ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR 2018 Grid Supply =976.5 MW Off Grid Supply =7.5 MW Total =984.0 MW

Upload: others

Post on 16-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

i | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

ELECTRICITY SUPPLY INDUSTRY PERFORMANCE

REPORT FOR THE YEAR 2018

Grid Supply

=976.5 MW

Off Grid

Supply

=7.5 MW

Total

=984.0 MW

Page 2: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

ii | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

TABLE OF CONTENTS

ACRONYMS ....................................................................................................................... iv

LIST OF FIGURES .................................................................................................................. v

EXECUTIVE SUMMARY.................................................................................................. vii

I.Peak Demand ................................................................................................................vii

II.Installed Generation Capacity ...................................................................................vii

III.Electricity Supply to the National Grid ......................................................................vii

IV.Transmission ................................................................................................................. viii

V.Electricity Distribution .................................................................................................. viii

VI.Off-Grid Generation and Supply ................................................................................ix

1.0.BACKGROUND ............................................................................................................. 1

1.1.Introduction ................................................................................................................. 1

2.0.ELECTRICITY GENERATION ....................................................................................... 1

2.1.Installed Generation Capacity ................................................................................. 1

2.1.1.Power Plants Generating Electricity in Uganda .................................................. 2

2.2.Projects Under Construction ...................................................................................... 4

2.3.Energy Generated and Sold to the National Grid ................................................ 5

2.3.1.Generation from Large Hydro Power Plants ........................................................ 5

2.3.2.Generation from Small Hydro Power Plants ......................................................... 6

2.3.3.Generation from the Thermal Power Plants ........................................................ 7

2.3.4.Generation from the Solar PV Plants .................................................................... 8

2.3.5.Generation from Bagasse Power Plants ............................................................... 9

2.4.Staff in the Electricity Generation Segment ......................................................... 10

3.0.ELECTRICITY TRANSMISSION SEGMENT ................................................................. 12

3.1.Introduction ............................................................................................................... 12

3.2.The Electricity Demand and Supply Nexus ........................................................... 12

3.3.UETCL Energy Purchases .......................................................................................... 14

3.4.UETCL Energy Sales ................................................................................................... 15

3.4.1.UETCL Energy Sales by ToU ................................................................................... 16

3.5.Transmission Energy Losses ....................................................................................... 17

3.6.Staff in Transmission Sagement ............................................................................... 18

Page 3: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

iii | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

3.7.Transmission Network Assets (Transmission Length, Substations) ....................... 18

4.0.ELECTRICITY DISTRIBUTION ON THE NATIONAL GRID ........................................... 20

4.1.Introduction ............................................................................................................... 20

4.2.Energy Purchases and Sales by Distribution Utilities ............................................. 20

4.2.1.Energy Sales by Customer Categories ............................................................... 21

4.3.Energy Distribution Losses ........................................................................................ 22

4.3.Energy Losses for UMEME Limited ........................................................................... 23

4.3.2.Energy Losses for Mini-Grids .................................................................................. 24

4.4.Customer Growth ..................................................................................................... 25

4.5.Distribution Network Length .................................................................................... 26

4.6.Staff in the Distribution Segment............................................................................. 27

4.7.Transformation Capacity ......................................................................................... 27

4.8.Key Performance Benchmarks for UMEME LIMITED ............................................. 28

4.9.Key Performance Benchmarks for Mini-Grids ....................................................... 30

5.0.ELECTRICITY GENERATION AND DISTRIBUTION BY OFF-GRIDS ............................. 32

5.1.Introduction ............................................................................................................... 32

5.2.Energy Generation and Sales by the Major Off-Grids ........................................ 32

5.3.Staff, Customers and Distribution Network in Off-Grids ....................................... 34

6.0.TREND OF ESI-RELATED MACRO-ECONOMIC VARIABLES .................................... 35

6.1.Introduction ............................................................................................................... 35

6.2.Crude Oil Prices ......................................................................................................... 35

6.3.Inflation ....................................................................................................................... 36

6.4.Consumer Price Index (CPI) .................................................................................... 36

6.5.United States Producer Price Index (US PPI) ......................................................... 37

6.6.Exchange Rate .......................................................................................................... 38

7.0.RETAIL TARIFFS ............................................................................................................ 40

7.1.Grid Retail Tariff ......................................................................................................... 40

7.2.Retail Tariffs for Mini-Grid Customers ...................................................................... 41

Page 4: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

iv | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

ACRONYMS

BEL Bujagali Energy Limited

Bn Billion

BoU Bank of Uganda

CPI Consumer Price Index

EIA Energy Information Administration

EPRC

ERA

Economic Policy Research Center

Electricity Regulatory Authority

ESI Electricity Supply Industry

GoU Government of Uganda

GWh Gigawatt hours

KCCL Kasese Cobalt Company Limited

KIL Kilembe Investments Limited

KRECS Kyegegwa Rural Electricity Cooperative Society

Kwh Kilowatt hours

kV Kilovolt

Ltd Limited

Mn Million

MoFPED Ministry of Finance, Planning and Economic Development

OPEC Organization of the Petroleum Exporting Countries

PACMECS Pader Abim Community Multi-purpose Electric Cooperative Society

PPI Producer Price Inflation

PV Photovoltaic

RETF Rural Electrification Trust Fund

SAIL Sugar and Allied Industries Limited

UBOS Uganda Bureau of Statistics

UEDCL Uganda Electricity Distribution Company Limited

Page 5: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

v | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

UEGCL Uganda Electricity Generation Company Limited

UETCL Uganda Electricity Transmission Company Limited

UGX Uganda Shilling

US United States

USD United States Dollar

WENRECO West Nile Rural Electrification Company

LIST OF TABLES

Table Description Page Number

Table 1 Uganda's Electricity generation plants as of December 2018 3

Table 2 Licensed power generation plants under construction as at the end of

December 2018

4

Table 3 Growth in energy purchases and sales of distribution utilities 21

Table 4 Total Customers on the network as at the end of December 2018 26

Table 5 Key Performance Indicators for UMEME 29

Table 6 Key Performance Indicators for Minigrids in 2018 31

Table 7 Staff, customers and Network in off-grids 34

Table 8 Tariffs for the customers served by mini-grids 41

LIST OF FIGURES

Figure Description Page Number

Figure 1 Installed capacity by technology as at the end of December 2018 2

Figure 2 Distribution of Energy generated over years by utilities on national grid

by technology (GWh

5

Figure 3 Energy dispatched by large hydro plants in GWh (2014-2018) 6

Figure 4 Annual generation from small hydro power plants (2015-2018)7 7

Figure 5 Distribution of energy generation from thermal power plants (2014-

2018)

8

Figure 6 Energy dispatch from the solar PV plants on the national grid 8

Figure 7 Generation from bagasse power plants 9

Figure 8 Number of staff in electricity generation segment as at 31st

December 2018

10

Figure 9 Monthly System Peak Demand January 2017 to October 2018 11

Figure 10 Peak electricity demand versus installed generation capacity (MW) 12

Figure 11 Distribution of energy purchased by UETCL (GWh) by technology

source

13

Figure 12 Percentage increase in energy purchases in 2018 as compared to 14

Page 6: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

vi | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

2017

Figure 13 UETCL energy sales (2014-2018) in GWh 14

Figure 14 Distribution of Energy sold by UETCL during 2018 (GWh) 15

Figure 15 Distribution of UETCL Energy sales by ToU over the years 16

Figure 16 Distribution of UETCL Transmission Losses 18

Figure 17 Employee growth in the transmission segment 17

Figure 18 Transmission Line growth (Kms) 17

Figure 19 Energy sales of distribution by customer categories 20

Figure 20 Distribution Losses (%) 21

Figure 21 UMEME Limited’s Distribution Energy losses 22

Figure 22 Distribution Energy losses in 2018 by service territory 23

Figure 23 Total Customers on the network as at the end of December 2018 23

Figure 24 The Distribution Network Length (In KMS) 24

Figure 25 Employees in the Electricity Distribution Segment 25

Figure 26 Transformation capacity over the years 26

Figure 27 Energy sold by off grids January to September 2018 (in GWh) 29

Figure 28 Distribution of energy sales by customer category 30

Figure 29 OPEC Prices of crude oil on international markets for the period

January 2017 to November 2018 (US$/b)

32

Figure 30 Monthly Consumer Price Index (CPI) 33

Figure 31 Monthly movements in the USPPI 34

Figure 32 Exchange Rate Uganda Shilling against US Dollar Movement for

November 2016 to November 2018

35

Figure 33 Quarterly retail Tariffs of customers on the main grid by customer

category over the Tariff period 2017 - 2018

36

Page 7: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

vii | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

EXECUTIVE SUMMARY

In 2018, the Electricity Supply Industry continued to register growth, as

measured by the various Key Parameters highlighted below.

I. Peak Demand

The Peak System Demand (including exports to Kenya and Tanzania)

during the year 2018 was registered at 644.79 MW (in August 2018),

signifying a 3% increment, compared to the 625.27 MW registered as

the highest in 2017 (November 2017). This growth was mainly attributed

to growth in Domestic Demand.

II. Installed Generation capacity

The total Installed Capacity was 984 MW, having increased from 932

MW as at the end of December 2017. About 7.5 MW of the Installed

Capacity was accounted for by Off-Grids that generated and sold

their own electricity.

The Power Plants that attained their Commercial Operation Date in

2018 included five (5) Small Hydropower Plants and one (1) Solar

PhotoVoltaic (PV) Plant. These are:

(a) Nyamwamba HPP (9.2 MW);

(b) Lubilia HPP (5.4 MW);

(c) Nkusi HPP (9.6 MW)

(d) Mahoma HPP (2.7 MW;

(e) Waki HPP (4.8 MW); and,

(f) Kabulasoke Solar Power Plant (20 MW).

III. Electricity Supply to the National Grid

Twenty-four (24) Power Plants supplied electricity to the National Grid in

2018. These included three (3) Large Hydropower Plants, 14 Small

Hydropower Plants, three (3) Bagasse Power Plants, two (2) Thermal

Power Plants and three (3) Solar PhotoVoltaic Plants.

Overall, the Power Plants generated 4084.5 GWh in 2018, signifying a

6% increment compared to the 3,856.2 GWh generated during 2017. By

Page 8: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

viii | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

technology, 3638.1 GWh (89%) was from Hydro (Large Hydro and Small

Hydropower Plants) with the other technologies contributing 446.4 GWh

(11%).

IV. Transmission

UETCL purchased 4,078.5 GWh compared to 3,867.1 GWh purchased in

2017, signifying a 5% increment.

By source, about 3,157.5 GWh (77%) of UETCL’s energy purchases were

from the Large Hydropower Plants; 444.4 GWh (11%) from the Mini-

Hydropower Plants; 206.5 GWh (5%) from Bagasse Co-generation; 198.9

GWh (5%) from Thermal Plants; 32.3 GWh (1%) from Solar PV and 39.0

GWh (1%) imported from the neighbouring countries of Rwanda and

Kenya.

UETCL sells its power to both local distribution utilities and neighbouring

countries (Tanzania, Rwanda and Democratic Republic of Congo).

UETCL sold 3,925.4 GWh in 2018 compared to 3,715.9 GWh sold in 2017,

signifying a 6% increment.

UETCL made most of the energy sales (92%) to Umeme Limited, while

the sales to other distribution utilities and exports constituted about 2%

and 6% respectively. Transmission losses in 2018 were 3.8%.

The total Transmission Network Length as at the end of 2018 was 2,569.8

Kms (220KV = 1,008 Kms; 132KV = 1,526 Kms, 66KV = 35.2 Kms). The

Transmission Line Length increased by 942.9 Kms (58%) compared to

1,626.9 Kms as at the end of 2017 (220KV = 150 Kms; 132KV = 1,441.7

Kms, 66KV = 35.2 Kms) following the construction of the Buseruka

Substation and the Nkenda – Fort Portal - Hoima 220 KV Power Line.

V. Electricity Distribution

The utilities that wheel power over the National Grid purchased 3,685.2

GWh from UETCL during 2018, compared to 3,390.5 GWh in 2017,

signifying a 9% increment. UMEME purchased about 3,601 GWh (98%)

Page 9: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

ix | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

of the energy sold by UETCL, while the other Distribution Utilities

purchased 84 GWh (2%).

The energy purchased by Umeme Limited increased by about 8%, from

3,335.7 GWh in 2017 to 3,601.1 GWh in 2018, while the purchases by the

Mini-Grids increased from 54.7 GWh in 2017 to 84.1 GWh in 2018.

The energy sales of the Distribution Utilities increased by 9% in 2018

(3,065.2 GWh), compared to 2017 (2,802.5 GWh). The growth in energy

sales by the Distribution Utilities was majorly attributed to increment in

demand, especially from the Industrial Customers during 2018.

Across all Utilities, about 66% of the Energy Sales were made to

Industrial Customers (Medium Industrial = 16%, Large Industrial = 26%,

Extra Large Industrial = 24%) with sales to Domestic and Commercial

Customers constituting about 22% and 13%, respectively.

The Distribution Utilities recorded a Distribution Loss of 16.8% for 2018,

signifying a 0.5% improvement from 17.3% recorded in 2017. Umeme

Limited, the largest Distribution Utility reduced its Distribution Losses to

16.4% in 2018, from 17.2% in 2017; although this was below the target of

14.7% set by the Authority for 2018.

As at the end of 2018, there were 1,352,735 Customers on the National

Grid, signifying an increment of 15%, from the 1,177,812 Customers as at

the end of 2017. About 93% of the Customers on the Network were

served by Umeme Limited and 7% by Mini Grids.

VI. Off-Grid Generation and Supply

Off-Grid Power Plants are not connected to the National Grid, thus they

do not sell energy to UETCL. They generate and sell their energy directly

to Customers.

Page 10: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

x | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

WENRECO, the leading Off-Grid, generated and sold about 16.5 GWh

to end users in 2018, whereas Kalangala Infrastructure Services Limited

generated and sold about 1.4 GWh.

The main Off-Grids (WENRECO and KIS) had 19,431 Customers

(Domestic = 12,697; Commercial = 6,958 and Industrial = 13). The

distribution of Energy Sales by Customer Category shows that 56% of

the energy sold by the Off-Grids was to Commercial Customers, 25% to

Domestic Customers and 18% to Industrial Customers.

Page 11: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

1 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

1.0 BACKGROUND

1.1 Introduction

The Electricity Supply Industry (ESI) Performance Report presents a

description on how the Industry performed during 2018. The Report

presents the performance on the various segments across the

Electricity Supply Chain, including Electricity Generation, Transmission,

Supply, Import, Export and Distribution.

This Performance Report indicates the performance of the ESI for the

period January to December 2018. The information presented is majorly

extracted from the submissions of the Licensees.

2.0 ELECTRICITY GENERATION

2.1 Installed Generation Capacity

The Installed Generation Capacity presented in Figure 1 is the capacity

as at the end of December 2018. This includes both On-Grid and Off-

Grid Installation Capacity. The total Installed Capacity was 9841 MW,

having increased from 932 MW as at the end of December 2017. The

planned commissioning of the 183 Isimba Hydro Power Plant at the end

of March 2019 shall increase the total Installed Capacity to 1,167 MW

by the end of the First Quarter of 2019.

The Plants commissioned in 2018 with a total Installed Capacity of 51.7

MW include; Nyamwamba HPP (9.2 MW), Lubilia (5.4 MW), Nkusi (9.6

MW), Mahoma HPP (2.7 MW), Waki HPP (4.8 MW) and Xsabo Solar

Power Plant (20 MW).

By Technological Mix, Figure 1 shows that 744.3 MW (76%) of the total

Installed Capacity is Hydro, 101.6 MW (10%) Thermal, 96.2 MW (10%)

Bagasse/Cogeneration and 40.8 MW (4%) Solar PV with the remaining

Technologies including Diesel and Biomass constituting about 1 MW.

1 Note: This does not include Emerging Power Solar PV (10MW) and Isimba (183MW) and which attained the Commercial Dates of Operations in February 2019 and March 2019 respectively

Page 12: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

2 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Of the total Installed Capacity, 7.5MW is for Off-Grid generation. The list

of licensed Power Plants in Uganda is presented in Table 1.

Figure 1: Installed capacity by technology as at the end of December 2018

Figure 2: Grid and Off-Grid distribution of Installed Generation Capacity as at the end of December 2018

2.1.1 Power Plants Generating Electricity in Uganda

Table 1 shows the list of the Licensed Power Generation Plants as at the

end of December 2018. All small Hydropower Plants (SHPPs), Thermal

Power Plants, Co-Generation Power Plants and Solar PV in Uganda are

operated by Independent Power Producers (IPPs).

Grid supply

=976.5 MW Off Grid

supply

=7.5MW

Total

=984.0MW

Page 13: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

3 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Kiira and Nalubaale HPPs are owned by Government of Uganda,

currently operated by Eskom Uganda Limited. Bujagali HPP on the

other hand was established as a Public Private Partnership (PPP) by the

Government of Uganda (GoU) and Bujagali Energy Limited (BEL). This

Power Plant is operated by BEL.

Table 1: Uganda's Electricity Generation Plants as of December 2018

No Name Category/Technology Purpose Capacity

(MW)

1 Bujagali Energy Limited Large Hydro GS 250

2 Kiira Power Station Large Hydro GS 200

3 Nalubaale Power Station Large Hydro GS 180

4 Africa EMS Mpanga Small Hydro GS 18

5 Bugoye Hydro Limited- Mubuku II Small Hydro GS 13

6 Kasese Cobalt Company Limited-

Mubuku III

Small Hydro GS 9.9

7 Nkusi Small Hydro GS 9.6

8 Nyamwamba Hydro Small Hydro GS 9.2

9 Hydromax Limited – Buseruka Small Hydro GS 9

10 Eco Power Uganda Limited- Ishasha Small Hydro GS 6.66

11 Muvumbe Hydro Limited Small Hydro GS 6.5

12 Rwimi Hydro Small Hydro GS 5.5

13 Lubilia Small Hydro GS 5.4

14 Tibet Hima Mining Company – Mubuku I Small Hydro GS 5

15 Siti I Small Hydro Power Small Hydro GS 5

16 Waki HPP Small Hydro GS 4.8

17 Mahoma Hydro Small Hydro GS 2.7

18 Kakira Sugar Limited Bagasse OU&GS 51.1

19 Kinyara Sugar Limited Bagasse OU&GS 14.5

20 Sugar and Allied Industries Limited Bagasse OU&GS 11.9

21 Sugar Corporation of Uganda Limited Bagasse OU 9.5

22 Mayuge Sugar Limited Bagasse OU 9.2

23 Xsabo Solar Power Limited (Kabulasoke) Solar PV GS 20

24 Access Uganda Solar Limited Solar PV GS 10

25 Tororo Solar North Solar PV GS 10

26 Jacobsen Thermal Plant Thermal GS 50

27 Electromaxx Uganda Limited Thermal GS 50

28 Pamoja-Tiribogo Biomass OF 0.032

29 Pamoja-Ssekanyonyi Biomass OF 0.011

30 Kalangala Infrastructure Services Limited Diesel OF 1

Page 14: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

4 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

31 Nyagak 1 – WENRECo Hydro OF 3.5

32 Kisiizi Hydro OF 0.4

33 Bwindi Hydro OF 0.1

34 Swam Hydro OF 0.04

35 Kalangala Infrastructure Services Limited Solar OF 0.6

36 Absolute Energy - Kitobo Solar OF 0.2

37 WENRECO - Thermal Thermal OF 1.6

Total 984

KEY: GS=Grid supply; OU=Own Use; OF=Offgrid; OU&GS= Own Use and Grid Supply

2.2 Projects Under Construction

The Power Generation Plants that were licensed and under

construction as at the end of 2018 are presented in Table 2. A total of

twelve (12) Power Plants were under construction with a total licensed

Installed Capacity of 948 MW (10 MW is Solar PV and 938 MW is Hydro).

The Large Hydropower Plants; Isimba Hydro (183 MW) and Karuma

Hydro Power Plant (600 MW) are expected to be commissioned in

March and August 2019 respectively. Isimba undertook preliminary tests

in December 2018 and the energy dispatched is included in this report.

Table 2: Licensed Power Generation Plants under construction as at the end of December 2018

NO Project Technology Capacity (MW)

1 Kyambura HPP Hydro 7.6

2 Sindila HPP Hydro 5.24

3 Ndugutu HPP Hydro 5.9

4 Nyamaghasani 1 HPP Hydro 6

5 Nyamaghasani 2 HPP Hydro 15

6 Siti 2 HPP Hydro 16.5

7 Kikagati HPP Hydro 16

8 Achwa 1 HPPS Hydro 41

9 Achwa 2 HPPS Hydro 42

10 Mayuge Solar PV Power Plant Solar 10

11 Isimba HPP Hydro 183

12 Karuma HPP Hydro 600

Total 948.24

Page 15: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

5 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

2.3 Energy Generated and sold to the National Grid

Twenty-four (24) Power Plants supplied electricity to the National Grid in

2018 (three Large Hydro Power Plants, 14 small Hydro Power Plants, 3

Bagasse Power Plants, 2 Thermal Plants and three Solar PV Plants) – (see

Appendix 1 for energy generated per Power Plant).

Overall, the Power Plants generated 4084.5GWh in 2018, signifying a 6%

increment compared to 3,856.2 GWh generated during 2017. By

Technology, Figure 3 shows that 3638.1GWh (89%) were from Hydro

(Large Hydro and Small Hydropower Plants) with the other Technologies

contributing 446.4GWh (11%).

Figure 3: Distribution of Energy generated over years by utilities on National Grid by Technology

(GWh)

2.3.1 Generation from Large Hydro Power Plants

Uganda currently has three Large Hydropower Plants; Kiira & Nalubaale

Hydro Complex (360 MW) and Bujagali HPP (380 MW) operated by

ESKOM (U) Limited and Bujagali Energy Limited respectively.

Page 16: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

6 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

The Large Hydropower Plants generated 3,184.5 GWh in 2018,

constituting about 78% of the total energy dispatched during the year.

The energy dispatch from the Large Hydropower Plants in 2018 did not

significantly differ from the 3,173.0 GWh dispatched in 2017 (see

Appendix 1). BEL and Eskom (U) Limited recorded an average Plant

Factor of 75% and 46% respectively in 2018.

Figure 4: Energy dispatched by Large Hydropower Plants in GWh (2014-2018)

2.3.2 Generation from Small Hydro Power Plants

Fourteen Small Hydropower Plants generated and dispatched

electricity to the National Grid in 2018 (see Appendix 1), generating

454.5 GWh during the reporting period. Energy generated from the

Small Hydropower Plants increased by 69% in 2018 compared to 268.4

GWh generated in 2017.

The growth in generation in 2018 compared to 2017 is partly attributed

to the new plants that achieved commercial dates of operation. The

Plants are: Nyamwamba, Lubilia, Nkusi, Waki and Mahoma.

Page 17: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

7 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 5: Annual Generation from Small Hydropower Plants (2015-2018)

2.3.3 Generation from the Thermal Power Plants

Uganda has two Thermal Power Plants generating electricity to the

National Grid; Jacobsen (U) Limited and Electromaxx (U) Limited, each

with an Installed Capacity of 50 MW.

Energy generation from the Thermal Power Plants is presented in Figure

6. The Thermal Power Plants generated 207.3 GWh in 2018 compared to

242.0 GWh in 2017. The drop in generation from the Thermal Power

Plants was due to an increment in energy generated from Renewable

Energy Sources (Hydro and Solar).

Generation start 2018

plants

Generation started in 2018

plants

Page 18: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

8 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 6: Distribution of Energy Generation from Thermal Power Plants (2014-2018)

2.3.4 Generation from the Solar PV Plants

Three Solar PV Power Plants generated power to the National Grid in

2018. The Plants are:

I. Tororo Solar PV (10 MW);

II. Access Solar PV in Soroti (10 MW); and,

III. Xsabo Solar in Kabulasoke (20 MW).

Xsabo Solar attained Commercial Date of Operation (COD) in the last

Quarter of 2018, a factor explaining the lower energy generation during

the year.

The Solar PV Power Plants generated 32.6GWh in 2018 compared to

23.0GWh generated in 2017, giving an increment of 42% (see Figure 7).

Page 19: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

9 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 7: Energy dispatch from the Solar PV Plants on the National Grid

2.3.5 Generation from Bagasse Power Plants

The Bagasse Technology uses the sugarcane waste to generate

electricity. Three (3) Bagasse Power Plants generated and sold power

to UETCL during 2018. These include:

I. Kakira Sugar Works Limited;

II. SAIL Kaliro; and

III. Kinyara Sugar Works Limited.

The Bagasse Power Plants generated 206.5 GWh, of which majority

(175.2GWh) was from Kakira Sugar Works (see Figure 8).

Page 20: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

10 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 8: Generation from Bagasse Power Plants

2.4 Staff in the Electricity Generation Segment

At the end of December 2018, there were 539 employees in the

Electricity Generation Segment2, signifying a 6% increment compared

to the 505 employees at the end of 2017. Increment in staff numbers

was mainly due to an increase in the number of Power Plants.

By Technology, Figure 9 shows that 242 employees (45%) were

employed in the Small Hydropower Plants, 173 employees were in the

Large Hydro Power Plants, 111 in the Thermal Power Plants and 13

employees in the Solar Power Plants.

2 This does not include Kilembe Mines Limited, Nkusi, Lubilia, Mahoma and the Bagasse power producers.

Page 21: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

11 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 9: Number of staff in Electricity Generation Segment as at 31st December 2018

Page 22: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

12 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

3.0 ELECTRICITY TRANSMISSION SEGMENT

3.1 Introduction

The Uganda Electricity Transmission Company Limited (UETCL) has

licenses for undertaking Systems Operations activities on High Voltage

Transmission Line, Bulk Power Supply and the Export and Import of

electricity to or from other countries. UETCL’s energy purchases are

driven by demand. This section presents the Peak Demand and UETCL

energy purchases and sales during the reporting period.

3.2 The Electricity Demand and Supply Nexus

A review of the system summaries captured by UETCL, shows a 3%

increase in Peak Demand in 2018 compared to 2017. The highest peak

system (including exports to Kenya and Tanzania) during 2018 was

registered as 644.79 MW (in August 2018) compared to 625.27 MW

registered as the highest in 2017 (November 2017). This growth was

mainly attributed to growth in Domestic Demand.

Figure 10 shows the Peak System Demand and Peak Domestic Demand

for the respective months in the period January 2017 to October 2018.

Page 23: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

13 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 10: Monthly System Peak Demand January 2017 to October 2018

The comparisons between electricity Peak Demand and the total

generation Installed Capacity (Figure 11) shows that the Peak Demand

of 2018 was below the available capacity by about 40%.

Figure 11: Peak Electricity Demand versus Installed Generation Capacity (MW)

Page 24: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

14 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

3.3 UETCL Energy Purchases

Figure 12 shows UETCL energy purchases. During 2018, UETCL

purchased 4,078.5 GWh compared to 3,867.1 GWh purchased in 2017,

signifying a 5% increment.

By source, Figure 12 shows that 3,157.5 GWh (77%) of UETCL’s energy

purchases in 2018 were from the Large Hydropower Plants; 444.4 GWh

(11%) from the Mini-Hydropower Plants; 206.5 GWh (5%) from Bagasse;

198.9 GWh (5%) from Thermal; 32.3 GWh (1%) from Solar PV and 39.0

GWh (1%) imported from the neighboring countries of Rwanda and

Kenya.

Figure 12: Distribution of Energy purchased by UETCL (GWh) by Technology Source

Comparisons of energy purchases of UETCL by source in 2018 (see

Figure 13) compared to 2017 show an increment in energy from Small

Hydropower Plants (68%), Bagasse (38%), solar (27%) and imports

(191%). The high percentage increase in imports in 2018 (39.0GWh)

compared to 2017 was mainly due to a drop observed in imports in

2017 (13.4 GWh) compared to the previous years.

Page 25: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

15 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

There was a drop in energy purchases from the Large Hydro and

Thermal Power Plants which is greatly attributed to the increase in

energy purchases from cheaper Renewable Sources including Solar

and Small Hydropower Plants.

Figure 13: Percentage increase in energy purchases in 2018 as compared to 2017

3.4 UETCL Energy Sales

UETCL sells power to both local Distribution Utilities and to neighboring

countries (Tanzania, Rwanda and DRC Congo) as presented in Figure

14. UETCL sold 3,925.4 GWh in 2018 compared to 3,715.9 GWh sold in

2017, signifying a 6% increment.

Page 26: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

16 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 14: UETCL energy sales (2014-2018) in GWh

UETCL made most (92%) of the energy sales in 2018 to UMEME Limited,

while the sales to other local Distribution Utilities and exports constituted

about 2% and 6%, respectively.

Figure 15: Distribution of Energy sold by UETCL during 2018 (GWh)

3.4.1 UETCL Energy Sales by ToU

UETCL charges Distributors on a Time-Of-Use (ToU) energy charge. The

Time-of-use periods are set by ERA and may be amended from time to

Page 27: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

17 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

time, should the Load Profile change. At present, there are three time

periods: Peak (the five hours between 18:00 and 23:00), Shoulder (the

thirteen hours between 05:00 and 18:00) and Off-Peak (the six hours

between 23:00 and 05:00).

Figure 16 shows that over the years, about half of the UETCL energy

sales are made during the shoulder time band, with the sales during

peak and off peak averaging 28% and 21% respectively.

Figure 16: Distribution of UETCL Energy Sales by ToU over the years

3.5 Transmission Energy Losses

Energy losses are computed as the difference between the energy

purchased and energy sold. UETCL’s transmission losses are presented

in Figure 17. During 2018, UETCL lost about 3.8% of the energy

purchased. Transmission losses have stagnated at averaged 3.9% over

the last three years (Figure 17).

Page 28: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

18 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 17: Distribution of UETCL Transmission Losses

3.6 Staff in Transmission

Figure 18 shows the growth in employees in the transmission segment

over the years. At the end of September 2018, there were 739

employees (476 contract, 263 casual) in the Electricity Transmission

Segment. This indicates a 6% increment from the total number of staff

as at the end of September 2017 (696 total, 451on contract, 245 casual

workers).

Figure 18: Employee growth in the Transmission Segment

3.7 Transmission Network Assets (Transmission Length, Substations)

Transmission Network Length:

Page 29: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

19 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

The total Transmission Network Length as at the end of 2018 was 2,569.8

Kms (220 kV=1,008 Kms; 132 kV=1,526 Kms, 66 kV=35.2 Kms). The

Transmission Line increased by 942.9 Kms (58%) compared to 1,626.9

Kms at the end of 2017 (220 KV=150 Kms; 132 kV=1,441.7 Kms, 66

kV=35.2 Kms) following the construction of the Buseruka Substation and

the Nkenda-Fort-Portal_Hoima 220 kilo Volt Power Line.

Figure 19: Transmission Line growth (Kms)

Substations

At the end of 2018, the Transmission Segment operated 22 Substations

compared to 18 Substations as at the end of 2017. Of the 22

Substations, three (3) (Masaka, Kawanda and Owen Falls) are

operating at 220 kV.

Page 30: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

20 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

4.0 ELECTRICITY DISTRIBUTION ON THE NATIONAL GRID

4.1 Introduction

This section presents the performance of the Electricity Distribution

Segment across the National Grid (not including Off-Grids that

generate and sell their own power). The Licensees on the National Grid

purchase electricity from the UETCL, the sole operator of the National

Transmission Grid.

Electricity Distribution on the National Grid is done by Six (6) Utilities,

namely: UMEME Limited, Uganda Electricity Distribution Company

Limited, Pader-Abim Community Multipurpose Electricity Cooperative

Society Limited, Kilembe Investments Limited, Kyegegwa Rural

Electricity Cooperative Society, and BECS. UMEME Limited is the largest

operator on the National Grid followed by UEDCL.

UEDCL operations are spread in eight Service Territories that include;

Central North Service Territory (CNST), Eastern Service Territory (EST),

Mid-West Service Territory (MWST), North East Service Territory (NEST),

North-North West Service Territory (NNWST), Southern Service Territory

(SST), Southern West Service Territory (SWST), North Western Service

Territory (NWST). In this Report, other than UMEME Limited, the other

Distribution Utilities are defined as Mini-Grids.

4.2 Energy Purchases and Sales by Distribution Utilities

The energy purchases and sales of the Distribution Utilities are

presented in Table 3. Overall, the Utilities that wheel power over the

National Grid purchased 3,685.2 GWh during 2018 compared to 3,390.5

GWh in 2017, signifying a 9% increment. The energy purchased by

UMEME Limited increased by about 8% from 3,335.7 GWh in 2017 to

3,601.1GWh in 2018 while the purchases of the Mini-Grids increased

from 54.7GWh in 2017 to 83.2 GWh in 2018.

Page 31: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

21 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Table 3: Growth in Energy Purchases and Sales of Distribution Utilities

2014 2015 2016 2017 2018

Total Energy purchased (GWh) 2,931.2 3,099.6 3,208.9 3,390.5 3,685.2

UMEME 2,898.8 3,051.1 3,170.3 3,335.7 3,601.1

Mini-grids 32.4 48.4 38.6 54.7 84.1

Total Energy sales (GWh) 2,298.1 2,493.8 2,595.4 2,802.5 3,065.2

UMEME 2,276.5 2,457.4 2,570.2 2,762.6 3,009.1

Mini-grids 21.5 36.4 25.2 40.0 56.1

Distribution Utilities are licensed to sell power to End-users. Table 3 shows

that the energy sales of the Distribution Utilities increased by 9% in 2018

(3,065.2 GWh) compared to 2017 (2,802.5 GWh). The growth in energy

sales by the Distribution Utilities is majorly attributed to an increment in

Demand especially from the Industrial Customers during the reporting

period.

4.2.1 Energy Sales by Customer Categories

Electricity customers in Uganda are classified as Domestic,

Commercial, Medium-Industrial, Large-Industrial, Extra-Large Industrial

and Street Lighting by the Electricity Regulatory Authority.

The energy sales by Customer Tariff Category during 2018 is shown in

Figure 20. Across all Utilities, about 66% of the energy sales were made

to Industrial Customers (Medium=16%, Large=26%, Extra-Large=24%)

with the sales to Domestic and Commercial Customers constituting

about 22% and 13%, respectively.

Page 32: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

22 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 20: Energy sales of Distribution Utilities by Customer Categories

4.3 Energy Distribution Losses

Electricity Distribution Losses still remain one of the major challenges

faced by Uganda’s Electricity Supply Industry. The Distribution Losses

presented here include both Commercial and Technical Losses and

computed as the difference between energy purchased and energy

sold.

Figure 21 shows the five-year historical trend of Distribution Losses.

Overall, the Distribution Utilities recorded a Distribution Loss of 16.8%

during 2018, indicating a 0.5%-point improvement from 17.3% recorded

in 2017. UMEME, the main operator reduced the Distribution Losses to

16.4% in 2018 from 17.3% in 2017; although this was below the target of

14.7% set by the Authority for 2018.

Page 33: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

23 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 21: Distribution Losses (%)

4.3.1 Energy Losses for UMEME Limited

UMEME Limited is Uganda’s main Distribution Utility, selling about 98% of

the energy that was sold to the end-users in 2018 (see Table 3). Figure

28 shows a reduction in percentages of energy losses of UMEME over

the years with energy losses reducing from 17.2% in 2017 to 16.4% in

2018. Whereas UMEME Limited recorded a reduction in the energy

losses, the performance was below the set targets of the Authority.

Page 34: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

24 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 22: UMEME Limited’s Distribution Energy losses

4.3.2 Energy Losses for Mini-Grids

The overall loss factor for the Mini-Grids increased from 27% in 2017 to

33.4% in 2018, off the Authority set target of 20.68% for the period. By

service territory operated by the Mini-Grids, Figure 23 shows that the

highest energy losses (48.7%) in 2018 were recorded in the North

Western Service Territory (NWST) of UEDCL.

Overall, UEDCL, the second largest Distribution Utility, recorded an

overall Distribution Loss of 36.7%. The energy losses for the other Mini-

Grids including PACMECS, KIL, BECS, and KRECS during 2018 were 9.8%,

16.7%, 23% and 24.8%. Various factors accounted for the losses

including lack of evacuation lines.

Page 35: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

25 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 23: Distribution Energy Losses in 2018 by Service Territory

4.4 Customer Growth

At the end of 2018, there were 1,352,735 Customers on the National

Grid (see Figure 24), signifying a 174,923 (15%) increment from the

1,177,812 Customers at the end of 2017.

About 93% of the Customers on the Network are served by UMEME

Limited, with the Customers under the jurisdiction of Mini-Grids

constituting 7%. The Electricity Supply Industry has seen the Customer

connections almost double over the five-year period between 2014

and 2018.

Figure 24: Total Customers on the Network as at the end of December 2018

UEDCL Overall=36.7%

Page 36: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

26 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

By Customer Tariff Structure, Table 4 shows that majority (92%) of the

Customers on the Network are classified as Domestic Customers, with

the other Customer Categories including Commercial, Industrial and

Street Lighting combined constituting about 8%.

Table 4: Total Customers on the Network as at the end of December 2018

Customer category 2014 2015 2016 2017 2018

Domestic 636,485 790,617 907,967 1,080,945 1,242,354

Commercial 58,787 68,710 80,475 93,412 106,824

Medium Industry 2,271 2,534 2,607 2,613 2,760

Large Industry 468 513 527 521 507

Extra Large 38 40

Street Lights 348 311 306 283 250

Total 698,359 862,685 991,882 1,177,812 1,352,735

4.5 Distribution Network Length

At the end of December 2018, the length of the Distribution Network

was 45,423.1 kilometers (Kms) translating into an increment of 5,144.1

Kms compared to the 40,279.0 Kms at the end of 2017. UMEME Limited

Network increased by about 512 Kms, while the distance by other Mini-

Grids combined increased by about 4,631.7 Kms.

The increment in the Network Length of Mini-Grids was mainly

attributed to the Grid Extensions by the Rural Electrification Agency

(REA), the Government Agency that operationalizes Government's

Rural Electrification Function.

Page 37: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

27 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 25: The Distribution Network Length (In KMS)

4.6 Staff in the Distribution Segment

The movements in the number of contract3 employees in the Electricity

Distribution Segment over the years is presented in Figure 26. At the end

of December 2018, there were 1,907 employees in the utilities

distributing electricity via the National Grid of whom 1,504 (79%) were

employed by UMEME Limited. The number of staff in the Distribution

Segment at the end of December 2018 increased by 4%, compared to

the 1,828 staff at the end of 2017.

Figure 26: Employees in the Electricity Distribution Segment

4.7 Transformation Capacity

Figure 27 shows the Transformation Capacity on the Distribution

Network. At the end of 2018, there were 14,815 Transformers on the

Distribution Network (UMEME Limited=12,476; Mini-Grids=2,331) with a

total Transformation Capacity of about 2,004MVA (UMEME=1,842 MVA;

Mini-Grids=162MVA). The total Transformation Capacity in 2018

increased by 6% compared to the 1,855 MVA reported in 2017

(UMEME=1,744 MVA; Mini-Grids=141 MVA). Majority (37%) of the

Transformers of the Distribution Network are of 50KVA capacity followed

by the 100 KVA (20%) and 200 KVA (14%). 3 This does not include the casual employees

Page 38: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

28 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Whereas there was an increment in Transformation Capacity in 2018

compared to 2017, these were below the Transformation Capacity

reported in 2016, which was attributed to exclusion of the privately

owned Transformers.

Figure 27: Transformation Capacity over the years

4.8 Key Performance Benchmarks for UMEME LIMITED

Table 5 shows a summary of UMEME Limited’s performance on Key

Performance Indicators.

Connections

UMEME limited had 156,262 new connections in 2018. By Customer

Category, majority of the new connections were of Domestic

Customers (143,352), Commercial Customers (12,860) and Medium

Industrial (98). The drop in Commercial Large Industrial Customers in

2018 compared to 2017 was mainly attributed to drop in energy

consumption of these industries, a factor considered in their

classification.

Customer-related indicators

Across all Customer Categories, the average energy consumption per

Customer in 2018 was 2.4MWh but with variations by Customer

Category. Table 5 shows that on average, a Domestic Customer

consumed 553.1kWh in 2018. On the other hand, a Commercial,

Page 39: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

29 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Medium Industrial, Large Industrial and Extra-Large Industrial Customer

averagely consumed 3.5 MWh, 182.9MWh, 1.6GWh and 18.3GWh,

respectively in 2018.

Averagely, there were 36.7 Customers per Km of Network Length in

2018 compared to 23.1 Customers per Km in 2017.

Employee-related indicators

The employee-related indicators include Customer to Employee ratio,

Energy sales per Employee, Operations and Maintenance (O&M) Costs

per Employee and Employees per Km of Network Length. On average,

an Employee of UMEME operated 22.9Kms; attended to 840 Customers,

and sold 2.0GWh.

Table 5: Key Performance Indicators for UMEME Limited

2014 2015 2016 2017 2018

Customer Growth (Number) 667,483.0 813,402.0 950,814.0 1,107,179.0 1,263,441.0

Domestic 606,325.0 742,303.0 867,671.0 1,011,673.0 1,155,025.0

Commercial 58,075.0 67,859.0 79,746.0 92,160.0 105,020.0

Medium Industrial 2,267.0 2,416.0 2,564.0 2,506.0 2,604.0

Large Industrial 468.0 513.0 527.0 519.0 502.0

Extra Large 38.0 40.0

Street Lights 348.0 311.0 306.0 283.0 250.0

Energy Purchased (GWh) 2,898.8 3,051.1 3,170.3 3,335.7 3,601.1

Energy Lost (GWh) 622.3 593.8 600.1 573.2 592.0

Distribution Loss Factor 21.5% 19.5% 18.9% 17.2% 16.4%

Energy Sold (GWh) 2,276.5 2,457.4 2,570.2 2,762.6 3,009.1

Domestic 540.9 570.2 584.7 620.6 638.9

Commercial 283.7 309.8 323.0 341.4 367.7

Medium Industrial 390.0 406.1 422.1 434.0 476.3

Large Industrial 1,060.1 1,169.7 1,238.8 718.0 792.9

Extra Large 647.1 732.2

Street Lights 1.9 1.6 1.6 1.6 1.1

Customer Related Indicators

Average Energy Sales per

Customer (MWh)

3.4 3.0 2.7 2.5 2.4

Domestic Customers (Kwh) 892.0 768.2 673.9 613.4 553.1

Commercial Customers (MWh) 4.9 4.6 4.1 3.7 3.5

Page 40: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

30 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Medium Industries (MWh) 172.0 168.1 164.6 173.2 182.9

Large Industries (GWh) 2.3 2.3 2.4 1.4 1.6

Extra-Large Industries (GWh) 17.0 18.3

Transformation Capacity (kVA) 1,688.7 1,844.1 1,978.3 1,743.6 1,841.8

Total Network Length (KMs) 32,551.1 33,959.8 34,472.2

Customer to Employee Ratio 481.0 597.0 687.0 752.0 840.0

Employee to Energy Sales (MWh) 1,639.0 1,803.0 1,857.0 1,877.0 2,001.0

Employee Cost (Shs) per kWh 28.1 32.5 29.1 30.3 29.4

Km of Network Length per

Employee

23.5 23.1 22.9

Customers per KM of Network

Length

29.2 32.6 36.7

O&M (Shs) per kWh sold 67.2 67.4 64.4 97.0 82.9

O&M (Million. Shs) per KM of

Network Length

5.1 7.9 7.2

Transformation Capacity in kVA per

km

60.8 51.3 53.4

4.9 Key Performance Benchmarks for Mini-Grids

Table 7 shows the performance of the Mini-Grids on selected Key

Performance Indicators (parameters). On average, the Mini-Grids had

8 Customers per kilometer of Network Length and a Customer

averagely consumed 0.6 MWh.

Averagely, an employee attended to 221.6 Customers, contributed to

sale of 139.1 MWh of energy and operated averagely 27.2 Kms of the

Network Length.

Page 41: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

31 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Table 6: Key Performance Indicators for Mini-Grids in 2018

C

ust

om

er

to E

mp

loye

e

Ra

tio

Em

plo

ye

e t

o E

ne

rgy s

ale

s

(MW

h)

En

erg

y p

urc

ha

sed

(G

Wh

)

En

erg

y S

old

(G

Wh

)

Dis

trib

utio

n L

oss

Fa

cto

r

Average Energy sales per customer

Cu

sto

me

r g

row

th

Km

s p

er

em

plo

ye

e

Cu

sto

me

rs p

er

Km

Ov

era

ll (

MW

h)

Do

me

stic

Cu

sto

me

rs

(Kw

h)

Co

mm

erc

ial

Cu

sto

me

rs(M

Wh

)

Me

diu

m In

du

strie

s

(MW

h)

Larg

e In

du

strie

s (G

wh

)

CNST 120.9 84.6 31.6 3.8 2.8 2.1 24.1% 0.7 342.3 13.2 103 3,023

EST 206.3 102.3 33.6 6.1 2.6 2.3 13.5% 0.5 273.9 12.7 4,539

KIL 391.7 159.6 24.8 15.8 6.3 5.3 16.7% 0.4 254.4 8.5 16.2 12,927

MWST 286.5 213.4 85.9 3.3 4.3 2.8 35.3% 0.7 339.1 11.2 56.3 3,725

NEST 133.1 127 27.3 4.9 6.1 3.9 35.9% 1 404 14.3 112 0.2 4,126

NNWST 183.1 128.9 28 6.5 6.8 5.4 20.6% 0.7 396.5 10.7 124 7,689

NWST 255.8 228 29.1 8.8 27.5 14.1 48.6% 0.9 374.9 9.1 79 0.6 15,857

SST 315.4 193.6 31.5 10 9.7 7.2 25.9% 0.6 362 9.1 18.7 11,669

SWST 277.3 168.6 32.4 8.5 8.4 5.4 35.7% 0.6 229.8 6.6 88.7 0.7 8,872

BECS 254.6 69.9 7.9 33.9 3.1 2.4 23.0% 0.3 235 5.9 8,657

PACME

CS

104.9 62.1 20.9 5 2.3 2.1 9.8% 0.6 408.8 9.5 3,567

KRECS 122.2 82.2 13 9.4 4.2 3.1 24.8% 0.7 349 14.5 4,643

Overall 221.6 139.1 27.2 8.2 84.1 56.1 33.3% 0.6 323 9.9 50.8 0.4 89,294

Page 42: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

32 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

5.0 ELECTRICITY GENERATION AND DISTRIBUTION BY OFF-GRIDS

5.1 Introduction

Off-Grid Power Plants are not connected to the National Grid, thus they

do not sell energy to Uganda Electricity Transmission Company Limited.

They generate and sell their energy directly to the Customers.

Nyagak 1 Hydropower Plant operated by West Nile Rural Electrification

Company Limited (WENRECO) and Kalangala Infrastructure Services

(KIS) operated by Kalangala Infrastructure Services Limited are the

largest Off-Grid Power Plants with Installation Capacities of 3.5 MW and

1.6 MW.

There are smaller Off-Grid Plants operated by Kisiizi Hospital Company

Limited, Absolute Energy Limited, Bwindi Community Micro Hydropower

Limited and Pamoja Energy Limited, among other companies. The

performance of these Plants during 2018 is not reported on, as they are

Licence-Exempted companies, with less stringent reporting

requirements.

5.2 Energy Generation and Sales by the Major Off-Grids

The energy generation and sales of the leading Off-Grids during 2018

are presented in Figure 28. WENRECO, the leading Off-Grid generated

and sold about 16.5GWh to the End-Users in 2018, whereas Kalangala

Infrastructure Services Limited generated and sold about 1.4GWh to

the End-Users.

Page 43: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

33 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 28: Energy sold by Off-Grids from January to September 2018 (in GWh)

As at the end of 2018, the main Off-Grids had 19,431 Customers

(Domestic=12,697; Commercial=6,958 and Industrial=13). The

distribution of Energy Sales by Customer Category (see Figure 29) shows

that 56% of the energy sold by Off-Grids was to Commercial Customers,

25% to Domestic Customers, and 18% to Industrial Customers.

Figure 29: Distribution of Energy Sales by Customer Category

Page 44: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

34 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

5.3 Staff, Customers and Distribution Network in Off-Grids

At the end of 2018, WENRECO and KIS had 112 employees

(WENRECO=97, KIS=15) a number that has remained relatively constant

over the previous two years.

Considering the Length of the Network, the major Off-Grids operated a

total of 851.1 Kms and this constitutes 0.5 Kms, 244.3 Kms and 606.3 Kms

of Street Lights, 11KV and 33KV, respectively.

Table 7: Staff, Customers and Network in Off-Grids

Network Length

(Kms)

Customers Staff Customers/Km

of Network

Customers/Staff Kms of Network/Staff

WENRECO 599 16,737 97 28 172.5 6.17

KIS 253 2,632 15 10.4 175.5 16.83

Total 851 19,369 112 22.8 172.9 7.6

Page 45: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

35 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

6.0 TREND OF ESI-RELATED MACRO-ECONOMIC VARIABLES

6.1 Introduction

The Electricity Supply Industry in Uganda is greatly influenced by the

Macro-Economic changes. These include the Consumer Price Index

(CPI), the US Dollar Producer Price Index (US PPI), Exchange Rate of the

Shilling (Shs) to Foreign Currencies and International Fuel Prices. Every

year, ERA sets Base Tariffs which are then adjusted on a Quarterly Basis

for these macro-economic factors. This section provides the

movements in the Macro-Economic Factors.

6.2 Crude Oil Prices

Uganda has two Thermal Power Plants; - Jacobsen and Electromaxx.

These Power Plants use Heavy Fuel Oil (HFO) for power generation. As

Uganda currently imports all the oil used, changes in oil prices on the

International Market affect the generation costs of these Thermal

Power Plants thereby impacting on UETCL’s costs of purchasing power.

Movements in the prices of crude oil on the International Market over

the reporting period are presented in Figure 30. Whereas there was a

drop in the oil prices in November 2018 compared to the previous

month, the oil prices per barrel (US$/b) increased significantly from

January 2017 to October 2018.

The increase in oil prices has been attributed to indications by key

OPEC members; Russia and Saudi Arabia aimed at supporting the

production adjustment to rebalance the Oil Market.

Page 46: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

36 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 30: OPEC Prices of crude oil on the International Market for the period January 2017 to

November 2018 (US$/b)

Source: Argus Media, Direct Communication, OPEC Secretariat and Platts.

6.3 Inflation

Inflation is measured by two parameters, the CPI and the US PPI. The

CPI is used to adjust for costs denominated in local currency, while the

US Producer Price Index (PPI) is for adjustment of costs denominated in

the US Dollar currency (US$).

Changes in price indices (CPI or US PPI) in a given period denote the

level of inflation in that period. The Tariff Adjustments are based on core

inflation, for better reliability of inflation trends.

6.4 Consumer Price Index (CPI)

Consumer Price Index (CPI) measures changes in the price level of the

market basket of consumer goods and services purchased by

households. The Tariff Methodology uses core CPI, which by definition

excludes energy and food prices because of their volatile nature. The

CPI used in the Tariff Methodology and presented in this Report (Figure

31) is as published by the Uganda Bureau of Statistics (UBOS).

The annual Consumer Price Index for the month ending November

2018 was 169.77 compared to 164.15 in November 2017. The annual

Page 47: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

37 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

underlying inflation rate reduced from 3.9% in November 2017 to 3.42%

in November 2018.

This reduction is largely attributed to improved Agricultural production,

leading to low food inflation during the second half of the year and

contained Foreign Exchange Rate pressure amidst a tight Monetary

Policy Regime exercised by Bank of Uganda in 2018.

Figure 31: Monthly Consumer Price Index (CPI)

6.5 United States Producer Price Index (US PPI)

This measures the average change over time in the selling prices

received by producers for their output. The US PPI is published by the

Bureau of Labor Statistics.

The US PPI increased from 200.5 in November 2017 to 205.4 in

November 2018, representing a 2.34% increment. This was mainly

attributed to finished consumer goods and crude material.

Page 48: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

38 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Figure 32: Monthly Movements in the USPPI

Source: United States Department of Labour - Bureau of Labour Statistics

6.6 Exchange Rate

Up to 70% of the costs in Uganda’s ESI are denominated in Foreign

Currency. Uganda’s ESI Tariff Methodology provides for Quarterly

Adjustment of a portion of Electricity Industry costs denominated in

Foreign Currency for changes in the Exchange Rate of the Uganda

Shilling against the US Dollar (US$). The Methodology uses the Mid-

Exchange Rate (the average of the buying and selling rates) for the last

day of the month as published by Bank of Uganda (BoU).

The last day of the Month’s Mid-Exchange Rate of the Uganda Shilling

(Shs) against the US Dollar (US$) for the Quarterly Tariff Determination

periods between November 2016 and November 2018 is presented in

Figure 2.

The Exchange Rate at the end of November 2018 was Shs 3,728.21/US$

compared to Shs 3,634.92/US$ at the end of November 2017. This

Page 49: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

39 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

movement represents a 2.57% depreciation of the Shilling against the

US Dollar at the end of November 2018.

The Uganda Shilling was a little unstable throughout 2018 peaking

3,850/US$ during the Second Quarter of 2018, subsiding slightly into the

Third and Fourth Quarters of 2018, owing to improved Foreign Currency

inflows and relaxed Central Bank Monetary Policy and investments in

Treasury Bills, Government Bonds and Infrastructure Investment

requirements together with continued Government Policy for

promotion of local content through the “Buy Uganda Build Uganda”

Policy.

Figure 33: Exchange Rate Uganda Shilling against US Dollar Movement for November 2016 to

November 2018

Page 50: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

40 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

7.0 RETAIL TARIFFS

The Authority sets Tariff Rates for the Distribution Licensees in

accordance with Sections 10 and 75 of the Electricity Act, 1999.

7.1 Grid Retail Tariff

FFigure 34 shows the Grid Tariffs for UMEME Limited and UEDCL by

Customer Category over the Tariff Review Periods in 2017 and 2018.

UMEME Limited and UEDCL operate under the same Tariff Structure as

their services are extended across the same service areas.

The observed fall in the Tariff for the Extra-Large Customer Category

during the Third and Fourth Quarters of 2018 compared to the other

Customer Categories or Tariff Review Periods (FFigure 34) is attributed to

the Bujagali Energy Limited Refinancing which was completed on 19th

July 2018.

During the consultative process, it was agreed that the benefits arising

out of the refinancing of the Bujagali Hydropower Plant are allocated

to the Extra-Large Industrial Consumers through the Fourth Quarter of

2018 and this status quo was maintained for the Extra-Large Industrial

Consumers in the First Quarter of 2019.

Page 51: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

41 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

F

Figure 34: Quarterly Retail Tariffs for Customers on the Main Grid by Customer Category over the

Tariff Period 2017 - 2018

7.2 Retail Tariffs for Mini-Grid Customers

Table 8 shows the average Tariff charges per kWh consumed by

customers served by the Mini-Grids (other than UEDCL) over the Tariff

Review Periods in 2018 in comparison with 2017. Comparisons of Tariffs

of the Quarter ending the years 2017 and 2018 show the highest Tariff

increments among the customers served by PACMECS (4-6%) which

was attributable to increase in operational costs.

Table 8: Tariffs for the Customers served by Mini-Grids

Customer

Category

2017 2018 %

Change

(Q4

Tariffs)

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

KIL Domestic 590.5 590.5 598.4 598.4 598.4 598.4 611.5 611.5 2%

Commercial 532.8 532.8 543.7 543.7 543.7 543.7 556.3 556.3 2%

PACMECS Domestic 590.5 590.5 610.2 610.2 610.2 610.2 635 635 4%

Commercial 544.9 544.9 562.1 562.1 562.1 562.1 593.9 593.9 6%

BECS Domestic 618.6 618.6 618.6 635.3 635.3 635.3 635.3 635.3 0%

Commercial 558 558 558 561.2 561.2 561.2 561.2 561.2 0%

KRECS Domestic 615.3 615.3 615.3 615.3 615.3 615.3 615.3 615.3 0%

Commercial 552.3 552.3 552.3 552.3 552.3 552.3 552.3 552.3 0%

Page 52: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

42 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

APPENDIX

Appendix 1: Annual Distribution of Energy generated by Power Plants on the National Grid in GWh

2013 2014 2015 2016 2017 2018

TOTAL ENERGY GENERATED 3,090.00 3,272.30 3,321.70 3,534.70 3,856.20 4,084.50

LARGE HYDRO POWER PLANTS 2,675.80 2,622.10 2,765.40 2,998.60 3,173.00 3,183.60

Eskom (U) Limited 1,264.50 1,229.90 1,303.40 1,437.70 1,505.90 1,536.20

Bujagali Energy Limited 1,411.20 1,392.30 1,462.00 1,560.80 1,667.10 1,647.40

SMALL HYDRO POWER PLANTS 295.7 313.6 305.3 288.5 268.4 454.5

Muvumbe Hydro (U) Limited - - - - 15.4 28.5

Maji-Power Bugoye-Limited 67.8 92.5 77.2 65.8 27.4 79.9

Kabalega Hydromax 18.7 29.5 33.1 37.2 44.9 40.3

Ecopower-Ishasha 29.1 22.8 24.2 23.4 16.5 21

EMS-Mpanga 101.2 81.8 76.7 71.8 54.8 81.2

Tibet Hima (U) Limited 19.2 27.6 30 31.6 29.5 14.7

Kasese Cobalt Company

Limited 59.6 59.4 64.1 58.8 61.5 61.6

Elgon Hydro Siti 11.5 20

Rwimi 6.9 29.2

Nyamwamba 30.7

Lubilia 13.3

Nkusi 29.3

Waki 1.1

Mahoma 3.6

BAGASSE 116.4 243.2 162.3 177.6 149.8 206.5

Kakira Sugar Works 116.43 243.22 162.29 148.84 126.08 175.17

Kinyara Sugar Works - - - 7.92 7.77 5.7

SAIL Kaliro - - - 20.82 15.92 25.59

THERMAL 2.2 93.3 88.7 66.3 242 207.3

Jacobsen (U) Limited 1.6 37 25.5 4.7 88.7 113.3

Electro-Maxx (U) Limited 0.5 56.3 63.2 61.5 153.3 94

SOLAR 0 0 0 3.7 23 32.6

Access Solar 0 0 0 3.7 16.4 16.5

Tororo Solar 0 0 0 0 6.6 15.9

Xsabo Solar 0 0 0 0 0 0.3

Page 53: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

43 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Appendix 2: UETCL Energy Purchases (GWh) for the period 2014 to January - September 2018 by Source

Utility 2014 2015 2016 2017 2018

Eskom (U) Limited 1,195.5 1,330.8 1,462.2 1,528.3 1,512.8

Bujagali Energy Limited 1,365.8 1,414.6 1,504.9 1,655.1 1,643.8

Isimba 0.9

Kasese Cobalt Company Limited 64.6 61.9 56.8 59.5 59.8

Kilembe Mines Limited 23.2 24.5 25.8 25.6 14.7

Maji-Power Bugoye-Limited 87.1 77.3 65.8 32.2 77.9

EMS-Mpanga 84.8 56.1 85.6 54.8 79.1

Ecopower-Ishasha 22.8 24.8 25.2 16.4 21.0

Kabalega Hydromax 27.5 62.3 34.5 41.2 37.1

Muvumbe Hydro (U) Limited 16.0 28.1

Elgon Hydro Siti 11.4 19.7

Rwimi 6.9 28.8

Nyamwamba 30.5

Lubilia 13.7

Mahoma 3.6

Waki 1.1

Nkusi 29.3

Electro-Maxx (U) Limited 52.4 61.0 61.6 144.3 88.6

Jacobsen (U) Limited 85.5 12.3 4.7 86.8 110.3

Kakira Sugar Works 203.2 164.3 148.8 126.1 175.2

Kinyara Sugar Works 10.3 8.7 7.9 7.8 5.7

SAIL Kaliro 1.1 20.8 15.9 25.6

Access Solar 3.7 19.9 16.3

Tororo Solar 5.5 15.8

Xsabo Solar 0.3

Kenya Power and Lighting Company (KPLC) 29.0 44.7 37.0 9.6 34.8

Rwanda 3.7 3.8 3.8 3.9 4.2

Total 3,255.4 3,348.1 3,549.0 3,867.1 4,078.5

Page 54: ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR … · Performance of Uganda’s Electricity Supply Industry in 2018 ELECTRICITY SUPPLY INDUSTRY PERFORMANCE REPORT FOR THE YEAR

44 | P a g e

Performance of Uganda’s Electricity Supply Industry in 2018

Appendix 3: Distribution of Energy sold by UETCL for the period 2013 – 2018 in GWh

2013 2014 2015 2016 2017 2018

(Jan-

Sep)

UMEME Limited 2,799.5 2,893.9 3,053.2 3,180.8 3,333.9 2,676.4

Ferdsult 21.2 22.4 26.8 30.4 4.9 -

Kilembe Investments Limited (KIL) 2.7 3.7 4.6 4.9 5.5 4.6

Bundibugyo Energy Cooperative

Society (BECS)

1.7 1.9 2.2 2.9 2.9 2.2

Pader-Abim Community Multipurpose

Electric Co-operative Society Limited

(PACMECS)

1.5 1.8 2.2 2.3 2.2 1.7

Kyegegwa Rural Electricity

Cooperative Society

-

1.4 2.1 2.6 3.8 3.0

UEDCL 2.1 5.6 8.5 11.2 46.0 47.6

Kenya Power and Lighting Company

(KPLC)

47.8 107.1 55.7 83.2 225.9 101.5

TANESCO 54.4 55.6 61.4 77.2 79.2 69.5

Rwanda (EWSA) 1.5 2.6 2.7 2.4 9.3 6.2

Democratic Republic of Congo SNEL 2.1 2.4 2.3 2.2 2.5 1.6

Total 2,934.4 3,098.4 3,221.7 3,400.1 3,715.9 2,914.3