ASHE October Technical MeetingERT Project OverviewOctober 8, 2015
Elizabeth River Tunnels Project
Project Location: Hampton Roads, VA
3
New, two-lane, WB tunnel
Rehab and life-safety
improvements of existing MTT
Brambleton Ave. / Hampton Blvd.
interchange modifications
Extending MLK to I-264, High St. interchange
Rehab and life-safety
improvements of existing DTT (EB
& WB tubes)
Portsmouth
Norfolk
ERT Project Scope
ERT Project Schedule
Project_______________ Completion Date
Refurbishment of Existing Downtown Tunnels • August 2016
New MLK Freeway Extension • December 2016
New Midtown Tunnel • December 2016
Refurbishment of Existing Midtown Tunnel • May 2018
Value to the Hampton Roads Region
Reduces congestion and travel time
Reduces idle time ‐ saving fuel and reducing emissions
Creates seamless connection to I‐264
Extends useful life of existing tunnels
Ends bi‐directional traffic in Midtown Tunnel
Improves reliability and connectivity
Enhanced public transportation services made available through partnership with HRT
Bank/Bond/TIFIA
Designers
Equity / Sponsors LendersDeveloper
Design-Build Contractor Operations & Maintenance
Owner
Tolling Contractor
3M
ERT Project Team
Organizational Responsibility
OTP3
VDOT
Central Office
VDOT
Hampton Roads District
Pre- Comprehensive Agreement
Post Comprehensive Agreement
Project Delivery
Development
OPCO
Immersed Tube Tunnel (ITT) Experience:
- Since 1964, installed 74% of the ITT’s in the USA
- Installed 52,500 feet of ITT in the USA
- 19,700 feet of ITT in the Norfolk Area
The Design-Build Team
Design-Build Joint Venture:
- Skanska USA Civil SE
- Kiewit Infrastructure Company
- Weeks Marine
Design Team:
- Parsons Brinckerhoff
- Volkert & Associates
ERT Project Funding
Project Funding
Financing – Cash Flow
No equity repayment until 2021 at earliest (assuming available funds)
Any revenue shared w VDOT must be used to benefit users of Project
Construction Overview & Update
ERT Project Schedule
Project_______________ Completion Date
Refurbishment of Existing Downtown Tunnels • August 2016
New MLK Freeway Extension • December 2016
New Midtown Tunnel • December 2016
Refurbishment of Existing Midtown Tunnel • May 2018
ERT Project Component 1:
Existing Tunnel Rehabilitation
Tunnel Rehabilitation Project Scope
Rehabilitation Projects
• Existing WB Downtown Tunnel
• Existing EB Downtown Tunnel
• Existing (EB) Midtown Tunnel
Rehabilitation Activities
• Removal of suspended ceilings
• Replace existing transverse with longitudinal ventilation
• Fire-life safety upgrades to 100 mega watt
• Concrete repairs (spalls and cracks)
• Electrical rehabilitation and upgrades
• Misc. signage, painting and repairs
DTT Rehabilitation: Ceiling Removal
DTT Rehabilitation: Barrier Repair
DTT Rehabilitation: Fire Protection & Ventilation Upgrades
installation of fire protection board installation of longitudinal ventilation system
DTT-WB Lighting Before … and After
ERT Project Component 2:
MLK Freeway Extension
MLK Freeway Extension
London Blvd.London Blvd.
I-264I-264
MLK ExtensionMLK Extension
High St.High St.
London Blvd.
I-264
MLK Extension
High St.
Architectural Rendering
MLK Extension: Pile Driving
MLK Extension: Ped Bridge Cap Pour
MLK Extension: Structural Steel Erection
26
MLK Extension: Aerial
MLK Extension: Aesthetic Treatments
High Street Gateway
Turnpike Road Plaza
ERT Project Component 3:
New Midtown Tunnel Approaches
New MTT: Portsmouth Approach
Aerial View
Existing MTT Approach
New MTT Approach
New MTT: Portsmouth Approach
31
Existing MTT Approach
New MTT Approach
New MTT: Norfolk Approach
New MTT: Norfolk Approach
Surface View
ERT Project Component 4:
New Midtown Tunnel
New MTT: Tunnel Element Fabrication
New MTT: Floating Tubes
New MTT: Element Tow Down
New MTT: Element Tow Down
New MTT: Elements Moored in Portsmouth
New MTT: Screed Barge
New MTT: Final Concept• Concrete shell, Immerse Tube Tunnel (ITT)• Westbound tube connecting Norfolk to Portsmouth• Two vehicular lanes and an egress corridor
Jet FansDeluge System
Promat
Utility Corridor
EgressCorridor
New MTT: Plan & Profile
New MTT: Offset Alignment
New Midtown Tunnel
Existing Midtown Tunnel
New MTT: Ballast Concrete Placement
New MTT: Lay Barge
45
New MTT: Elements Docked
Seals between Elements
- Gina Joint (gasket type)
- Omega Seal (inner connection)
Elements to connect to Cast in Place Approach work
New MTT: Element Seals
New MTT: Element Placement
New MTT: Portsmouth Slot
New MTT: Immersion of Element in Slot
New MTT: Backfill of Element in Slot
51
New MTT: Immersion of the Final Element
Questions?