Pleasereadandfollowtheinstallationoperatinginstructionscarefully,toensurethelonglifeandreliableoperationofthisappliance.TheElectricHeatingCompanymaymakeminorchangeswhennecessarytotheappliancethatwillnotbe
showninthisdocument,solongasthemainfeaturesoftheboilerremainthesame.Allboilerscomewitha24monthwarrantythatcoversalldefectsoriginatingfromfaultymaterialsandwork-
manshipinthemanufactureoftheboilers.Thewarrantywillnotcoveranydamagetotheboilerfrompoororincorrectinstallationwork.Inadditionthe
WarrantywillnotcoveranycalloutchargesthathavenotbeenauthorisedbytheElectricHeatingCompanyLtd.Thewarrantywillnotcoveranywaterleaksintotheboilerthatmaycausedamagetotheelectricalorelec-
troniccontrolsystem.Allplumbingconnectionsmustbecheckedandautoairventspositionedtothesideoftheboilerandnot
directlyabovetheunit.AMagneticFiltermustbeinstalledtotheboilersreturnpipeworkbeforethecirculationpump.Itisrecom-
mendedthatthefilteriscleaned;failuretocleantheMagneticFiltermayresultinboiler/systemfailure.War-rantycallswillnotbecoveredwheretheaboverequirementshavenotbeenmet.
The “Slim Jim” boiler is a low temperature boiler intended for use in unvented or vented central heating systems with forced circulation.
(Protected according to legally binding directives).
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge unless they have been given supervision or instruction concerning the use of the appliance by a person responsible for their safety.
Children should be supervised to ensure that they do not operate or interfere with the appliance.
Page Contents
INTRODUCTION 3PREPERATION 5LOCATION 5GENERAL 6BOILER INTERNAL LAYOUT 8INSTALLATION 9SYSTEM PROTECTION - COMMISSIONING 11ELECTRICAL CONNECTIONS 12ELECTRICAL CONNECTIONS 14CONTROL WIRING 16BOILER CONTROL PANEL 17TECHNICAL SPECIFICATION 18PARTS LIST TABLE 19
INTRODUCTION
4GB-063C_f.615
Boiler Features.
• OptionofVoltFreeOR240voltControlSignalling• WaterLevelSensor• HighCurrentSafetydevice• LowMaintenance• BoilerPowerOutputSelector• EasytouseController
Thecentralheatingsystem,inwhichtheSlimJimboilerisbeinginstalledinto,mustbefittedwiththefollowing:
Vented Systems:
• CirculationPump• PumpValves• F&ETank• MagneticFilter• AutomaticBypassifReq
Sealed Systems:
• CirculationPump• PumpValves• MagneticFilter• AutomaticBypassifReq• SealedSystemKit• AutomaticAirVent
Instructions and Building Regulations:
Thisappliancemustbefittedinaccordancewiththefollowinginstructions.
TheLocalBuildingRegulations.TheBuildingRegulations.TheBuildingStandards,(Scotland-consolidated)Regulations.Localwaterbylaws.
BritishStandardscodeofpractice.BS EN 12828Heatingsystemsinbuildings.Designforwater-basedheatingsystems.
BS EN 12831Heatingsystemsinbuildings.Methodforcalculationofthedesignheatload.BS EN 14336Heatingsystemsinbuildings.Installationandcommissioningofwaterbasedheatingsystems.
BS7671: 2015Requirementsforelectricalinstallations.IEEWiringRegulations.Seventeenthedition.
BS EN 13831Closedexpansionvesselswithbuilt-indiaphragmforinstallationinwater.
C.O.S.H.H.Materialsusedinthemanufactureofthisappliancearenonhazardousandnospecialprecautionsarere-
quiredwhenfittingorservicingthisappliance.
5GB-063C_f.615
1. Load Check Aloadcheckmustbetakenintoconsiderationwheninstallinghighpowerboilers.Thiscanbecarriedout
byaqualifiedelectrician.Theremaybearequirementtoupgradethemainincomingfusesupplyingtheproperty;thiswilldependontheboileroutputbeinginstalledandexistingelectricalloadrequirementsoftheproperty.
2. Boiler location Theboilermustbeinstalledontoawallthatwillprovideanadequatefixing.Precautionsmustbetakenif
theboileristobeinstalledinareassubjecttodamporfrostconditions.
3. Central heating (design & installation) DetailedrecommendationsaregiveninBSEN12828,BS6700:+A1andCP342-2.
Pipesformingpartoftheusefulheatingsurfaceshouldbeinsulatedtopreventanypotentialheatlossorfrostdamage.(BS6700).
Drainvalvesshouldbefittedatthelowestpointofthesystempipeworkinanaccessibleposition.DrainvalvesshouldbeinaccordancewithBS2879andcoppertubetoBSEN1057isrecommended.
PREPERATION
LOCATION
Theboilercanbeinstalledinalmostanylocationwithinadomesticorcommercialproperty;howevercon-siderationshouldbemadeforfuturemaintenance.Neverleavetheboilerswitchedoffifthereisadangerofhavingtemperaturesbelow0°Cintheroomwhereitislocated,(Anadditionalfroststatmustbeusedifthereisalikelihoodofthetemperaturefallingbelow0°C).Werecommendthataminimumclearanceof400mmshouldbeallocatedfortheremovalofthefrontcover
toallowadequateaccesstotheboilersplumbingandtheinternalelectricalconnections.A50mmallowanceshouldbemadeateithersideoftheboilertoallowfreeflowairintotheboiler.
! The boiler must be installed in the upright position; failure to do so will invalidate the Warranty!
6GB-063C_f.615
GENERAL
1. General
Theboilermustbeinstalledbyaprofessionalplumberorheatingengineerandmustbeconnectedtothepubliclowvoltagenetworkbyacompetentperson.Werecommendthisisinstalledbya17thEditioncertifiedElectrician.
The Electric Heating Company Ltd will not be held responsible for any faulty installations which are performed by un-qualified tradespersons.
2. Pipe Connections
SlimJimElectricBoilershave22mmcompressionconnectionsattheboiler’sflowandreturnpipes.Pleasenotethattheboilersaresuppliedwithblankingplugsfortransitpurposes.Thesemustberemovedbeforeconnectionstoexternalpipescanbemade.
The Flow Outlet (TopRedConnection)andReturnInlet(BottomBlueConnection)areclearlymarkedwithin theboilercase.Undernocircumstancesshould theseconnectionsbereversed.HotSolderedJointsshouldnotbemadeasadirectconnectiontotheboiler,Compressionjointsshouldused.
3. Case Removal
Inordertotakeoffthefrontcover,undothefixingscrewsatthetopandbottomoftheunitandpullthecovertowardyou,Careshouldbetakennottodamagethefrontcontroller.
4. Isolation Valves
Werecommendthatlock-shieldisolationvalvesarefittedontheFlowandReturnpipe-work.Suchvalvesmustbefullboreandnot“ballvalves”.Theinstallationof“ballvalves”intheflowandreturnpipe-workwillreducetherecommendedflowratesthroughtheboiler.
! Care must be made when installing the isolation valves that the PRV and expansion positions are not impaired.
5. Auto air vents Anautoairventmustbefittedtotheexternalpipeworkwheninstalledinanunventedsystem.
! Do not install AAV’s directly above the SlimJim boilers. AAV’s should be installed to either the top left or right hand side of the boilers. (This is to prevent any water entering the boiler in the event of an AAV leaking).
6. Boiler Sizing
Calculatethe“SpaceHeating”requirementsinaccordancewithBSEN12831andBSEN14336.Iftheboileristoheatthedomestichotwater,anadditionalallowanceof3kW(10,239Btu’s)shouldbemadetothe“Spaceheating”calculationtodeterminethecorrectboileroutput.
7. Insulation
Wherepractical,andifpossible,werecommendthatallpipe-workisinsulated,inparticulartheprimarypipe-workwithinaboilercupboard.Thisistoreduceheatlossandreducehighcupboardtemperaturesfromexposedpipe-work.(BS6700+A1).
8. System Design
AstheSlimJimboilersareoflowwatercontentanopencircuitmustbeachievedincorporatingapprox2metresofcontinuous22mmpipeworkaftertheboilerconnectionsandbeforeanyzonevalves.(SPlan)Wealsorecommendthatamagneticfilterisusedandinstalledintothereturnpipeworkofthesystembeforethepumpaspertheschematiconpage10.Provisionshouldbemadetoallowthefiltertobecleanedwithoutdrainingthefullheatingsystem.
7GB-063C_f.615
! We recommend the use of an automatic bypass within this circuit. Ifabypassradiatorisusedanallowanceshouldbemadeforaminimumradiatorsizeof600mmx600mm
singleconvectororequalto2500Btutobeinstalledwithintheheatingcircuitandlockedopen.
(Thiswillbelocatedintheroomwherethethermostatisinstalled).
Tocomplywithbuildingregulations,PartLandPartJ(inScotland),roomandcylinderthermostatsmustbefitted.
9. Water Connections
Provisionsmustbemadeforthereplacementofwaterlostfromtheheatingsystem(sealedsystems).ReferenceshouldbemadetoBSEN14336forthemethodoffillingandmakeupofwater.Theremustbenodirectconnectionbetweentheboilerscentralheatingsystemandthemainwatersupply.Whenmainswaterisrequiredtofillthesystemdirectly,alllocalwaterbylawsmustbeobserved,andanyconnectionmademustbedisconnectedafteruse.
10. Flushing
Thesystemmust be flushedtowithin10%ofmainswaterPPMtoensurethatnodebrisistrappedintheflowsensorasthismayresultinboilerfailure.Whereexistingradiatorsandpipe-workareutilisedapowerflushmustbecarriedouttoremovedebris.
11. System Pressures
Allboilersarepressuretestedinthefactory.Thenormalworkingpressureoftheboilershouldbesettoapprox1.0/1.5bar.Allsealedsystemsshouldcomplywiththerelevantbuildingregulationsandstandards,includingBSEN13831-SpecificationforExpansionVessels.
! It is imperative that a pre-installed magnetic filter is removed and cleaned annually. Failure to carry out this action will increase contamination of the boiler by the system residue.
8GB-063C_f.615
Figure 1
1 - Flow Outlet Connection 2 - Run Dry Sensor 3 - Outlet Temperature Sensor 4 - Heat Exchanger 5 - Power Board 6 - Contactor 7 - WT3 Safety Thermal Cut-Out 8 - Inlet Temperature Sensor 9 - Control board 10 - Return Inlet Connection 11 - Pump & Control Cable Entry Points 12 - Main Power Entry Point 13 - Front Control Panel
1
2
3
6
5
7
8
9
10
11
12
13
4
! The boiler is fitted with a safety temperature cut-out that protects the boiler from failure. The safety temperature cut-out (Item 7) cuts the power to the boiler if the temperature reaches approx 100°C. if this occurs the boiler will shut off the main power to the unit. A service engineer will be required to re-set the boiler. However further investigation will be required to identify the cause of the fault.
BOILER INTERNAL LAYOUT
9GB-063C_f.615
12. System types
The“SlimJim”boilerrangecanbeusedinvarioussystemdesignsincludingunderfloorsystems.Therearetwoheatingschematicsonpage10Figure1&2thatillustrateanIndirectSystem(SPlan)&DirectSystem(HeatingOnly).
WerecommendtheuseofThermostaticRadiatorvalvesonallradiatorsexcludingthebypassradiator;thisradiatorshouldbefittedwithlockshieldvalvesandleftinthefullyopenposition.Inadditionwerecommendthatanautomaticbypassisusedinzonedsystemsandsettotherelevantflowratesrequiredforthesystemdesign.(Thebypassradiatorshouldbeaminimumsizeof600mmx600mmsingleconvectororequalto2500Btutobeinstalledwithintheheatingcircuitandlockedopen.Thiswillbelocatedinthesameareaastheroomthermostat).
! The system design should meet all current building regulations in force at the time of installation.
13. Hanging the Boiler
1 Takecarewhenremovingtheboilerfromitspackaging.Donotopenwithsharpobjectsasthismaydamagetheunit.
2 Hangtheboilerinaverticalpositionusingthetemplateandscrewsprovidedwithintheboilerpackaging.Takecaretoleavealltherecommendedclearancesasshownintheschematicdrawingbelow.
3 AClearanceofapprox400mmatthefrontoftheunitisrecommendedtoallowaccessforanyfuturemaintenancethatmayberequired.
INSTALLATION
M4x8
M4x8
C
D
D
C
130
35
780
850
200
203
765
130
min.3
00
min.50
min.50
Front Cover Fixing Screws Boiler Dimensions & Fixing Positions
10GB-063C_f.615
Figure 2
aav
Expansion Vessel
Pump
Magnetic Filter
Gauge
PRV
Flow
Return
Filling Loop
Auto Bypass
aav
HW
Cylinder
Zone
valveZone
valve
Pressure
aav
Expansion Vessel
Pump
Magnetic Filter
Gauge
PRV
Flow
Return
Filling Loop
Auto Bypass
Pressure
Figure 1
! The boilers may also be configured to run multi zone heating systems or under floor heating circuits if required.
11GB-063C_f.615
SYSTEM PROTECTION - COMMISSIONING
14. System protectionFailuretoprotectthesystemwillinvalidatethemanufac-turer’swarranty.After thesystemhasbeeninstalledthecleansingandinhibitingproceduremustbecarriedoutasfollows:
Procedure:1. Fill the systemwith coldmainswater to the recom-
mendedpressure1.5barandcheckforleaks,thendrainthesystemthoroughlymakingsurealldraincocksarefullyopenandthatthesystemiscompletelydrained.
2. AddFernoxHeavyDuty restorer through theheadertankorviafillingloopattherecommendeddose.Onebottlemustbeusedasaminimumperdwelling.Ifyouareunsureofthecorrectdoserate,contactFernox.
3. Re-fillthesystemandcirculatetheHeavy-DutyRestorerpriortotheboilerbeingfiredup,thencommissionthesysteminthenormalway.Thecleansingagentmustbeinthesystemforaminimum1hourwiththesystemat normal operating temperature.A longer period oftimewouldbemorebeneficialtothecleansingprocessespeciallyifexcessfluxwasused.
4. Drainandflushthesystemthoroughlytoremovethecleaningagentandanydebrisorcontaminant.Thisisacriticalpartofthecleaningprocessandmustbecarriedoutcorrectly.Usearinsetestmeter(TDS),suchastheFernoxCTM.Thereadingmustbewithin10%ofthemainsppmvalue.
5. ThenaddtheFernoxProtector(CopalMB1orSuperconcentrate).Thiswill protect against the formationofscale,corrosionandmicrobiologicalgrowths.Itiscrucialhowever,thatfortheprotectortoworkcorrectly,thesystemmustbeproperlycleansedandflushed.
6. ThelabelincludedwithintheFernoxProtectorcartonshouldbecompletedandattachedadjacenttotheboiler.
7. Werecommendinhibitorlevelsarecheckedonanan-nualbasis(usuallyduringtheservice)orsoonerifthesystemcontentislost.ThisshouldbecarriedoutusingaFernoxinhibitorTestKit.
8. FernoxTechnicalServiceHelplineon08708700362forfurtherassistance.
IFSUPPLIEDWITHTHEGRUNDFOSSUPM3PUMP
15. Start-up / Commissioning1. Ensuresystemisfilledwithwater&vented.2. Checkiftheappropriatesysteminstallationpressureis
reached3. Switchtheboileron&setexternalcontrolstocallfor
heat.4. Checkthepumpissettothecorrectmode(seetable
below).Todothis,press buttonfornomorethan2seconds.TheLED’sshouldsignalanoperatingmodeattheplacepointedbyarrow.
5. IftheLEDsaresignalingadifferentoperatingmodethanrecommendedinthetablebelow,settheappropriatemodeaccordingtothefollowinginstructions:press buttonforlongerthan2seconds,butlessthan10sec-onds(LED’swillstarttoflash),thepumpthenswitchestothesettingsmode.LEDsglowstoindicatethecur-rentsettings.Tochangethesettingsof thepump inaccordancewiththetablebelow,youcansettherightcombinationofglowingLEDsbypressingthe button.OnceLEDcombinationissetcorrect,bynotpressing
Rated power[kW]
Pump lifting height [m]
LED 1 red
LED 2yellow
LED 3yellow
LED 4yellow
LED 5yellow
4 ● ●4 - 7 5 ● ● ●
10 - 12 6 ● ● ● ●12 - 14 7 ● ● ●
alarm statusIf the pump has detected one or more alarms, the bicolored LED 1 switches from green to red. When an alarm is active, the LEDs indicate the alarm type as defined in the table below. If multiple alarms are active at the same time, the LEDs only show the error with the highest priority. The priority is defined by the sequence of the table. When there is no active alarm anymore, the user in-terface switches back to operation mode.
Display Indication Pump operation
counter action
One red LED + one yellow LED (LED 5)
Rotor is blocked.
Trying to start again every 1,5 seconds
Wait or deblock the shaft.
One red LED + one yellow LED (LED 4)
Supply volt-age too low
Only warning pump runs
Control the sup-ply voltage
One red LED + one yellow LED (LED 3)
Electrical error
Pump is stopped because of low supply voltage or serious failure
Control the supply voltage /Exchange the pump
LED
1
2
3
4
5
LED
thebuttonfor10secondsthepumpwillrememberbuttonfor10secondsthepumpwillrememberthisset-tingandwillexitfromsettingmodebacktoperformanceview.
Note: holding button for more than 10 seconds will enter the pump into key lock mode. This pre-vents the user from altering the pump settings. To remove the key lock the pump settings and allow the pump settings to be changed, hold button again for more than 10 seconds.
6. Ensureadequateflowthroughtheboilerisreached.Thepumpshouldselfventafterashortperiodofrunning.Ifnecessaryassisttheventingprocessinthefollowingway;Warningthescrewheadinthecentreofthepumpisnotintendedtobeusedtoassistventingofthepump,Damagetothepumpinternalsmayoccur!
• closetheisolationvalveontheoutlet,• leaveboilerrunningfor15sec.• opentheisolationvalve.,7. Switchtheboileroff.8. Settheboilertotherequiredsystemtemperature,see
the„Operating”section.
12GB-063C_f.615
ELECTRICAL CONNECTIONS
! All wiring must be carried out in accordance with current IEE wiring regulations BS:7671 (all electrical connections must be made by a qualified tradesperson).
LOAD CHECKAloadcheckmustbetakenintoconsiderationwheninstallinghighpowerboilers.Thiswillbecarriedoutbya
qualifiedelectrician.Theremaybeanadditionalrequirementtoupgradetheincomingmainfusesupplyingthepropertyifotherhighpowerdevicesareusedwithintheproperty.E.gElectricShowers.IfanelectricshowerispresentwerecommendthataShowerSensorisinstalledwithinthesystem.Thiswillcauseaninterrupttotheboilerscontrolsignalwhentheshowerisinuse.Itwilldisabletheboilerprotectingtheelectricalsystemfromoverload.Allboilersmustbeprotectedatthemeterpositionwitha30mAdoublepoleRCDwithaminimumof3mm
contactseparationaccompaniedbyasuitableratedMCB.Iftheboilerisnotfittedlocaltothemeterpositionthenanadditionalisolationswitchmustbefittedlocaltotheboilerforeachsupply.
THIS APPLIANCE MUST BE EARTHED.Allpipe-workmustbeearthedinaccordancewiththeIEEBS7671WiringRegulations.Aftercompletionofallelectricalworks,anelectricalsafetycheckshouldbecarriedouti.e.shortcircuit,earth
continuity,resistancetoearthandpolaritycheck,andallrelevantTestCertificatescompleted.
ELECTRICAL CONNECTIONSTheelectricalconnectionsareclearlymarkedinthebottomLHSideoftheunit.
L N(24hrLIVE)
The24hr live is thepermanentFeedconnection to theboiler fromthemainssupply.Externalcontrolswillrequireanindependentfusedspursuppliedfromtheconsumerunit,howeverthisfusedspurshouldbesuppliedbythesamepowersource&protectedbythesameRCDastheboileritself,thecontrolcircuitshouldbeprotectedbya6AmpMCB.TheBoiler&controlcircuitRCDshouldbeindepend-entofallotherdomesticcircuits.TheboilersupplycableshouldbecalculatedbythemeansofacablecalculationinaccordancewithBS7671byasuitablyqualifiedelectrician.
BOILER PROTECTIONTherecommendedprotectionisasfollows:
MODEL NO BOILER SIZE PROTECTIONEHCSJIM4KW-4kWOUTPUT BOILER20AMPProtectionEHCSJIM7KW-7kWOUTPUT BOILER40AMPProtectionEHCSJIM10KW-10kWOUTPUT BOILER50AMPProtectionEHCSJIM12KW-12kWOUTPUT BOILER63AMPProtectionEHCSJIM14.4KW-14.4kWOUTPUT BOILER80AMPProtection
EXTERNAL CONTROLSWerecommendtheuseoftheSingleChannelHeatPackforheatingonlyinstallations.ForHeatingandHot
waterinstallationswerecommendtheuseoftheTwinChannel’HeatPack’.The‘HeatPack’willincorporatealltherelevantpartstocomplywithcurrentbuildingregulationsi.eCirculation
Pump&MotorizedValvestocontroltheheatingandhotwatercircuitsandRoomandCylinderThermostatstocontroltheroomandhotwatertemperatures.Thiswillalsoprovideboilerinterlock.TheuseofTRV’salonewillnotprovideboilerinterlock.
! This control method is recommended by TACMA (The Association of Control Manufactures) in order to comply with the current building regulations.
13GB-063C_f.615
Slim Jim
Boiler
General Electrical Network Connection
L N
Main Power Electrical Connection L N E
Figure 1
Figure 2
14GB-063C_f.615
Figure 3
2
7
1
3
8
9
12
11
10
5
MSK.72
ELECTRICAL CONNECTIONS
MSK.72 Control Board [1] - Pre-wired Control board supply [2] - Front panel control ribbon connection [3] - Flow temperature sensor [4] - Power Stage Selector + 240 volt control enable selector. [5] - Return Temperature Sensor [6] - Power Board Control Connection [7] - Water Level Sensor. The wire must be connected to one of two slots (both are the same). [8] - L N Contactor Connections [9] - Pump Fuse 1A 240V (slow blow) [10] - RP Volt Free Control Connections [11] - 240 Volt Control SW live & Neutral Connections (Optional) [12] - External Pump Supply Connections N L E
15GB-063C_f.615
Volt Free Control Signals
1 POWER STAGE VOLT FREE
2 POWER STAGE VOLT FREE
3 POWER STAGE VOLT FREE
240 Volt Control Signals
1 POWER STAGE 240 VOLT
2 POWER STAGE 240 VOLT
3 POWER STAGE 240 VOLT
Dip Switch Settings
External Control Options:
TheSlimjimboilerscanbeusedwithVoltFreeor240voltcontrolsignals.Volt Free control operation.RemovethelinkfromtheRPConnection(10)andconnectyourexternalvolt
freecontrolcableshere.Whenthisconnectionis“Closed”theboilerwillfire,andwhen“Open”theboilerwillbeinstandby.(Thecontrolenabledipswitch4mustbeintheOFFpositionasshowninthetablebelow).
240 volt control operation.ThelinkmustbeleftintheRPConnections(10)andaliveSWandNeutralconnectedtothecontrolterminals(11)ToenablethefeatureyoumustselectDip4toON.ThisislocatedatthetopLHSofthecontrolBoard.(Thecontrolenabledipswitch4mustbeintheONpositionasshowninthetablebelow).
Boiler Output Control.YoucancontrolallSlimJimboilerspoweroutputsin3stagesbyselectingdipswitchessettingsasshown
inthetablebelow.e.g.Ifa6kWisusedanddipswitch1on= 2kW Output – 6kWboilerdipswitch1&2on= 4kW Output –
6kWboilerdipswitch1,2&3on= 6kW Output.
16GB-063C_f.615
CONTROL WIRING
PROGRAMMER CYL STAT
N L 1 2 3 4 1 2 3
10987654321
L
N
E
240V
SUPPLY
3A Switched
Fuse Isolator
R P
Volt Free Boiler
Control
Connections
Junction
box
1 2 3
ROOM STAT
GRBRBL OR
HW zone valve
GRBRBL OR
CH zone valve
6 Amp
PROGRAMMER ROOM STAT
N L 1 2 3 4 1 2 3
10987654321
L
N
E
240V SUPPLY
R P
Volt Free Boiler
Control
Connections
Junction
box
3A Switched
Fuse Isolator
6 Amp
Figure 1
Heating & Hot Water Wiring: S Plan (Volt Free Output) UsedforIndirectPlumbingSystems
! This S plan wiring schematic will provide a volt free contact across the boilers RP Connections. No voltage has been taken to the Grey cable of the zone valves therefore creating a volt free contact across the grey & orange switch wires of the valves when heating or hot water is in demand.
If the boiler is connected to an existing heating control system with 240 Volt switching then the boilers control board should be setup as mentioned on page 14 (240 Volt control signals).
Figure 2
Heating Only Wiring (Volt Free Output)UsedforDirectPlumbingSystems
! The Boilers Control PCB will be damaged if a voltage it put to the RP connections!
17GB-063C_f.615
BOILER CONTROL PANEL
OFF
0
30
40
1 3
5
2 4
Front Control Panel LED introduction;
[1] - Power Indicator [2] - Boiler Operation Indicator [3] - Heat Call Indicator [4] - Low Water Indicator [5] - On/Off & Temperature Dial
User instructions, TheControlpanelislocatedontheoutsideboilercover.Itconsistsofadualpurposedialthatallowsyouto
selecttheboilerOutputTemperatureorSwitchtheBoilerOnorOff.Toswitchtheboiler“Off”YousimplyturnthedialAnticlockwisetothe“Offposition.”Indicator(1)willflashandtheboilerwillshutdownandstopheat-ingthesystem.Thepumpwillrunforafurther90secondsthenturnoff.Iftheboilerisleftintheoffpositionthecontrolsystemwillrunthepumpperiodicallytopreventsystemfailure.Toswitchtheboiler“On”simplyturnthedialClockwisetoyourdesiredtemperaturesettinggenerallyaround
65degC.Theboilerwillnowsitinstandbywaitingforacallfromtheexternalcontrolstofireandheatthesystemwhenrequired.
LED Functions and Fault Finding
FUNCTIONS ON-OFFSTAND-BY
BOILERHEATING
CALL FOR HEAT
WARNINGINDICATOR
All LED’s OffCheckthatMainPowerisON?
Check–WT3OverHeatStat?IfWT3requiresre-setinginvestigatethecause!
off off off off
Boiler is ON WaitingforCallfromexternalcontrols. on off off off
Boiler is ON and running.ExternalControlsareCallingforheat on on on off
Low Water LevelTopupHeatingSystemWaterLevel. off off off on
Temperature Sensor Failure.Theboilerwillstillheatiftheinletsensorhas
failedbutnottheoutletsensor!ReplaceBothSensors.
Overheatingcanbepossible(“MaxInlettemperaturereached”-condition).Controller
decreaseapowerinthissituation.
off flashing off on
Max Inlet Temperature reached.Nodemandfromsystem. on off flashing off
Boiler OffLEDwillflashfor90secondsuntilthepump
stops. flashing off off off
Figure 3
18GB-063C_f.615
EHCPartNumber: EHCSJIM 4KW
EHCSJIM 7KW
EHCSJIM 10KW
EHCSJIM 12KW
EHCSJIM 14.4KW
Boilerrange kW 4kW 7kW 10kW 12kW 14.4kW
Pipeentryboilers-flow top
Pipeentryboilers-return bottom
Centralheatingflow&returnpipes mm 22
Maxpressure bar 3
Min.pressure bar 0,5
Outflowwatertemperature °C 30÷80
Max.watertemperature °C 100
Overalldimensions(heightxwidthxdepth) mm 912x203x172
Weight kg 11
Waterconnection mm 22
Safetyclass IP22
Electricalsupply VAC 240V1ph50Hz
Loadcurrent A 16,7 29,2 41,7 50,0 60,0
Minimumpermittedcablediameter mm 6 10 16
Heatoutput(Btu/h) BTU/h 13648 23885 34121 40946 49135
Temperaturesetting(factoryset) °C 80
Min.temperaturesetting °C 30
Overheatprotection °C 100
Protection A 20 40 50 63 80
TECHNICAL SPECIFICATION
Pos. Service code Picture number Name Amount
(pcs) Notice
1
01629 EKCO.A1-01.00.00/01 HeatingboxEKCO.A14kW/230V
1 E1
01630 EKCO.A1-01.00.00/02 HeatingboxEKCO.A17kW/230V
01631 EKCO.A1-01.00.00/03 HeatingboxEKCO.A110kW/230V
01632 EKCO.A1-01.00.00/04 HeatingboxEKCO.A112kW/230V
01633 EKCO.A1-01.00.00/05 HeatingboxEKCO.A114,4kW/230V
2
3 01635 EKCO.A1-03.02.00 FrontcoverEKCO.A1 1
4 01636 EKCO.A1-03.01.00 BasehousingEKCO.A1 1
5 01641 EKCO.A1-02.00.00 ControlpanelEKCO.A1 1 A3
6 01640 EKCO.A1-00.01.00 InteriorbracketEKCO.A1 1
7 01196 WE-020 Returntemperaturesensor 1 Tin,T1
8 01393 01.151.0009.0 ContactorRIK25-40/230VEKCO.A 1 RIK
9 01394 WT3a-00.00.00/06 WT-3safetycut-outEKCO.A 1 F1
10 01638 PCA-MSK.71 BoardMSK-71EKCO.A1 1 A2
11 01389 EKCO.A-10.00.00 PowerboardEKCO.A 1 A1
12 00791 WE-005/02 Flowtemperaturesensor 1 Tout,T2
13 01639 WE-030 Watersensor 1 SPW
14 01637 WP-146 KnobWP-146 1
15 Wireclamping 1
16 WM-172 Earthconnector 1
17 MARCOPOL ScrewTW4.1x20PZ 2
18 MARCOPOL ScrewTW3.6x9TX 3
19 MARCOPOL ScrewTW3,6x16TX 2
20 ScrewTW3,6x13TX 2
21 MARCOPOL Self-formingscrewFWWM3x6TX 2
22 PN-86/M-82202 ScrewM4x8 2 Frontcovermount
23 01.232.0007.0 ElementLCBS-7-01 2 MSK-71mount
24 ADSYS ElementR912-7 2
25 ScrewM4x6 3 Powerboardmount
26 Terminalstrip4E25PA/GVVO 1 XP
PARTS LIST TABLE
electric heating company ltdUnit 40, Block 5
Third RoadBlantyre Industrial Estate
BlantyreGlasgow
G72 0UP
Tel: 01698 820533 Fax: 01698 825697
www.electric-heatingcompany.co.ukwww.ehc-renewables.co.uk