electron losses and fields investigation - igpp … · electron losses and fields investigation...
TRANSCRIPT
![Page 1: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/1.jpg)
1
Electron Losses and Fields Investigation
Subsystem PDREarth Station
Kyle Colton
Los Angeles, California12 November 2014
![Page 2: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/2.jpg)
2
BOARD MEMBERS
Name Organization
Sara Spangelo JPL / UMich
Scott Tripp JPL / UMich
![Page 3: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/3.jpg)
Define subsystem scope and responsibility
Provide feedback on the detailed design of the subsystem, down to the schematic level (where needed)
Unify the subsystem team in their efforts (tie the pieces together)
3
OBJECTIVE AND SCOPE OF PDR
![Page 4: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/4.jpg)
Overview Space Segment Subsystem Overview Subsystem Team
Knudsen Details Block Diagram Shed Temperatures Junction Box Antenna Array
Boelter Details Block Diagram Rooftop Room
Operations Operational Concept Schedule Calibration Plan Facilities
Performance Assurance Mechanical Assurance Tracking Assurance Link Assurance Data Volume Assurance Subsystem Tests Contamination Control Safety
Trades and Problems
4
TABLE OF CONTENTS
![Page 5: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/5.jpg)
Overview • Space Segment• Subsystem Overview• Subsystem Team
5
![Page 6: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/6.jpg)
Perpendicular V-Dipoles UHF downlink VHF uplink
Spinning spacecraft Spin fading
He-100 radio 1 watt RF Power 19k2 baud downlink 9k6 baud uplink
6
SPACE SEGMENT
![Page 7: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/7.jpg)
Worst VHF: -7.8 dBi Worst UHF: -7.3 dBi
7
SPACE SEGMENT NULLS
![Page 8: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/8.jpg)
Knudsen High gain 4 UHF, 2 VHF Yagis
Boelter Lower Gain 1 UHF, 1 VHF Yagi
Worcester Planned east coast station Geographically Diverse Approximately doubles
data volume 2 UHF yagis, 1 VHF yagi
8
SUBSYSTEM OVERVIEW
![Page 9: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/9.jpg)
9
SUBSYSTEM TEAM
![Page 10: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/10.jpg)
Knudsen
10
![Page 11: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/11.jpg)
11
KNUDSEN DETAILS
UHF/VHF Antenna 436CP42UG (4x) / 2MCP22 (2x)
UHF/VHF Gain (Est) 23 dBi / 16 dBi
Polarization Circular
Preamplifier P432VDG / LNA 70
Noise Floor Pending TradeGain Pending Trade
Amplifier Mirage B-2518-G
Output Power 160 WRotor AlphaSpid RASVertical Load 250 kgTorque 158 N mBreak Torque 1582 N m
Coax LMR-400 / LMR-900
dB/100m @ 150MHz 5.0 / 2.2
dB/100m @ 450MHz 8.9 / 3.8
Run Length (Est) 10m / 15m
Radio Icom IC-910H
![Page 12: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/12.jpg)
12
BLOCK DIAGRAM
![Page 13: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/13.jpg)
5’x4’ footprint Housed on top of pallets
Allows water and airflow Building Power and Network Metallic Paint
Reflects Sunlight Elevator Tower
Provides shade “Attic vent” on roof Holes in floor allow airflow
13
SHED
![Page 14: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/14.jpg)
Air drawn through floor holes, exhausted through roof fan
Reflective metallic paint on shed exterior
Temperatures now reflect outside temperature
Next step: stabilization
14
SHED TEMPERATURES
![Page 15: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/15.jpg)
15
SHED TEMPERATURES
![Page 16: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/16.jpg)
Located Foot of the tower
Contains Port dividers (M2) Ethernet Switch Arduino Mega
(rotor control) PoE Injector Amplifier Power regulator(s)
12v to switch, amplifier 5v to PoE
Note: May use I2C Repeaters instead of μC
16
JUNCTION BOX
![Page 17: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/17.jpg)
6 ft spacing between UHF antennas
10 ft spacing between VHF antennas
AlphaSpid RAS rotor
Aluminum mast Fiberglass crossbeams
17
ANTENNA ARRAY
6 ft.
6 ft.
10 ft.
![Page 18: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/18.jpg)
18
KNUDSEN
![Page 19: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/19.jpg)
Boelter
19
![Page 20: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/20.jpg)
20
BOELTER DETAILSUHF / VHF Gain (est) 12 dBi / 13.3 dBi
Polarization Circular
Preamplifier P432VDG / LNA 70
Noise Floor Pending Trade
Gain Pending Trade
Rotor Yaesu G5500
Vertical Load 200 kg
Torque Az/El 137 kg m / 59 kg m
Break Torque 392 kg m
Coax LMR-400
dB/100m @ 150MHz 5.0
dB/100m @ 450MHz 8.9
Run Length (Est) 20m
Duplexer CF-4160
Insertion Isolation VHF / UHF 0.15/60dB / 0.25/60dB
Radio Yaesu FT-897
![Page 21: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/21.jpg)
21
BLOCK DIAGRAM - CURRENT
![Page 22: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/22.jpg)
22
BLOCK DIAGRAM - FUTURE
![Page 23: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/23.jpg)
2m Cross-Polarized Yagi 7 elements per plane approx 12.0 dBiC
70cm Cross Polarized Yagi 9 elements per plane approx 13.3 dBiC
Yaesu G5500 rotor
TBD Preamp Trade Pending
23
ROOFTOP
![Page 24: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/24.jpg)
20m run of LMR-400
Yeasu FT-897 half-duplex radio Controlled via Hamlib Currently has frequency
drifts due to software control Software Trade
Yaesu G5500 rotor control Sat688 “interpreter” Moving to K3NG arduino
based rotor control Gives absolute positioning Allows for more control Gives better feedback
Gpredict tracking software Trade in progress Testing Cal Poly’s Earth
Station Network code
TNC trade Moving from soundmodem
to Kantronics KPC-9612+
24
ROOM
![Page 25: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/25.jpg)
Operations • Operational Concept• Schedule• Ground Support Equipment• Calibration Plan
25
![Page 26: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/26.jpg)
Command Uplink1. Daily TLEs are fetched from
MOC2. Commands sent from MOC3. Commands loaded into ESN
buffer4. During a pass, commands
are Tx’d5. ESN checks for ACK / NAK6. ESN proceeds on in
commands when possible7. All commands are saved
along with their ACK / NAK and TLEs used for tracking
8. ACK / NAK and TLEs are relayed back to MOC
Data Downlink1. Daily TLEs are fetched from
MOC2. Rotors track during a pass3. LHCP / RHCP RSSI test4. CRC / FEC checked as
necessary (see trade)5. Downlinked packets are
backed up and relayed to MOC (along with TLE record)
6. Basic actions on downlinkedpackets Queue failed packets for
subsequent download request Alert cognizant engineer(s)
about out of bounds engineering data
26
OPERATIONAL CONCEPT
![Page 27: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/27.jpg)
Boelter Repair (by Dec 2014) Enhancements (by Feb 2015) Rx Testing (by Mar 2015) Tx Testing (by Jun 2015)
Knudsen Repair (by Jan 2014) Build (by Jun 2015) Enhancement (by Aug 2015) Rx Testing (by Sept 2015) Tx Testing (by Dec 2015)
System Automation Emissions Testing Worcester Station (Pending)
All projects are tested on Boelter first More student accessible Less risk of damage
Knudsen lags behind Boelterin sub-projects, but not overall
27
SCHEDULE
![Page 28: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/28.jpg)
Scissor Lift Rental Array alignment
Field strength meter Emissions testing
Array Alignment Install and calibrate
LSM303s when aligned Track reported position Realign if LSMs report
out-of-bounds alignment
28
CALIBRATION PLAN
![Page 29: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/29.jpg)
Performance Assurance• Mechanical• Tracking• Link Budget• Data Volume Budget• Testing• Contamination Control• Safety
29
![Page 30: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/30.jpg)
Full motion checks before automation to look for snagging
Regular visual inspection Roof mounted cameras watch
antennas LSM303 array checks for
alignment error
30
MECHANICAL ASSURANCE
![Page 31: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/31.jpg)
Backup copy of TLEs Save a copy of each TLE used
for pass planning and tracking
Backup downlinked data locally
Queue uplinked data locally before a pass
31
TRACKING ASSURANCE
![Page 32: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/32.jpg)
W3GEY’s Link Budget 25.7dB up, 7.6dB down 800km circular, 10° mask 5w Earth, 1w Space 19k2 dn, 9k6 up FSK
Terrestrial Packet Testing On-Orbit spacecraft
CSSWE, Vermont Lunar, CubeBug-2
HAB test
Link Budget Assumes worst case
spacecraft orientation Includes:
Antenna gain Pointing Losses Atmospheric Losses Polarization Losses Line Losses Free Space
Calculations Modulation Scheme
32
LINK ASSURANCE
![Page 33: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/33.jpg)
Ground Station:
Ground Station Transmitter Power Output: 5.0watts
Ground Stn. Total Transmission Line Losses: 3.2dB
Antenna Gain: 17.5dBi
Ground Station EIRP: 21.3dBW
Uplink Path:
Ground Station Antenna Pointing Loss: 0.4dB
Gnd-to-S/C Antenna Polarization Losses: 3.0dB
Path Loss: 143.1dB
Atmospheric Losses: 1.1dB
Ionospheric Losses: 0.7dB
Rain Losses: 0.0dB
Isotropic Signal Level at Spacecraft: -127.1dBW
Spacecraft (Eb/No Method):
Spacecraft Antenna Pointing Loss: 6.6dB
Spacecraft Antenna Gain: 3.1dBi
Spacecraft Total Transmission Line Losses: 0.1dB
Spacecraft Effective Noise Temperature: 153K
Spacecraft Figure of Merrit (G/T): -18.9dB/K
S/C Signal-to-Noise Power Density (S/No): 76.0 dBHz
System Desired Data Rate: 9600 bps
Command System Eb/No: 36.2 dB
Demodulation Method Seleted: Coherent FSK
Forward Error Correction Coding Used: None
System Allowed or Specified Bit-Error-Rate: 1.0E-04
Demodulator Implementation Loss: 0.0 dB
Telemetry System Required Eb/No: 10.5 dB
Eb/No Threshold: 10.5 dB
System Link Margin: 25.7 dB
Spacecraft:
Spacecraft Transmitter Power Output: 1.0watts
Spacecraft Total Transmission Line Losses: 0.4dB
Spacecraft Antenna Gain: 1.5dBi
Spacecraft EIRP: 1.1dBW
Downlink Path:
Spacecraft Antenna Pointing Loss: 8.1dB
S/C-to-Ground Antenna Polarization Loss: 3.0dB
Path Loss: 152.7dB
Atmospheric Loss: 1.1dB
Ionospheric Loss: 0.4dB
Rain Loss: 0.0dB
Isotropic Signal Level at Ground Station: -164.2dBW
Ground Station (EbNo Method):
Ground Station Antenna Pointing Loss: 2.7dB
Ground Station Antenna Gain: 24.0dBi
Ground Station Total Transmission Line Losses: 1.4dB
Ground Station Effective Noise Temperature: 213K
Ground Station Figure of Merrit (G/T): -0.7dB/K
G.S. Signal-to-Noise Power Density (S/No): 61.0 dBHz
System Desired Data Rate: 19200 bps
Telemetry System Eb/No for the Downlink: 18.1 dB
Demodulation Method Seleted: Coherent FSK
Forward Error Correction Coding Used: None
System Allowed or Specified Bit-Error-Rate: 1.0E-04
Demodulator Implementation Loss: 0 dB
Telemetry System Required Eb/No: 10.5 dB
Eb/No Threshold: 10.5 dB
System Link Margin: 7.6 dB
33
LINK BUDGET
![Page 34: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/34.jpg)
Data Volume Budget Ensure maximum contact
time Calculations done
assuming 10 degree mask Mask can be overcome to
horizon per link budget (1.5w RF)
2 geographically diverse stations (backup telecommand) Increases data down East / West coast ensures
non-overlap in orbit Beginning Error Correction
trade
34
DATA VOLUME ASSURANCE
![Page 35: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/35.jpg)
Current Satellite Tracking ISS CSSWE Vermont Lunar CubeBUG-2 BugSat 1 Looking for 19k2
Firebirds 3/4?
Planned High Altitude Balloon Using He-100 radio Allows rotation in free
space at range
Station to station testing On campus or community Terrestrial packet is the
simplest, most configurable test
35
SUBSYSTEM TESTS
![Page 36: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/36.jpg)
Lines (network, power) are run through garden hose Protects against water and
UV Drip loops are also used
Shed is elevated from the roof by plastic pallets Allows water to flow under
Possible filter on air holes in shed
36
CONTAMINATION CONTROL
![Page 37: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/37.jpg)
Tower Climbing Staff Supervised Gear (harness, hardhat,
etc)
Tower Motion Trip Hazards RF Exposure
Controlled Environment Signage
37
SAFETY
![Page 38: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/38.jpg)
Trades and Problems• Preamp Trade• Software Trade• TNC Trade• Problem Areas
38
![Page 39: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/39.jpg)
SSB LNA 70 Selected Vital figures
are better Everything
else is acceptable
Note: Cal Poly moving from SSB to AR2
Preamps fried
Support was hard to get
39
TRADES - PREAMP
AR2
P432VDG
SSBLNA 435 MKII(Discontinued)
SSBLNA 70
420-450 MHz 430-440 MHz 430-440 MHz
.5 dB Noise .25 dB Noise @ 20C
.35 dB Noise @ 20C
18 dB Gain 22 dB Gain 21 dB Gain
2 oz = 57 g 150 g 140 g
$90 Discontinued $230
![Page 40: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/40.jpg)
40
TRADES - SOFTWARE
Nova(NLSA) SatPC32
Pros• Popular• Existing• Low Schedule Cost
• Popular• Existing• Low Schedule Cost
Cons
• Windows only• Current problems with Space-Track• Some implementation time
• Windows only• Some implementation time• Non-free• Closed Source
![Page 41: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/41.jpg)
41
TRADES - SOFTWARECal Poly
Earth Station Network
Gpredict Custom Solution
Pros
• Open Source• Network (group)• Community goodwill• Cross Platform• We already need ‘network’ from UCLA to WPI
• Open Source• Least schedule cost
• Our Source• Exactly what we want• Best integration with MOC and other software• Could be cross platform
Cons• Not our policyserver• Some schedule cost
• No native multi-satellite tracking• Linux only
• Highest schedule cost• Highest risk of failure
![Page 42: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/42.jpg)
42
TRADES - TNC
MixW Direwolf
Pros • Free software• Uses soundcard
• Open Source• Free software• Uses soundcard
Cons
• Complicated• Platform dependent• Windows only• Closed Source
• Can’t do 19k2
![Page 43: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/43.jpg)
43
TRADES - TNC
USRP 2 Kantronics Soundmodem
Pros
• Programmable• “Waterfall”• Best for early orbit• Widest Bandwidth• Save and replay passes
• Established community• Proven to work• Platform independent
• Open Source• Free software• Uses soundcard
Cons • Highest Cost• Least experience
• Closed Source• 90s Tech• “Isn’t there something better?”• Difficult to implement FEC
• Old development• Limited support• Complicated• Platform dependent• Difficult to implement FEC
![Page 44: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/44.jpg)
44
PROBLEM AREAS
Problem Status Fix
Schedule Slipping Grow subteam, optimizetime on rooftop
Alignment PlannedRental of scissor lifts, realignment, LSM303s for tracking alignment
Tracking Software In ProgressTesting Cal Poly’s Earth
Station Network software
Corrosion In Progress
Replacing parts as they are needed, working to
weatherize as we upgrade
![Page 45: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro](https://reader031.vdocument.in/reader031/viewer/2022022016/5b5db38d7f8b9aa3048b8f57/html5/thumbnails/45.jpg)
Thank you to all of our sponsors, stakeholders,and contributors
Shaun Murphy @ Northrop GrummanKatharine Gamble @ UT Austin
Jim White WD0E @ Colorado Satellite ServicesMark Spencer WA8SME @ ARRL
Tony Monteiro AA2TX & Bob Davis KF4KSS @ AMSAT-NA
45
ACKNOWLEDGEMENTS
Competition Sensitive. Do Not Distribute.