electrak new flyer

8
Electrak ® ... the next generation of power distribution POWERED BY SPECIALISTS ELECTRAK SYSTEMS / OVERVIEW

Upload: eka-group

Post on 19-Feb-2016

224 views

Category:

Documents


2 download

DESCRIPTION

Electrack catalogue

TRANSCRIPT

Page 1: Electrak New Flyer

Electrak®...the next generation of power distribution

P O W E R E D B Y S P E C I A L I S T S

Electrak®... the specialist in power distribution throughout the workplace

Legrand... global strengthbuilt on local knowledge

Electrak, part of the Legrand Group in the UK, is a leading manufacturer of power distribution and lighting control solutions. Its power track, floor boxes, grommets, desk modules and lighting control ranges are installed in high specification offices around the world.

Legrand is the global specialist in electrical and digital building infrastructures. Innovation is the driving force behind its development. With an increasing investment in research and development (circa 5% of sales) and more than 4,000 active patents, the Legrand Group is focused on maintaining a high rate of new product launches that present innovative solutions to the market.

LEGrand In thE UK - poWErEd by spEcIaLIstsIn the UK Legrand has developed a customer focused structure which harnesses the power of its market leading specialist brands including Bticino, Electrak and Zucchini to deliver innovative, integrated solutions for every phase of construction.

LEGrand’s poWEr dIstrIbUtIon dIVIsIon From Zucchini transformers, through rising main busbars and distribution boards to Electrak’s power track, desk modules and lighting control, Legrand’s power distribution division provides market leading solutions to the increasing demands of today’s buildings.

To find out more go to: www.electraknextgen.co.uk

Elec

trak

intr

oduc

tion

11/2

012.

1K

the Legrand logo is a registered trademark of the Legrand group of companies.this document is printed on sustainably sourced paper. please recycle.

UnItEd KInGdom • Morgan Stanley, Canary Wharf• Media City, Manchester• JP Morgan, Canary Wharf• RBS, Edinburgh• Bridgewater Place, Leeds• Network Rail, Nationwide• Swiss Re, City of London• Amazon, Swansea• Heathrow Airport, London• Morgan Stanley, Canary Wharf• Fort Dunlop, Birmingham• Royal Bank of Canada,

city of London• Snow Hill, Birmingham• Barclays Capital, Canary Wharf• Temple Back, Bristol• Standard Chartered Bank, City of London• London Underground• BBC, White City• Mann Island, Liverpool

mIddLE East & IndIa • ADMA-OPCO HQ, Dubai• Internet City, Dubai• Burjuman Centre, Dubai• ADIC/Al Bahr Towers, Abu Dhabi• Al Dar HQ, Abu Dhabi• Central Bank of Kuwait• Ministry of Education, Kuwait• PIFFS Aridya, Kuwait• PAAET, Kuwait• Qatar News Agency• Barclays, Chennai, India• Barclays, Pune, India• Barclays, Andheri, India• Barclays, Mumbai, India• RBS, Delhi, India• Fidelity, Delhi, India

QUALITY ASSURED UK MANUFACTURING

ASIA PACIFIC• Credit Suisse, ICC I, Hong Kong• Deutsche Bank, ICC I, Hong Kong• Barclays Capital, Cheung

Kong centre• Customs Headquarters,

north point, hong Kong• Standard Chartered Bank,

IFC II, Hong Kong• Citi Bank Tower, Hong Kong• Macquarie Bank, IFC I, Hong Kong• UBS Bank, IFC II, Hong Kong• JP Morgan, Hong Kong• Standard Chartered Bank, Marina

bay, singapore• Barclays Capital, Marina Bay, Singapore• Nomura Bank, Marina Bay, Singapore• Credit Suisse, Serangoon Road,

singapore• ABN Amro, One Raffles Quay, Singapore• RBS, One George Street, Singapore• Barclays Capital, Shanghai• Standard Chartered Bank, Shanghai• UBS Bank, Shanghai

Head office (UK and Ireland):Legrand Electric LimitedGreat King street north, birmingham, B19 2LFtel: +44 (0) 870 608 9000 Fax: +44 (0) 870 608 9004Website: www.legrand.co.uk

Quotations and technical support: the power distribution division of Legrand Electric Ltd.Great King street north,Birmingham, B19 2LFtel: +44 (0) 845 600 6266Fax: +44 (0) 845 600 6760E-mail: [email protected]

Customer Services:the power distribution division of Legrand Electric Ltd.no. 1 Industrial Estatemedomsley road, consettcounty durham, dh8 6srtel: +44(0) 845 600 6266Fax: +44 (0) 845 600 6366E-mail: [email protected]

From design through to manufacturing, the Legrand Group selects materials and processes that respect people and the environment.

• Efficient and environmentally aware product design

• Product functions that help to avoid energy waste

• Management of manufacturing and logistics sites

• Integration of environmental concerns and ISO 14001 procedures at the Group’s global sites*

* 84% of sites are ISO 14001:2004 accredited including all UK sites.

ELEctraK systEms / oVErVIEW

Page 2: Electrak New Flyer

Electrak®...the next generation of power distribution

P O W E R E D B Y S P E C I A L I S T S

Electrak®... the specialist in power distribution throughout the workplace

Legrand... global strengthbuilt on local knowledge

Electrak, part of the Legrand Group in the UK, is a leading manufacturer of power distribution and lighting control solutions. Its power track, floor boxes, grommets, desk modules and lighting control ranges are installed in high specification offices around the world.

Legrand is the global specialist in electrical and digital building infrastructures. Innovation is the driving force behind its development. With an increasing investment in research and development (circa 5% of sales) and more than 4,000 active patents, the Legrand Group is focused on maintaining a high rate of new product launches that present innovative solutions to the market.

LEGrand In thE UK - poWErEd by spEcIaLIstsIn the UK Legrand has developed a customer focused structure which harnesses the power of its market leading specialist brands including Bticino, Electrak and Zucchini to deliver innovative, integrated solutions for every phase of construction.

LEGrand’s poWEr dIstrIbUtIon dIVIsIon From Zucchini transformers, through rising main busbars and distribution boards to Electrak’s power track, desk modules and lighting control, Legrand’s power distribution division provides market leading solutions to the increasing demands of today’s buildings.

To find out more go to: www.electraknextgen.co.uk

Elec

trak

intr

oduc

tion

11/2

012.

1K

the Legrand logo is a registered trademark of the Legrand group of companies.this document is printed on sustainably sourced paper. please recycle.

UnItEd KInGdom • Morgan Stanley, Canary Wharf• Media City, Manchester• JP Morgan, Canary Wharf• RBS, Edinburgh• Bridgewater Place, Leeds• Network Rail, Nationwide• Swiss Re, City of London• Amazon, Swansea• Heathrow Airport, London• Morgan Stanley, Canary Wharf• Fort Dunlop, Birmingham• Royal Bank of Canada,

city of London• Snow Hill, Birmingham• Barclays Capital, Canary Wharf• Temple Back, Bristol• Standard Chartered Bank, City of London• London Underground• BBC, White City• Mann Island, Liverpool

mIddLE East & IndIa • ADMA-OPCO HQ, Dubai• Internet City, Dubai• Burjuman Centre, Dubai• ADIC/Al Bahr Towers, Abu Dhabi• Al Dar HQ, Abu Dhabi• Central Bank of Kuwait• Ministry of Education, Kuwait• PIFFS Aridya, Kuwait• PAAET, Kuwait• Qatar News Agency• Barclays, Chennai, India• Barclays, Pune, India• Barclays, Andheri, India• Barclays, Mumbai, India• RBS, Delhi, India• Fidelity, Delhi, India

QUALITY ASSURED UK MANUFACTURING

ASIA PACIFIC• Credit Suisse, ICC I, Hong Kong• Deutsche Bank, ICC I, Hong Kong• Barclays Capital, Cheung

Kong centre• Customs Headquarters,

north point, hong Kong• Standard Chartered Bank,

IFC II, Hong Kong• Citi Bank Tower, Hong Kong• Macquarie Bank, IFC I, Hong Kong• UBS Bank, IFC II, Hong Kong• JP Morgan, Hong Kong• Standard Chartered Bank, Marina

bay, singapore• Barclays Capital, Marina Bay, Singapore• Nomura Bank, Marina Bay, Singapore• Credit Suisse, Serangoon Road,

singapore• ABN Amro, One Raffles Quay, Singapore• RBS, One George Street, Singapore• Barclays Capital, Shanghai• Standard Chartered Bank, Shanghai• UBS Bank, Shanghai

Head office (UK and Ireland):Legrand Electric LimitedGreat King street north, birmingham, B19 2LFtel: +44 (0) 870 608 9000 Fax: +44 (0) 870 608 9004Website: www.legrand.co.uk

Quotations and technical support: the power distribution division of Legrand Electric Ltd.Great King street north,Birmingham, B19 2LFtel: +44 (0) 845 600 6266Fax: +44 (0) 845 600 6760E-mail: [email protected]

Customer Services:the power distribution division of Legrand Electric Ltd.no. 1 Industrial Estatemedomsley road, consettcounty durham, dh8 6srtel: +44(0) 845 600 6266Fax: +44 (0) 845 600 6366E-mail: [email protected]

From design through to manufacturing, the Legrand Group selects materials and processes that respect people and the environment.

• Efficient and environmentally aware product design

• Product functions that help to avoid energy waste

• Management of manufacturing and logistics sites

• Integration of environmental concerns and ISO 14001 procedures at the Group’s global sites*

* 84% of sites are ISO 14001:2004 accredited including all UK sites.

ELEctraK systEms / oVErVIEW

Page 3: Electrak New Flyer

Electrak®...the next generation of power distribution

P O W E R E D B Y S P E C I A L I S T S

Electrak®... the specialist in power distribution throughout the workplace

Legrand... global strengthbuilt on local knowledge

Electrak, part of the Legrand Group in the UK, is a leading manufacturer of power distribution and lighting control solutions. Its power track, floor boxes, grommets, desk modules and lighting control ranges are installed in high specification offices around the world.

Legrand is the global specialist in electrical and digital building infrastructures. Innovation is the driving force behind its development. With an increasing investment in research and development (circa 5% of sales) and more than 4,000 active patents, the Legrand Group is focused on maintaining a high rate of new product launches that present innovative solutions to the market.

LEGrand In thE UK - poWErEd by spEcIaLIstsIn the UK Legrand has developed a customer focused structure which harnesses the power of its market leading specialist brands including Bticino, Electrak and Zucchini to deliver innovative, integrated solutions for every phase of construction.

LEGrand’s poWEr dIstrIbUtIon dIVIsIon From Zucchini transformers, through rising main busbars and distribution boards to Electrak’s power track, desk modules and lighting control, Legrand’s power distribution division provides market leading solutions to the increasing demands of today’s buildings.

To find out more go to: www.electraknextgen.co.uk

Elec

trak

intr

oduc

tion

11/2

012.

1K

the Legrand logo is a registered trademark of the Legrand group of companies.this document is printed on sustainably sourced paper. please recycle.

UnItEd KInGdom • Morgan Stanley, Canary Wharf• Media City, Manchester• JP Morgan, Canary Wharf• RBS, Edinburgh• Bridgewater Place, Leeds• Network Rail, Nationwide• Swiss Re, City of London• Amazon, Swansea• Heathrow Airport, London• Morgan Stanley, Canary Wharf• Fort Dunlop, Birmingham• Royal Bank of Canada,

city of London• Snow Hill, Birmingham• Barclays Capital, Canary Wharf• Temple Back, Bristol• Standard Chartered Bank, City of London• London Underground• BBC, White City• Mann Island, Liverpool

mIddLE East & IndIa • ADMA-OPCO HQ, Dubai• Internet City, Dubai• Burjuman Centre, Dubai• ADIC/Al Bahr Towers, Abu Dhabi• Al Dar HQ, Abu Dhabi• Central Bank of Kuwait• Ministry of Education, Kuwait• PIFFS Aridya, Kuwait• PAAET, Kuwait• Qatar News Agency• Barclays, Chennai, India• Barclays, Pune, India• Barclays, Andheri, India• Barclays, Mumbai, India• RBS, Delhi, India• Fidelity, Delhi, India

QUALITY ASSURED UK MANUFACTURING

ASIA PACIFIC• Credit Suisse, ICC I, Hong Kong• Deutsche Bank, ICC I, Hong Kong• Barclays Capital, Cheung

Kong centre• Customs Headquarters,

north point, hong Kong• Standard Chartered Bank,

IFC II, Hong Kong• Citi Bank Tower, Hong Kong• Macquarie Bank, IFC I, Hong Kong• UBS Bank, IFC II, Hong Kong• JP Morgan, Hong Kong• Standard Chartered Bank, Marina

bay, singapore• Barclays Capital, Marina Bay, Singapore• Nomura Bank, Marina Bay, Singapore• Credit Suisse, Serangoon Road,

singapore• ABN Amro, One Raffles Quay, Singapore• RBS, One George Street, Singapore• Barclays Capital, Shanghai• Standard Chartered Bank, Shanghai• UBS Bank, Shanghai

Head office (UK and Ireland):Legrand Electric LimitedGreat King street north, birmingham, B19 2LFtel: +44 (0) 870 608 9000 Fax: +44 (0) 870 608 9004Website: www.legrand.co.uk

Quotations and technical support: the power distribution division of Legrand Electric Ltd.Great King street north,Birmingham, B19 2LFtel: +44 (0) 845 600 6266Fax: +44 (0) 845 600 6760E-mail: [email protected]

Customer Services:the power distribution division of Legrand Electric Ltd.no. 1 Industrial Estatemedomsley road, consettcounty durham, dh8 6srtel: +44(0) 845 600 6266Fax: +44 (0) 845 600 6366E-mail: [email protected]

From design through to manufacturing, the Legrand Group selects materials and processes that respect people and the environment.

• Efficient and environmentally aware product design

• Product functions that help to avoid energy waste

• Management of manufacturing and logistics sites

• Integration of environmental concerns and ISO 14001 procedures at the Group’s global sites*

* 84% of sites are ISO 14001:2004 accredited including all UK sites.

ELEctraK systEms / oVErVIEW

Page 4: Electrak New Flyer

Intersoc-R is a modular desk power system designed to meet the demands of modern workplaces for faster and more adaptable solutions. Available in standard and clean earth versions, its latest evolution offers fixed and rotatable socket options.

Fast modular connection: • Single push-fit action with auto lock mechanism

• Safe shuttered electrical connections

• Robustly designed rigid joint between modules

Features and technical specification: • Fixed or rotatable socket options

• Range of international sockets modules

• 2, 3 or 4 gang modules with fused or unfused (BS 6396) sockets

• 32A rated, meets the requirements of BS 7671 : 2008 (including section 543.7)

• Protection options: Fuse / switch / neon / RCD / RCBO / MCB

• Outgoing connections: Flexible interlink or end cap with ST or GST

INTERFACE SOLUTIONSFloor boxes: • Raised access floor and slab mounted floor boxes

• Available pre-wired with power track tap-offs or supplied unassembled

Grommets: • Ranging from 144mm to 232mm in diameter

• New 169mm diameter grommet can accommodate up to 3 x 32mm conduits

• New cleaner’s socket with flat mounted RCD socket

poWEr tracKThe system consists of continuous lengths of track which are fed via feed units and can be installed in floor voids as low as 48mm

• 63A rated, IP40 protection

• Available in 1.2, 1.8, 2.4 and 3.6m lengths

• Tap-off outlets located at every 300 or 600mm pitch

• Single phase, clean earth, dual circuit, three phase and auxiliary earth configurations

• Floor mountable with stand-off brackets also available

snap on... pLUG In Lightrak lighting control units (LCUs) simply snap on and plug into Electrak’s Buscom trunking and are easily unplugged, moved and reprogrammed to accommodate future lighting layout changes.

THE HEART OF YOUR LIGhtInG controL systEmInstalling a matrix of Buscom trunking in the ceiling void creates an accessible power and communications backbone throughout a building. The backbone can be tapped into at any point to facilitate instant connection to power and control circuits.

• Fast, easy installation. Snap on / plug in lighting control units

• Fully addressable and PC reconfigurable

• Analogue, DSI and DALI control

• Comprehensive range of energy saving switching, sensing and scheduling devices available

• Seamless connectivity with KNX devices from over 270 manufacturers

• Interface with other building control systems via the open KNX protocol

• Two way communication with DALI, facilitating control and feedback

• Emergency lighting test function

• Comprehensive design and commissioning service

• Power and communications within a single trunking system

• Suitable for use with any lighting control protocol, including: KNX; LonWorks and DALI

• Modular, flexible system which is quick and simple to install and adapt

• Reduced potential points of failure in comparison with traditional wiring installations

buscom trunking...a unique power and data backbone

power at the workstation...fast, robust modularity... Intersoc-R

Underfloor power... easy, adaptable, reliable

Lightrak®...fully addressable lighting controldesigned to work in harmony with Electrak’s buscom trunking, Lightrak’s lighting control system offers high end sophistication with unbeatable flexibility and speed of installation.

buscom is at the heart of Electrak’s lighting control solutions... distributing both power and communications within a single busbar trunking system, it provides a flexible and simple alternative to traditional wiring installations.

Intersoc-R is a modular desk power system designed to meet the increasing need for adaptable solutions in the modern workplace. available in standard and clean earth versions, its latest evolution offers fixed and rotatable socket options.

Electrak’s power track system is perfect for cavity floor installations. With minimal parts, push-fit assembly and a complementary range of floor boxes and grommets, this flexible, easy to install system can be reconfigured at any time.

IntErsoc-r modULar dEsK poWEr systEm

Page 5: Electrak New Flyer

Intersoc-R is a modular desk power system designed to meet the demands of modern workplaces for faster and more adaptable solutions. Available in standard and clean earth versions, its latest evolution offers fixed and rotatable socket options.

Fast modular connection: • Single push-fit action with auto lock mechanism

• Safe shuttered electrical connections

• Robustly designed rigid joint between modules

Features and technical specification: • Fixed or rotatable socket options

• Range of international sockets modules

• 2, 3 or 4 gang modules with fused or unfused (BS 6396) sockets

• 32A rated, meets the requirements of BS 7671 : 2008 (including section 543.7)

• Protection options: Fuse / switch / neon / RCD / RCBO / MCB

• Outgoing connections: Flexible interlink or end cap with ST or GST

INTERFACE SOLUTIONSFloor boxes: • Raised access floor and slab mounted floor boxes

• Available pre-wired with power track tap-offs or supplied unassembled

Grommets: • Ranging from 144mm to 232mm in diameter

• New 169mm diameter grommet can accommodate up to 3 x 32mm conduits

• New cleaner’s socket with flat mounted RCD socket

poWEr tracKThe system consists of continuous lengths of track which are fed via feed units and can be installed in floor voids as low as 48mm

• 63A rated, IP40 protection

• Available in 1.2, 1.8, 2.4 and 3.6m lengths

• Tap-off outlets located at every 300 or 600mm pitch

• Single phase, clean earth, dual circuit, three phase and auxiliary earth configurations

• Floor mountable with stand-off brackets also available

snap on... pLUG In Lightrak lighting control units (LCUs) simply snap on and plug into Electrak’s Buscom trunking and are easily unplugged, moved and reprogrammed to accommodate future lighting layout changes.

THE HEART OF YOUR LIGhtInG controL systEmInstalling a matrix of Buscom trunking in the ceiling void creates an accessible power and communications backbone throughout a building. The backbone can be tapped into at any point to facilitate instant connection to power and control circuits.

• Fast, easy installation. Snap on / plug in lighting control units

• Fully addressable and PC reconfigurable

• Analogue, DSI and DALI control

• Comprehensive range of energy saving switching, sensing and scheduling devices available

• Seamless connectivity with KNX devices from over 270 manufacturers

• Interface with other building control systems via the open KNX protocol

• Two way communication with DALI, facilitating control and feedback

• Emergency lighting test function

• Comprehensive design and commissioning service

• Power and communications within a single trunking system

• Suitable for use with any lighting control protocol, including: KNX; LonWorks and DALI

• Modular, flexible system which is quick and simple to install and adapt

• Reduced potential points of failure in comparison with traditional wiring installations

buscom trunking...a unique power and data backbone

power at the workstation...fast, robust modularity... Intersoc-R

Underfloor power... easy, adaptable, reliable

Lightrak®...fully addressable lighting controldesigned to work in harmony with Electrak’s buscom trunking, Lightrak’s lighting control system offers high end sophistication with unbeatable flexibility and speed of installation.

buscom is at the heart of Electrak’s lighting control solutions... distributing both power and communications within a single busbar trunking system, it provides a flexible and simple alternative to traditional wiring installations.

Intersoc-R is a modular desk power system designed to meet the increasing need for adaptable solutions in the modern workplace. available in standard and clean earth versions, its latest evolution offers fixed and rotatable socket options.

Electrak’s power track system is perfect for cavity floor installations. With minimal parts, push-fit assembly and a complementary range of floor boxes and grommets, this flexible, easy to install system can be reconfigured at any time.

IntErsoc-r modULar dEsK poWEr systEm

Page 6: Electrak New Flyer

Intersoc-R is a modular desk power system designed to meet the demands of modern workplaces for faster and more adaptable solutions. Available in standard and clean earth versions, its latest evolution offers fixed and rotatable socket options.

Fast modular connection: • Single push-fit action with auto lock mechanism

• Safe shuttered electrical connections

• Robustly designed rigid joint between modules

Features and technical specification: • Fixed or rotatable socket options

• Range of international sockets modules

• 2, 3 or 4 gang modules with fused or unfused (BS 6396) sockets

• 32A rated, meets the requirements of BS 7671 : 2008 (including section 543.7)

• Protection options: Fuse / switch / neon / RCD / RCBO / MCB

• Outgoing connections: Flexible interlink or end cap with ST or GST

INTERFACE SOLUTIONSFloor boxes: • Raised access floor and slab mounted floor boxes

• Available pre-wired with power track tap-offs or supplied unassembled

Grommets: • Ranging from 144mm to 232mm in diameter

• New 169mm diameter grommet can accommodate up to 3 x 32mm conduits

• New cleaner’s socket with flat mounted RCD socket

poWEr tracKThe system consists of continuous lengths of track which are fed via feed units and can be installed in floor voids as low as 48mm

• 63A rated, IP40 protection

• Available in 1.2, 1.8, 2.4 and 3.6m lengths

• Tap-off outlets located at every 300 or 600mm pitch

• Single phase, clean earth, dual circuit, three phase and auxiliary earth configurations

• Floor mountable with stand-off brackets also available

snap on... pLUG In Lightrak lighting control units (LCUs) simply snap on and plug into Electrak’s Buscom trunking and are easily unplugged, moved and reprogrammed to accommodate future lighting layout changes.

THE HEART OF YOUR LIGhtInG controL systEmInstalling a matrix of Buscom trunking in the ceiling void creates an accessible power and communications backbone throughout a building. The backbone can be tapped into at any point to facilitate instant connection to power and control circuits.

• Fast, easy installation. Snap on / plug in lighting control units

• Fully addressable and PC reconfigurable

• Analogue, DSI and DALI control

• Comprehensive range of energy saving switching, sensing and scheduling devices available

• Seamless connectivity with KNX devices from over 270 manufacturers

• Interface with other building control systems via the open KNX protocol

• Two way communication with DALI, facilitating control and feedback

• Emergency lighting test function

• Comprehensive design and commissioning service

• Power and communications within a single trunking system

• Suitable for use with any lighting control protocol, including: KNX; LonWorks and DALI

• Modular, flexible system which is quick and simple to install and adapt

• Reduced potential points of failure in comparison with traditional wiring installations

buscom trunking...a unique power and data backbone

power at the workstation...fast, robust modularity... Intersoc-R

Underfloor power... easy, adaptable, reliable

Lightrak®...fully addressable lighting controldesigned to work in harmony with Electrak’s buscom trunking, Lightrak’s lighting control system offers high end sophistication with unbeatable flexibility and speed of installation.

buscom is at the heart of Electrak’s lighting control solutions... distributing both power and communications within a single busbar trunking system, it provides a flexible and simple alternative to traditional wiring installations.

Intersoc-R is a modular desk power system designed to meet the increasing need for adaptable solutions in the modern workplace. available in standard and clean earth versions, its latest evolution offers fixed and rotatable socket options.

Electrak’s power track system is perfect for cavity floor installations. With minimal parts, push-fit assembly and a complementary range of floor boxes and grommets, this flexible, easy to install system can be reconfigured at any time.

IntErsoc-r modULar dEsK poWEr systEm

Page 7: Electrak New Flyer

Intersoc-R is a modular desk power system designed to meet the demands of modern workplaces for faster and more adaptable solutions. Available in standard and clean earth versions, its latest evolution offers fixed and rotatable socket options.

Fast modular connection: • Single push-fit action with auto lock mechanism

• Safe shuttered electrical connections

• Robustly designed rigid joint between modules

Features and technical specification: • Fixed or rotatable socket options

• Range of international sockets modules

• 2, 3 or 4 gang modules with fused or unfused (BS 6396) sockets

• 32A rated, meets the requirements of BS 7671 : 2008 (including section 543.7)

• Protection options: Fuse / switch / neon / RCD / RCBO / MCB

• Outgoing connections: Flexible interlink or end cap with ST or GST

INTERFACE SOLUTIONSFloor boxes: • Raised access floor and slab mounted floor boxes

• Available pre-wired with power track tap-offs or supplied unassembled

Grommets: • Ranging from 144mm to 232mm in diameter

• New 169mm diameter grommet can accommodate up to 3 x 32mm conduits

• New cleaner’s socket with flat mounted RCD socket

poWEr tracKThe system consists of continuous lengths of track which are fed via feed units and can be installed in floor voids as low as 48mm

• 63A rated, IP40 protection

• Available in 1.2, 1.8, 2.4 and 3.6m lengths

• Tap-off outlets located at every 300 or 600mm pitch

• Single phase, clean earth, dual circuit, three phase and auxiliary earth configurations

• Floor mountable with stand-off brackets also available

snap on... pLUG In Lightrak lighting control units (LCUs) simply snap on and plug into Electrak’s Buscom trunking and are easily unplugged, moved and reprogrammed to accommodate future lighting layout changes.

THE HEART OF YOUR LIGhtInG controL systEmInstalling a matrix of Buscom trunking in the ceiling void creates an accessible power and communications backbone throughout a building. The backbone can be tapped into at any point to facilitate instant connection to power and control circuits.

• Fast, easy installation. Snap on / plug in lighting control units

• Fully addressable and PC reconfigurable

• Analogue, DSI and DALI control

• Comprehensive range of energy saving switching, sensing and scheduling devices available

• Seamless connectivity with KNX devices from over 270 manufacturers

• Interface with other building control systems via the open KNX protocol

• Two way communication with DALI, facilitating control and feedback

• Emergency lighting test function

• Comprehensive design and commissioning service

• Power and communications within a single trunking system

• Suitable for use with any lighting control protocol, including: KNX; LonWorks and DALI

• Modular, flexible system which is quick and simple to install and adapt

• Reduced potential points of failure in comparison with traditional wiring installations

buscom trunking...a unique power and data backbone

power at the workstation...fast, robust modularity... Intersoc-R

Underfloor power... easy, adaptable, reliable

Lightrak®...fully addressable lighting controldesigned to work in harmony with Electrak’s buscom trunking, Lightrak’s lighting control system offers high end sophistication with unbeatable flexibility and speed of installation.

buscom is at the heart of Electrak’s lighting control solutions... distributing both power and communications within a single busbar trunking system, it provides a flexible and simple alternative to traditional wiring installations.

Intersoc-R is a modular desk power system designed to meet the increasing need for adaptable solutions in the modern workplace. available in standard and clean earth versions, its latest evolution offers fixed and rotatable socket options.

Electrak’s power track system is perfect for cavity floor installations. With minimal parts, push-fit assembly and a complementary range of floor boxes and grommets, this flexible, easy to install system can be reconfigured at any time.

IntErsoc-r modULar dEsK poWEr systEm

Page 8: Electrak New Flyer

Electrak®...the next generation of power distribution

P O W E R E D B Y S P E C I A L I S T S

Electrak®... the specialist in power distribution throughout the workplace

Legrand... global strengthbuilt on local knowledge

Electrak, part of the Legrand Group in the UK, is a leading manufacturer of power distribution and lighting control solutions. Its power track, floor boxes, grommets, desk modules and lighting control ranges are installed in high specification offices around the world.

Legrand is the global specialist in electrical and digital building infrastructures. Innovation is the driving force behind its development. With an increasing investment in research and development (circa 5% of sales) and more than 4,000 active patents, the Legrand Group is focused on maintaining a high rate of new product launches that present innovative solutions to the market.

LEGrand In thE UK - poWErEd by spEcIaLIstsIn the UK Legrand has developed a customer focused structure which harnesses the power of its market leading specialist brands including Bticino, Electrak and Zucchini to deliver innovative, integrated solutions for every phase of construction.

LEGrand’s poWEr dIstrIbUtIon dIVIsIon From Zucchini transformers, through rising main busbars and distribution boards to Electrak’s power track, desk modules and lighting control, Legrand’s power distribution division provides market leading solutions to the increasing demands of today’s buildings.

To find out more go to: www.electraknextgen.co.uk

Elec

trak

intr

oduc

tion

11/2

012.

1K

the Legrand logo is a registered trademark of the Legrand group of companies.this document is printed on sustainably sourced paper. please recycle.

UnItEd KInGdom • Morgan Stanley, Canary Wharf• Media City, Manchester• JP Morgan, Canary Wharf• RBS, Edinburgh• Bridgewater Place, Leeds• Network Rail, Nationwide• Swiss Re, City of London• Amazon, Swansea• Heathrow Airport, London• Morgan Stanley, Canary Wharf• Fort Dunlop, Birmingham• Royal Bank of Canada,

city of London• Snow Hill, Birmingham• Barclays Capital, Canary Wharf• Temple Back, Bristol• Standard Chartered Bank, City of London• London Underground• BBC, White City• Mann Island, Liverpool

mIddLE East & IndIa • ADMA-OPCO HQ, Dubai• Internet City, Dubai• Burjuman Centre, Dubai• ADIC/Al Bahr Towers, Abu Dhabi• Al Dar HQ, Abu Dhabi• Central Bank of Kuwait• Ministry of Education, Kuwait• PIFFS Aridya, Kuwait• PAAET, Kuwait• Qatar News Agency• Barclays, Chennai, India• Barclays, Pune, India• Barclays, Andheri, India• Barclays, Mumbai, India• RBS, Delhi, India• Fidelity, Delhi, India

QUALITY ASSURED UK MANUFACTURING

ASIA PACIFIC• Credit Suisse, ICC I, Hong Kong• Deutsche Bank, ICC I, Hong Kong• Barclays Capital, Cheung

Kong centre• Customs Headquarters,

north point, hong Kong• Standard Chartered Bank,

IFC II, Hong Kong• Citi Bank Tower, Hong Kong• Macquarie Bank, IFC I, Hong Kong• UBS Bank, IFC II, Hong Kong• JP Morgan, Hong Kong• Standard Chartered Bank, Marina

bay, singapore• Barclays Capital, Marina Bay, Singapore• Nomura Bank, Marina Bay, Singapore• Credit Suisse, Serangoon Road,

singapore• ABN Amro, One Raffles Quay, Singapore• RBS, One George Street, Singapore• Barclays Capital, Shanghai• Standard Chartered Bank, Shanghai• UBS Bank, Shanghai

Head office (UK and Ireland):Legrand Electric LimitedGreat King street north, birmingham, B19 2LFtel: +44 (0) 870 608 9000 Fax: +44 (0) 870 608 9004Website: www.legrand.co.uk

Quotations and technical support: the power distribution division of Legrand Electric Ltd.Great King street north,Birmingham, B19 2LFtel: +44 (0) 845 600 6266Fax: +44 (0) 845 600 6760E-mail: [email protected]

Customer Services:the power distribution division of Legrand Electric Ltd.no. 1 Industrial Estatemedomsley road, consettcounty durham, dh8 6srtel: +44(0) 845 600 6266Fax: +44 (0) 845 600 6366E-mail: [email protected]

From design through to manufacturing, the Legrand Group selects materials and processes that respect people and the environment.

• Efficient and environmentally aware product design

• Product functions that help to avoid energy waste

• Management of manufacturing and logistics sites

• Integration of environmental concerns and ISO 14001 procedures at the Group’s global sites*

* 84% of sites are ISO 14001:2004 accredited including all UK sites.

ELEctraK systEms / oVErVIEW