Page 1: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

1

Electron Losses and Fields Investigation

Subsystem PDREarth Station

Kyle Colton

Los Angeles, California12 November 2014

Page 2: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

2

BOARD MEMBERS

Name Organization

Sara Spangelo JPL / UMich

Scott Tripp JPL / UMich

Page 3: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Define subsystem scope and responsibility

Provide feedback on the detailed design of the subsystem, down to the schematic level (where needed)

Unify the subsystem team in their efforts (tie the pieces together)

3

OBJECTIVE AND SCOPE OF PDR

Page 4: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Overview Space Segment Subsystem Overview Subsystem Team

Knudsen Details Block Diagram Shed Temperatures Junction Box Antenna Array

Boelter Details Block Diagram Rooftop Room

Operations Operational Concept Schedule Calibration Plan Facilities

Performance Assurance Mechanical Assurance Tracking Assurance Link Assurance Data Volume Assurance Subsystem Tests Contamination Control Safety

Trades and Problems

4

TABLE OF CONTENTS

Page 5: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Overview • Space Segment• Subsystem Overview• Subsystem Team

5

Page 6: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Perpendicular V-Dipoles UHF downlink VHF uplink

Spinning spacecraft Spin fading

He-100 radio 1 watt RF Power 19k2 baud downlink 9k6 baud uplink

6

SPACE SEGMENT

Page 7: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Worst VHF: -7.8 dBi Worst UHF: -7.3 dBi

7

SPACE SEGMENT NULLS

Page 8: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Knudsen High gain 4 UHF, 2 VHF Yagis

Boelter Lower Gain 1 UHF, 1 VHF Yagi

Worcester Planned east coast station Geographically Diverse Approximately doubles

data volume 2 UHF yagis, 1 VHF yagi

8

SUBSYSTEM OVERVIEW

Page 9: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

9

SUBSYSTEM TEAM

Page 10: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Knudsen

10

Page 11: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

11

KNUDSEN DETAILS

UHF/VHF Antenna 436CP42UG (4x) / 2MCP22 (2x)

UHF/VHF Gain (Est) 23 dBi / 16 dBi

Polarization Circular

Preamplifier P432VDG / LNA 70

Noise Floor Pending TradeGain Pending Trade

Amplifier Mirage B-2518-G

Output Power 160 WRotor AlphaSpid RASVertical Load 250 kgTorque 158 N mBreak Torque 1582 N m

Coax LMR-400 / LMR-900

dB/100m @ 150MHz 5.0 / 2.2

dB/100m @ 450MHz 8.9 / 3.8

Run Length (Est) 10m / 15m

Radio Icom IC-910H

Page 12: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

12

BLOCK DIAGRAM

Page 13: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

5’x4’ footprint Housed on top of pallets

Allows water and airflow Building Power and Network Metallic Paint

Reflects Sunlight Elevator Tower

Provides shade “Attic vent” on roof Holes in floor allow airflow

13

SHED

Page 14: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Air drawn through floor holes, exhausted through roof fan

Reflective metallic paint on shed exterior

Temperatures now reflect outside temperature

Next step: stabilization

14

SHED TEMPERATURES

Page 15: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

15

SHED TEMPERATURES

Page 16: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Located Foot of the tower

Contains Port dividers (M2) Ethernet Switch Arduino Mega

(rotor control) PoE Injector Amplifier Power regulator(s)

12v to switch, amplifier 5v to PoE

Note: May use I2C Repeaters instead of μC

16

JUNCTION BOX

Page 17: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

6 ft spacing between UHF antennas

10 ft spacing between VHF antennas

AlphaSpid RAS rotor

Aluminum mast Fiberglass crossbeams

17

ANTENNA ARRAY

6 ft.

6 ft.

10 ft.

Page 18: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

18

KNUDSEN

Page 19: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Boelter

19

Page 20: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

20

BOELTER DETAILSUHF / VHF Gain (est) 12 dBi / 13.3 dBi

Polarization Circular

Preamplifier P432VDG / LNA 70

Noise Floor Pending Trade

Gain Pending Trade

Rotor Yaesu G5500

Vertical Load 200 kg

Torque Az/El 137 kg m / 59 kg m

Break Torque 392 kg m

Coax LMR-400

dB/100m @ 150MHz 5.0

dB/100m @ 450MHz 8.9

Run Length (Est) 20m

Duplexer CF-4160

Insertion Isolation VHF / UHF 0.15/60dB / 0.25/60dB

Radio Yaesu FT-897

Page 21: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

21

BLOCK DIAGRAM - CURRENT

Page 22: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

22

BLOCK DIAGRAM - FUTURE

Page 23: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

2m Cross-Polarized Yagi 7 elements per plane approx 12.0 dBiC

70cm Cross Polarized Yagi 9 elements per plane approx 13.3 dBiC

Yaesu G5500 rotor

TBD Preamp Trade Pending

23

ROOFTOP

Page 24: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

20m run of LMR-400

Yeasu FT-897 half-duplex radio Controlled via Hamlib Currently has frequency

drifts due to software control Software Trade

Yaesu G5500 rotor control Sat688 “interpreter” Moving to K3NG arduino

based rotor control Gives absolute positioning Allows for more control Gives better feedback

Gpredict tracking software Trade in progress Testing Cal Poly’s Earth

Station Network code

TNC trade Moving from soundmodem

to Kantronics KPC-9612+

24

ROOM

Page 25: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Operations • Operational Concept• Schedule• Ground Support Equipment• Calibration Plan

25

Page 26: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Command Uplink1. Daily TLEs are fetched from

MOC2. Commands sent from MOC3. Commands loaded into ESN

buffer4. During a pass, commands

are Tx’d5. ESN checks for ACK / NAK6. ESN proceeds on in

commands when possible7. All commands are saved

along with their ACK / NAK and TLEs used for tracking

8. ACK / NAK and TLEs are relayed back to MOC

Data Downlink1. Daily TLEs are fetched from

MOC2. Rotors track during a pass3. LHCP / RHCP RSSI test4. CRC / FEC checked as

necessary (see trade)5. Downlinked packets are

backed up and relayed to MOC (along with TLE record)

6. Basic actions on downlinkedpackets Queue failed packets for

subsequent download request Alert cognizant engineer(s)

about out of bounds engineering data

26

OPERATIONAL CONCEPT

Page 27: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Boelter Repair (by Dec 2014) Enhancements (by Feb 2015) Rx Testing (by Mar 2015) Tx Testing (by Jun 2015)

Knudsen Repair (by Jan 2014) Build (by Jun 2015) Enhancement (by Aug 2015) Rx Testing (by Sept 2015) Tx Testing (by Dec 2015)

System Automation Emissions Testing Worcester Station (Pending)

All projects are tested on Boelter first More student accessible Less risk of damage

Knudsen lags behind Boelterin sub-projects, but not overall

27

SCHEDULE

Page 28: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Scissor Lift Rental Array alignment

Field strength meter Emissions testing

Array Alignment Install and calibrate

LSM303s when aligned Track reported position Realign if LSMs report

out-of-bounds alignment

28

CALIBRATION PLAN

Page 29: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Performance Assurance• Mechanical• Tracking• Link Budget• Data Volume Budget• Testing• Contamination Control• Safety

29

Page 30: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Full motion checks before automation to look for snagging

Regular visual inspection Roof mounted cameras watch

antennas LSM303 array checks for

alignment error

30

MECHANICAL ASSURANCE

Page 31: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Backup copy of TLEs Save a copy of each TLE used

for pass planning and tracking

Backup downlinked data locally

Queue uplinked data locally before a pass

31

TRACKING ASSURANCE

Page 32: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

W3GEY’s Link Budget 25.7dB up, 7.6dB down 800km circular, 10° mask 5w Earth, 1w Space 19k2 dn, 9k6 up FSK

Terrestrial Packet Testing On-Orbit spacecraft

CSSWE, Vermont Lunar, CubeBug-2

HAB test

Link Budget Assumes worst case

spacecraft orientation Includes:

Antenna gain Pointing Losses Atmospheric Losses Polarization Losses Line Losses Free Space

Calculations Modulation Scheme

32

LINK ASSURANCE

Page 33: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Ground Station:

Ground Station Transmitter Power Output: 5.0watts

Ground Stn. Total Transmission Line Losses: 3.2dB

Antenna Gain: 17.5dBi

Ground Station EIRP: 21.3dBW

Uplink Path:

Ground Station Antenna Pointing Loss: 0.4dB

Gnd-to-S/C Antenna Polarization Losses: 3.0dB

Path Loss: 143.1dB

Atmospheric Losses: 1.1dB

Ionospheric Losses: 0.7dB

Rain Losses: 0.0dB

Isotropic Signal Level at Spacecraft: -127.1dBW

Spacecraft (Eb/No Method):

Spacecraft Antenna Pointing Loss: 6.6dB

Spacecraft Antenna Gain: 3.1dBi

Spacecraft Total Transmission Line Losses: 0.1dB

Spacecraft Effective Noise Temperature: 153K

Spacecraft Figure of Merrit (G/T): -18.9dB/K

S/C Signal-to-Noise Power Density (S/No): 76.0 dBHz

System Desired Data Rate: 9600 bps

Command System Eb/No: 36.2 dB

Demodulation Method Seleted: Coherent FSK

Forward Error Correction Coding Used: None

System Allowed or Specified Bit-Error-Rate: 1.0E-04

Demodulator Implementation Loss: 0.0 dB

Telemetry System Required Eb/No: 10.5 dB

Eb/No Threshold: 10.5 dB

System Link Margin: 25.7 dB

Spacecraft:

Spacecraft Transmitter Power Output: 1.0watts

Spacecraft Total Transmission Line Losses: 0.4dB

Spacecraft Antenna Gain: 1.5dBi

Spacecraft EIRP: 1.1dBW

Downlink Path:

Spacecraft Antenna Pointing Loss: 8.1dB

S/C-to-Ground Antenna Polarization Loss: 3.0dB

Path Loss: 152.7dB

Atmospheric Loss: 1.1dB

Ionospheric Loss: 0.4dB

Rain Loss: 0.0dB

Isotropic Signal Level at Ground Station: -164.2dBW

Ground Station (EbNo Method):

Ground Station Antenna Pointing Loss: 2.7dB

Ground Station Antenna Gain: 24.0dBi

Ground Station Total Transmission Line Losses: 1.4dB

Ground Station Effective Noise Temperature: 213K

Ground Station Figure of Merrit (G/T): -0.7dB/K

G.S. Signal-to-Noise Power Density (S/No): 61.0 dBHz

System Desired Data Rate: 19200 bps

Telemetry System Eb/No for the Downlink: 18.1 dB

Demodulation Method Seleted: Coherent FSK

Forward Error Correction Coding Used: None

System Allowed or Specified Bit-Error-Rate: 1.0E-04

Demodulator Implementation Loss: 0 dB

Telemetry System Required Eb/No: 10.5 dB

Eb/No Threshold: 10.5 dB

System Link Margin: 7.6 dB

33

LINK BUDGET

Page 34: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Data Volume Budget Ensure maximum contact

time Calculations done

assuming 10 degree mask Mask can be overcome to

horizon per link budget (1.5w RF)

2 geographically diverse stations (backup telecommand) Increases data down East / West coast ensures

non-overlap in orbit Beginning Error Correction

trade

34

DATA VOLUME ASSURANCE

Page 35: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Current Satellite Tracking ISS CSSWE Vermont Lunar CubeBUG-2 BugSat 1 Looking for 19k2

Firebirds 3/4?

Planned High Altitude Balloon Using He-100 radio Allows rotation in free

space at range

Station to station testing On campus or community Terrestrial packet is the

simplest, most configurable test

35

SUBSYSTEM TESTS

Page 36: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Lines (network, power) are run through garden hose Protects against water and

UV Drip loops are also used

Shed is elevated from the roof by plastic pallets Allows water to flow under

Possible filter on air holes in shed

36

CONTAMINATION CONTROL

Page 37: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Tower Climbing Staff Supervised Gear (harness, hardhat,

etc)

Tower Motion Trip Hazards RF Exposure

Controlled Environment Signage

37

SAFETY

Page 38: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Trades and Problems• Preamp Trade• Software Trade• TNC Trade• Problem Areas

38

Page 39: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

SSB LNA 70 Selected Vital figures

are better Everything

else is acceptable

Note: Cal Poly moving from SSB to AR2

Preamps fried

Support was hard to get

39

TRADES - PREAMP

AR2

P432VDG

SSBLNA 435 MKII(Discontinued)

SSBLNA 70

420-450 MHz 430-440 MHz 430-440 MHz

.5 dB Noise .25 dB Noise @ 20C

.35 dB Noise @ 20C

18 dB Gain 22 dB Gain 21 dB Gain

2 oz = 57 g 150 g 140 g

$90 Discontinued $230

Page 40: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

40

TRADES - SOFTWARE

Nova(NLSA) SatPC32

Pros• Popular• Existing• Low Schedule Cost

• Popular• Existing• Low Schedule Cost

Cons

• Windows only• Current problems with Space-Track• Some implementation time

• Windows only• Some implementation time• Non-free• Closed Source

Page 41: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

41

TRADES - SOFTWARECal Poly

Earth Station Network

Gpredict Custom Solution

Pros

• Open Source• Network (group)• Community goodwill• Cross Platform• We already need ‘network’ from UCLA to WPI

• Open Source• Least schedule cost

• Our Source• Exactly what we want• Best integration with MOC and other software• Could be cross platform

Cons• Not our policyserver• Some schedule cost

• No native multi-satellite tracking• Linux only

• Highest schedule cost• Highest risk of failure

Page 42: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

42

TRADES - TNC

MixW Direwolf

Pros • Free software• Uses soundcard

• Open Source• Free software• Uses soundcard

Cons

• Complicated• Platform dependent• Windows only• Closed Source

• Can’t do 19k2

Page 43: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

43

TRADES - TNC

USRP 2 Kantronics Soundmodem

Pros

• Programmable• “Waterfall”• Best for early orbit• Widest Bandwidth• Save and replay passes

• Established community• Proven to work• Platform independent

• Open Source• Free software• Uses soundcard

Cons • Highest Cost• Least experience

• Closed Source• 90s Tech• “Isn’t there something better?”• Difficult to implement FEC

• Old development• Limited support• Complicated• Platform dependent• Difficult to implement FEC

Page 44: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

44

PROBLEM AREAS

Problem Status Fix

Schedule Slipping Grow subteam, optimizetime on rooftop

Alignment PlannedRental of scissor lifts, realignment, LSM303s for tracking alignment

Tracking Software In ProgressTesting Cal Poly’s Earth

Station Network software

Corrosion In Progress

Replacing parts as they are needed, working to

weatherize as we upgrade

Page 45: Electron Losses and Fields Investigation - IGPP … · Electron Losses and Fields Investigation Subsystem PDR Earth Station Kyle Colton ... Mark Spencer WA8SME @ ARRL Tony Monteiro

Thank you to all of our sponsors, stakeholders,and contributors

Shaun Murphy @ Northrop GrummanKatharine Gamble @ UT Austin

Jim White WD0E @ Colorado Satellite ServicesMark Spencer WA8SME @ ARRL

Tony Monteiro AA2TX & Bob Davis KF4KSS @ AMSAT-NA

45

ACKNOWLEDGEMENTS