eleftherios zografos (en/mef)* wp4, esr 5 mid term review meeting, 26 september 2012
DESCRIPTION
CATHI Marie Curie Initial Training Network C ryogenics, A ccelerators and T argets at H IE- I SOLDE. Eleftherios Zografos (EN/MEF)* WP4, ESR 5 Mid Term Review Meeting, 26 September 2012. Outline. Background; Activity at CERN; Project Status and Achievement; Training activities - PowerPoint PPT PresentationTRANSCRIPT
Mid Term Review Meeting, 26 September 2012 E.Zografos1
* The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA-2010-264330-CATHI)
CATHIMarie Curie Initial Training Network
Cryogenics, Accelerators and Targets at HIE-ISOLDE
Eleftherios Zografos (EN/MEF)*WP4, ESR 5
Mid Term Review Meeting, 26 September 2012
Mid Term Review Meeting, 26 September 2012 E.Zografos2
Outline
Background;
Activity at CERN;
Project Status and Achievement;
Training activities
Conclusions
Mid Term Review Meeting, 26 September 2012 E.Zografos3
Background
Studies Production Engineering and Management
Technical University of Crete
Diploma Thesis: Acceleration of a Differential Evolution
Algorithm with the use of Artificial Neural Networks -
Implementation in the Airfoil Shape Optimization.
Mid Term Review Meeting, 26 September 2012 E.Zografos4
Background
Professional Experience NIKI MEPE, Greece: Apprenticeship
CAD, FEM, Technical Documentation atec-innovation GmbH, Germany: Automotive Engineering
CAD Modelling and Rapid Prototyping Technologies Change Management Data Management
• Bertrand AG
• Delphi Deutschland GmbH
• Dr. Ing. h.c. F. Porsche AG
• Daimler AG (Stationed in Mercedes Technology
Center) CERN, Switzerland, member of EN-MEF-INT
Mid Term Review Meeting, 26 September 2012 E.Zografos5
EN-MEF-INT mandates
Engineering Department (EN): provides Engineering Competences, Infrastructure Systems and Technical Coordination for the design, installation, operation, maintenance and dismantling of the CERN accelerator complex and its experimental facilities.
Machines & Experimental Facilities Group (MEF) : is responsible for planning and coordinating all maintenance and installation activities in the CERN Accelerator Complex
Integration Section (INT): studies the layout and installation procedure of all machines and transfer lines.
Mid Term Review Meeting, 26 September 2012 E.Zografos6
Personal mandate
Domains of responsibility The definition of the hardware baseline
Identification of Equipment and Technical Specifications
Creation and update of the machine layout Complete 3D design of the accelerator Layout database
The integration of the machine inside the equipped building In cooperation with the services integrators provide a
Complete 3D design of the facility The configuration management
documentation and implementation of all proposed changes in the configuration of the machine
Mid Term Review Meeting, 26 September 2012 E.Zografos7
Project Status 1
Hardware Baseline (Already uploaded in EDMS and SmarTeam)
Mid Term Review Meeting, 26 September 2012 E.Zografos8
Project Status 2
Machine Layout
Mid Term Review Meeting, 26 September 2012 E.Zografos9
Project Status 3
Integration in the building
Mid Term Review Meeting, 26 September 2012 E.Zografos10
Training activities 1
Attended training courses Accelerators technology
AXEL: Introduction to Particle Accelerators; Tools & Methods
EDMS Local administration, SmarTeam , e-groups Management & communication
General and Professional French , Making presentations, Introduction to Project Management for young researchers Safety
Radiological Protection, Self-Rescue Mask (Biocell)
Mid Term Review Meeting, 26 September 2012 E.Zografos11
Training activities 2
Future training activities Secondment to Hydro Québec, Canada
CERN Accelerator School, Spain
Pursuit of a Masters Degree
Mid Term Review Meeting, 26 September 2012 E.Zografos12
Conclusions
An overall useful experience Challenging beginning: new field, complicated
task, wide range of responsibilities
Good working environment: really international, competent colleagues
Variety of training opportunities: technical, management, communication
Promotes personal and professional development
Mid Term Review Meeting, 26 September 2012 E.Zografos13
Thank You