco, Director of Land and Title
5000 Executive Parkway, Suite 140
San Ramon, CA 94583
Darren Kelly
Sr. Business Manager
Terra-Gen Power, LLC
565 - 5th Avenue, Floor 27
New York, NY 10017
Bill Barnes
Dir of Asset Mgmt AES Wind Gen
4542 Ruffner Street, Suite 200
San Diego, CA 92111
Cash Long
Mogul Energy
7201 Panorama Drive
Bakersfield, CA 93306
Jeff Ciachurski, CEO
Western Wind Energy Corp/
Aero Energy
Box 1041
Vancouver, BC V6C 3E8
T. Alana Steele
General Counsel
Western Wind Energy Corporation
3500 Glenrose Avenue
Altadena, CA 91001
Cuddy Valley Statistical
11667 Steinhoff Road
Frazier Park, CA 93222
Metrostudy
5001 California Avenue, Suite 210
Bakersfield, CA 93309
William Nelson
P.O. Box 308
Tehachapi, CA 93581-0308
Notice of Completion & Environmental Document Transmittal Mail to: State Clearinghouse, P. O. Box 3044, Sacramento, CA 95812-3044 (916) 445-0613
For Hand Delivery/Street Address: 1400 Tenth Street, Sacramento, CA 95814
Project Title: Eland 1 Solar Project Solar by 68SF 8me LLC
Lead Agency: Kern County Planning Department Contact Person: Carlos E. Rojas
Mailing Address: 2700 "M" Street Suite 100 Phone: (661) 862-5015
City: Bakersfield Zip: 93301-2323 County: Kern
Project Location: County: Kern City/Nearest Community: California City
Cross Streets: South of Munsey Road, East and West of Neuralia Road, East of SR-14, North and South of Phillips Road Zip Code: 93560
Lat. / Long.: 35 18 39 N / 117 58’ 54 W Total Acres: 2,652.7
Assessor's Parcel No.: Multiple Section: Multiple Twp.: Multiple Range: Multiple Base: MDB&M
Within 2 Miles: State Hwy #: SR-14 Waterways: N/A
Airports: N/A Railways: N/A Schools: N/A
Document Type:
CEQA: NOP Draft EIR NEPA: NOI Other: Joint Document
Early Cons Supplement/Subsequent EIR EA Final Document
Neg Dec (Prior SCH No.) Draft EIS Other
Mit Neg Dec Other FONSI
Local Action Type:
General Plan Update Specific Plan Rezone Annexation
General Plan Amendment Master Plan Prezone Redevelopment
General Plan Element Planned Unit Development Use Permit Coastal Permit
Community Plan Site Plan Land Division (Subdivision, etc.) Other
Development Type:
Residential: Units Acres Water Facilities: Type MGD
Office: Sq.ft. Acres Employees Transportation: Type
Commercial: Sq.ft. Acres Employees Mining: Mineral
Industrial: Sq.ft. Acres Employees Power: Type Solar PV MW 500
Educational Waste Treatment: Type MGD
Recreational Hazardous Waste: Type
Other:
Project Issues Discussed in Document:
Aesthetic/Visual Fiscal Recreation/Parks Vegetation
Agricultural Land Flood Plain/Flooding Schools/Universities Water Quality
Air Quality Forest Land/Fire Hazard Septic Systems Water Supply/Groundwater
Archeological/Historical Geologic/Seismic Sewer Capacity Wetland/Riparian
Biological Resources Minerals Soil Erosion/Compaction/Grading Wildlife
Coastal Zone Noise Solid Waste Growth Inducing
Drainage/Absorption Population/Housing Balance Toxic/Hazardous Land Use
Economic/Jobs Public Services/Facilities Traffic/Circulation Cumulative Effects
Other
Present Land Use/Zoning/General Plan Designation:
Undeveloped Land. Zoning: A (Exclusive Agriculture); E (2.5) RS MH (Estate 2.5 acres, Residential Suburban, Mobile Home); Kern County General Plan: 4.3 (Specific Plan Required)
Project Description: (please use a separate page if necessary) The project proponent is requesting: (a) Amendment to the Circulation Element of the Kern County General Plan Circulation Element to Eliminate road reservations along section and mid-section lines in Section 23, 28, 31, 32, 33, 34, and 45 T31S/R37E, in zone maps 152 and 152-28; (b) four changes in zone classification from the existing zone district A-1 (Limited Agriculture) to A (Exclusive Agriculture) on 265.3 acres of the project site within zoning Map 152, from the existing zone district A-1 MH (Mobilehome Combining) to A on 81.7 acres of the project site within zoning Map 152, from the existing zone district E (20) RS (Estate (20) Residential Suburban Combining) to A on 81.5 acres of the project site within Zoning Map 152-28, from the existing zone district PL RS MH (Platted Lands-Residential Suburban Combining-Mobilehome Combining) to A on 81.4 acres of the project site within Zoning Map 152; (e) five Conditional Use Permits to allow for the construction and operation of 500 megawatt solar photovoltaic electrical generating facility (Section 19.12.030.G) in an A District; (g) The project would be supported by a 230-kV gen-tie overhead and/or underground electrical transmission line(s) originating from one or more on-site substation(s)/switchyard(s) and terminating at the Los Angeles Department of Water and Power’s (LADWP) Barren Ridge Substation. The project’s permanent facilities would include, service roads, a power collection system, communication cables, overhead and underground transmission lines, electrical switchyards, project substations, and operations and maintenance facilities.
SCH #
Reviewing Agencies Checklist
Lead Agencies may recommend State Clearinghouse distribution by marking agencies below with and "X".
If you have already sent your document to the agency please denote that with an "S".
Air Resources Board Office of Emergency Services
Boating & Waterways, Department of Office of Historic Preservation
California Highway Patrol Office of Public School Construction
CalFire Parks & Recreation
S Caltrans District # 6 & 9 Pesticide Regulation, Department of
Caltrans Division of Aeronautics S Public Utilities Commission
Caltrans Planning (Headquarters) S Regional WQCB # Lahontan
Central Valley Flood Protection Board Resources Agency
Coachella Valley Mountains Conservancy S.F. Bay Conservation & Development Commission
Coastal Commission San Gabriel & Lower L.A. Rivers and Mtns Conservancy
Colorado River Board San Joaquin River Conservancy
Conservation, Department of Santa Monica Mountains Conservancy
Corrections, Department of State Lands Commission
Delta Protection Commission SWRCB: Clean Water Grants
Education, Department of SWRCB: Water Quality
Energy Commission SWRCB: Water Rights
S Fish & Game Region # Fresno Tahoe Regional Planning Agency
Food & Agriculture, Department of Toxic Substances Control, Department of
General Services, Department of Water Resources, Department of
Health Services, Department of
Housing & Community Development Other
Integrated Waste Management Board Other
S Native American Heritage Commission
Local Public Review Period (to be filled in by lead agency)
Starting Date July 19, 2018 Ending Date August 20, 2018
Lead Agency (Complete if applicable):
Consulting Firm: Applicant:
Address: Address:
City/State/Zip: City/State/Zip:
Contact: Phone:
Phone:
Signature of Lead Agency Representative: /s/ Date: 7/19/18
Authority cited: Section 21083, Public Resources Code. Reference: Section 21161, Public Resources Code.
Initial Study/Notice of Preparation July 2018
INITIAL STUDY/NOTICE OF PREPARATION
Eland 1 Solar Project
by 68SF 8me LLC
General Plan Amendment 9, Map 152
Zone Change Case No. 11, Map 152
Zone Change Case No. 12, Map 152
Zone Change Case No. 1, Map 152-28
Zone Change Case No. 13, Map 152
Conditional Use Permit 23, Map 152
Conditional Use Permit 24, Map 152
Conditional Use Permit 25, Map 152
Conditional Use Permit 26, Map 152
Conditional Use Permit 3, Map 152-28
(PP18211)
LEAD AGENCY:
Kern County Planning and Natural Resources Department
2700 M Street, Suite 100
Bakersfield, CA 93301-2370
Contact: Carlos E. Rojas
(661) 862-5015
July 2018
Initial Study/Notice of Preparation July 2018
1. Project Description ....................................................................................................... 1
1.1 Background .............................................................................................................. 1
1.2 Location .................................................................................................................... 1
1.3 Environmental Setting .............................................................................................. 1
1.4 Project Description.................................................................................................. 11
1.5 Project Objectives ................................................................................................... 17
1.6 Proposed Discretionary Actions/Required Approvals ............................................ 18
2. Kern County Environmental Checklist Form .......................................................... 20
2.1 Environmental Factors Potentially Affected ........................................................... 20
2.2 Determination (To Be Completed By the Lead Agency) ....................................... 20
3. Evaluation of Environmental Impacts ...................................................................... 21
Aesthetics ...................................................................................................................... 22
Agriculture and Forest Resources ................................................................................. 24
Air Quality .................................................................................................................... 26
Biological Resources .................................................................................................... 29
Cultural Resources ........................................................................................................ 31
Tribal Cultural Resources ............................................................................................. 33
Geology and Soils ......................................................................................................... 34
Greenhouse Gas Emissions ........................................................................................... 37
Hazards and Hazardous Materials ................................................................................ 38
Hydrology and Water Quality ....................................................................................... 43
Land Use and Planning ................................................................................................. 46
Mineral Resources ........................................................................................................ 48
Noise ............................................................................................................................. 49
Population and Housing ................................................................................................ 51
Public Services .............................................................................................................. 53
Recreation ..................................................................................................................... 55
Transportation/Traffic ................................................................................................... 56
Utilities and Service Systems........................................................................................ 58
Mandatory Findings of Significance ............................................................................. 60
Figures
Figure 1 Site Vicinity ................................................................................................. 3
Figure 2 Project Site Boundaries ............................................................................... 4
Figure 3 Existing General Plan Designation .............................................................. 7
Figure 4 Existing Zoning ........................................................................................... 8
Figure 5 Potential Gen-Tie Routed .......................................................................... 14
Tables
Table 1 Project Assessor Parcel Numbers and Corresponding Map Codes,
Existing and Proposed Zoning, and Acreage ................................................ 5
Table 2 Existing On-and-Off Site Land use, General Plan Map Code
Designations, and Zoning ............................................................................ 9
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 1 July 2018
1. Project Description
1.1 Background This Notice of Preparation (NOP) is being circulated pursuant to Section 15082 of the California
Environmental Quality Act (CEQA) Guidelines, and serves to notify responsible and trustee agencies of
the preparation of a Supplemental Environmental Impact Report (EIR) to the Beacon Photovoltaic Project
(State Clearinghouse No. 2012011029). The Supplemental EIR will modify the previously certified Beacon
Photovoltaic Project EIR pursuant to Section 15163 of the CEQA Guidelines.
The Beacon Photovoltaic Project (Beacon Project) included the construction and operation of a solar facility
capable of generating up to 250 megawatts (MW) of electricity on 2,298 acres. The Beacon Project also
included a three mile transmission line to connect the solar facility to the existing Barren Ridge Substation.
On October 30, 2012, the Kern County Board of Supervisors certified the Beacon Photovoltaic Final EIR
and approved the Beacon Project, which consisted of a Conditional Use Permit (CUP) (CUP 11, Map 152).
In 2013, subsequent applications for three individual CUPs were filed with the County to allow the
construction and operation of two additional solar facility sites in proximity to the original Beacon Project.
The CUPs were for the 345-acre Oryx Solar Farm and 951-acre Springbok Solar Farm. These two additional
solar facility sites were analyzed in the Addendum to the Beacon Photovoltaic Solar Project Final EIR
prepared in November 2013, which was approved by the Kern County Board of Supervisors in early 2014.
In 2018, 68SF 8me LLC (Applicant or project proponent) submitted applications for five individual CUPs
to allow the construction and operation of five additional solar facility sites in proximity to the Beacon
Project, Oryx Solar Farm Project, and Springbok Solar Farm Project boundaries (Figure 1). The Kern
County Planning and Natural Resources Department as Lead Agency is requiring that a Supplemental EIR
be prepared for the five additional solar facility sites.
1.2 Location The Eland 1 Solar Farm Project (project or proposed project) would develop a photovoltaic (PV) solar
facility and associated infrastructure necessary to generate up to 500 megawatts (MW) of renewable
electrical energy on 2,652.7 acres of privately-owned land. The project would include a new transmission
line to connect the solar facility to the existing Barren Ridge Substation. Multiple transmission routes are
under consideration and discussed further in Section 1.3.
The project site is located in unincorporated Kern County, southeast of the unincorporated community of
Cantil and immediately north of the California City limits (Figure 1). The project site is a relatively flat
desert landscape with the Sierra Nevada Mountains located approximately 0.5 miles to the west. The project
site is located south of Munsey Road, east and west of Neuralia Road, east of California State Route (SR)
14, and north and south of Phillips Road. SR 14, a four-lane divided highway, provides regional access to
the project site.
1.3 Environmental Setting The project site is located within the Fremont Valley, southwest of Koehn Dry Lake in the western portion
of the Mojave Desert. Cadastrally, the project site is located on the California City North and Mojave North
East 7.5 minute quadrangles with smaller sections located in the Cinco and Cantil Quadrangles.
The project site located is south of the existing Springbok 1 and 2 Solar Farms and the Beacon Solar facility,
north of California City and south of the unincorporated area of Cantil. The project site is transected by the
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 2 July 2018
north-south traversing Neuralia Road, State Highway 14 and the Southern Pacific Railroad on its western
boundary, BLM trail “Jawbone Canyon” W-30 on its eastern boundary and Phillips Road near its southern
boundary.
Elevations within the project site range from roughly 2,420 feet above mean sea level at the southwest
corner of the project site, to roughly 2,120 feet at the northeast corner of the project site. The land slopes
gently from the southwest towards the northeast throughout. The project site is relatively flat and features
numerous ephemeral desert drainages trending to the northeast, which ultimately drain into Koehn Dry
Lake located to the northeast of the project site.
Landforms in the Fremont Valley include granite-derived alluvial fans and plains, low hills, washes, and
an alkaline basin. The entire area drains in a northeasterly direction to Koehn Lake. Native vegetation on-
site is typical of that found throughout the Mojave Desert, dominated by creosote bush and white bursage
on slopes and plains and saltbush scrub in the alkaline basin. Many of the project parcels have been
previously disturbed and/or cultivated. Currently, these areas include fallow agricultural fields and cleared
parcels that were never put into agricultural production.
Based on a review of the Federal Emergency Management Agency’s (FEMA) Flood Insurance Rate Maps
(Panels 06029C2930E and 06029C2940E), Site 1 and Site 2 have small areas mapped as 100-year (Zone
A) floodplains. Zone A is defined as areas subject to inundation by the 1-percent-annual-chance flood event
generally determined using approximate methodologies. The rest of the project site is mapped as Zone X,
which is defined as areas of minimal flood hazard that are outside of the Special Flood Hazard Area and
beyond the limits of the 0.2-percent-annual-chance (500-year) flood.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 3 July 2018
Figure 1: SITE VICINITY
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 4 July 2018
Figure 2: PROJECT SITE BOUNDARIES
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 5 July 2018
Table 1. Project Assessor Parcel Numbers and Corresponding Map Codes, Existing and Proposed
Zoning, and Acreage
CUP
Site
APN Kern County General Plan
Map Code Designation
Existing
Zoning
Proposed
Zoning
Acres
CUP 1 469-030-01 8.5 A, A FP A 647.8
Subtotal 647.8
CUP 2 330-010-01 8.5 A, A FP A 642.5
Subtotal 642.5
CUP 3 470-010-11 8.5 A
A
119.3
470-010-12 8.5 A 120.2
470-312-01 4.2/5.6 A-1 39.8
470-312-02 4.2/5.6 A-1 39.5
470-080-01 8.5 PL RS MH 5.2
470-080-02 8.5 PL RS MH 5.1
470-080-03 8.5 PL RS MH 10.1
470-080-04 8.5 PL RS MH 10.2
470-080-05 8.5 PL RS MH 10.3
470-080-06 8.5 PL RS MH 5.1
470-080-07 8.5 PL RS MH 5.1
470-080-08 8.5 PL RS MH 5.1
470-080-09 8.5 PL RS MH 5.1
470-080-10 8.5 PL RS MH 10.1
470-080-11 8.5 A 19.1
470-080-12 8.5 PL RS MH 10.0
470-080-13 8.5 A 20.2
470-080-14 8.5 A 20.3
Subtotal 459.8
CUP 4 470-020-08 8.5 A
A
153.7
470-321-18 4.2/5.6 A-1 61.4
470-321-19 4.2/5.6 A-1 60.8
470-322-14 4.2/5.6 A-1 10.5
470-330-05 8.5 A 20.2
470-330-09 4.2/5.6 A-1 9.5
470-330-11 4.2/5.6 A-1 MH 81.7
470-330-12 4.2/5.6 A-1 20.7
470-330-13 8.5 A 79.5
Subtotal 498.0
CUP 5 470-020-11 4.2/5.8 E(20) RS
A
81.5
470-020-12 4.2/5.6 A-1 162.5
470-020-13 4.2/5.6 A-1 160.6
Subtotal 404.6
TOTAL 2652.7
4.2 = Interim Rural Community Plan; 5.6 = Min. 2.5 Gross Acres/Unit; 5.8 = Min. 20 Gross Acres/Unit; 8.5 =
Resource Management (Min. 20 Acre Parcel Size)
A = Exclusive Agriculture; A-1 = Limited Agriculture; E(20) = Estate, 20 Acres; FP = Floodplain Combining ;
MH = Mobile Home Combining; PL = Platted Lands; RS = Residential Suburban Combining
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 6 July 2018
The project would be served Kern County Sheriff’s Department for law enforcement and public safety,
Kern County Fire Department for fire protection, and Kern County Medical Emergency Services. The
nearest sheriff and fire stations are located in Mojave, located approximately 12 miles southwest of the
project site. The project site is not located within two miles of a public or public use airport or within an
area covered by the Kern County Airport Land Use Compatibility Plan (ALUCP), and is not located within
an airport sphere of influence identified in the ALUCP. The nearest public airport is the California City
Airport, which is located approximately 2.50 miles south of the project site (from southern boundary of Site
4).
Sites 1 and 2 are located entirely within the Kern County General Plan area. As shown in Figure 3, portions
of Sites 3, 4 and 5 are located within the Kern County General Plan area and the Fremont Interim Rural
Community Plan. As shown in Figure 3, the project site consists of 32 parcels designated by the Kern
County General Plan as Map Code 8.5 (Resource Management, minimum 20 acre parcel size) and by the
Fremont Interim Rural Community Plan as 4.2/5.6 (Interim Rural Community Plan/ Min. 2.5 Gross
Acres/Unit) and 4.2/5.8 (Interim Rural Community Plan/ Min. 20 Gross Acres/Unit). As shown in Figure
4, the project site has a zone classification of A (Exclusive Agriculture), A FP (Exclusive Agriculture,
Floodplain Combining), A-1 (Limited Agriculture), E (20) RS (Estate, 20 Acres, Residential Suburban
Combining), and PL RS MH (Platted Lands, Residential Suburban Combining, Mobile Home Combining).
Existing land uses in the surrounding area are primarily undeveloped. Table 2 identifies the project site and
surrounding land uses. The majority of the project site is zoned A (Exclusive Agriculture) or A-1 (Limited
Agriculture), which allows for the operation of a solar facility with approval of a Conditional Use Permit.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 7 July 2018
Figure 3: EXISTING GENERAL PLAN DESIGNATION
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 8 July 2018
Figure 4: EXISTING ZONING
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 9 July 2018
Table 2. Existing On- and Off-Site Land Use, General Plan Map Code Designations, and Zoning
Location Existing Land Use Existing General Plan
Map Code Designations Existing Zoning
Site 1 Undeveloped 8.5 (Resource Management, Min. 20 Acre
Parcel Size)
A (Exclusive Agriculture);
A FP (Exclusive
Agriculture, Floodplain
Combining)
North Undeveloped 8.5 (Resource Management, Min. 20 Acre
Parcel Size)
A (Exclusive Agriculture)
East Undeveloped 1.1 (State or Federal Land); 8.5 (Resource
Management, Min. 20 Acre Parcel Size);
8.5/2.5 (Resource Management, Min. 20
Acre Parcel Size/Flood Hazard)
PL RS (Platted Lands,
Residential Suburban
Combining); PL RS FPS
(Platted Lands, Residential
Suburban Combining,
Floodplain Secondary
Combining); RF
(Recreation Forestry)
South Undeveloped 8.5 (Resource Management, Min. 20 Acre
Parcel Size)
A (Exclusive Agriculture);
A FP (Exclusive
Agriculture, Floodplain
Combining); A FPS
(Exclusive Agriculture,
Floodplain Secondary
Combining)
West Undeveloped 8.5 (Resource Management, Min. 20 Acre
Parcel Size)
A (Exclusive Agriculture);
PL RS MH (Platted Lands,
Residential Suburban
Combining, Mobile Home
Combining)
Site 2 Undeveloped 8.5 (Resource Management (Min. 20 Acre
Parcel Size)
A (Exclusive Agriculture);
A FP (Exclusive
Agriculture, Floodplain
Combining)
North Undeveloped 8.5 (Resource Management (Min. 20 Acre
Parcel Size)
A (Exclusive Agriculture);
A GH (Exclusive
Agriculture, Geologic
Hazard)
East Undeveloped 8.5 (Resource Management (Min. 20 Acre
Parcel Size)
A FP (Exclusive
Agriculture, Floodplain
Combining)
South Undeveloped 1.2 (Incorporated Cities) N/A – California City
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 10 July 2018
Location Existing Land Use Existing General Plan
Map Code Designations Existing Zoning
West Undeveloped 8.5/2.1 (Resource Management, Min. 20
Acre Parcel Size/Seismic Hazard)
A (Exclusive Agriculture);
A GH (Exclusive
Agriculture, Geologic
Hazard); PL RS MH
(Platted Lands, Residential
Suburban Combining,
Mobile Home Combining)
Site 3 Undeveloped 8.5 (Resource Management (Min. 20 Acre
Parcel Size); 4.2/5.6 (Interim Rural
Community Plan/ Min. 2.5 Gross
Acres/Unit)
A (Exclusive Agriculture);
A-1 (Limited Agriculture);
PL RS MH (Platted Lands,
Residential Suburban
Combining, Mobile Home
Combining)
North Undeveloped, sparse
residential dwellings
8.5 (Resource Management (Min. 20 Acre
Parcel Size)
PL RS (Platted Lands,
Residential Suburban
Combining)
East Undeveloped 8.5 (Resource Management (Min. 20 Acre
Parcel Size)
A (Exclusive Agriculture)
South Undeveloped 8.5 (Resource Management (Min. 20 Acre
Parcel Size)
PL RS MH (Platted Lands,
Residential Suburban
Combining, Mobile Home
Combining)
West Undeveloped 4.2 (Interim Rural Community Plan) A-1 (Limited Agriculture);
A-1 MH (Limited
Agriculture, Mobile Home
Combining)
Site 4 Undeveloped 8.5 (Resource Management (Min. 20 Acre
Parcel Size); 4.2/5.6 (Interim Rural
Community Plan/ Min. 2.5 Gross
Acres/Unit)
A (Exclusive Agriculture);
A-1 (Limited Agriculture);
A-1 MH (Limited
Agriculture, Mobile Home
Combining)
North Undeveloped 4.2 (Interim Rural Community Plan); 8.5
(Resource Management (Min. 20 Acre
Parcel Size);
A (Exclusive Agriculture);
A-1 MH (Limited
Agriculture, Mobile Home
Combining); PL RS (Platted
Lands, Residential
Suburban Combining)
East Undeveloped 4.2 (Interim Rural Community Plan) A-1 (Limited Agriculture);
A-1 MH (Limited
Agriculture, Mobile Home
Combining)
South Undeveloped 1.2 (Incorporated Cities) N/A – California City
West Undeveloped 8.5 (Resource Management (Min. 20 Acre
Parcel Size)
A (Exclusive Agriculture)
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 11 July 2018
Location Existing Land Use Existing General Plan
Map Code Designations Existing Zoning
Site 5 Undeveloped, rural
residential dwellings
4.2/5.6 (Interim Rural Community Plan/
Min. 2.5 Gross Acres/Unit); 4.2/5.8 (Interim
Rural Community Plan/ Min. 20 Gross
Acres/Unit)
A-1 (Limited Agriculture);
E(20) RS (Estate 20 Acres,
Residential Suburban
Combining)
North Undeveloped 8.5 (Resource Management (Min. 20 Acre
Parcel Size)
A (Exclusive Agriculture);
PL RS MH (Platted Lands,
Residential Suburban
Combining, Mobile Home
Combining)
East Undeveloped, sparse
rural residential
dwellings
8.5 (Resource Management (Min. 20 Acre
Parcel Size)
PL RS MH (Platted Lands,
Residential Suburban
Combining, Mobile Home
Combining)
South Undeveloped, sparse
rural residential
dwellings
4.2 (Interim Rural Community Plan) A-1 (Limited Agriculture)
West Undeveloped, rural
residential dwellings
(Fremont rural
community)
4.2 (Interim Rural Community Plan) A-1 (Limited Agriculture);
A-1 MH (Limited
Agriculture, Mobile Home
Combining); E (1/4) RS
MH (Estate, 0.25 acres,
Residential Suburban
Combining, Mobile Home
Combining)
1.4 Project Description The proposed project would develop a PV solar facility and associated infrastructure necessary to generate
up to 500 MW of renewable electrical energy on 2,652.7 acres of privately-owned land. Power generated
by the proposed project would be delivered from the project site via an up to 230 kilovolts (kV) overhead
and/or underground electrical transmission line(s) originating from one or more on-site
substation(s)/switchyard(s) and terminating at the Los Angeles Department of Water and Power’s
(LADWP) Barren Ridge Substation.
PV Module Configuration
The proposed project would utilize PV panels or modules (including but not limited to concentrated PV
technology) on mounting frameworks to convert sunlight directly into electricity. Individual panels would
be installed on either fixed-tilt or tracker mount systems (single- or dual-axis, using galvanized steel or
aluminum). If the panels are configured for fixed tilt, the panels would be oriented toward the south. For
tracking configurations, the panels would rotate to follow the sun over the course of the day. The panels
would stand up to 20 feet high, depending on mounting system used.
The solar array fields would be arranged in groups called “blocks,” with inverter stations generally located
centrally within the blocks. Blocks would produce direct electrical current (DC), which is converted to
alternating electrical current (AC) at the inverter stations.
Each PV module would be placed on a fixed-tilt or tracker mounting structure. The foundations for the
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 12 July 2018
mounting structures would extend up to eight feet below the prevailing ground surface, depending on the
structure, soil conditions, and wind loads. If required, the foundations may be encased in concrete or utilize
small concrete footings. Final solar panel layout and spacing would be optimized for project area
characteristics and the desired energy production profile.
Inverter Stations
Photovoltaic energy is delivered via cable to inverter stations, generally located near the center of each
block. Inverter stations are typically comprised of one or more inverter modules with a rated power of up
to two MW each, a unit transformer, and voltage switch gear. The unit transformer and voltage switch gear
are housed in steel enclosures, while the inverter module(s) are housed in cabinets. Depending on the vendor
selected, the inverter station may lie within an enclosed or canopied metal structure, typically on a skid or
concrete mounted pad.
Energy Storage System
The proposed project may include one or more Energy Storage Systems (ESSs), located at or near a
substation (onsite or shared) and/or at the inverter stations. Such large-scale ESSs would consist of modular
and scalable battery packs and battery control systems that conform to U.S. national safety standards. The
ESS modules, which may include commercially available flow batteries, typically consist of standard
International Organization for Standardization (ISO) containers (approximately 40 feet in length by 8 feet
in width by 8 feet in height) housed in pad- or post-mounted, stackable metal structures, but may also be
housed in a dedicated building in compliance with applicable regulations. The maximum height of a
dedicated structure is not expected to exceed 25 feet. The actual dimensions and number of energy storage
modules and structures vary depending on the application, supplier, and configuration chosen, as well as
on off-taker/power purchase agreement requirements and County building standards.
The proposed project may integrate with an existing ESS located at one or more nearby solar projects or
may operate one or more standalone ESS facilities within the project site.
Substation
Output from the inverter stations would be transferred via electrical conduits and electrical conductor wires
to one or more on-site substation(s). Each substation may contain several components, including auxiliary
power transformers, distribution cabinets, revenue metering systems, and voltage switch gear. Each
substation would occupy an area of approximately 200 feet by 200 feet, secured separately by an additional
chain-link fence, and located along the perimeter of the project site. The final location(s) will be determined
before issuance of building permits.
Substations typically include a small control building (roughly 500 square feet) standing approximately ten
feet tall. The building is either prefabricated concrete or steel housing with rooms for the voltage switch
gear and the metering equipment, a room for the station supply transformer, and a separate control
technology room in which the main computer, the intrusion detection system, and the main distribution
equipment are housed. Components of this building (e.g., control technology room and intrusion detection
system) may instead be located at an operations and maintenance (O&M) building.
Transmission Line
Power generated by the proposed project would be delivered from the project site via an up to 230 kilovolts
(kV) overhead and/or underground electrical transmission line(s) (gen-tie) originating from one or more
on-site substation(s)/switchyard(s) on the project site. The transmission line would extend up to 11.5 miles
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 13 July 2018
and terminate at either the LADWP Beacon Substation or the LADWP Barren Ridge Substation. Potential
gen-tie routes are depicted on Figure 5.
Water Usage
Water demand for panel washing and O&M domestic use is not expected to exceed 50 acre-feet per year.
Water usage during construction, primarily for dust-suppression purposes, is not expected to exceed 400
acre-feet. Water is anticipated to be obtained from an existing on-site well within Site 5. According to the
landowner, the well is capable of producing 1,500 gallons per minute. Alternatively, water may be obtained
from one or more off-site source(s) and delivered to the project site via truck. If off-site water is used, it
will likely be obtained from one of the nearby Springbok projects or from a commercial source. If the
Applicant determines that off-site water will be used, the Applicant will submit a Will Serve Letter from
the proposed off-site water purveyor(s). A small water treatment system may be installed to provide
deionized water for panel washing.
Water Storage Tank(s)
One or more above-ground water storage tanks with a total capacity of up to 50,000 gallons may be placed
on-site near the O&M building. The storage tank(s) near the O&M building would have the appropriate fire
department connections to be used for fire suppression purposes.
Operations and Maintenance Building
The proposed project may include an O&M building of approximately 40 feet by 80 feet in size, with
associated on-site parking. The O&M building would be steel framed, with metal siding and roof panels.
The O&M building may include the following:
Office
Repair building/parts storage
Control room
Restroom
Septic tank and leach field
Roads, driveways and parking lot entrances would be constructed in accordance with Kern County
improvement standards. Parking spaces and walkways would be constructed in conformance with all
California Accessibility Regulations.
As previously mentioned, the proposed project may share O&M facilities and/or staff with one or more
nearby solar projects, and/or may be remotely operated. Any “unused” O&M areas on-site may be covered
by solar panels.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 14 July 2018
Figure 5: POTENTIAL GEN-TIE ROUTES
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 15 July 2018
Project Site Security and Fencing
The project site would be enclosed within a chain link fence with barbed wire measuring up to eight feet in
height (from finished grade). The proposed project would include an intrusion alarm system comprised of
sensor cables integrated into the perimeter fence, intrusion detection cabinets placed approximately every
1,500 feet along the perimeter fence, and an intrusions control unit or similar technology. The intrusions
control unit would be located either in the substation control room or at the O&M building. Additionally,
the proposed project may include additional security measures including, but not limited to, barbed wire,
low voltage fencing with warning reflective signage, controlled access points, security alarms, security
camera systems, and security guard vehicle patrols to deter trespassing and/or unauthorized activities that
could interfere with operation of the proposed project.
Controlled access gates would be maintained at the main entrances to the project site. Project site access
would be provided to off-site emergency response teams that respond in the event of an “after-hours”
emergency. Enclosure gates would be manually operated with a key provided in an identified key box
location.
Project Site Lighting
All project site lighting would be directed away from any public rights-of-way. Lighting used on-site would
be minimal. Site lighting may include motion sensor lights for security purposes. Lighting used on-site
would be of the lowest intensity foot candle level, in compliance with any applicable regulations, measured
at the property line after dark.
Construction Activities
The construction period, from site preparation through construction, testing, and commercial operation, is
expected to commence in early 2019 and will extend for approximately 12 to 18 months. Construction of
the facility will include the following activities:
Site Preparation
Grading and earthwork
Concrete foundations
Structural steel work
Electrical/instrumentation work
Collector line installation
Architecture and landscaping
No roadways would be affected by the proposed project, except during the proposed project’s construction
period. Construction traffic would access the project site from Philips Road, Gantt Road, and Neuralia
Road. It is estimated that up to 1,000 workers per day (during peak construction periods) would be required
during the construction of the proposed project.
Heavy construction is expected to occur between 6:00 am and 5:00 pm, Monday through Friday. Additional
hours may be necessary to make up schedule deficiencies or to complete critical construction activities.
Nighttime activities could potentially include, but are not limited to, refueling equipment, staging material
for the following day’s construction activities, quality assurance/control, and commissioning.
Materials and supplies would be delivered to the project site by truck. Truck deliveries will normally occur
during daylight hours. However, there will be offloading and/or transporting to the project site on weekends
and during evening hours.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 16 July 2018
Earthmoving activities are expected to be limited to the construction of the access roads, any O&M building,
any substation, any ESSs, and any storm water protection or storage (detention) facilities. Final grading
may include revegetation with low lying grass or applying earth-binding materials to disturbed areas.
Work Force
Once the project is constructed, maintenance will generally be limited to the following:
Cleaning of PV panels
Monitoring electricity generation
Providing site security
Facility maintenance – replacing or repairing inverters, wiring, and PV modules
It is expected that the proposed project would require up to five full-time employees. As previously
mentioned, it is possible that the proposed project would share O&M, substation, and/or transmission
facilities with one or more nearby projects. In such a scenario, the projects would share personnel, thereby
potentially reducing the proposed project’s on-site staff.
The solar facility would operate seven days a week, 24 hours a day, generating electricity during normal
daylight hours when the solar energy is available. Maintenance activities may occur seven days a week, 24
hours a day to ensure PV panel output when solar energy is available.
Project Features and Best Management Practices
The following describes standard project features and best management practices (BMPs) that will be
applied during construction and long-term operation of the proposed project.
Waste and Hazardous Materials Management
The proposed project would have minimal levels of materials on-site that have been defined as hazardous
under 40 CFR, Part 261. The following materials are expected to be used during the construction,
operation, and long-term maintenance of the proposed project:
Insulating oil – used for electrical equipment
Lubricating oil – used for maintenance vehicles
Various solvents/detergents – equipment cleaning
Gasoline – used for maintenance vehicles
Hazardous materials and wastes will be managed, used, handled, stored, and transported in accordance with
applicable local and State regulations. All hazardous wastes will be maintained at quantities below the
threshold requiring a Hazardous Material Management Program (HMMP) (one 55 gallon drum). Though
not expected, should any on-site storage of hazardous materials exceed one 55-gallon drum, an HMMP
would be prepared and implemented.
Spill Prevention and Containment
Hazardous materials stored on-site will be in quantities of less than 55 gallons. Spill prevention and
containment for construction and operation of the proposed project will adhere to the U. S. Environmental
Protection Agency’s guidance on Spill Prevention Control and Countermeasures.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 17 July 2018
Waste Water/Septic System
A standard on-site septic tank and leach field may be used at the O&M building to dispose sanitary
wastewater, designed to meet operation and maintenance guidelines required by Kern County laws,
ordinances, regulations, and standards.
Inert Solids
Inert solid wastes resulting from construction activities may include recyclable items such as paper,
cardboard, solid concrete and block, metals, wire, glass, type 1-4 plastics, drywall, wood, and lubricating
oils. Non-recyclable items include insulation, other plastics, food waste, vinyl flooring and base, carpeting,
paint containers, packing materials, and other construction wastes. A Construction Waste Management Plan
will be prepared for review by the County. Consistent with local regulations and the California Green
Building Code, the Plan would provide for diversion of a minimum of 50 percent of construction waste
from landfills.
Chemical storage tanks (if any) would be designed and installed to meet applicable local and state
regulations. Any wastes classified as hazardous such as solvents, degreasing agents, concrete curing
compounds, paints, adhesives, chemicals, or chemical containers will be stored (in an approved storage
facility/shed/structure) and disposed of as required by local and state regulations. Material quantities of
hazardous wastes are not expected.
Health and Safety
Safety precautions and emergency systems will be implemented as part of the design and construction of
the proposed project to ensure safe and reliable operation. Administrative controls will include classroom
and hands-on training in operating and maintenance procedures, general safety items, and a planned
maintenance program. These will work with the system design and monitoring features to enhance safety
and reliability.
The proposed project will have an Emergency Response Plan (ERP). The ERP will address potential
emergencies including chemical releases, fires, and injuries. All employees will be provided with
communication devices, cell phones, or walkie-talkies, to provide aid in the event of an emergency.
1.5 Project Objectives
The project proponent has defined the following objectives for the project: Construct and operate a
solar energy facility capable of producing up to 500 MW of electricity to assist the State of California
in achieving its 50 percent renewable portfolio standard by 2030;
To provide energy to the electric grid to meet increasing demand for in-state generation;
To facilitate enhanced grid operation by connecting the proposed project energy storage facilities to
directly to LADWP’s Barren Ridge substation;
Integrate operating facilities with other existing solar projects in the vicinity to maximize economies of
scale; and
To promote economic development and bring living-wage jobs to the region throughout the life of the
proposed project.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 18 July 2018
1.6 Proposed Discretionary Actions/Required Approvals Construction and operation of the proposed solar energy facility may require certain discretionary
actions and approvals including, but not limited to, the following:
Federal
United States Fish and Wildlife Service (USFWS) Section 10 Incidental Take Permit and
Habitat Conservation Plan, if required;
Bureau of Land Management Right of Way Agreement for Limited Improvements for Access
Roads and Gen-tie Line
United States Army Corps of Engineers Section 404 Permit
State
California Public Utilities Commission
o Section 851 Permit
California Department of Fish and Wildlife (CDFW)
o Section 1600 et seq. permits (Streambed Alteration Agreements)
o Section 2081 Permit (State-listed endangered species)
Lahontan Regional Water Quality Control Board (RWQCB)
Waste Discharge Requirements
o Regional Water Quality Certification (401 Permit)
National Pollutant Discharge Elimination System (NPDES) Construction General Permit
General Construction Stormwater Permit (Preparation of a SWPPP)
Regional Water Quality Certification (401 Permit)
California Department of Transportation
o Right-of-Way Encroachment Permit
o Oversized Loads Permit
Other additional permits or approvals from responsible agencies may be required for the project.
Local
Kern County Planning and Community Development Department
Land Use Approval (General Plan Amendment, Zone Change, Conditional Use Permit)
Certification of Environmental Impact Report
Mitigation Monitoring Program
Los Angeles Department of Water and Power
Rights-of-Way Crossing Permits
Eastern Kern County Air Pollution Control District
Fugitive Dust Control Plan
Authority to Construct
Permit to Operate
Kern County Engineering, Surveying and Permit Services Department
Plan for the Disposal of Drainage Waters
Grading and Building Plans
Kern County Environmental Health Services Division
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 19 July 2018
Hazardous Materials Business Plan
Septic and Water System Permits
Kern County Fire Department
Fire Safety Plan
Kern County Board of Supervisors
Amendment to the Circulation Element of the Kern County General Plan
Amendment of Zone Maps
Conditional Use Permit for Construction of Batch Plants
Kern County Roads Department
Proposed Access Road Design and Encroachment Permit
Other additional permits or approvals from Kern County may be required for the project.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 20 July 2018
2. Kern County Environmental Checklist Form
2.1 Environmental Factors Potentially Affected
The environmental factors checked below would be potentially affected by this project, involving at least
one impact that is a “potentially significant impact” as indicated by the Kern County Environmental
Checklist on the following pages.
Aesthetics Agricultural and Forestry
Resources
Air Quality
Biological Resources Cultural Resources Tribal Cultural Resources
Geology and Soils Greenhouse Gas Emissions Hazards and Hazardous
Materials
Hydrology and Water Quality Land Use and Planning Mineral Resources
Noise Population and Housing Public Services
Recreation Transportation and Traffic Utilities and Service
Systems
Mandatory Findings of
Significance
2.2 Determination (To be completed by the Lead Agency)
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE
DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the environment, there will not be
a significant effect in this case because revisions in the project have been made by or agreed to by the project
proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have a “potentially significant impact” or “potentially significant unless
mitigated” impact on the environment, but at least one effect (a) has been adequately analyzed in an earlier
document pursuant to applicable legal standards, and (b) has been addressed by mitigation measures based
on the earlier analysis as described on attached sheets. An ENVIRONMENT IMPACT REPORT is required,
but it must analyze only the effects that remain to be addressed.
I find that although the proposed project could have a significant effect on the environment, because all
potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE
DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that
earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed
upon the proposed project, nothing further is required.
Signature
Date
Printed Name
For
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 21 July 2018
3. Evaluation of Environmental Impacts
1. A brief explanation is required for all answers except “No Impact” answers that are adequately supported
by the information sources a lead agency cites in the parentheses following each question. A “No Impact”
answer is adequately supported if the referenced information sources show that the impact simply does not
apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A “No Impact”
answer should be explained where it is based on project-specific factors as well as general standards (e.g.,
the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis).
2. All answers must take account of the whole action involved, including offsite as well as onsite, cumulative
as well as project-level, indirect as well as direct, and construction as well as operational impacts.
3. Once the lead agency has determined that a particular physical impact may occur, then the checklist answers
must indicate whether the impact is potentially significant, less than significant with mitigation, or less than
significant. “Potentially Significant Impact” is appropriate if there is substantial evidence that an effect may
be significant. If there are one or more “Potentially Significant Impact” entries when the determination is
made, an EIR is required.
4. Negative Declaration: “Less than Significant with Mitigation Incorporated” applies where the incorporation
of mitigation measures has reduced an effect from “Potentially Significant Impact” to a “Less-than-
Significant Impact.” The lead agency must describe the mitigation measure and briefly explain how they
reduce the effect to a less than significant level (mitigation measures from Section XVII, “Earlier Analyses,”
may be cross-referenced).
5. Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect
has been adequately analyzed in an earlier EIR or negative declaration, Section 15063(c)(3)(D). In this case,
a brief discussion should identify the following:
a. Earlier Analysis Used. Identify and state where they are available for review.
b. Impacts Adequately Addressed. Identify which effects from the above checklist where within the scope
of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state
whether such effects were addressed by mitigation measures based on the earlier analysis.
c. Mitigation Measures. For effects that are “Less than Significant with Mitigation Incorporated,” describe
the mitigation measures that were incorporated or refined from the earlier document and the extent to
which they address site-specific conditions for the project.
6. Lead agencies are encouraged to incorporate into the checklist references to information sources for potential
impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document
should, where appropriate, include a reference to the page or pages where the statement is substantiated.
7. Supporting Information Sources: A source list should be attached, and other sources used or individuals
contacted should be cited in the discussion.
8. This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies
should normally address the questions from this checklist that are relevant to a project’s environmental
effects in whatever format is selected.
9. The explanation of each issue should identify:
a. The significance criteria or threshold, if any, used to evaluate each question; and
b. The mitigation measure identified, if any, to reduce the impact to a less-than–significant level.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 22 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
AESTHETICS
Would the project:
a. Have a substantial adverse effect on a scenic
vista?
b. Substantially damage scenic resources,
including, but not limited to, trees, rock
outcroppings, and historic buildings within a
state scenic highway?
c. Substantially degrade the existing visual
character or quality of the site and its
surroundings?
d. Create a new source of substantial light or
glare that would adversely affect day or
nighttime views in the area?
Discussion:
(a) The aesthetic features of the existing visual environmental in the project area are relatively uniform,
with broad, dry, flat landscapes leading to distant mountains. The project site is generally surrounded
by undeveloped and fallow agricultural land and other solar developments with low scenic qualities.
Scenic vistas in the region are evident from hiking trails in local hills. Trails crossing these hills
occasionally provide expansive views of the flatlands below. Therefore, potential impacts to scenic
vistas may occur and will be evaluated in the EIR.
(b) According to the California Department of Transportation (Caltrans) California Scenic Highway
Mapping System, SR 14 is considered an eligible scenic highway from its junction with SR 58 to its
merge with SR 395. From the nearest project boundary, Site 2 is located approximately 1.5 miles
from SR 14.Thefore, the proposed project is unlikely to be visible from SR 14. However, further
analysis of this issue will be provided in the EIR.
(c) The aesthetic features of the existing visual environment in the project boundaries are relatively
uniform, with broad, dry, flat landscapes. Outside of the project boundaries include undeveloped land
and the Fremont rural community located immediately adjacent to Site 5. Due to the flat topography
of the project site and the height of proposed PV panels, visual impacts would most likely be limited
to the small number of persons traveling along nearby roads such as Philips Road and Neuralia Road.
Views of the proposed project would also be visible from the residences located in the Fremont rural
community. Placement of PV solar panels and associated structures on the project site would alter
the existing character of the area. Residents and travelers on adjacent roads would observe alterations
to the existing landscape. Changes to the visual quality and character of the project site may be
significant, and impacts will be further evaluated in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 23 July 2018
(d) With the exception of various structures located along Barrel Cactus Street within Site 5, the project
site is generally undeveloped land and does not generate substantial source of nighttime light. The
Fremont rural community is located immediately adjacent to Site 5 and consists predominantly of
rural residential dwellings. The existing residences in the project vicinity generate a minimal to
moderate amount of light, primarily from building or outdoor lighting. The PV modules are designed
to absorb sunlight to maximize electrical output; therefore, they are not expected to create significant
reflective surfaces or the potential for glint/glare during the day. The proposed solar facility lighting
would be designed to provide the minimum illumination needed to achieve safety and security
objectives, and would be directed downward and shielded to focus illumination on the desired areas
only and minimize light trespass. All lighting at the proposed solar facility would be designed to meet
Kern County Zoning Ordinance Chapter 19.81- Outdoor Lighting- Dark Skies requirements.
However, further analysis of the specific lighting and effects of nighttime light and glare from the
proposed project will be provided in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 24 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
AGRICULTURE AND FOREST RESOURCES. In determining whether impacts to agricultural
resources are significant environmental effects, lead agencies may refer to the California Agricultural
Land Evaluation and Site Assessment Model (1997) prepared by the California Department of
Conservation as an optional model to use in assessing impacts on agriculture and farmland. In
determining whether impacts to forest resources, including timberland, are significant environmental
effects, lead agencies may refer to information compiled by the California Department of Forestry and
Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment
Project and the Forest Legacy Assessment project; and the forest carbon measurement methodology
provided in the Forest Protocols adopted by the California Air Resources Board. Would the project:
a. Convert Prime Farmland, Unique Farmland,
or Farmland of Statewide Importance
(Farmland), as shown on the maps prepared
pursuant to the Farmland Mapping and
Monitoring Program of the California
Resources Agency, to nonagricultural use?
b. Conflict with existing zoning for
agricultural use or a Williamson Act
Contract?
c. Conflict with existing zoning for, or cause
rezoning of, forest land (as defined in Public
Resources Code section 12220(g)),
timberland (as defined by Public Resources
Code section 4526), or timberland zoned
Timberland Production (as defined by
Government Code section 51104(g))?
d. Result in the loss of forest land or
conversion of forest land to non-forest use?
e. Involve other changes in the existing
environment which, due to their location or
nature, could result in conversion of
Farmland, to non-agricultural use or
conversion of forest land to non-forest use?
f. Result in the cancellation of an open space
contract made pursuant to the California
Land Conservation Act of 1965 or Farmland
Security Zone Contract for any parcel of 100
or more acres (Section 15205(b)(3) Public
Resources Code)?
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 25 July 2018
Discussion:
(a) According to the California Department of Conservation (CDC), Division of Land Resource
Protection’s Kern County Important Farmland Maps (DOC 2016), there are no agricultural lands
designated Prime Farmland, Unique Farmland, or Farmland of Statewide Importance located within
the project site. Sites 1 through 4 are designated as nonagricultural and natural vegetation, while Site
5 is designated as vacant or disturbed land. There are no important farmland located adjacent to or in
the vicinity of the project site. Therefore, construction and/or operation of the proposed project would
not result in the conversion of designated Farmland to a nonagricultural use. No further evaluation is
required in the EIR.
(b) According to the CDC, Division of Land Resource Protection’s Kern County Williamson Act FY
2013/2014 map, the project site does not contain lands that are subject to Williamson Act contracts,
either active or in nonrenewal. There are no lands under Williamson Act contracts adjacent to or in
the vicinity of the project site. The project site and surrounding area includes land that is zoned as A
(Exclusive Agriculture) and A-1 (Limited Agriculture); however, solar facilities are considered a
compatible use with this designation with a Conditional Use Permit (CUP), and no active agricultural
lands would be affected by the proposed project. As such, there would be no impacts to Williamson
Act lands and lands zoned for agricultural use. No further evaluation is required in the EIR.
(c)-(d) The project site if not situated on forest or timberland with areas that are currently under production.
There is no land in the vicinity of the project site that is zoned as forest land, timberland, or lands
zoned for timberland production. Therefore, there would be no impacts related to the rezoning of
forest land, timberland, or timberland zoned for timberland production and no further analysis is
warranted in the EIR.
(e) As mentioned above, the project site is not classified as Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance, and there are no active farmlands located in the project vicinity.
The proposed project would not have indirect impacts to the existing environment that would affect
agricultural uses. The project site is not designated as forest land. As such, there would be no
conversion of forest land. No further evaluation is required in the EIR.
(f) The project site is not subject to an open space contract made pursuant to the California Land
Conservation Act of 1965 or the Farmland Security Zone Contract. As stated above, the project site
is not under a Williamson Act Contract, and no impacts are anticipated. No further evaluation is
required in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 26 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
AIR QUALITY. Where available, the significance criteria established by the applicable air quality
management or air pollution control district may be relied upon to make the following determinations.
Would the project:
a. Conflict with or obstruct implementation of
the applicable air quality plan?
b. Violate any air quality standard as adopted in
(c) i or (c) ii, or as established by EPA or air
district or contribute substantially to an
existing or projected air quality violation?
c. Result in a cumulatively considerable net
increase of any criteria pollutant for which
the project region is in nonattainment under
an applicable federal or state ambient air
quality standard (including releasing
emissions which exceed quantitative
thresholds for ozone precursors)?
Specifically, would implementation of the
project exceed any of the following adopted
thresholds:
i. San Joaquin Valley Unified Air Pollution
Control District:
Operational and Area Sources
Reactive organic gases (ROG)
10 tons per year.
Oxides of nitrogen (NOX)
10 tons per year.
Particulate matter (PM10)
15 tons per year.
Stationary Sources - as Determined by
District Rules
Severe nonattainment
25 tons per year.
Extreme nonattainment
10 tons per year.
ii. Eastern Kern Air Pollution Control
District.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 27 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
Operational and Area Sources
Reactive organic gases (ROG)
25 tons per year.
Oxides of nitrogen (NOX)
25 tons per year.
Particulate matter (PM10)
15 tons per year.
Stationary Sources – as Determined by
District Rules
25 tons per year.
d. Expose sensitive receptors to substantial
pollutant concentrations?
e. Create objectionable odors affecting a
substantial number of people?
Discussion:
(a) The project site is located entirely within the jurisdiction of the Eastern Kern Air Pollution Control
District (EKAPCD), in the Mojave Desert Air Basin (MDAB). EKAPCD is designated as a
nonattainment area for both the State and federal ozone standards and the state particulate matter
(PM10) standard. Project construction would generate emissions of reactive organic gases (ROG) and
oxides of nitrogen (NOX), both of which are known as ozone precursors, and PM10 that could result
in significant impacts to air quality in the area. EKAPCD’s most recently adopted air quality
management plan is its Ozone Air Quality Attainment Plan (AQAP)(EKAPCD 2005). As the
proposed project would generate emissions of ozone precursors (along with PM10) during
construction, the proposed project could potentially conflict with EKAPCD’s Ozone AQAP. Thus,
further analysis of the project’s air quality impacts is warranted to determine whether the proposed
project would conflict with or obstruct implementation of EKAPCD’s applicable air quality plan for
attainment and, if so, to determine the reasonable and feasible mitigation measures that could be
imposed. These issues will be evaluated in the EIR.
(b) Short-term construction emissions could significantly contribute to an existing or projected air quality
violation of PM10 or ozone standards, requiring the consideration of mitigation measures. This impact
is potentially significant and will be evaluated further in the EIR.
(c) The project site is located within the EKAPCD and is not under the under the jurisdiction of the San
Joaquin Valley Air Pollution Control District (SJVAPCD); therefore, the SJVAPCD standards will
not be addressed further. EKAPCD is a nonattainment area for the state and federal ozone standards
and the state PM10 standard. EKAPCD rules and regulations apply to all project activities. The air
quality analysis will include a quantitative discussion of emissions created by the proposed project.
This will include quantifying emissions for activities such as truck trips to deliver panels or
employees to the site. Cumulative contributions to this air basin could be potentially significant.
Construction and operational emissions will be evaluated in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 28 July 2018
(d) Sensitive receptors located in the project area consist predominantly of rural residential dwellings
located at varying distances from the project site. The Fremont rural community is located
immediately adjacent to Site 5 and consists predominantly of rural residential dwellings. The nearest
sensitive receptors are adjacent to the project boundary for Sites 3 and 5. Nearby sensitive receptors
could be exposed to pollutant emissions during construction of the proposed project. The proposed
project’s construction-related activities would result in diesel exhaust emissions and dust that could
adversely affect air quality for the nearest sensitive receptors.
Exposure to Valley Fever from fugitive dust generated during construction is a potentially significant
impact. There is the potential that cocci spores could be stirred up during excavation, grading, and
earth-moving activities, exposing construction workers and nearby sensitive receptors to these spores
and thereby to the possibility of contracting Valley Fever. Thus, impact to sensitive receptors via
pollutant concentrations is potentially significant and will be evaluated further in the EIR.
(e) Land uses typically producing objectionable odors include dairies, agricultural uses, wastewater
treatment plants, chemical plants, food processing facilities, composting, refineries, and fiberglass
molding facilities. The project would not have any stationary sources or equipment located on-site
that would generate objectionable odors. During construction activities, only short-term, temporary
odors from vehicle exhaust and construction equipment engines would occur. However, these odors
would be temporary and would be dispersed rapidly. Therefore, it is anticipated that there would be
no impact and further analysis is not warranted in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 29 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
BIOLOGICAL RESOURCES
Would the project:
a. Have a substantial adverse effect, either
directly or through habitat modifications, on
any species identified as a candidate,
sensitive, or special-status species in local or
regional plans, policies, or regulations or by
the California Department of Fish and Game
or U.S. Fish and Wildlife Service?
b. Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional
plans, policies, regulations, or by the
California Department of Fish and Game or
U.S. Fish and Wildlife Service?
c. Have a substantial adverse effect on
federally protected wetlands as defined by
Section 404 of the Clean Water Act
(including, but not limited to, marsh, vernal
pool, coastal, etc.) through direct removal,
filling, hydrological interruption, or other
means?
d. Interfere substantially with the movement of
any native resident or migratory fish or
wildlife species, or with established native
resident or migratory wildlife corridors, or
impede the use of native wildlife nursery
sites?
e. Conflict with any local policies or
ordinances protecting biological resources,
such as a tree preservation policy or
ordinance?
f. Conflict with the provisions of an adopted
habitat conservation plan, natural
community conservation plan, or other
approved local, regional, or state habitat
conservation plan?
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 30 July 2018
Discussion:
a. The project site is located within the Fremont Valley, in the western portion of the Mojave Desert.
The project site is generally comprised of disturbed habitat from previous agricultural uses.
Nonetheless, there is a potential for special-status plants and wildlife species to be present onsite or
in the proposed project vicinity. Field surveys for special-status plant and animal species will be
included in the EIR. Impacts to biological resources and sensitive plant communities are potentially
significant and will be analyzed in the EIR.
b. The project site is generally disturbed habitat from previous agricultural uses. Field surveys for
sensitive natural communities will be completed for the proposed project, and the results will be
included in the EIR.
c. Potential jurisdictional features such as streams and washes could be present on the project site. A
determination as to whether the project site contains features considered under federal or state
jurisdiction will be conducted as part of the EIR. Impacts to protected wetlands would be considered
potentially significant, if required. Further analysis will be included in the EIR.
d. The project site and surrounding area may be used for migration or dispersal by some avian species.
Project construction and operation could also remove foraging habitat. This impact is potentially
significant and will be further evaluated in the EIR.
e. There is no local policy or ordinance protecting biological resources. Additionally, the site is devoid
of trees. There would be no impacts and no further analysis is warranted in the EIR.
f. The project site is not located within a local, regional, or state habitat conservation plan boundary.
There would be no impacts and no further analysis is required in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 31 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
CULTURAL RESOURCES
Would the project:
a. Cause a substantial adverse change in the
significance of a historical resource as
defined in CEQA Guidelines Section
15064.5?
b. Cause a substantial adverse change in the
significance of an archaeological resource
pursuant to CEQA Guidelines Section
15064.5?
c. Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature?
d. Disturb any human remains, including those
interred outside of formal cemeteries?
Discussion:
(a) The project site consists of undeveloped land. Development of the proposed project would require
ground disturbance for grading, installation of the solar arrays, gen-tie line, and placement of
underground electrical and communications lines. The proposed project could potentially impact
historical resources. A cultural resources survey will be conducted for the proposed project as part of
the EIR. Further evaluation in the EIR is warranted to identify potential impacts to historical resources
and to formulate avoidance or mitigation measures, if applicable.
(b) As discussed above, development of the proposed project would require ground disturbance for
grading, installation of the solar arrays, gen-tie line, and placement of underground electrical and
communications lines. The proposed project could potentially impact archaeological resources. A
cultural resources survey will be conducted for the proposed project as part of the EIR. Further
evaluation in the EIR is warranted to identify potential impacts to archaeological resources and to
formulate avoidance or mitigation measures, if applicable.
(c) Kern County is rich in paleontological resources. Of particular note are the Maricopa and Citric Brea
Tar Pits, the Bean Hills Petrified Forest, and Shark Tooth Hill at Round Mountain. The project site
is not located near any of these known paleontological resources and construction activities would
involve relatively shallow excavations and trenching; therefore, impacts to paleontological resources
are anticipated to be less than significant. However, the EIR will include an analysis of
paleontological resources to document the findings.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 32 July 2018
(d) There is no evidence that the project site is located within an area likely to contain human remains,
and discovery of human remains during earthmoving activities is not anticipated. Therefore, impacts
to human remains are anticipated to be less than significant. However, this issue will be further
evaluated in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 33 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
TRIBAL CULTURAL RESOURCES
Would the project:
a. Cause a substantial adverse change in the
significance of a tribal cultural resource,
defined in Public Resources Code section
21074 as either a site, feature, place,
cultural landscape that is geographically
defined in terms of the
size and scope of the landscape, sacred
place, or object with cultural value to a
California Native American tribe, and that
is:
i. Listed or eligible for listing in the
California Register of Historical
Resources, or in a local register or
historical resources as defined in
Public Resources Code section
5020.1(k), or
ii. A resource determined by the lead
agency in its discretion and
supported by substantial evidence, to
be significant pursuant to criteria set
forth in subdivision (c) of Public
Resources Code Section 5024.1. In
applying the criteria set forth in
subdivision (c) of Public Resources
Code Section 5024.1, the lead
agency shall consider the
significance of the resource to a
California Native American tribe.
Discussion: (a) The proposed project could potentially impact tribal cultural resources. All tribes with possible
cultural affiliation and interest within the project area will be notified, per Assembly Bill 52. Further
evaluation in the EIR is warranted to identify potential impacts to tribal cultural resources and to
formulate avoidance or mitigation measures, if applicable.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 34 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
GEOLOGY AND SOILS
Would the project:
a. Expose people or structures to potential
substantial adverse effects, including the
risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as
delineated on the most recent Alquist-
Priolo Earthquake Fault Zoning Map
issued by the State Geologist for the area
or based on other substantial evidence of
a known fault? Refer to Division of
Mines and Geology Special Publication
42.
ii. Strong seismic ground shaking?
iii. Seismic-related ground failure, including
liquefaction?
iv. Landslides?
b. Result in substantial soil erosion or the loss
of topsoil?
c. Be located on a geologic unit or soil that is
unstable, or that would become unstable as a
result of the project, and potentially result in
on- or offsite landslide, lateral spreading,
subsidence, liquefaction, or collapse?
d. Be located on expansive soil, as defined in
Table 18-1-B of the Uniform Building Code
(1994), creating substantial risks to life or
property?
e. Have soils incapable of adequately
supporting the use of septic tanks or
alternative wastewater disposal systems in
areas where sewers are not available for the
disposal of wastewater?
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 35 July 2018
Discussion:
(a) (i) The project site is not located within a currently mapped Alquist-Priolo Special Studies Fault
Zone. The nearest active fault is the Garlock (Center) fault, located approximately 3 miles east
of the project site. The Garlock (Center) fault trace trends in a northeast – southwest direction.
The fault projects towards the project site. Based on the fault’s distance from the project site
and because the fault projects towards the project in the southeast portion of the site, the
potential for surface fault rupture to occur on the project site is moderate. This is considered a
potentially significant impact and will be further evaluated in the EIR.
(ii) Strong seismic ground shaking could occur at the project site, resulting in damage to structures
that are not properly designed to withstand strong ground shaking. The proposed project would
include the construction of a solar field of PV panels, transmission lines, an electrical collection
system, an O&M facility, and other associated infrastructure. Up to five employees would be
located onsite once operational. These staff could be affected by strong seismic ground shaking.
Construction workers would be on-site temporarily. Construction of the proposed project
would be subject to all applicable ordinances of the Kern County Building Code (Chapter
17.08). Kern County has adopted the California Building Standards Code (CBC), which
imposes substantially the same requirements as the International Building Code (IBC). The
entire County is located in seismic Zone 4, a designation previously used in the Uniform
Building Code to denote the areas of the highest risk to earthquake ground motion. Adherence
to applicable regulations would minimize the potential impacts associated with the proposed
project. This issue will be analyzed further in the EIR.
(iii) Seismically induced liquefaction occurs when loose, water-saturated sediments of relatively
low density are subjected to extreme shaking that causes soils to lose strength or stiffness
because of increased pore water pressure. Groundwater in the site vicinity is expected to be
approximately 225 feet below the ground surface, and thus the potential for liquefaction at the
surface is low. Structures constructed as part of the project would be required by state law to
be constructed in accordance with all applicable IBC and CBC earthquake construction
standards, including those relating to soil characteristics. Adherence to all applicable
regulations would avoid any potential impacts to structures resulting from liquefaction at the
project site. Impacts resulting from liquefaction are anticipated to be less than significant;
however, further analysis in the EIR is warranted.
(iv) The project site is located in a relatively flat-lying plain, where landslides are not likely. Therefore, impacts related to landslides are not anticipated to occur or pose a hazard to the
proposed project or surrounding area. Further analysis of this issue is not warranted in the EIR.
b. Minimal grading and excavation would be required for foundations at the site, but some trenching
would be required for the installation of underground cables and circuits. Project construction would
have the potential to result in erosion, sedimentation, and discharge of construction debris from the
site. Clearing of vegetation and grading activities, for example, could lead to exposed or stockpiled
soils susceptible to peak storm water runoff flows and wind forces. The compaction of soils by heavy
equipment may minimally reduce the infiltration capacity of soils (exposed during construction) and
increase runoff and erosion potential. The presence of large amounts of raw materials for
construction, including aggregate base course material, may lead to storm water runoff
contamination. The Applicant would be required to obtain coverage under the National Pollution
Discharge Elimination System (NPDES) Construction General Permit (CGP), because the proposed
project would disturb greater than one acre of land. In order to conform to the requirements of the
CGP, a storm water pollution prevention plan (SWPPP) would need to be prepared that outlines
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 36 July 2018
specific BMPs to prevent construction pollutants, including eroded soils (such as topsoil), from
moving off-site. Impacts are anticipated to be less than significant with implementation of the above
requirements. However, this issue will be further evaluated in the EIR.
c. The proposed project lies in a relatively flat-lying plain where landslides, lateral spreading,
subsidence, liquefaction, and collapse are not expected to occur. Therefore, impacts related to
geologic instability are not anticipated to occur or pose a hazard to the proposed project or
surrounding area, and further analysis of this issue is not warranted in the EIR.
Depth to groundwater at the project site is generally deep (approximately 225 feet below the ground
surface), and soil properties on-site do not exhibit liquefaction characteristics, therefore liquefaction
potential is low. Seismic settlement, lateral spreading and collapse are not expected to result in
significant impacts. Furthermore, the structures would be subject to all applicable ordinances of the
Kern County Building Code (Chapter 17.08), as well as all applicable IBC and CBC earthquake
construction standards, including those relating to soil characteristics. Impacts are anticipated to be
less than significant with implementation of the above requirements. However, these issues will be
further evaluated in the EIR.
d. Expansive soils are fine-grained soils (generally high plasticity clays) that can undergo a significant
increase in volume with an increase in water content and a significant decrease in volume with a
decrease in water content. Changes in the water content of a highly expansive soil can result in severe
distress to structures constructed on or against the soil. Preliminary geotechnical investigation has
indicated that the majority of the project site is located in areas with soil composed of sand, gravel,
and silt. Most of the soil at the project site is not considered expansive soils. The proposed project
would be designed to comply with applicable building codes and structural improvement
requirements to withstand the effects of expansive soils. Impacts are anticipated to be less than
significant; however, this issue will be further evaluated in the EIR.
e. The project may include an O&M facility to serve an estimated five employees. This facility may
include development of a septic tank and associated disposal field, the impacts of which are
potentially significant. This issue will be further evaluated in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 37 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
GREENHOUSE GAS EMISSIONS
Would the project:
a. Generate greenhouse gas emissions, either
directly or indirectly, that may have a
significant impact on the environment?
b. Conflict with any applicable plan, policy, or
regulation adopted for the purpose of
reducing the emissions of greenhouse
gases?
Discussion:
(a) Greenhouse gas (GHG) emissions emitted by human activity are implicated in global climate change
or global warming. The principal GHGs are CO2, methane (CH4), NOX, ozone, water vapor, and
fluorinated gases. The temporary construction activities associated with the proposed project, which
would involve operation of heavy off-road equipment, on-road trucks (for deliveries and hauling),
and construction worker commute trips, would generate GHGs. However, as a solar facility, the
proposed project is expected to displace traditional sources of electricity production that involves
combustion energy sources (e.g., burning coal, fuel oil, or natural gas). As such, the provision of solar
energy by the proposed project would produce GHG-free electricity that is anticipated to offset GHGs
that would otherwise be generated by traditional sources of electricity. The potential impacts
associated with GHG emissions generated during construction of the project and the potential GHG
offsets resulting from operation of the project will be further evaluated in the EIR.
(b) California has passed several bills and the governor has signed at least three executive orders
regarding GHGs. Assembly Bill (AB) 32 (the Global Warming Solutions Act) was passed by the
California legislature on August 31, 2006 that require the State’s global warming emissions to be
reduced to 1990 levels by 2020. The reduction will be accomplished through an enforceable statewide
cap on GHG emissions that was phased in starting in 2012.
In 2002, California established its Renewable Portfolio Standards (RPS) Program, with the goal of
increasing the percentage of renewable energy in the State’s electricity mix to 20 percent renewable
energy by 2017. In 2006, under SB 107, the RPS Program codified the 20 percent goal. The RPS
Program requires electric utilities and providers to increase procurement from eligible renewable
energy resources by at least one percent of their retail sales annually until they reach 20 percent by
2017. On November 17, 2008, the governor signed Executive Order S-14-08, requiring California
utilities to reach the 33 percent renewable goal by 2020. In 2015, SB 350 was enacted to increase the
RPS to 50 percent and reduce greenhouse gas emissions by 40 percent by the year 2030.
The proposed project is intended to: (1) reduce importation of power from fossil fuel power plants;
and (2) contribute to a reduction in GHGs. Heavy equipment operation, truck deliveries, and
construction worker commute trips associated with construction of the proposed project would
temporarily generate GHGs; however, operation of the project would offset GHGs generated by
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 38 July 2018
traditional sources of electricity. The project’s potential GHG impacts and the potential GHG offsets
resulting from operation of the project will be further evaluated in the EIR.
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
HAZARDS AND
HAZARDOUS MATERIALS. Would the project:
a. Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
b. Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
c. Emit hazardous emissions or involve handling hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?
d. Be located on a site that is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
e. For a project located within the adopted Kern County Airport Land Use Compatibility Plan, would the project result in a safety hazard for people residing or working in the project area?
f. For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area?
g. Impair implementation of, or physically interfere with, an adopted emergency response plan or emergency evacuation plan?
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 39 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
h. Expose people or structures to a significant risk of loss, injury, or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where resi-dences are intermixed with wildlands?
i. Would implementation of the project generate vectors (flies, mosquitoes, rodents, etc.) or have a component that includes agricultural waste? Specifically, would the project exceed the following qualitative threshold: The presence of domestic flies, mosquitoes, cockroaches, rodents, and/or any other vectors associated with the project is significant when the applicable enforcement agency determines that any of the vectors:
i. Occur as immature stages and adults in
numbers considerably in excess of those
found in the surrounding environment;
and
ii. Are associated with design, layout, and
management of project operations; and
iii. Disseminate widely from the property;
and
iv. Cause detrimental effects on the public
health or well-being of the majority of the
surrounding population.
Discussion:
a. The proposed project is not expected to create a significant hazard to the public or the environment
through the routine transport, use, or disposal of hazardous materials. This is because the proposed
project would not involve the routine transport, use, or disposal of hazardous materials as defined by
the Hazardous Materials Transportation Uniform Safety Act. During construction, the proposed
project would include the transport of general construction materials (i.e., concrete, wood, metal,
fuel, etc.) as well as materials necessary to construct the proposed PV arrays. Project-related
infrastructure would not emit hazardous materials, or be constructed of acutely hazardous materials
or substances, that could adversely impact the public or on-site workers. Wastes to be generated
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 40 July 2018
during construction of the proposed project would also be non-hazardous, and would consist of
cardboard, wood pallets, copper wire, scrap steel, common trash, and wood wire spools. Although
field equipment used during construction activities could contain various hazardous materials (i.e.,
hydraulic oil, diesel fuel, grease, lubricants, solvents, adhesives, paints, etc.), these materials are not
considered to be acutely hazardous and would be used in accordance with the manufacturers
specifications and all applicable regulations. In addition, hazardous fuels and lubricants used on field
equipment would be subject to a Construction Waste Management Plan and, if required, a Spill
Prevention, Containment and Countermeasure Plan. Impacts resulting from the transport, use or
disposal of hazardous materials during construction of the proposed project would be less than
significant; however, the EIR will include an evaluation of potential hazardous materials impacts.
The proposed project would be subject to all local, state, and federal laws pertaining to the use of
hazardous materials on-site and would be subject to review by the Kern County Environmental Health
Services Division. Through the review process, the project would be required to submit a complete
list of all materials used on-site, how the materials would be transported, and in what form they would
be used to maintain safety and prevent possible environmental contamination or worker exposure.
During construction of the proposed project, Material Safety Data Sheets (MSDS) for all applicable
materials present at the site would be made readily available to on-site personnel. During construction
of the facilities, non-hazardous construction debris would be generated and disposed of in approved
facilities. During construction of the facility, sanitary waste would be managed using portable toilets
located at reasonably accessible on-site locations. Therefore, project construction would not create a
significant hazard to the public or the environment through the routine transport, use, or disposal of
hazardous materials.
The PV panels may include solid materials that are considered to be hazardous, such as cadmium
telluride. The project would use the manufacturer’s collection and recycling program to ensure the
proper collection and recycling of PV panels, as needed. Solar panels are in a solid and non-leachable
state; broken PV panels would not be a source of pollution to storm water. Dust palliative and
herbicides, if used, may be transported to and stored at the project site. These materials would be
stored in appropriate containers that would prevent their accidental release at the site.
There are no designated routes for the transport of hazardous materials located within or adjacent to
the project; however, SR 14 and SR 58 are designated routes for the transport of hazardous materials.
These roadways are equipped to handle the transport of hazardous materials and both SR 14 and SR
58 would provide regional access to the project. Impacts resulting from the transport, use or disposal
of hazardous materials during construction and operation of the proposed project will be evaluated
further in the EIR.
(b) Construction and operation of the proposed project may include the accidental release of storage
materials, such as cleaning fluids and petroleum products including lubricants, fuels, and solvents.
Electrical transformer equipment that would be installed as part of the proposed project may include
various hazardous substances, including polychlorinated biphenyls. The toxicity and potential release
of these materials would depend on the quantity, type of storage container, safety protocols used on
the site, location and/or proximity to schools and residences, frequency and duration of spills or
storage leaks, and the reactivity of hazardous substances with other materials. The proposed project
would be subject to all local, state, and federal laws pertaining to the use of hazardous materials on-
site and would be subject to review by the Kern County Environmental Health Services Division.
Through the review process, the project proponent would be required to submit a complete list of all
materials used on-site, how the materials would be transported, and in what form they would be used.
This would be recorded to maintain safety and prevent possible environmental contamination or
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 41 July 2018
worker exposure. This would include submission of MSDS for all applicable materials present at the
site, and the MSDS would be made readily available to on-site personnel. It is anticipated that
adherence to regulations and standard protocols during the storage, transportation, and usage of any
hazardous materials would avoid significant impacts. However, potential impacts will be evaluated
in the EIR.
(c) There are no existing or proposed schools located within one-quarter mile of the project site. The
project will not emit hazardous materials or involve handling hazardous or acutely hazardous
materials, substances or waste within one-quarter miles of an existing or proposed school. No
significant impacts are anticipated, and further analysis of this issue is not warranted in the EIR.
(d) The project site is not identified in any of the California hazardous materials databases. Searches
were completed for the subject parcels in the following hazardous materials lists: California
Environmental Protection Agency’s (CalEPA) Cortese List including the California Department of
Toxic Substances and Control’s EnviroStor database of hazardous substances release sites; and
Geotracker, the California database of leaking underground storage tanks. Finally, as provided by
CalEPA, there are no active Cease and Desist Orders or Clean Up and Abatement Orders for
hazardous materials/facilities in the immediate project vicinity of the project site. Therefore,
significant impacts are not anticipated, and further analysis is not warranted in the EIR.
(e) The project site is not located within two miles of a public or public use airport or within an area
covered by the Kern County Airport Land Use Compatibility Plan (ALUCP), and is not located within
an airport sphere of influence identified in the ALUCP. The nearest public airport is the California
City Airport, which is located approximately 2.5 miles south of the project site (from southern
boundary of Site 4). Impacts are expected to be less than significant; however, this issue will be
further evaluated in the EIR.
(f) The project site is not located within two miles of a public or public use airport. Therefore, safety
hazards related to proximity to a private airstrip are not anticipated. Significant impacts are not
anticipated and further analysis of this issue is not warranted in the EIR.
(g) The project would not physically impede an existing emergency response plan, emergency vehicle
access, or personnel access to the project site. The project site is located in an area with several
alternative access roads allowing access in the event of an emergency. Access would be maintained
throughout construction, and appropriate detours would be provided in the event of potential road
closures. Therefore, no significant impacts related to impairment of the implementation of or physical
interference with an adopted emergency response plan or emergency evacuation plan would occur.
Further analysis of this issue is not warranted in the EIR.
(h) The proposed project is located outside of areas identified by the California Department of Forestry
and Fire (CALFIRE) as having substantial or very high risk of fires (CAL FIRE 2007). The project
site consists of undeveloped and fallow agricultural land. This area was previously farmed but was
abandoned for several decades and or/ were previously used for unregulated sheep grazing. The
surrounding land is primarily disturbed agricultural land. The construction and operation of the
proposed project would not result in increased risk of wildfires in the project area. The proposed
project would comply with all applicable wildland fire management plans and policies established
by CAL FIRE and Kern County Fire Department. Therefore, the proposed project is not expected to
expose people or structures to a significant risk of loss, injury, or death involving wildland fires. No
further evaluation is required in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 42 July 2018
(i) The proposed project would involve the construction of photovoltaic panels for use with solar energy
generation. Project-related infrastructure is not expected to result in features or conditions (such as
standing water, agricultural products, agricultural waste, or human waste) that would provide habitat
for vectors such as mosquitoes, flies, cockroaches or rodents. During construction and operation,
workers would generate small quantities of solid waste (i.e., trash) that would be appropriately stored
for permanent disposal. Therefore, impacts would not occur and no further analysis is warranted.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 43 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
HYDROLOGY AND WATER QUALITY
Would the project:
a. Violate any water quality standards or waste
discharge requirements?
b. Substantially deplete groundwater supplies
or interfere substantially with groundwater
recharge such that there would be a net
deficit in aquifer volume or a lowering of
the local groundwater table level (e.g., the
production rate of pre-existing nearby wells
would drop to a level that would not support
existing land uses or planned uses for which
permits have been granted)?
c. Substantially alter the existing drainage
pattern of the site or area, including through
the alteration of the course of a stream or
river, in a manner that would result in
substantial erosion or siltation on site or off
site?
d. Substantially alter the existing drainage
pattern of the site or area, including through
the alteration of the course of a stream or
river, or substantially increase the rate or
amount of surface runoff in a manner that
would result in flooding on site or off site?
e. Create or contribute runoff water that would
exceed the capacity of existing or planned
stormwater drainage systems or provide
substantial additional sources of polluted
runoff?
f. Otherwise substantially degrade water
quality?
g. Place housing within a 100-year flood
hazard area as mapped on a federal flood
hazard boundary or flood insurance rate
map or other flood hazard delineation map?
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 44 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
h. Place within a 100-year flood hazard area
structures that would impede or redirect
flood flows?
i. Expose people or structures to a significant
risk of loss, injury, or death involving
flooding, including flooding as a result of
the failure of a levee or dam?
j. Contribute to inundation by seiche,
tsunami, or mudflow?
Discussion:
(a) Project construction activities have the potential to result in erosion, sedimentation, and the discharge
of construction debris. It is anticipated that appropriate BMPs and compliance with applicable
regulations, including the NPDES CGP, would reduce potential water quality impacts to a less than
significant level. Soil stabilization measures would be used to prevent soil erosion caused by storm
water runoff. The proposed project contractor(s) would apply for coverage under the state’s General
Construction Permit for stormwater discharges from construction activities and would prepare a
SWPPP that would include implementation of BMP erosion-control measures to control stormwater
runoff. Site-specific BMPs would be designed by the contractor in compliance with regulations and
permit conditions. A comprehensive hydrology and water quality impact analysis will be included in
the EIR. This issue will be further analyzed in the EIR.
(b) Water demand for panel washing and O&M domestic use is not expected to exceed 50 acre-feet per
year. Water usage during construction, primarily for dust-suppression purposes, is not expected to
exceed 400 acre-feet. Water is anticipated to be obtained from an existing on-site well within Site 5.
According to the landowner, the well is capable of producing 1,500 gallons per minute. Alternatively,
water may be obtained from one or more off-site source(s) and delivered to the project site via truck.
If off-site water is used, it will likely be obtained from one of the nearby Springbok projects or from
a commercial source. If the project proponent determines that off-site water will be used, the project
proponent will submit a Will Serve Letter from the proposed off-site water purveyor(s).
The project site is undeveloped, relatively flat, and covered with soils that allow for storm water
percolation. The impervious surfaces required for the inverters, transformers, and other infrastructure
would be minimized as much as possible. Impacts related to groundwater supplies and the drainage
patterns of the site, as well as the potential for increased erosion or siltation, will be evaluated in the
EIR.
(c) Construction of the concrete pads for the switchyard, inverters, transformers, O&M buildings, etc.,
as well as foundational supports for panel installation, soil compaction, and any grading may alter
the existing drainage pattern of the site. A hydrologic study will be prepared for the project in
accordance with Kern County requirements, and potentially significant impacts to existing drainage
patterns and flooding conditions on the project site will be analyzed in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 45 July 2018
(d) Construction and operational activities associated with the proposed project could result in an
increase in the rate or amount of surface runoff. Portions of the project site are located within Flood
Zone A FP. A hydrologic study will be prepared for the project in accordance with Kern County
requirements, and potentially significant impacts will be analyzed in the EIR.
(e) During construction and following installation of the solar arrays, the vast majority of the site would
remain as pervious surfaces. The design of the solar arrays is such that storm water infiltration would
occur similar to existing conditions. No component of the project would concentrate runoff and
exceed the capacity of existing or planned storm water drainage systems. Similarly, no component of
the project is considered a substantial source of polluted runoff. The construction period SWPPP and
the operational period Water Quality Management Plan would ensure the proper control and
treatment, if necessary, of any storm water prior to discharge. With adherence to site-specific BMPs,
potential pollutants would be minimized to the extent practicable and would not exceed numeric
thresholds for water quality protection. Nevertheless, this impact will be discussed further in the EIR.
(f) Project construction activities (such as grading) could potentially degrade water quality through
erosion and subsequent sedimentation of streams. Additionally, accidental release of potentially
harmful materials, such as engine oil, diesel fuel, and cement slurry could degrade the water quality
of nearby streams. Therefore, construction and operation of the proposed project has the potential to
substantially degrade water quality. This issue will be evaluated further in the EIR.
(g) The proposed project would not place housing within a 100-year flood hazard area as mapped on a
federal flood hazard boundary or flood insurance rate map or other flood hazard delineation map.
Therefore, no impact would occur and no further evaluation is required in the EIR.
(h) Based on a review of the FEMA’s Flood Insurance Rate Maps (FEMA 2008), Panels 06029C2930E
and 06029C2940E, Site 1 and Site 2 have small areas mapped as 100-year (Zone A) floodplains.
Zone A is defined as areas subject to inundation by the 1-percent-annual-chance flood event generally
determined using approximate methodologies. The proposed project would be reviewed by the Kern
County Public Works Department- Floodplain for adherence to all floodplain management standards.
Further analysis is required to identify appropriate mitigation/design measures to reduce potentially
significant impacts from potential flooding and additional review will be provided in the EIR.
(i) The proposed project is not located near any levees or dam. Therefore, the proposed project would
not expose people or structures to a significant risk of loss, injury, or death due to flooding. Impacts
would not be expected, and no further analysis is warranted in the EIR.
(j) The project site is not located near an ocean or enclosed body of water, and would not be subject to
inundation by seiche or tsunami. The topography surrounding the project area is relatively flat;
therefore, the potential to be inundated by mudflow is considered remote. Therefore, no impacts
would result and no further evaluation is required in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 46 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
LAND USE AND PLANNING
Would the project:
a. Physically divide an established
community?
b. Conflict with any applicable land use plan,
policy, or regulation of an agency with
jurisdiction over the project (including, but
not limited to, the general plan, specific
plan, local coastal program, or zoning
ordinance) adopted for the purpose of
avoiding or mitigating an environmental
effect?
c. Conflict with any applicable habitat
conservation plan or natural community
conservation plan?
Discussion:
(a) The project site is located on existing undeveloped land formerly used for agriculture and sheep
grazing. The Fremont rural community is located immediately adjacent to Site 5 and consists
predominantly of rural residential dwellings. The proposed project would not physically divide or
restrict access to the Fremont rural community, or its relationship other surrounding communities.
Therefore, impacts related to the physical division of an established community would not occur, and
no further evaluation is required in the EIR.
(b) Sites 1 and 2 are located entirely within the Kern County General Plan area. As shown in Figure 3,
portions of Sites 3, 4 and 5 are located within the Kern County General Plan area and the Fremont
Interim Rural Community Plan. As shown in Figure 3, the project site consists of 32 parcels
designated by the Kern County General Plan as Map Code 8.5 (Resource Management, minimum 20
acre parcel size) and by the Fremont Interim Rural Community Plan as 4.2/5.6 (Interim Rural
Community Plan/ Min. 2.5 Gross Acres/Unit) and 4.2/5.8 (Interim Rural Community Plan/ Min. 20
Gross Acres/Unit). As shown in Figure 4, the project site has a zone classification of A (Exclusive
Agriculture), A FP (Exclusive Agriculture, Floodplain Combining), A-1 (Limited Agriculture), E
(20) RS (Estate, 20 Acres, Residential Suburban Combining), and PL RS MH (Platted Lands,
Residential Suburban Combining, Mobile Home Combining).
The project proponent has requested a change in zone classifications from A FP, A-1, E (20) RS, and
PL RS MH to A. According to Kern County Zoning Ordinance 19.12.030, solar energy electrical
facilities are permitted within the A Zone District with the approval of a CUP. The project proponent
is requesting five CUPs to allow for the construction and operation of five solar facilities. With
approval of the zone change classifications and CUPs, the proposed solar project would be an
allowable use within the A Zone District. The project proponent is requesting a General Plan
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 47 July 2018
Amendment to amend the Circulation Element of the Kern County General Plan. With approval of
the requested CUPs and the zone change classifications, the proposed project would not have the
potential to conflict with any applicable land use plan, policy, or regulation of an agency with
jurisdiction over the project adopted for the purpose of avoiding or mitigating an environmental
effect.
The Lead Agency notes that with the implementation of numerous renewable energy projects,
cumulative effects of utility-sized solar power generation facilities, there is the potential for outside
factors – such as the development of newer technology, changes in state or national policy that
encourages the construction of such facilities, or other economic factors – to result in the
abandonment of such facilities by project proponents. Discussion of potentially significant impacts
associated with the abandonment of solar facilities will be discussed in the EIR. Additionally, the
military has identified potential conflicts of users of the radio frequency spectrum located both on
and off military installations as an area to be reviewed for compatibility issues. Operations of
unmanned radio-controlled aircraft flights can have electronic interference from other sources of
radio signals from telemetry equipment associated with the solar facility. The consistency of the
proposed project with policies contained in the Kern County General Plan and ALUCP adopted for
the purpose of avoiding or mitigating an environmental effect will be further discussed in the EIR.
(c) The project site is not located within the boundaries of any habitat conservation plan or natural
community conservation plan. Therefore, no impact would occur and no further evaluation is required
in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 48 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less–than-
Significant
Impact
No
Impact
MINERAL RESOURCES
Would the project:
a. Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the state?
b. Result in the loss of availability of a locally
important mineral resource recovery site
delineated on a local general plan, specific
plan, or other land use plan?
Discussion:
a. The project site is not designated as a mineral recovery area by the Kern County General Plan, nor is
it identified as a mineral resource zone by the Department of Conservation’s State Mining and
Geology Board. Construction and operation of the proposed project would not interfere with mineral
extraction and processing, and would not have significant impacts on future mineral development.
Therefore, there would be no impact and no further analysis is warranted in the EIR.
b. As mentioned previously, the project site is not located within a designated mineral and petroleum
resource site within the Kern County General Plan. The project site is not located within the NR
(Natural Resources) or PE (Petroleum Extraction) zoned districts. Therefore, the installation of the
solar facilities would not preclude future mineral resource development nor would it result in the loss
of a locally important mineral resource recover site. There would be no impact and no further analysis
is warranted in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 49 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
NOISE
Would the project result in:
a. Exposure of persons to, or generate, noise
levels in excess of standards established in
a local general plan or noise ordinance or
applicable standards of other agencies?
b. Exposure of persons to or generate
excessive ground borne vibration or ground
borne noise levels?
c. A substantial permanent increase in
ambient noise levels in the project vicinity
above levels existing without the project?
d. A substantial temporary or periodic
increase in ambient noise levels in the
project vicinity above levels existing
without the project?
e. For a project located within the Kern
County Airport Land Use Compatibility
Plan, would the project expose people
residing or working in the project area to
excessive noise levels?
f. For a project located within the vicinity of a
private airstrip, would the project expose
people residing or working in the project
area to excessive noise levels?
Discussion:
(a) Land uses determined to be “sensitive” to noise as defined by the Kern County General Plan include
residential areas, schools, convalescent and acute care hospitals, parks and recreational areas, and
churches. The Kern County General Plan Noise Element sets a 65 dBA (A-weighted decibels) Day-
Night noise level (Ldn) limit on exterior noise levels for stationary sources (i.e., non-transportation)
at sensitive receptors. The closest off-site noise sensitive receptors to the project site are rural
residential dwellings located in the Fremont rural community, located immediately adjacent to Site 5
along Yucaipa Street. Noise generated by the proposed project would occur primarily during the
construction phase; whereas as the long-term operation of the solar facility would be relatively quiet.
No substantial noise-generating equipment would be located at the project site during operations. The
project proponent would be required to adhere to the provisions outlined in the Noise Control
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 50 July 2018
Ordinance in the Kern County Ordinance Code Section 8.36.020 and the General Plan Noise Element.
This impact will be analyzed further in the EIR.
(b) Ground borne vibration and ground borne noise could originate from the operation of heavy off-road
equipment during the construction phase of the project. Erection of the solar arrays would include
support structures that may potentially need to be driven into the soil using pneumatic techniques. As
such, the installation of these support structures may cause localized vibration-related annoyance
and/or damage to structures in close proximity. This issue will be further analyzed in the EIR.
(c) Due to the quiet nature of solar facilities, it is unlikely that long-term noise generated by the proposed
project will exceed existing ambient noise levels. Traffic on the proposed project access roads would
be for routine maintenance activities and would primarily consist of personal vehicles, and would
only occur several times per year. Therefore, the majority of operations would not produce noise
discernible above ambient conditions. Although general maintenance activities would be conducted,
they would be subject to applicable Kern County Noise Control Ordinance requirements and comply
with the General Plan Noise Element, which would minimize impacts to receptors. This issue will be
evaluated further in the EIR.
(d) Heavy equipment used during construction would cause a temporary or periodic increase in ambient
noise levels and be considered a potentially significant impact. Therefore, the potential for the
project’s construction activities to result in a substantial temporary or periodic increase in ambient
noise levels at the nearest offsite sensitive receptors will be further evaluated in the EIR.
(e) The project site is not located within two miles of an airport or within an area covered by the ALUCP.
The proposed project would not introduce new residences and would not result in people residing or
working in the project area to be exposed to excessive noise levels. No impacts are expected, and no
further analysis is warranted in the EIR.
(f) The project site is not located within two miles of a private airstrip. The proposed project would not
introduce new noise sensitive land uses that could otherwise be exposed to excessive noise levels
from private airports. No impacts are expected, and no further analysis is warranted in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 51 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less- than
Significant
Impact
No
Impact
POPULATION AND HOUSING
Would the project:
a. Induce substantial population growth in an
area, either directly (for example, by
proposing new homes and businesses) or
indirectly (for example, through extension
of roads or other infrastructure)?
b. Displace substantial numbers of existing
housing, necessitating the construction of
replacement housing elsewhere?
c. Displace substantial numbers of people,
necessitating the construction of
replacement housing elsewhere?
Discussion:
(a) The proposed project would result in temporary employment during construction activity. The on-
site workforce is expected to peak at 1,000 individuals. Construction workers are expected to travel
to the site from various locations throughout Southern California; however the majority would likely
come from the existing labor pool in the general vicinity. The number of workers anticipated to
relocate to the surrounding area is not expected to be substantial. If temporary housing should be
necessary, it is expected that accommodations would be available in the nearby communities of
California City, Rosamond, Mojave, Tehachapi, or Lancaster. Therefore, the proposed project would
not directly or indirectly induce the development of any new housing or businesses in the immediate
project area.
Operation of the proposed project would require up to five on-site staff and would use the available
housing stock in the area. Typical established local thresholds of significance for housing and
population growth pursuant to the CEQA Guidelines, Section 15064.7, include effects that would
induce substantial growth or concentration of a population beyond county projections; alter the
location, distribution, density, or growth rate of the population beyond that projected in the Kern
County General Plan Housing Element; result in a substantial increase in demand for additional
housing; or create a development that significantly reduces the ability of the county to meet housing
objectives set forth in the housing element. Based on the proposed project’s low projected long-term
employment, it would be unlikely to require additional housing stock or impact Kern County’s
housing objectives in accordance with the housing element allocation plan. No impact would result.
Although the proposed project would produce additional electricity, it is intended to meet the demand
for renewable energy per the State RPS for electrical demands based on planned growth in
communities around California. As such, the generation of electricity by the proposed project would
be considered growth-accommodating, rather than growth-inducing. In addition, state law requires
utility companies to produce a certain renewable product and would help the utility companies meet
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 52 July 2018
this new state law.
The proposed project’s electricity would replace electricity generated by fossil fuels, thereby
contributing to California’s renewable energy goals, and would not contribute to induced growth. No
significant impacts related to population growth are expected from the proposed project and further
analysis of this issue is not warranted in the EIR.
(b) The proposed project is located on former agricultural land with no existing housing; as such, the
proposed project would not displace any existing housing such that it would necessitate the
construction of replacement housing elsewhere. Therefore, displacement of existing housing would
not occur and no further evaluation is required in the EIR.
(c) The proposed project is located on former agricultural land with no existing housing. The proposed
project would not displace people such that it would necessitate the construction of replacement
housing in the project area. No further evaluation is required in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 53 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
PUBLIC SERVICES
Would the project:
a. Result in substantial adverse physical
impacts associated with the provision of
new or physically altered governmental
facilities, need for new or physically altered
governmental facilities, the construction of
which could cause significant
environmental impacts, in order to maintain
acceptable service ratios, response times, or
to other performance objectives for any of
the public services:
i. Fire protection?
ii. Police protection?
iii. Schools?
iv. Parks?
v. Other public facilities?
Discussion:
(a) i. Fire Protection. The Kern County Fire Department (KCFD) provides fire suppression and
emergency medical services to the project area. The project site would be served by Station #14,
located at 4953 Hwy 58, which is 15 miles south of the project site. Adherence to all applicable
regulations would reduce wildfire ignitions and prevent the spread of wildfires. However,
construction and operation activities may result in increased need for firefighting personnel and
facilities in the area. Therefore, the potential impact on fire services from construction and operation
of the project is considered potentially significant and will be evaluated in the EIR.
ii. Police Protection. Police protection services in the project area are provided by the Kern County
Sheriff’s Department (KCSD). The project site would be served by the Mojave Substation at 1771
Highway 58, approximately 13 miles south of the project site. Although the potential is low, the
proposed project may attract vandals or other security risks, and construction activities could result
in increases in traffic volumes along surrounding roads. On-site security would be provided and
access would be limited to the areas surrounding the project site during construction and operation,
thereby minimizing the need for police surveillance. Nonetheless, the proposed project’s impacts on
sheriff services are potentially significant and will be evaluated in the EIR.
iii. Schools. During project construction, a relatively large number of construction workers would be
required. It is expected that most of these workers would live in the broader region and commute to
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 54 July 2018
the project site from surrounding communities where their children are already enrolled in school
and where their contribution to local taxes, including funds for schools, is assessed locally. The
proposed project would not require employees or their children to relocate to the project area.
Therefore, substantial temporary increases in population that would adversely affect local school
populations are not expected. Likewise, the operational workforce is small and not expected to
generate a permanent increase in population that would impact school populations. Therefore, no
significant impacts to schools are anticipated to occur and further analysis is not warranted in the
EIR.
iv. Parks. The population increase that would be experienced during the construction phase of the
proposed project would be temporary and would not result in additional demand for park facilities.
Operational employees would be minimal (up to five). Therefore, no significant impacts to parks are
anticipated to occur, and further analysis of this issue is not warranted in the EIR.
v. Other Public Facilities. During project construction, a relatively small number of construction
workers would be required. However, it is expected that most of these workers would commute to
the project site from surrounding communities. Therefore, substantial temporary increases in
population that would adversely affect local public facilities, such as post office, courthouse, and
library services, are not expected. The proposed project would not require the appreciable use of other
public facilities—such as libraries, courts, and Kern County services—that would result in a
significant impact. Once constructed, the proposed project would only employ up to five full-time
employees who would monitor operations and conduct maintenance activities when needed. The need
for the project proponent to use other services in the future is speculative. The proposed project would
have a less than significant impact on other public services; however, further analysis of this issue is
warranted in the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 55 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less–than-
Significant
Impact
No
Impact
RECREATION
Would the project:
a. Increase the use of existing neighborhood
and regional parks or other recreational
facilities such that substantial physical
deterioration of the facility would occur or
be accelerated?
b. Include recreational facilities or require the
construction or expansion of recreational
facilities that might have an adverse
physical effect on the environment?
Discussion:
(a) The proposed project would not result in a temporary or permanent increase of population that could
result in a detectable increase in the use of existing parks. Additionally, no park facilities are located
adjacent to the project site which could otherwise be impacted during construction. No impact would
occur and no further analysis is warranted.
(b) The proposed project does not include the construction of new recreational facilities. No impact
would result and no further analysis is warranted.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 56 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
TRANSPORTATION AND TRAFFIC
Would the project:
a. Conflict with an applicable plan,
ordinance,, or policy establishing measures
of effectiveness for the performance of the
circulation system, including but not limited
to intersections, streets, highways and
freeways, pedestrian and bicycle paths, and
mass transit?
b. Conflict with an applicable congestion
management program, including, but not
limited to level of service standards and
travel demand measures, or other standards
established by the county congestion
management agency for designated roads or
highways?
i. Metropolitan Bakersfield General Plan
LOS “C”?
ii. Kern County General Plan LOS “D”?
c. Result in a change in air traffic patterns,
including either an increase in traffic levels
or a change in location that results in
substantial safety risks?
d. Substantially increase hazards due to a
design feature (e.g., sharp curves or
dangerous intersections) or incompatible
uses (e.g., farm equipment)?
e. Result in inadequate emergency access?
f. Conflict with adopted policies, plans, or
programs regarding public transit, bicycle,
or pedestrian facilities, or otherwise
decrease the performance or safety of such
facilities?
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 57 July 2018
Discussion:
(a) Construction activities associated with the proposed project could potentially affect traffic volumes
on nearby roadways. It is estimated that up to 1,000 workers per day (during peak construction
periods) would be required during the construction of the proposed project. During the operational
phase, the proposed project would have up to five full-time staff. Trip generation during the
operational phase, which also includes occasional truck deliveries during maintenance activities,
would not likely result in a substantial increase in traffic in relation to the existing roadway capacity
nor congestion at intersections. Nonetheless, the proposed project’s temporary construction impacts
could be potentially significant and will be analyzed further in the EIR.
(b) i. The proposed project site is located outside of the Metropolitan Bakersfield General Plan Area, and
the LOS standards are not applicable to the proposed project. Although trips generated by the
proposed project may be distributed throughout the Metropolitan Bakersfield General Plan Area, the
anticipated minimal number of trips are unlikely to affect LOS standards. Further analysis of this
issue is not warranted in the EIR.
ii. As detailed in the response to (a) above, construction of the proposed project would generate
construction trips and may require roadway lane closures, which could temporarily increase the daily
traffic volumes on local roadways and intersections in Kern County. The employees required for
operation and maintenance of the proposed project are expected to originate from the local area and
would not result in a substantial number of trips on roadways in the metropolitan Bakersfield area or
in other parts of Kern County. Therefore, the proposed project’s impacts on Kern County’s
traffic/circulation system are anticipated to be less than significant, but this issue will be further
analyzed in the EIR.
(c) No public or private airports or airstrips are located within two miles of the project site. The project
is not located within the Kern County ALUCP. The project would not result in a change in air traffic
patterns. No further analysis is required in the EIR.
(d) The project proposes access from existing roads. Beyond driveway and related access improvements,
no new design or features would be introduced that would result in transportation-related hazards or
safety concerns. Although no significant impacts related to increased hazards are anticipated to occur,
further analysis of this issue is warranted in the EIR.
(e) Construction of the proposed project would generate construction trips and potential roadway lane
closures, which could temporarily increase the daily traffic volumes on local roadways and
intersections. However, emergency access would be maintained at all times, and appropriate detours
would be provided, as necessary. Although no significant impacts related to emergency access are
anticipated to occur, further analysis of this issue is warranted in the EIR.
(f) Construction of the proposed project would generate construction trips and potential roadway lane
closures, which could temporarily disrupt any bicycle traffic on local roadways. However, due to the
rural nature of the area, no bus stops or designated bicycle lanes exist on the roadways along the
project site. Therefore, the proposed project would not conflict with any applicable policies, plans,
or programs supporting alternative transportation. Further analysis of this issue is not warranted in
the EIR.
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 58 July 2018
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less-than-
Significant
Impact
No
Impact
UTILITIES AND SERVICE SYSTEMS.
Would the project:
a. Exceed wastewater treatment requirements
of the applicable regional water quality
control board?
b. Require or result in the construction of new
water or wastewater treatment facilities or
expansion of existing facilities, the
construction of which could cause
significant environmental effects?
c. Require or result in the construction of new
storm water drainage facilities or expansion
of existing facilities, the construction of
which could cause significant
environmental effects?
d. Have sufficient water supplies available to
serve the project from existing entitlements
and resources, or would new or expanded
entitlements be needed?
e. Result in a determination by the wastewater
treatment provider that serves or may serve
the project that it has adequate capacity to
serve the project’s projected demand in
addition to the provider’s existing
commitments?
f. Be served by a landfill with sufficient
permitted capacity to accommodate the
project’s solid waste disposal needs?
g. Comply with federal, state, and local
statutes and regulations related to solid
waste?
Discussion:
(a) The proposed project would generate a minimal volume of wastewater. It is estimated that up to 1,000
workers per day (during peak construction periods) would be required during the construction of the
project. Wastewater would be contained within portable toilet facilities and disposed of at an
approved offsite location. The Kern County Environmental Health Services Division is responsible
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 59 July 2018
for monitoring the use of portable toilet facilities, and a condition of approval would require the
Applicant to provide documentation of a portable toilet pumping contract. A standard on-site septic
tank and leach field may be used at the O&M building to dispose sanitary wastewater. With a
maximum of five employees, the proposed project is not anticipated to generate substantial volumes
of wastewater. Impacts would be less than significant; however, further analysis of this issue is
warranted in the EIR.
(b) Although the proposed project would create a small amount of additional impervious surface and
may require a small amount of imported water for dust suppression during construction and the
washing of panels, these changes would not substantially increase the amount of storm water runoff.
The project area does not rely on constructed storm water drainage systems. As previously stated, the
pattern and concentration of runoff could be altered by project activities, such as grading of the site
and roads, and must comply with the NPDES CGP through preparation of a SWPPP and complying
with local drainage requirements. It is not anticipated that the amount of runoff across the project site
would be substantially altered. Therefore, the proposed project is not expected to overwhelm existing
storm water drainage systems or create substantial additional sources of polluted runoff, and the
proposed project would comply with the NPDES requirements. However, further analysis of this
issue will be included in the EIR.
(c) Water demand for panel washing and O&M domestic use is not expected to exceed 50 acre-feet per
year. Water usage during construction, primarily for dust-suppression purposes, is not expected to
exceed 400 acre-feet. Water is anticipated to be obtained from an existing on-site well within Site 5,
which is capable of producing 1,500 gallons per minute. Alternatively, water may be obtained from
one or more off-site source(s) and delivered to the project site via truck. If off-site water is used, it
will likely be obtained from one of the nearby Springbok projects or from a commercial source. If
the project proponent determines that off-site water will be used, a Will Serve Letter from the
proposed off-site water purveyor(s) will be submitted. Impacts to water use may be potentially
significant and will be further evaluated in the EIR.
(d) The proposed project would include construction of a septic system and all wastewater would be
handled onsite. Therefore, no impacts to any existing wastewater treatment facilities would occur,
and further analysis of this issue is not warranted in the EIR.
(e) The proposed project is not expected to generate a significant amount of waste that would exceed the
capacity of local landfills. Materials brought to the project site would be used to construct facilities,
and few residual materials are expected. Non-hazardous construction refuse and solid waste would
be either collected and recycled per the Construction Waste Management Plan or disposed of at a
local landfill, while any hazardous waste generated during construction would be disposed of at an
approved off-site location. It is not anticipated that the amount of solid waste generated by the
proposed project would exceed the capacity of local landfills needed to accommodate the waste.
Impacts are anticipated to be less than significant; however, further analysis of this issue will be
included in the EIR.
(f) The proposed project would generate solid waste during construction and operation, thus requiring
the consideration of waste reduction and recycling measures. The 1989 California Integrated Waste
Management Act (AB 939) requires Kern County to attain specific waste diversion goals. In addition,
the California Solid Waste Reuse and Recycling Access Act of 1991, as amended, requires expanded
or new development projects to incorporate storage areas for recycling bins into the proposed project
design. The proposed project would comply with the 1989 California Integrated Waste Management
Act and the 1991 California Solid Waste Reuse and Recycling Access Act of 1991, as amended, per
the County’s conditions of approval. Therefore, impacts are anticipated to be less than significant;
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 60 July 2018
however, further analysis of this issue will be included in the EIR.
Discussion:
a. The EIR’s biological resources section will discuss project specific and potential cumulatively
considerable impacts on plants and wildlife. The EIR will also evaluate the proposed project’s
contribution to cumulative habitat loss of sensitive biological resources and propose mitigation, if
required.
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
MANDATORY FINDINGS OF
SIGNIFICANCE
a. Does the project have the potential to
degrade the quality of the environment,
substantially reduce the habitat of a fish or
wildlife species, cause a fish or wildlife
population to drop below self-sustaining
levels, threaten to eliminate a plant or
animal community, substantially reduce the
number or restrict the range of a rare or
endangered plant or animal, or eliminate
important examples of the major periods of
California history or prehistory?
b. Does the project have impacts that are
individually limited, but cumulatively
considerable? (“Cumulatively
considerable” means that the incremental
effects of a project are significant when
viewed in connection with the effects of
past projects, the effects of other current
projects, and the effects of probable future
projects.)
c. Does the project have environmental effects
that would cause substantial adverse effects
on human beings, either directly or
indirectly?
KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT
ELAND 1 SOLAR PROJECT
Initial Study/Notice of Preparation 61 July 2018
b. The proposed project has the potential to contribute to cumulative impacts to aesthetics, air quality,
biological resources, cultural resources, greenhouse gas emissions, hazards and hazardous materials,
hydrology and water quality, land use and planning, noise, and utilities and service systems. The
project’s contribution to cumulative impacts on these and other resource areas will be evaluated in
the EIR.
c. The proposed project would not result in the long-term operation of any emission sources that would
adversely affect nearby sensitive receptors. However, short-term construction activities could result
in temporary increases in pollutant concentrations. Pollutants of primary concern commonly
associated with construction-related activities include toxic air contaminants (i.e., DPM), asbestos,
and fugitive dust. Within the project area, the potential for increased occurrences of Valley Fever is
also of concern. Human health impacts from the short-term cumulative contribution to air quality