Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted on 3rd Apr, 2019 By SafetyCulture Staff Complete Inspection score 82.93% Failed items 7 Created actions 2 Site Sydney Equipment Electrical Control Cabinet (TAG22T3-100B) Client Bigwin Realty Corporation Manufacturing Facility Location JT Manufacturers 4790 Seneca Dr., Portland, OR 97205 Quality Manager Sierra Blassingame Conducted on 3rd Apr, 2019 8:01 AM +08 Private & Confidential Page 1/13

Upload: others

Post on 11-Aug-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Electrical Control Cabinet (TAG22T3-100B) / 03 Apr2019 / Sierra BlassingameFactory Acceptance Test Checklist Conducted on 3rd Apr, 2019 By SafetyCulture Staff Complete

Inspection score

82.93%

Failed items

7

Created actions

2

Site

Sydney

Equipment

Electrical Control Cabinet (TAG22T3-100B)

Client

Bigwin Realty Corporation

Manufacturing Facility Location

JT Manufacturers 4790 Seneca Dr., Portland, OR 97205

Quality Manager

Sierra Blassingame

Conducted on

3rd Apr, 2019 8:01 AM +08

Private & Confidential Page 1/13

Page 2: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Failed items 7 Failed

Inspection / Factory Acceptance Test (FAT) / Pre-Factory Acceptance Test Checklist / Factory Acceptance Test Protocol

Recommended Spare Parts Lists Incomplete

Actions

Done Coordinate with fabrication manager and design engineers to gather the complete list ofrecommended spare parts for machinery maintenance.

Inspection / Factory Acceptance Test (FAT) / Pre-Factory Acceptance Test Checklist / Factory Acceptance Test

Preparation

Safety Inspection Incomplete

Are FAT personnel aware of the location of the first aid cabinet? No

Notes

Informed FAT personnel about the location of the first aid cabinet for proper emergency responseprocedure.

Are machinery nameplates visible? No

Photos

Actions

Done The current location of the nameplate makes it hard for the operator to view. Add to andupdate the punch list.

Inspection / Factory Acceptance Test (FAT) / Factory Acceptance Test Checklist / Factory Acceptance Test Personnel

Are all FAT personnel equipped with the right PPE? No

Notes

Coordinated with health and safety officer for proper PPE of FAT personnel

Inspection / Factory Acceptance Test (FAT) / Factory Acceptance Test Checklist / Factory Acceptance Test of Equipment

Photo 9

Private & Confidential Page 2/13

Page 3: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Safety Fail

Maintenance Fail

Private & Confidential Page 3/13

Page 4: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Actions 2 Actions

SafetyCulture Staff created a High priority action

Done 4th Apr, 2019 8:00 AM +08

Relocate nameplateThe current location of the nameplate makes it hard for the operator to view. Add to and update the punch list.

Inspection / Factory Acceptance Test (FAT) / Pre-Factory Acceptance Test Checklist / Factory Acceptance TestPreparation

Are machinery nameplates visible?

SafetyCulture Staff created a High priority action

Done 4th Apr, 2019 8:00 AM +08

Provide recommended spare parts listCoordinate with fabrication manager and design engineers to gather the complete list of recommended spare parts formachinery maintenance.

Inspection / Factory Acceptance Test (FAT) / Pre-Factory Acceptance Test Checklist / Factory Acceptance Test Protocol

Recommended Spare Parts Lists

Private & Confidential Page 4/13

Page 5: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Inspection 7 Failed 2 Actions 82.93%

Factory Acceptance Test (FAT)

Pre-Factory Acceptance Test Checklist

Factory Acceptance Test Protocol 1 Failed 1 Actions

Standard Work Procedures Complete

Certificates of Compliance Complete

Photos

Welding Processes Qualifications Complete

As-built Technical Drawings Complete

Photos

Instruments Calibration Certificates Complete

Equipment Data Sheets Complete

Materials Data Sheets Complete

Standard Maintenance Procedures Complete

Installation, Maintenance and Users’ Manuals Complete

Photo 1

Photo 2

Private & Confidential Page 5/13

Page 6: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Recommended Spare Parts Lists Incomplete

Actions

Done Coordinate with fabrication manager and design engineers to gather the complete list ofrecommended spare parts for machinery maintenance.

Training Materials Complete

FAT Procedure Complete

Photos

Photo 3 Photo 4 Photo 5 Photo 6 Photo 7

Photo 8

Private & Confidential Page 6/13

Page 7: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Factory Acceptance Test Preparation 3 Failed 1 Actions

Hazard Identification Complete

Safety Inspection Incomplete

Are guard doors accessible and easy to use? Yes

Are emergency stop buttons in good locations? Yes

Are fire alarms functioning correctly? Yes

Are fire extinguishers in place and clearly marked? Yes

Are FAT personnel aware of the location of the first aid cabinet? No

Notes

Informed FAT personnel about the location of the first aid cabinet for proper emergency responseprocedure.

Are emergency numbers displayed? Yes

Are safety switches installed? Yes

Are adequate machine guards in place? Yes

Are there adequate equipment and material labels? Yes

Are machinery nameplates visible? No

Photos

Actions

Done The current location of the nameplate makes it hard for the operator to view. Add to andupdate the punch list.

Ergonomic Assessment Complete

Photo 9

Private & Confidential Page 7/13

Page 8: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Factory Acceptance Test Checklist

Factory Acceptance Test Personnel 1 Failed

Were pre-tests conducted? Yes

Do the design engineers and fabrication manager agree that theequipment is ready for FAT?

Yes

Are operators and maintenance personnel present? Yes

Is the client aware of the acceptance criteria? Yes

Are all FAT personnel equipped with the right PPE? No

Notes

Coordinated with health and safety officer for proper PPE of FAT personnel

Factory Acceptance Test of Equipment 2 Failed

Startup process Pass

Safety Fail

Control System Pass

User Interface Pass

Ergonomics Pass

Performance Pass

Shutdown process Pass

Maintenance Fail

Regulatory/Sanitary Design Pass

Conformance to Specifications Pass

Post-Factory Acceptance Test Checklist

Punch List Complete

Completion

Private & Confidential Page 8/13

Page 9: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Additional observations

Nameplates relocated to be visible to the operator and pass the safety criteria. Recommended spare partslist completed for maintenance personnel and pass the maintenance criteria.

The equipment has been produced according to the specifications of the client. Since the equipmentreliability has been verified, it is scheduled for delivery and installation at the site of the client.

Full Name and Signature of Quality Manager

Sierra Blassingame

3rd Apr, 2019 9:41 AM +08

Full Name and Signature of Client Representative

Ruth Chundler

3rd Apr, 2019 9:42 AM +08

Full Name and Signature of Head of Design Engineers

Ryan Samaniego

3rd Apr, 2019 9:42 AM +08

Full Name and Signature of Fabrication Manager

James Beaufort

3rd Apr, 2019 9:43 AM +08

Full Name and Signature of Maintenance Coordinator

Deborah Peachey

3rd Apr, 2019 9:44 AM +08

Private & Confidential Page 9/13

Page 10: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Full Name and Signature of Head Operator

Hansen Lubbock

3rd Apr, 2019 9:45 AM +08

Private & Confidential Page 10/13

Page 11: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Photos 9 Photos

Photo 1

Photo 3

Photo 2

Photo 4

Private & Confidential Page 11/13

Page 12: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Photo 5

Photo 7

Photo 6

Photo 8

Private & Confidential Page 12/13

Page 13: Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 ......Electrical Control Cabinet (TAG22T3-100B) / 03 Apr 2019 / Sierra Blassingame Factory Acceptance Test Checklist Conducted

Photo 9

Private & Confidential Page 13/13