ELECTRICAL DRAWING
MECHANICAL BLOCK (JIGME NAMGYEL ENGINEERINGCOLLEGE, DEWATHANG, SAMDRUP JONGKHAR)
SPECIFICATIONS FOR ELECTRICAL WORKS
1) GENERAL SPECIFICATIONS:
DESCRIPTION OF THE GENERAL SPECIFICATIONS
All the light point wiring shall be with 2C 1.5 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25mm recessed HDPE conduit pipe.
1
All the light circuit wiring shall be with 2C 2.5 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25 mm recessed HDPE conduit pipe, unlessotherwise specified in the drawing. (Refer Load Distribution chart for wire sizedetails).
Sl.NO.
All the power point socket outlet shall be located at 0.3 meters from the finishedfloor level.
All the power point wiring shall be with 2C 4 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25 mm recessed HDPE conduit pipe.3
4
2
5
6
The power point socket outlet for kitchen and toilet shall be located at 1.2 metersfrom the finished floor level.
All the wall mounted fixture shall be located at 2.75 meters from the finished floorlevel.All the light switch board shall be located at 1.25 meters from the finished floorlevel, 0.3 meters away from the door and edges of the wall.9
All the non-current carrying conductor should be connected to the common ground.
During execution no phase difference is allowed in the same conduit, refer thedesign drawing.
7
8
10
2) THE FOLLOWING TEST SHOULD SATISFY THE INSTALLATION:
The height of the main control panel board and distribution board shall be 1.5meters from finished floor level or as per the site condition.
11
Earth polarity test1
Earthing test
2
Sl.NO.DESCRIPTION OF THE
TEST
Insulation test
4 Earth continuity test
3
3) SPECIFICATIONS FOR TELEVISION NETWORK:
Test result must not be less than 1mega ohm.
Test result must be within 5-8 ohms.
All switches must be on live conductor.
Low voltage test result should satisfythe installation.
REMARKS OF THE TEST
1
DESCRIPTION OF THE SPECIFICATIONS
The telephone cable duct must be separated by 0.5 meters awayfrom the electrical cable duct and must be in recessed.2
Sl.NO.
The television cable duct shall be with HDPE pipe of 25mm dia inrecessed.
The television coaxial socket outlet shall be located at 0.25 metersfrom the finished floor level.
The televison network wiring shall be with RG6 (solid) 75 ohm microsatcom coaxial cables in HDPE pipe.
4
3
NOTE:
The height of the television divider box shall be located as per thesite conditon, refer design drawing.
All the earth wire shall be 8 & 14SWG copper conductor cable 1.1 KVG for A.Csocket &16A socket respectively, 14SWG copper wire for light points ifnecessary, 8SWG bare copper conductor for SDB earthing.
5
All the A.C power point wiring shall be with 2C 6 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25 mm recessed HDPE conduit pipe.
Refer the " Specification of Electrical Works 2018" approved by BSB (BhutanStandards Bureau), MoWHS & IS standard code of practice for more details.
12
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/01
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: i OF iiDATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
1.
SYMBOLS.N REMARKS
3.
11.
Light Switch Box.
MDB
Sub-Distribution Box.
SHORTFORM.
PP-N
Telephone Terminal Cabinet.
Data outlet socket numbering.TV-1...
2.
LEGENDS FOR ELECTRICAL WORKS
DESCRIPTION OF SYMBOLS MAKE
4.
5.
6.
7.
8.
9.
10.
S.N
SBSDB
Main Distribution Box, main utilitypower source supply from BPCgrid power.
Television socket numbering.Power Point.
D-1...
READ AS/FULL-FORM
TTC
3.
1.2.
4.
ABBREVIATIONS
6.5.
7.
CEILING FAN (1200MM SWEEP, 1400 RPM)
EXHAUST FAN (80W, 300MM SWEEP, 900 RPM)
Linear DLX 20WLEDSURFACE MOUNTED LED TUBELIGHT 20W
CrownSURFACE MOUNTED (ROUND) LED DOWNLIGHT 12W Note: All the light switches in SBshall be silver aluminum switch.
16A POWER SOCKET (2000W)
TELEPHONE & INTERNET COMBINE SOCKET
12.
Havells orequivalent.
Pluto PanelSURFACE MOUNTED LED PANEL (SQUARE) 34W
IN INTERNET SOCKET
Havells orequivalent.
Havells orequivalent.
Havells orequivalent.
Havells orequivalent.
Havells orequivalent.
16A/32A THREE PHASE POWER SOCKET Havells orequivalent.
Havells orequivalent.
16A, POP-UP TYPE POWER SOCKET (2000W)
16A POWER SOCKET (2000W)Havells orequivalent.
SPLIT TYPE AC
25°C
SPLIT TYPE AIR CONDITIONER (2000W)Havells orequivalent.
Havells orequivalent.
Havells orequivalent.
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/02
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: ii OF iiDATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
BASEMENT FLOOR PLAN
exit/entry
wc
wc
wc
wc
wc
wc
urinals
washbasin
FILTER
RAMP
UP
ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)
UP
shaft door
STORE
STORE
STORE
STORE
SBs to Light Fittings Conduit Layout Plan
SB-4SB-3SB-2SB-1
SB-2
4SB
-23
SB-2
2
SB-5
SB-6
SB-7
SB-8
SB-9
SB-12
SB-13
SB-14
SB-10
SB-11
SB-1
5SB
-17
SB-1
6
SB-18
SB-20
SB-21
SB-19
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/03
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 01 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
BASEMENT FLOOR PLAN
exit/entry
wc
wc
wc
wc
wc
wc
urinals
washbasin
FILTER
RAMP
UP
ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)
UP
shaft door
STORE
STORE
STORE
STORE
SBs to Light Fittings Wiring Layout Plan
SB-4SB-3SB-2SB-1
SB-2
4SB
-23
SB-2
2
SB-5
SB-6
SB-7
SB-8
SB-9
SB-12
SB-13
SB-14
SB-10
SB-11
SB-1
5SB
-17
SB-1
6
SB-18
SB-20
SB-21
SB-19
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/04
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 02 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
BASEMENT FLOOR PLAN
exit/entry
wc
wc
wc
wc
wc
wc
urinals
washbasin
FILTER
RAMP
UP
ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)
UP
shaft door
STORE
STORE
STORE
STORE
SDB to SBs Conduit Layout Plan
SB-4SB-3SB-2SB-1
SB-2
4SB
-23
SB-2
2
SB-5
SB-6
SB-7
SB-8
SB-9
SB-12
SB-13
SB-14
SB-10
SB-11
SB-1
5SB
-17
SB-1
6
SB-18
SB-20
SB-21
SB-19
SDB
-1
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/05
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 03 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
BASEMENT FLOOR PLAN
exit/entry
STORAGE/SERVICES
FEMALE TOILET
MALE TOILET
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
FILTER
RAMP
UP
ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
UP
shaft door
STORE
STORE
STORE
STORE
SDB to PPs Conduit Layout Plan
PP-1/R
PP-2/R
PP-3/R PP-4/R
PP-5/R
PP-6/R
PP-18/B PP-17/B
PP-16/B PP-15/B
PP-14/B
PP-12/B
PP-11/Y
PP-13/B
PP-10/Y
PP-9/Y
PP-7/Y PP8/Y
SDB
-1
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/06
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 04 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
BASEMENT FLOOR PLAN
exit/entry
STORAGE/SERVICES
FEMALE TOILET
MALE TOILET
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
FILTER
RAMP
UP
ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
UP
shaft door
STORE
STORE
STORE
STORE
Telephone & Internet Conduit Layout Plan
TTC
D/T-1
D/T-2
D/T-3D/T-4D/T-5
D/T-6
D/T-7
D/T-8D/T-9
D/T-10
D/T-11
D/T-12
D/T-13
D/T-14
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/07
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 05 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
COMPUTER LAB 1(25 COMPUTERS)
LAB 2LAB 3
LAB 4
LAB 5
LAB 6
LAB 7
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Staircase 2
RAMP
LAB/STORE/CLASS
UP
GROUND FLOOR PLANSBs to Light Fittings Conduit Layout Plan
SB-5
SB-6
SB-1 SB-2
SB-4
SB-A
SB-3
SB-1
SB-3
SB-4
SB-2
SB-6
SB-5
SB-7
SB-8
SB-9
SB-8
SB-7
SB-11
SB-9
SB-10
SB-B
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/08
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 06 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
COMPUTER LAB 1(25 COMPUTERS)
LAB 2LAB 3
LAB 4
LAB 5
LAB 6
LAB 7
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Staircase 2
RAMP
LAB/STORE/CLASS
UP
GROUND FLOOR PLANSBs to Light Fittings Wiring Layout Plan
SB-5
SB-6
SB-1 SB-2
SB-4
SB-A
SB-3
SB-1
SB-3
SB-4
SB-2
SB-6
SB-5
SB-7
SB-8
SB-9
SB-8
SB-7
SB-11
SB-9
SB-10
SB-B
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/09
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 07 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
COMPUTER LAB 1(25 COMPUTERS)
LAB 2LAB 3
LAB 4
LAB 5
LAB 6
LAB 7
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Staircase 2
RAMP
LAB/STORE/CLASS
UP
GROUND FLOOR PLAN
SB-5
SB-6
SB-1 SB-2
SB-4
SB-A
SB-3
SB-1
SB-3
SB-4
SB-2
SB-6
SB-5
SB-7
SB-8
SB-9
SB-8
SB-7
SB-11
SB-9
SB-10
SDB to SBs Conduit Layout Plan
SB-B
SDB-2
SDB
-3SD
B-4
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/10
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 08 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
COMPUTER LAB 1(25 COMPUTERS)
LAB 2LAB 3
LAB 4
LAB 5
LAB 6
LAB 7
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Staircase 2
C O R R I D O R
C O R
R I
D O R
RAMP
LAB/STORE/CLASS
UP
GROUND FLOOR PLANSDB to PPs Conduit Layout Plan
PP-3/R PP-5/R
PP-6/RPP-4/R
PP-12/B
PP-11/B
PP-8/YPP-7/Y
PP-20/B
PP-19/B
PP-21/B
PP-22/Y
PP-2/RPP-1/R
PP-11/YPP-12/R
PP-2/R
PP-1/R
PP-9/YPP-10/Y
PP-7/R
PP-8/Y
PP-14/YPP-13/Y
PP-23/Y
PP-24/B
PP-17/B
PP-16/B
PP-18/B
PP-15/B
SDB-2
SDB
-3SD
B-4
PP-1/R PP-2/R
PP-4/R
PP-5/R PP-3/R
PP-6/Y
PP-9/Y
PP-10/Y
PP-14/B
PP-15/B
PP-13/B
250x200 mmCable Duct
16 A-Pop up Power Socket150x100x5 mmMS Cable Channel
PP-3/RPP-4/RPP-5/RPP-6/R
PP-7/R
PP-8/Y PP-9/Y PP-10/Y PP-11/YPP-12/Y
PP-13/Y
PP-14/YPP-15/YPP-16/BPP-17/BPP-18/R
PP-19/B
PP-20/BPP-21/B PP-22/B PP-23/B PP-24/B
PP-25/Y
PP-26/B
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/11
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 09 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
COMPUTER LAB 1(25 COMPUTERS)
LAB 2LAB 3
LAB 4
LAB 5
LAB 6
LAB 7
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Staircase 2
C O R R I D O R
C O R
R I
D O R
RAMP
LAB/STORE/CLASS
UP
GROUND FLOOR PLANSDB to ACs Conduit Layout Plan
SDB
-5
SPLIT TYPE AC
25°C
SP
LIT
T
YP
E A
C
25°C
SPLIT TYPE AC
25°C
SPLIT TYPE AC
25°C
SP
LIT
T
YP
E A
C
25°C
SPLIT TYPE AC
25°C
S
P
L
I
T
T
Y
P
E
A
C
2
5
°
C
S
P
L
I
T
T
Y
P
E
A
C
2
5
°
C
SPLIT TYPE AC
25°C
SPLIT TYPE AC
25°C
SPLIT TYPE AC
25°C
SPLIT TYPE AC
25°C
SPLIT TYPE AC
25°C
SPLIT TYPE AC
25°C
SP
LIT
T
YP
E A
C
25°C
SP
LIT
T
YP
E A
C
25°C
AC-1/Y
AC-7/B
AC-8/B
AC-9/B
AC-6/B
AC-2/Y
AC-3/Y AC-4/Y
AC-5/Y
AC-11/R
AC-12/R
AC-13/R
AC-14/R
AC-16/R
AC-10/B
AC-15/R
OU
TDO
OR
UN
IT
OU
TDO
OR
UN
IT
OU
TDO
OR
UN
IT
OU
TDO
OR
UN
IT
OU
TDO
OR
UN
IT
OUTDOORUNIT
OUTDOORUNIT
OUTDOORUNIT
OUTDOORUNIT
OUTDOORUNIT
OU
TDO
OR
UN
IT
OUTDOORUNIT
OUTDOORUNIT
OUTDOOR
UNIT
OUTDOOR
UNIT
OUTDOORUNIT
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/12
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 10 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
COMPUTER LAB 1(25 COMPUTERS)
LAB 2
LAB 3
LAB 4
LAB 5
LAB 6
LAB 7
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Staircase 2
C O R R I D O R
C O R
R I
D O R
RAMP
LAB/STORE/CLASS
UP
GROUND FLOOR PLANMDB to Three Phase Power Point Conduit Layout Plan
32A/PP(3P)-2
32A/PP(3P)-3
32A/PP(3P)-1
32A/PP(3P)-6
32A/PP(3P)-5
32A/PP(3P)-4
MD
B
From BasementElectrical Room
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/13
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 11 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
COMPUTER LAB 1(25 COMPUTERS)
LAB 2LAB 3
LAB 4
LAB 5
LAB 6
LAB 7
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice
Lab in-charge'sOffice Lab in-charge's
Office
Staircase 2
C O R R I D O R
C O R
R I
D O R
RAMP
LAB/STORE/CLASS
UP
GROUND FLOOR PLANTelephone & Internet Conduit Layout Plan
D/T-2 D/T-1
D/T-3
D/T-4
D/T-6
D/T-5
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
I
N
I
N
D-1
D-4
D-5
D-6
D-7
D-3
D-2
D-15
D-14
D-12
D-13
D-11
D-10
D-9
D-8
IN
D-20
IN
D-31
IN
D-32
IN
D-33
IN
IN
IN
IN
D-25
D-26
D-38
D-39
250x200 mmCable Duct
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
D-34 D-35 D-36 D-37
D-30 D-29 D-28 D-27
D-21 D-22 D-23 D-24
D-19 D-18 D-17 D-16TTC
150x100x5 mmMS Cable Channel
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/14
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 12 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
CLASSROOM 4(capacity:40stds)
down
DRAWING HALL(capacity:60stds)
CIRCULATION SPACE
Staircase 2
CLASSROOM 2(capacity:40stds)
CLASSROOM 3(capacity:40stds)
CLASSROOM 5(capacity:40stds)
CLASSROOM 6(capacity:40stds)
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
-300mm floor level
DWN
MAIN DOOR
UP
UP
FIRST FLOOR PLANSBs to Light Fittings Conduit Layout Plan
SB-5
SB-4
SB-2
SB-1
SB-1
SB-3
SB-3SB-6
SB-2
SB-4
SB-7
SB-8
SB-9
SB-11
SB-10
SB-15
SB-11
SB-1
4SB
-12
SB-13
SB-9
SB-7
SB-6
SB-5
SB-8SB-1
0
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/15
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 13 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
CLASSROOM 4(capacity:40stds)
down
DRAWING HALL(capacity:60stds)
CIRCULATION SPACE
Staircase 2
CLASSROOM 2(capacity:40stds)
CLASSROOM 3(capacity:40stds)
CLASSROOM 5(capacity:40stds)
CLASSROOM 6(capacity:40stds)
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
-300mm floor level
LANDING
DWN
MAIN DOOR
UP
UP
FIRST FLOOR PLANSBs to Light Fittings Wiring Layout Plan
SB-5
SB-4
SB-2
SB-1
SB-1
SB-3
SB-3SB-6
SB-2
SB-4
SB-7
SB-8
SB-9
SB-11
SB-10
SB-15
SB-11
SB-1
4SB
-12
SB-13
SB-9
SB-7
SB-6
SB-5
SB-8SB-1
0
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/16
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 14 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
CLASSROOM 4(capacity:40stds)
down
DRAWING HALL(capacity:60stds)
CIRCULATION SPACE
Staircase 2
CLASSROOM 2(capacity:40stds)
CLASSROOM 3(capacity:40stds)
CLASSROOM 5(capacity:40stds)
CLASSROOM 6(capacity:40stds)
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
-300mm floor level
DWN
MAIN DOOR
UP
UP
FIRST FLOOR PLANSDB to SBs Conduit Layout Plan
SB-5
SB-4
SB-2
SB-1
SB-1
SB-3
SB-3SB-6
SB-2
SB-4
SB-7
SB-8
SB-9
SB-11
SB-10
SB-15
SB-11
SB-1
4SB
-12
SB-13
SB-9
SB-7
SB-6
SB-5
SB-8SB-1
0
SDB-6
SDB
-7
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/17
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 15 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
CLASSROOM 4(capacity:40stds)
down
DRAWING HALL(capacity:60stds)
ENTRANCE LOBBY level+150mm
C O R R I D O R
FEMALE TOILET
MALE TOILET
CIRCULATION SPACE
Staircase 2
CLASSROOM 2(capacity:40stds)
CLASSROOM 3(capacity:40stds)
CLASSROOM 5(capacity:40stds)
CLASSROOM 6(capacity:40stds)
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
-300mm floor level
LANDING
DWN
MAIN DOOR
UP
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
UP
FIRST FLOOR PLANSDB to PPs Conduit Layout Plan
PP-8/B PP-4/Y PP-4/R PP-3/R
PP-6/Y
PP-1/Y
PP-7/B PP-5/Y PP-3/Y
PP-2/Y
PP-1/R
PP-2/R
PP-10/B PP-9/B
PP-11/R
PP-12/R
PP-14/R
PP-13/R
PP-15/RPP-16/R
PP-5/B
PP-6/B
PP-8/B PP-9/R
PP-12/R
PP-7/B
PP-11/R
PP-10/R
PP-13/R
SDB-6
SDB
-7
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/18
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 16 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
CLASSROOM 4(capacity:40stds)
down
DRAWING HALL(capacity:60stds)
ENTRANCE LOBBY level+150mm
C O R R I D O R
FEMALE TOILET
MALE TOILET
CIRCULATION SPACE
Staircase 2
CLASSROOM 2(capacity:40stds)CLASSROOM 3
(capacity:40stds)
CLASSROOM 5(capacity:40stds)
CLASSROOM 6(capacity:40stds)
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
-300mm floor level
LANDING
FILTER
DWN
MAIN DOOR
UP14
25[4'-
8"]
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
UP
FIRST FLOOR PLANSDB to PPs Conduit Layout Plan
IN
D-9
IN
D-2
IN
D-1
IN
D-8
IN
D-4
IN
D-3IN D-5
IN
D-7
IN
D-6
IN
D-10
IN
D-11
I
N
D-12
I
N
I
N
I
N
D-13
D-14
D-15
IN
D-21
IN
D-19
IN
D-17
IN
D-18
IN D-20
IN D-16
TTC
850
[2'-9"]
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/19
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 17 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
PANTRYOFFICE
HOD'S OFFICE
CONFERENCE
HALL capa
city:40-45 pp
l
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
Staircase 2
ALUMINIUM PARTITION(refer section for heights)
SLIDINGDOOR
SLIDINGDOOR
CUBICLES
CUBICLES
CUBICLES
CABIN
UP
-300mm floor level
-300mm floor level
DWN
SECOND FLOOR PLANSBs to Light Fittings Conduit Layout Plan
SB-10
SB-9
SB-1
SB-2SB-3SB-4
SB-A
SB-5
SB-7
SB-6
SB-8
SB-1
1
SB-9
SB-7
SB-6
SB-5
SB-8
SB-11
SB-1
2SB
-14
SB-1
3
SB-1 SB-2 SB
-3
SB-4
SB-1
0
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/20
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 18 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
PANTRYOFFICE
HOD'S OFFICE
CONFERENCE
HALL capa
city:40-45 pp
l
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
Staircase 2
ALUMINIUM PARTITION(refer section for heights)
SLIDINGDOOR
SLIDINGDOOR
CUBICLES
CUBICLES
CUBICLES
CABIN
UP
-300mm floor level
-300mm floor level
DWN
SECOND FLOOR PLANSBs to Light Fittings Wiring Layout Plan
SB-10
SB-9
SB-1
SB-2SB-3SB-4
SB-A
SB-5
SB-7
SB-6
SB-8
SB-1
1
SB-9
SB-7
SB-6
SB-5
SB-8
SB-11
SB-1
2SB
-14
SB-1
3
SB-1 SB-2 SB
-3
SB-4
SB-1
0
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/21
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 19 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
PANTRYOFFICE
HOD'S OFFICE
CONFERENCE
HALL capa
city:40-45 pp
l
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
Staircase 2
ALUMINIUM PARTITION(refer section for heights)
SLIDINGDOOR
SLIDINGDOOR
CUBICLES
CUBICLES
CUBICLES
CABIN
UP
-300mm floor level
-300mm floor level
DWN
SECOND FLOOR PLAN
SB-9
SB-7
SB-6
SB-5
SB-8
SB-11
SB-1
2SB
-14
SB-1
3
SB-10
SB-9
SB-1
SB-2SB-3SB-4
SB-A
SB-1
SB-2 SB-3
SB-4
SB-5
SB-7
SB-6
SB-8
SB-1
0
SB-1
1
SDB to SBs Conduit Layout Plan
SDB
-8
SDB
-9
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/22
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 20 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
PANTRY
OFFICE
HOD'S OFFICE
CONFERENCE H
ALL
capacit
y:40-45 pp
l
FEMALE TOILET
MALE TOILET
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
Staircase 2
ALUMINIUM PARTITION(refer section for heights)
SLIDINGDOOR
SLIDINGDOOR
CUBICLES
CUBICLES
CUBICLES
CABIN
UP
-300mm floor level
-300mm floor level
DWN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
SECOND FLOOR PLANSDB to PPs Conduit Layout Plan
PP-1/Y
PP-14/Y
PP-13/R
PP-12/R
PP-10/R
PP-11/R
PP-9/R
PP-8/R
PP-6/Y
PP-7/Y
PP-5/Y
PP-4/Y
PP-2/Y
PP-3/Y
PP-15/R
PP-19/BPP-18/B
PP-17/B
PP-16/R
PP-20/B
PP-25/B
PP-22/B
PP-26/B
SDB
-8
PP-24/B
PP-23/B
SDB
-9
PP-21/R
PP-6/
PP-5/Y
PP-3/Y
PP-7/
PP-4/Y
PP-12/
PP-11/
PP-13/
PP-10/
PP-16/
PP-15/
PP-17/
PP-14/
PP-9/
PP-18/
PP-2/Y
PP-1/Y
PP-8/
250x200 mmCable Duct
150x100x5 mmMS Cable Channel
250x200 mmCable Duct
150x100x5 mmMS Cable Channel
150x100x5 mmMS Cable Channel
14285[46'-9"]
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/23
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 21 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
PANTRY
OFFICE
HOD'S OFFICE
CONFERENCE H
ALL
capacit
y:40-45 pp
l
FEMALE TOILET
MALE TOILET
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
Staircase 2
ALUMINIUM PARTITION(refer section for heights)
SLIDINGDOOR
SLIDINGDOOR
CUBICLES
CUBICLES
CUBICLES
FILTER
CABIN
UP
-300mm floor level
-300mm floor level
DWN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
SECOND FLOOR PLANSDB to ACs Conduit Layout Plan
SP
LIT
T
YP
E A
C
25°C
AC-1/
OU
TDO
OR
UN
IT
S
P
L
I
T
T
Y
P
E
A
C
2
5
°
C
S
P
L
I
T
T
Y
P
E
A
C
2
5
°
C
AC-2/
AC-3/
OUTDOOR
UNIT
S
P
L
I
T
T
Y
P
E
A
C
2
5
°
C
AC-4/
OUTDOOR
UNIT
OUTDOOR
UNIT
SDB
-9
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/24
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 22 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
PANTRY
OFFICE
HOD'S OFFICE
CONFERENCE H
ALL
capacit
y:40-45 pp
l
FEMALE TOILET
MALE TOILET
wc
wc
wc
wc
wc
wc
urinals
washbasin
washbasin
washbasin
Staircase 2
ALUMINIUM PARTITION(refer section for heights)
SLIDINGDOOR
SLIDINGDOOR
CUBICLES
CUBICLES
CUBICLES
FILTER
CABIN
UP
-300mm floor level
-300mm floor level
DWN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
EXHAUSTFAN
SECOND FLOOR PLANTelephone & Internet Conduit Layout Plan
D/T-4
D/T-5
D/T-6
D/T-2
D/T-3
D/T-1
IN
D-1IN
D-13IN
D-10IN
D-9IN
D-6IN
D-5IN
D-2
IN
D-3IN
D-4IN
D-7IN
D-8IN
D-11IN
D-12
TTC
IN
D-18
IN
D-19
IN
D-17
IN
D-16
IN
D-22
IN
D-23
IN
D-21
IN
D-20
I
N
D-14
I
N
D-15
250x200 mmCable Duct
150x100x5 mmMS Cable Channel
250x200 mmCable Duct
150x100x5 mmMS Cable Channel
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/25
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 23 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SEMINAR HALL
DEPARTMENTAL LIBRARY
LOBBY
UP
SB-2
SB-1
SB-4
SB-3
JAMTHO FLOOR PLANSBs to Light Fittings Conduit Layout Plan
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/26
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 24 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SEMINAR HALL
DEPARTMENTAL LIBRARY
LOBBY
UP
SB-2
SB-1
SB-4
SB-3
JAMTHO FLOOR PLANSBs to Light Fittings Wiring Layout Plan
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/27
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 25 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SEMINAR HALL
DEPARTMENTAL LIBRARY
LOBBY
UP
SB-2
SB-1
SB-4
SB-3
JAMTHO FLOOR PLANSDB to SBs Conduit Layout Plan
SDB
-10
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/28
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 26 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SEMINAR HALL
DEPARTMENTAL LIBRARYLOBBY
UP
PP-6/ PP-5/
PP-7/
PP-8/ PP-9/
PP-4/
PP-1/
PP-2/
PP-3/
SDB
-10
JAMTHO FLOOR PLANSDB to PPs Conduit Layout Plan
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/29
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 27 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SEMINAR HALL
DEPARTMENTAL LIBRARYLOBBY
UP
SPLIT TYPE AC
25°C
AC-2/
OU
TDO
OR
UN
IT
SPLIT TYPE AC
25°C
AC-1/
OU
TDO
OR
UN
IT
SPLIT TYPE AC
25°C
AC-3/
OU
TDO
OR
UN
IT
SPLIT TYPE AC
25°C
AC-4/
OU
TDO
OR
UN
IT
SDB
-10
JAMTHO FLOOR PLANSDB to ACs Conduit Layout Plan
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/30
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 28 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SEMINAR HALL
DEPARTMENTAL LIBRARYLOBBY
UP
IN
D-4
IN
D-3
IN D-5
IN
D-1
IN
D-6
IN
D-2
TTC
JAMTHO FLOOR PLANInternet Conduit Layout Plan
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/31
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 29 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
630A, 415V,70KA, TPN
MCCB.
312C 630 SQ.MM PVC INSULATED, ARMOURED AL.
UG CABLE.
BUSBAR- 4 strips,1350mm bars, 800A
SDB-1
EM
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
AL.
CABLE
.
63A,415V,
TPN MCB.
MDB-DETAILS
SDB-2
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
AL.
CABLE
.
63A,415V,
TPN MCB.
SDB-3
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
AL.
CABLE
.
63A,415V,
TPN MCB.
SDB-4
4C, 16 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
AL.
CABLE
.
40A,415V,
TPN MCB.
SDB-5 SDB-6
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
AL.
CABLE
.
63A,415V,
TPN MCB.
SDB-7 SDB-8
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
AL.
CABLE
.
63A,415V,
TPN MCB.
SDB-9
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
AL.
CABLE
.
63A,415V,
TPN MCB.
SDB-10
4C, 10 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
AL.
CABLE
.
32,415V,
TPN MCB.
4C, 16 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
AL.
CABLE
.
40A,415V,
TPN MCB.
4C, 16 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
AL.
CABLE
.
40A,415V,
TPN MCB.
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/31
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 29 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SDB-1 DETAILS
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
ALU
MIN
UM
CABLE
.
FROM MAIN DISTRIBUTIONBOARD
16A, SP,B-TYPE MCB
2X4
SQ
MM
PVC
CU
WIR
E
63A, 415V,TPN RCCB.
SDB-2 DETAILS
FROM MAIN DISTRIBUTIONBOARD
63A, 415V,TPN RCCB.
L-1
6A, SP,B-TYPE MCB
2X2
.5 S
Q M
M P
VC
CU W
IRE
L-18 L-2 PP-1 PP-2 PP-3 PP-18
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
ALU
MIN
UM
CABLE
.
SMDB-1 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB
12+36, IC+OGRESPECTIVELY
B TYPE, 6A MCB= 18 NosB TYPE, 16A MCB= 18 Nos
SMDB-2 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB
12+36, IC+OGRESPECTIVELY
B TYPE, 6A MCB= 08 NosB TYPE, 16A MCB= 24 Nos
8 S
WG
CU E
ARTH
WIR
E
8 S
WG
CU E
ARTH
WIR
E
EARTH LINK EARTH LINK
16A, SP,B-TYPE MCB
2X4
SQ
MM
PVC
CU
WIR
E
L-1
6A, SP,B-TYPE MCB
2X2
.5 S
Q M
M P
VC
CU W
IRE
L-8 L-2 PP-1 PP-2 PP-3 PP-24
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/32
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 30 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SDB-3 DETAILS
4C
, 2
5 S
Q.M
M P
VC
INSULA
TED
ARM
ORED
ALU
MIN
UM
CABLE
.FROM MAIN DISTRIBUTION
BOARD
16A, SP,B-TYPE MCB
2X4
SQ
MM
PVC C
UW
IRE
63A, 415V,TPN RCCB.
SDB-4 DETAILS
FROM MAIN DISTRIBUTIONBOARD
40A, 415V,TPN RCCB.
PP-5PP-26 PP-4 PP-3 PP-2 PP-1
4C
, 1
6 S
Q.M
M P
VC
INSULA
TED
ARM
ORED
ALU
MIN
UM
CABLE
.
SMDB-3 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB
12+36, IC+OGRESPECTIVELY
B TYPE, 16A MCB= 26 Nos
SMDB-4 ACRYLIC DOOR (DOUBLEDOOR),8 WAYS, TPN-DB
8+24, IC+OGRESPECTIVELY
B TYPE, 6A MCB= 09 NosB TYPE, 16A MCB= 15 Nos
8 S
WG
CU E
ARTH
WIR
E
8 S
WG
CU E
ARTH
WIR
E
EARTH LINK EARTH LINK
16A, SP,B-TYPE MCB
2X4
SQ
MM
PVC C
UW
IRE
L-1
6A, SP,B-TYPE MCB
2X2
.5 S
Q M
M P
VC
CU W
IRE
L-9 L-2 PP-1 PP-2 PP-3 PP-15PP-6
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/33
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 31 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SDB-5 DETAILS
4C, 16 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
ALU
MIN
UM
CABLE
.FROM MAIN DISTRIBUTION
BOARD
40A, 415V,TPN RCCB.
SDB-6 DETAILS
FROM MAIN DISTRIBUTIONBOARD
63A, 415V,TPN RCCB.
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
ALU
MIN
UM
CABLE
.
SMDB-5 ACRYLIC DOOR (DOUBLEDOOR),6 WAYS, TPN-DB
6+18, IC+OGRESPECTIVELY
B TYPE, 16A MCB= 16 Nos
SMDB-6 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB
12+36, IC+OGRESPECTIVELY
B TYPE, 6A MCB= 10 NosB TYPE, 16A MCB= 16 Nos
8 S
WG
CU E
ARTH
WIR
E
8 S
WG
CU E
ARTH
WIR
E
EARTH LINK EARTH LINK
16A, SP,B-TYPE MCB
2X4
SQ
MM
PVC
CU
WIR
E
L-1
6A, SP,B-TYPE MCB
2X2
.5 S
Q M
M P
VC
CU W
IRE
L-10 L-2 PP-1 PP-2 PP-3 PP-16
16A, SP,B-TYPE MCB
2X4
SQ
MM
PVC
CU
WIR
E
AC-5AC-16 AC-4 AC-3 AC-2 AC-1AC-6
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/34
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 32 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SDB-7 DETAILS
4C, 16 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
ALU
MIN
UM
CABLE
.
FROM MAIN DISTRIBUTIONBOARD
16A, SP,B-TYPE MCB
2X4
SQ
MM
PVC C
UW
IRE
40A, 415V,TPN RCCB.
SDB-8 DETAILS
FROM MAIN DISTRIBUTIONBOARD
63A, 415V,TPN RCCB.
L-1
6A, SP,B-TYPE MCB
2X2
.5 S
Q M
M P
VC
CU W
IRE
L-12 L-2 PP-1 PP-2 PP-3 PP-13
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
ALU
MIN
UM
CABLE
.
SMDB-7 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB
12+36, IC+OGRESPECTIVELY
B TYPE, 6A MCB= 12 NosB TYPE, 16A MCB= 13 Nos
SMDB-8 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB
12+36, IC+OGRESPECTIVELY
B TYPE, 6A MCB= 10 NosB TYPE, 16A MCB= 26 Nos
8 S
WG
CU E
ARTH
WIR
E
8 S
WG
CU E
ARTH
WIR
E
EARTH LINK EARTH LINK
16A, SP,B-TYPE MCB
2X4
SQ
MM
PVC C
UW
IRE
L-1
6A, SP,B-TYPE MCB
2X2
.5 S
Q M
M P
VC
CU W
IRE
L-10 L-2 PP-1 PP-2 PP-3 PP-26
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/35
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 33 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
SDB-9 DETAILS
4C, 25 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
ALU
MIN
UM
CABLE
.
FROM MAIN DISTRIBUTIONBOARD
16A, SP,B-TYPE MCB
2X4
SQ
MM
PVC
CU
WIR
E
63A, 415V,TPN RCCB.
L-1
6A, SP,B-TYPE MCB
2X2
.5 S
Q M
M P
VC
CU W
IRE
L-10 L-2 PP-1 PP-2 PP-3 PP-23
SMDB-9 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB
12+36, IC+OGRESPECTIVELY
B TYPE, 6A MCB= 10 NosB TYPE, 16A MCB= 23 Nos8 S
WG
CU E
ARTH
WIR
E
EARTH LINK
SDB-10 DETAILS
FROM MAIN DISTRIBUTIONBOARD
32A, 415V,TPN RCCB.
4C, 10 S
Q.M
M P
VC IN
SULA
TED
ARM
ORED
ALU
MIN
UM
CABLE
.
SMDB-10 ACRYLIC DOOR (DOUBLEDOOR),6 WAYS, TPN-DB
6+18, IC+OGRESPECTIVELY
B TYPE, 6A MCB= 04 NosB TYPE, 16A MCB= 13 Nos
8 S
WG
CU E
ARTH
WIR
E
EARTH LINK
16A, SP,B-TYPE MCB
2X4
SQ
MM
PVC
CU
WIR
E
L-1
6A, SP,B-TYPE MCB
2X2
.5 S
Q M
M P
VC
CU W
IRE
L-4 L-2 PP-1 PP-2 PP-3 PP-13
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/36
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 34 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR:
1200.01200.0
120.0
40.0
300.0
2800.0
Ø20.0 G.I PIPEFOR WATERING
WIRE MESH
Ø6.0 M.S ROD
C.I FRAME
CEMENT CONCRETE (1:4:8)
600
Ø15.0 G.I PIPE1500 MIN3000 MAX
3600.0
600.0
A
600x600x3.0CU PLATE
(OR)600x600x6.0G.I PLATE
ALTERNATE LAYER OF SALTAND CHARCOAL OR COKE
EARTH LEAD FOREARTH CONNECTIONIN G.I PIPE
2400.0
2400.0
3600.0
Ø15.0 G.I PIPE
EARTH LEAD
EARTH ELECRODE
ENLARGED DETAILS OF A
NOTE:1. BOLT, NUTS, CHECK NUT AND WASHER TO BE OF G.I FOR G.I PLATE AND TI24ED BRASS FOR
COPPER PLATE ELECTRODE.
2. EARTH RESISTANCE SHALL NOT BE GREATER THAN 5Ω AND IN ROCKY SOILS MAY BE UP TO 8Ω.
3. EARTHING LEAD SHALL BE OF G.I. WIRE (6 SWG)/G.I. STRIP (25 MM X 4 MM), IN CASE OF G.I. PLATEEARTH ELECTRODE AND COPPER WIRE (8 SWG)/COPPER STRIP ( 20MM X 3MM) IN THE CASE OFCOPPER EARTH ELECTRODE.
4. PROTECTION PIPE SHALL BE BURIED WITHIN THE GROUND AT LEAST 50CM DEEP. IN CASE OFROAD CROSSING AND PAVEMENTS SHALL BE BURIED 0.6 TO 0.7M.
5. AN EARTH ELECTRODE SHALL NOT BE SITUATED LESS THAN 1.8 M FROM ANY BUILDING.
6. MINIMUM DISTANCE BETWEEN TWO EARTH PIT SHALL NOT BE LESS THAN 5M.
7. THE SIZE OF EARTH CONTINUITY WIRE SHALL BE NOT LESS THAN 1.5 SQ.MM (16SWG) AND 2.5SQ.MM (14SWG) BARE COPPER WIRE FOR LIGHT AND POWER CIRCUIT RESPECTIVELY.
C.I COVER HINGED TO C.IFRAME
GROUNDLEVEL
600.0
RIV0
LOCATION: DEWATHANG, SAMDRUP JONGKHAR
PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/37
DRAWING TITLE.: As mention above.
SCALE: NTS SHEET NO.: 35 OF 35DATE:
ALL DIMENSIONS ARE IN MILLIMETER
CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE
ASH BAHADUR SUBBAELECTRICAL ENGINEER
APPROVED BYCHECKED BYDESIGNED/DRAWN
MODIFICATIONDATE
REVISION5
4 CONSTRUCTION
3
2
1 APPROVAL
RECORD
INFORMATION
ISSUED FOR: