Indonesia technologicaly advanced Data Center, with Tier III CertificationTRANSCRIPT
Building and Facility Pictures
Elitery Certifications
Loading Space
Elitery Data Center Lay Out
Loading Space
Loading Space
Loading Space
6
• Located 200 meter above the sea level, in flood free area.• Strategically located in 42 km south of Jakarta, ideal for DRC site.• Easy access to Jagorawi Toll Road connecting to Jakarta Inner and
outer ring Road.• Gas supply from PGN (government owned gas company), for chiller
engine.• Electricity supplied by two different substations, from two different
power plants.• Five Tier One Backbone Telco providers already have their FO
network in the facility, namely; Telkom, Lintas Arta, Indosat, Icon +area and Linknet/First Media.
• Police Station, Fire House and Hospital are five minutes away.• No government buildings and no factories in surrounding areas,
reducing social unrest risk such as labor demo, etc.
Bogor Site SITE
Front view from Pajajaran Street
Parking lot and diesel fuel tanks area
Make up water tanks area
Steel gate
Reception area and staging room, first floor
Meeting room, first floor
Building Management System, basement floor
ATS Wing C. Form 3B Power Panel, basement floor
FM 200 Fire Suppression, basement floor
2 Perkins Genset @1.5 MW, basement floor
High end Genset Controller by Schneider, basement floor
Water pumps, basement 1 floor
Gas Substation for chiller engine basement floor
• Cool water tower (N+1) • Chiller engine (N+1)
Chiller engine and cool water tower, basement floor
Electricity Substations, from two different power plants
• UPS Battery
Wing A, Capacitor Banks and UPS, basement floor
• UPS N+1
Lounge area, 6th floor
Engineers bedroom, 6th floor
Cooling towers and pipes, 7th floor
Our Offer: Elitery Data Center – Building Specs
Gross Area: 5000m2 (50,000 ft2)Building Management SystemConcurrently Maintainable BuildingMultiple Separated M&E Rooms with redundant AHU unitsDual Redundancy Chill Water Chillers SystemDual Redundancy Cooling Tower SystemDual Redundancy Pump SystemSpecial Design Diesel Generators Room216.000 Liters Diesel Tanks100,000 Liters makeup Water Tanks100,000 Liters Hydrant Water Tanks100,000 Liters Ground Water TanksStructure:
Reinforce Concrete Structure building with Fire resistance wallsEarthquake Resistance Building up to 8.5 RS5.0 m slab to slab heightColumn spacing primarily based on 7 & 8.5m gridBomb, Bullet & Quake resistance windowsDual Separated & compartmented RisersPassenger/Cargo Lift 1x1.6 tones (2x2 meters internal dimension)Positive Air Intake Building
Our Offer: Elitery Data Center – Data Center Specs
Gross Area: 1,320m2 (13,200 ft2)Gross Raise Floor: 1,140m2 (11,400 ft2)Structure:
Data Center floor loading of 1 toneReinforced Concrete Floor with Fire & Water Resistance applied Floor5 meters slabs to slabs Height Flooring0.8 meter high 1 ton Raised floor with anti static tilesDual Feed Chilled water pipe on ring topology Under Raised FloorDual Feed Zonings Power Distribution System Under Raised FloorPre Action FM 200 Above & Under Raised FloorSmoke, Heat & water Detection system above & Under RaisedTrap man Door appliedRedundant Duel Coil CRAC Parameter CoolingSeparated Utility from Datacenter FloorState of the art Access Door SystemState of the art CCTV & Surveillance System
Our Offer: Elitery Data Center – Power and Environment System Specs
Power2 Separated Power Feeds to 2 Dry TransformerForm 3B Power Panels SystemBus Bar Panel InterconnectionN +1 centralized redundant UPS systemBattery reserve 15 to 30 minutes depends on loadIndividual Rack power outlet (Form 2B)100% Full backup generatingOnsite diesel tank support up to 14 days (216.000 liters)
Environmental SystemN+1 Total Redundancies Water Cool Chiller SystemN+1 Total Redundancies Chilled Water Piping SystemN+1 Dual Coil Precision Air Conditioning SystemUp to 15- ‐30 Minets CWT depends on LoadTemperature maintained at 22oC (+/-2oC)Humidity range of 45% (+/-10%)